Loading...
Report ,1laia Office Saler,. _�nre Bead Offrre Carlson Testing, liP 1II' ( iev Non O0 S iii 6302 OR Br1�0 Rd`II 1 \7 Inc. 11■ 1■ Tear d OR 9, - "3 Salem OR 97_rr)! H, ad OR 97702 Phone (= 0316�d -3160 Yhwic. I�03J T: 9 -1_' ±` Phone 15-lO 330-9155 l en x3031694 -0930 Fru. r'0 +15,99.1309 Fin (011330.9I&' Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER November 27, 2007 T0509634.0 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Canterbury Place Phase 2C — Building 26 10797 SW Canterbury Lane — Tigard, OR Permit No.: BUP2005 -00284 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. teven W. Leach Project Manager SW L /eah cc: Polygon Northwest Co — Dana Hunt CT Engineering — Todd Eaton Milbrandt Architects — Bob Weible