Loading...
Report Carlson Testing, Inc. Main Office S °i, OR °°n" 3 SW llunciker Sale Hutson 30 St NE 63075 OR Rdev Rd n11 lived, OR 9721) 4060 Hudson 97301 Bend, OR 97702 e: (503) 684 -3460 Phone: (503)589425? Phone (541) 330 -9155 Construction Materials Testing & Inspection Fox (503) 68J -0954 Fax (503)539 -1309 Nov (541)330 -9/63 Special Inspection FINAL SUMMARY LETTER February 28, 2008 T0705129.A City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Paul Schatz Furniture — New Retail Building (Project #56535) 6670 SW Bonita Road Tigard, OR Permit No.: BUP2007 -00410 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors Structural Masonry Structural Welding- Shop All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. each Project Manager SWL/rc cc: R & H Construction — Kelly Pyrch City of Tigard Building Division T M Rippey Consulting Engineers — Ralph Turnbaugh Mildren Design Group — M Ryan Wing Paul Schatz Furniture 4.,[,x2,;?0,,e 7— vi Fire Marshal's Offices T V /12 1 North Division - 14480 SW Jenkins Rd., Beaverton, OR 97005 • PH (503) 356 -4700 • Fax (503) 644 -2214 0 Tualatin Valley South Division - 7401 SW Washo Ct., Ste. 101, Tualatin, OR 97062 • PH (503) 612 -7000 • Fax (503) 612 -7003 Fire & Rescue R Building Survey Report C E I/E FMZ : (to be filled out by TVF &R) Code Edition: AUG -0 Name of Facility: PRAM_ 3‘° *i A "6TP-N (it"( R-� ( r i ., Name of Building: 4 t��IN� y iltVIST Address: Le LEI p S1L4 E VEI -NNp .- 1 - . Su_LT. 1 1, Owner:_Fotc-k of vie - f tEs LLC. Telephone No. ( 503) Lab - LiL 00 Architect: MIL- - prt -FN st &rt 4e -.5■- Telephone No. (503) '144- - ° -55 Architect Address: die 5a 5W - PeveL - ANA i rT 1E lab s tt I& P--P OPEC 9-zz3 ITEM , , ' COMM. * , DESCRIPTION 1. Occupancy C Type I M 1 Si Use � -u 441 L Capacity 2. Construction Type it 1 — - Year Built zo D } 3. Area (Sq. Ft.) Total 4 , . 4- , Largest Floor Basement , ,/ 4. Stories No. l Height ■ / High Rise El .e NI 41/4u- 1E5 5 a. Exterior Wall Construction 'e.- N Is I vv - M F C - — C b. Opening Protection NO NE 6. Interior Wall Construction N o N e 7. Floor Construction CS 8. Roof Construction D 9. Attic Draft Stops No. N e N Ec 10a. Occ. Sep. Wall Construction No. N o ..1C b. Opening Protection NI o 14 1 Ia. Fire Wall Construction No. ^ r o N V I b. Opening Protection IN w i o N 12a. Smoke Barrier Wall Construction No. IV ©NC b. Opening Protection N it, NE 13a. Corridor Wall Construction N F 0 N b. Opening Protection � Noki l= 14a. Corridor Ceiling Construction N p NE b. Opening Protection V N oNE 15a. Shafts No. I, F Iv ONC (Type I b. Opening Protection 014E, building Survey Report FMZ • (to be filled out by TVF &R) Name of Facility: '^L S a44 F - i rt 1 1 12-5' '— J - TI't 1 L H ITEM COMM. DESCRIPTION 16a. Stair Enclosure No. No I b. Opening Protection NI 0 14 17. Stairs No. N 47N� 18. Ramps No. NI o NEE 19. Interior Finish Class Room N 0 E Corridor Exit Enclosure N 20. Exits No. 4. Total Width 2 , 0 4." 21. Exit Hardware Type 1:13•44 . < L o c St=T W I LE v eV 22a. Exit Signs /Illumination b. Emergency Lighting 23. Auto Sprinkler Coverage r:S - 24. Standpipe Class/Locations N�'NOim 25. Fire Alarm Type /Coverage aK b N 26. Heating, Ventilation & Air Conditioning Type Vp I Fuel C 27. Electrical Installation s Cis dN 1?ut ' � C Ifi- G Lt. t — 13R A 28. Stage/Platform N D N @ 29. Hazardous Area N o Nl 30. Other Comments: OaGrn.pc`NC - N GCti e � � ,, // � AN � K ruti e►�- - r15 w,�� � _ � f , M 15 A% 1,'1'$taafl T - VAP-112S, �L� ti L4>fN4 - . £�//tiTI .NS s�8L°T /l 3' t Alternate Materials & Methods TVF &R Use Only Inspected By: Date I No. Attachments Reviewed By: I Date Updated Form 2a Project Name: TILAL a M A-- - rtA - 33.-ti , --pw Page: I /1 SUMMARY Project 1. Project Name 14(.. S+1 „-rte * & % - .14.%L1-IN4 2. Project Address ( --0 Sw pr PIp, 3. City/Town II wER -'A ,6.0 N crizadt- 5. County WAstl INqtbN 4. Building, Gross Area (ft2) .4 , 1+4 5F 6. No. of Floors l 7. Construction Site Elevation Above 2,000 ft? ❑ YES LIO Attached Chapter Type ID Description Attac Forms and Building Envelope Form 3a Building Envelope - General Worksheets 3b Prescriptive Path - All Climate Zones ❑ * CodeComp Report for Simplified Trade -off ❑ * In lieu of 3b * Floppy disc with .occ CodeComp file ❑ Check boxes to Worksheet 3a Wall U- factor ❑ indicate attached 3b Roof U- factor ❑ forms and 3c Floor U- factor ❑ worksheets 3d Window /Skylight Schedule ❑ Systems Form 4a Systems - General ❑ 4b Complex Systems ❑ Worksheet 4a Unitary Air Conditioners - Air Cooled ❑ 4b Unitary Air Cond. Water & Evap Cooled ❑ C) Q 4c Unitary Heat Pump - Air Cooled ❑ 4d Unitary Heat Pump - Water Cooled ❑ 141 ® 4e Packaged Terminal A.C. - Air Cooled ❑ �f ' 4f Packaged Terminal Heat Pump - Air Cooled ❑ 4g Water Chilling Pkgs Water & Air Cooled ❑ Q !q 4h Heat Rejection Equipment ❑ Cr QS 4i Boiler - Gas -Fired and Oil -Fired ❑ co 4j Furnace & Unit Heaters - Gas and Oil -Fired ❑ 4k Simultaneous Heating and Cooling ❑ 41 Air Transport Energy ❑ 4m Natural Ventilation ❑ Lighting Form 5a Lighting - General ❑ 5b Interior Lighting Power - Tenant Method ❑ 5c Int. Ltng, Power - Space -by -Space Method ❑ Worksheet 5a Lighting Schedule ❑ 5b Interior Lighting Power ❑ Applicant 7. Name l•( Wime, 10. Telephone 963 -A4+ -D 8. Company tA i L3 - 1:›E s I c- ( �P oLA--P 11. Date 81 U I tz 9. Signature M. ,e.,, A ' a Attached No. of Pages Description of Documentation Document- ation 2 -1 Compliance with OSSC, effective 01/01/05 Form 3a Project Name: L3c+4 K .% — ii-1 Page: Z/2 BUILDING ENVELOPE - GENERAL Check all boxes 1. Exceptions (Section 1312) that apply. ❑ No Envelope Components. The building plans do not call for new or altered building envelope f° mponents, e.g., walls, floors or roof /ceilings. C1 A Non- conditioned Building. The proposed structure has no spaces heated or cooled by an HVAC system. Exceptions ❑ Exception. All new or altered building envelope components do not comply with the Discussion of qualifying requirements, Section 1312, but qualify for Exception: ❑ -1 ❑ -2 ❑ -3 ❑ -4 ❑ -5 exceptions in Portions of the building that qualify: instructions section. Plans /Specs Show compliance by The plans /specs show compliance in the following locations: including a drawing sheet, detail number, specification section 2. Air Leakage (Section 1312.1.1) and /or subparagraph. ❑ Complies. Plans require penetrations in building envelope are sealed and windows and doors are caulked, gasketed or weatherstripped. The plans /specs show compliance in the following locations: 3. Suspended Ceiling (Section 1312.1.2.1) ❑ Complies. Building plans do not show suspended ceilings used to separate conditioned space from unconditioned space. No exceptions permitted. 4. Recessed Light Fixtures (Section 1312.1.2.2) ❑ Complies. The building plans do not show recessed light fixtures installed in ceilings separating conditioned spaces from unconditioned spaces. ❑ Exception. The building plans require that fixtures installed in direct contact with insulation be insulation coverage (IC) rated. The plans /specs show compliance in the following locations: 5. Moisture Control (Section 1312.1.4) ❑ Complies. A one -perm vapor retarder is installed on the warm side (in winter) of all exterior floors, walls and ceilings, and a ground cover installed in the crawl space of both new and existing buildings where insulation is installed. The plans /specs show compliance in the following locations: ❑ Exception. All new or altered building envelope components do not comply with the vapor retarder requirements of the code, but qualify for an exception. Note applicable exception. Section 1312.1.4, Exception: ❑ -1 ❑ -2 Portions of the building that comply: Climate 6. Climate Zones Zones ❑ Zone 1 - A building site is in Climate Zone 1 if its elevation is less than 3000 feet above sea level and it is in one of the following counties: Benton, Columbia, Clackamas, Clatsop, Coos, Curry, Douglas, Jackson, Josephine, Lane, Lincoln, Linn, Marion, Multnomah, Polk, Tillamook, Yamhill, or Washington ❑ Zone 2 - Building sites not in Zone 1, or where construction site elevation is 3000 feet or \\:-.;;; higher in Zone 1, are in Zone 2. 3-1 Compliance with OSSC, effective 01/01/05