Loading...
Permit CITY OF TIGARD ELECTRICAL PERMIT - RESTRICTED ENERGY P. �l� l DEVELOPMENT SERVICES PERMIT #: ELR2000 -00049 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 DATE ISSUED: 3/6/00 SITE ADDRESS: 14545 SW 126TH AVE PARCEL: 2S109AD 00700 SUBDIVISION: BLUE RIDGE ZONING: R - BLOCK: LOT: 007 JURISDICTION: TIG Project Description: Installation of burglar alarm. A. RESIDENTIAL B. COMMERCIAL AUDIO & STEREO: AUDIO & STEREO: INTERCOM & PAGING: BURGLAR ALARM: X BOILER: LANDSCAPE /IRRIGAT: GARAGE OPENER: CLOCK: MEDICAL: HVAC: DATA/TELE COMM: NURSE CALLS: VACUUM SYSTEM: FIRE ALARM: UTDOOR LANDSC LITE: OTHER: : HVAC: PROTECTIVE SIGNAL: INSTRUMENTATION: OTHER: TOTAL # OF SYSTEMS: Owner: Contractor: RAUTMAN, PAUL JR HILLIPS ELECTRONICS 4545 SW 126TH AVE DBA FOR MASTER ALARM L.L.C.) IGARD, OR 97223 110 NW FLANDERS ORTLAND, OR 97209 Phone: Phone: 222 - 5083 Reg #: LIC 00125364 SUP 329JLE ELE 26213CLE FEES Required Inspections Type By Date Amount Receipt Low Voltage Inspection PRM3 DEB 3/6/00 $60.00 0000462 Elect'I Final 5PC2 DEB 3/6/00 $4.80 0000462 Total $64.80 irs` This Permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is A not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080. You may obtain copies of these rules or direct questions to OUNC at (503) 246 -1987. Issued by Permittee Signature OWNER INSTALLATION ONLY O The installation is being made on property I own which is not intended for sale. lease, or rent. ci OWNER'S SIGNATURE: DATE: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR. ELEC'N DATE: LICENSE NO: Call 639 -4175 by 7:00 P.M. for an inspection needed the next business day BUP - Building Permit ELC - Electrical Permit 4 Inspection Description Date Passed By I Inspection Description Date Passed By Footing /Setback Underground cover Foundation walls Wall cover Footing drain Ceiling cover Waterproof bsmt walls Electrical rough -in Slab Electrical service Crawl drain Electrical final Underfloor insulation Post/beam structural Shear walls /anchors ELR - Restricted Ener Pe ' =/lk Roof nailing © Inspection Description 17• Passed By Firewall II Low volta_e 4 Tilt -up panel • Electrical final rANIFIGIPMEM Masonry /Reinforcement • Framing MFG - Structure set -up MEC - Mechanical Permit Insulation . q Inspection Description Date Passed By Drywall nailing Post/beam mechanical Suspended ceiling Gas line • Engineered soils Mechanical rough -in Welding Lab Final Fire damper Concrete Lab Final Duct work Bolting Lab Final Smoke detector Fireproofing Lab Final Mechanical fmal Structural observation Final inspection PLM - Plumbing Permit - 4 Inspection Description Date Passed By BUP - Fire Protection System Permit Plumbing underslab 11 Inspection Description Date Passed By Crawl drain Sprinkler underfloor /slab Post/beam plumbing Sprinkler rough -in Plumbing top -out Sprinkler final RP /backflow preventer Fire alarm final Rain drain Storm drain Water service SIT - Site Permit Sanitary sewer 4 Inspection Description Date Passed By Culvert/catch basin Footings Pump /fill septic tank Foundation walls Plumbing final Sprinkler supply lines Sprinkler underfloor /slab Catch basin /Manhole SWR - Sewer Permit Engineered soils 4 Inspection Description Date Passed By Engineering acceptance Sanitary sewer Final inspection Final inspection INSPECTION RECORD - BUP, PLM, SWR, ELC, ELR, MEC SIT PERMITS