Loading...
Permit 4: CITY OF TIGARD SEWER CONNECTION PERMIT - . �i�, DEVELOPMENT SERVIC z A I D ATE SSU 62g/gg - 00084 13125 SW Hall Blvd., Tigard, OR 97223 1 :) 6 [GIN H SITE ADDRESS; 14155 SW 120TH PL PARCEL: 2S110B6 - RED02 SUBDIVISION: REDWOOD VISTA ZONING: R - 4.5 BLOCK: LOT: 002 JURISDICTION: TIG TENANT NAME: FOUR D CONSTRUCTION USA NO: FIXTURE UNITS: CLASS OF WORK: NEW DWELLING UNITS: 1 TYPE OF USE: SF NO. OF BUILDINGS: 1 INSTALL TYPE: LTPSWR IMPERV SURFACE: Remarks: Sewer connection for a new single family dwelling. Owner: FEES FOUR D CONSTRUCTION PO BOX 1577 Type By Date Amount Receipt BEAVERTON, OR 97075 PRMT GEO 6/28/99 $2,300.00 99- 316445 INSP GEO 6/28/99 $35.00 99- 316445 Phone: Total $2,335.00 Contractor: G + B PLUMBING PO BOX 1269 HILLSBORO, OR 97123 -1269 Phone: 640 - 5770 Reg #: LIC 00000199 PLM 34 -44PB Required Inspections Sewer Inspection This Applicant agrees to comply with all the rules and regulations of the Unified Sewage Agency. The permit expires 180 days from the date issued. The total amount paid will be forfeited if the permit expires. The Agency does not guarantee the accuracy of the side sewer laterals. If the sewer is not located at the measurement given, the installer shall prospect 3 feet in all directions from the distance given. If not so located, the installer shall purchase a "Tap and Side Sewer" Permit and the Agency will install a lateral. ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080. You may obtain copies of these rules or direct questions to OUNC by calling (503) 246 -1987 / Issued by: b i/f Permittee Signature: Call (5• ) 639-4175 by 7:00 P.M. for an inspection needed the next b • siness day CITY OF TIGARD BUILDING INSPECTION DIVISION MST Iggq / 24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested &j S44 AM PM BLD Location 12.0-1/^- Suite MEC Contact Person C` G Ph (LID - PLM Contractor Ph SWR I Y4 DO& `I® BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT Post & Beam Ext Sheath /Shear Int Sheath/Shear Framing ) 1 t:; C5? �-✓� Insulation �QQ Drywall Nailing 1V�►1/�_ C�� �� ' d--d Fire wall v ✓l Fire Sprinkler ��, tv� Fire Alarm Susp'd Ceiling � � ■U■ • Roof Misc: Final PART FAIL KILMEDiq Post & Beam Under Slab Top Out Water Service Fin �.�- { al PART FAI ICAL ry; Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL Service Rough In UG /Slab Low Voltage l'CN\11\ Fire Alarm Final PASS PART FAIL SITE Backfill /Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin Fire Supply Line [ ] Please call for reinspection RE: [ ] Unable to inspect - no access ADA � Approach/Sidewalk Date . - 7/ l \ 7`r 1 Insector `� " Ext Other � L? Final PASS PART FAIL DO NOT REMOVE this inspection record from the job site.