Loading...
Permit ~ CITY OF � PERMIT PERMIT #.......: M5T95-0191 CbMMUNUTYDEVELOPMENTDEPART00ENl[ DATE ISSUED: 05/04/95 13125 SW Hall Blvd. Tigard, Oregon 97223°e199 (503) 639-4171 PARCEL: 2S111AA-GP057 SITE ADDRESS...: 14341 3W 88TH AVE SUBDIVISION....: GREENSWARD PARK NO 2 ZONING: R-4.5 BL��CK..........: LOT.............:057 ' - - • ------ BUILDING ------------ --------- ----- REISSUE: DWELLING UNITS:1 BASEMENT........:0 s� CLASS OF WORK.:NEW BEDRMS:3 BATHS:3 GARAGE..........:622 sf TYPE OF USE...:SF FLOOR AREAS---------- REQUIRED SETBACK3--- -- TYPE OF CONST.:5N FIRST....:1076 sf LEFT—t6 ft RIGHT.:18 ft OCCUPANCY SRP.:R3 SECOND...:819 sf FRONT,:20 ft REAR..:46 ft / STORIES.......:2 FINBSMENT:0 if REQUIRED---------- HEIG||T. . . . . . . . :24 ft TOTAL------a1895 sf SMOKE DETECTORS. ;Y FLOOR LOAD....40 psf VALUE...".$: 132651 PARKING SPACES—al Renarks: PATH I ----- ---- ----- PLUMBING - ----- -- FLOOR DRAING. . . . :0 BACKFLCW PREVWTRS. . :1 LAVATORIES.....:4 WATER HEATERS...:1 TRAPS..............:0 TUD/SHOWERS. . . . :3 LAUNDRY TRAYS. . . a0 CATCH 8ASIKS. . . . . . . Q WATER CLOSETS—a3 SEWER LINE (ft).:0 GREASE TRAPS—.....:0 DISH%ASKERC, . . . : 1 WATER LINE <ft) . c 100 OTHER FIXTURES , . . . " u0 EA9BAGE DISP...:1 RAIN DRAIN (ft).:0 WASHTNC MACH...:1 SF RAIN DRAINS-21 -------- - MECHANICAL ---- ----------------------- FEES --- ----- FUEL UNIT HTR3. . :0 type amount by :late rezpt /GAS/ / / VENTS .....:0 TIF $ 1550.00 B 05/04/95 - MAX INPUT:0 BTU VENT FANS—c4 SWM $ 180.00 B 05/04/95 - FURN < 100K ..:1 H000S."....a1 SWM $ 100.00 B 05/04/95 - ruRN >=100K ..;0 WOODSTOVES.:N BPRT $ 51E.50 B 0E/04/95 - FLOOR FURN....:0 CLO DRYERS.: 1 BPLC $ 335.08 SW] 05/02/95 95-264892 BCIL/CMP < 3>>Pa0 OTHER UNITS: 1 C5PC $ 25.78 B 05/04/95 - GAS OUTLETS:1 PARK $ 500.00 B 05/04/95 - Oxrer: ----------'--'----------' --------M�AT $ 43.50 B 05/04/95 - ROSEWOOD HOMES INC MPLC $ 10.88 B 05/04/95 - 7140 SW 2097| MEPC $ 2.1C D 05/04/95 - 3BTH $ 225.00 B 05/04/95 - 3EAVERTCN OR w007 P5PC $ 11.25 B 05/04/�5 - Phone #: 642-4049 EROS $ 64.00 B 05/04/95 - ��ontraztor: ---------------------- ERPC $ 20.80 B 05/04/05 - ROSEWOOD HOMES INC ERPC $ 20.80 B. 05/04/95 - 7140 SW 205TH DEAVERTON OR 97007 Phone #; 1142'^4040 Reg #..: 69173 - - ----------- ----- $ 3604.77 TOTAL This perait is issued subject tu the regulations contained in Vie REQUIRED INSPECTIONS - Tigard %oicipal Code, State cf Ore. Specialty Codes and all other Footing Insp • Plumb Top Out applicable laws. All work will be done in azardanze with approved Foundation Insp Framing T.nsp plans. This pernit will expire if work is not started within 12 Post/Beam Struct Fireplace Insp days af issuance, or if work is slspended for Post/Beam Mechan Gas Line Insp Crawl Drain Insulation Insp Permittee Si Plm/undslab Ilsp Cyp Board Insp PLM/Underfloor Rain drain Insp � By Mechanical Insp Water Line Insp Call for inspection - 639-4175 • • ' -- ../4 ,..,,.‘,,..•:. 'Residential Building Permit Application 46: City of Tigard ` 13125 SW Hall Blvd. Tigard, OR 97223 (503) 639 -4171 /Jobsite Address: �'3 �� s G/� ��' C ° Subdivision: Lot # C� NI S :-r � �Y� �.� /Uo � ,s_ 7 (°r a e ,s: Valuation: 1 3 2 3/, Permit #: )7 1 5T Y %: ; . Corner Lot? Y N `::_::;;,;? Flag Lot? Y 9 Owner: DiM J S c � d c � c In Aroyals'= R ea ired ��` `�''<'<:� �`: �_" Address: Plan' ning ; ; i� . S . let? G ll? 7 0 2 ;En ioneerin �5 c°c2 ►J� Phone: - . � y� C r or: 5 ont act _ D o '/ S. h S � chi f� vhc c ::::;(ferns Reu ire » > : : >-< „ ;z q r s: Add es h � rc� a � a �<:'` Subcontractors ': :� ; > `::, :::': : :< � < <'' a v � 9� 1 >T De ails` "'�: > >': <'<< <' � ><= » � < `< > °; >' t Phone: , o \ D ' . :. 'l>l , . >� '. e License # Contractor's �� ..:. (attach copy of current Oregon license) Contact Name & Phone ��a h G . Rapp � ( 1 /9 " 9 6 Subcontractors: Z to A Architect /Engineer: ¢ j'�(j 4 Iumbing: ' Horn k7/ 1r ' 2/V" ' ' �� Address: • % � S ��LU ✓� 0 f) /Mechanical: ��� r' / t P 'T f-/c`31 . ��v� J 7 � ( 1% C 2 dO (attach copy b current OR ntractors Licen (� `�' ,°14 _ �, 6J I Phone: \_9 ,2,,,, — /��/ JOB DESCRIPTION: /l —S/ Ap = Signature & Phone nu�►*:�'r I Received by: \��1�u 41:4 J� Date Received: I Z Permit* Account Description Amount Amt. Pd. Bal. Due ins*q -o /Y/ Bldg. Permit (BUILD) ,5 /S'5o S /SAS a Plumb. Permit (PLUMB) Z Z,7 .(- 2_2-5 CV Mech. Permit (MECH) 43.3P c13 State Tax (TAX) Bldg: 025; r Plumb: f/. L / Mech: ?- 1S' V Plan Check (PLANCK) 3 4 1 . � `/ 250 Bldg: 335 .GY,/ Plumb: Mech: /0.51 ,51,, .4.i U18L Sewer Connection (SWUSA) Lev Sewer Inspection (SWINSP) 3> 3 ) Parks Dev Charge (PKSDC) -So U S Residential TIF (TIF -R) /43° /� f 3 o / Mass Transit TIF (TIF -MT) / 21) /20 Commercial TIF (TIF -C) Industrial TIF (TIF -I) Institutional TIF (TIF -IS) Office TIF (TIF -O) Water Quality (WQUAL) / Water Quantity (WQUANT) Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) 6 Y" f�(/ w Erosion Planck/USA (ERPLAN) 2z- Erosion Planck/COT (EROSN) �u- � 4f ./ TOTALS: SY39, 27 230. 551177 _ PLUMBING PERMIT PERMIT #. . . . . . . : MST95-0101 . DATE ISSUED: 05/04/95 COMMUNITY DEVELOPMENT DEPARTMENT / 13125 SW Hall Blvd. Tigard, Oregon 97223°819e (503 noo��p� ' PARCELt 2S111AA-GP057 SITE ADDREG3...: 14341 SW 88TH AVE SUBDIVISION....: GREENSWARD PARK NO 2 ZONING: R-4.5 DL2CK. . . . .. .. .. x LOT. . . .. . .. . . . . . :Q57 . _ _____ __________________ ____________________________ CLASS OF WORK..:NEW GARBAGE DISPQSALS..:1 • TYPE OF USE....:BF WASHING MACH....... �1 8ACKFLOW PREVNTRS..:1 CCCUPANCY SRP..:R3 FLOOR DRAINS.......:0 TRAPS..............:0 STO0IES........:2 WATER HEATERS......:1 CATCH BAGINS.......:0 FIXTURES---------,---- LAUNDRY TRAYS......:0 SF RAIN DRAINS.....t1 SYNKS. . . . . . . . . . : 1 GREASE TRAPS. . . . . . . :0 LAVATORIES..... s4 OTHER FIXTURES.. .. . x0 TUB/SHOWERS....: SEWER LINE (ft)....:0 WATER CLOSETS..:3 WATER LINE (ft)....:100 DISHWASHERG....:1 RAIN DRAIN (ft)....:0 Remarks: PATH I OWNER: --- -- -----------------FEES--- ----- ROSEWOCD HOMES INC TIF $ 1550.00 B 05/04/95 - 7140 SW 209TH SWM $ 180.00 B 05/04/95 - SWM $ 100.00 D 05/04/95 - BEAVERTON OR 97007 BPRT $ 515.50 B 05/04/95 ~ Phone #: 642-4049 . BPLC $ 335.08 SW] 05/02/95 95-264392 . B5PC $ 25.78 B 05/04/95 - Plumbing Contraptor:---`---'-------- PARK $ 502.00 5 05/04/95 - MPRT $ 43.50 B 05/04/95 - Names. MPLC $ 1��. 8G B 05/04/95 ' #ddr M5PC $ 2.18 B 05/04/95 - City __ 3BTH $ 225.00 B 05/04/95 - Zip: #: P5PC $ 11.25 B 05/04/95 - Reg !>. _ Additional fees not shown hepe......... • REQUIRED INSPECTIONS ------- This permit is issued subject to the reg- . ulations contained in the Tigard Municipal Footing Insp Insulation Insp Code, State of Ore. Specialty Codes and all Foundation Insp Gyp Board Insp other applicable laws. All work will be done Post/Beam Struct Rain drain Insp in =c*cordance with approved plans. This Post/Beam Meehan Water Line Insp permit will expire if work is not started Crawl Drain Water Service In within 1[}0 days of issuance, or if work is Plm/undslab insp Apwr/Sdwlk Insp suspended for more than 180 days. PLM/Underfloor Mechanical Final Mechanical Insp Plumb Final . Plumb Top Cut Building Final Framing Insp Erosion Control Fireplace Insp ____ __ x_ - ___-_-_- _ Gas Line Insp __________ __ - Authorized Pi .mbing Contractor Signature Call for inspection - 639-4175 Contractor Notes: _______ _ ____ - ----------- ---' ------------- --- — ---- _ ___ ____ __-___ _ _ _ _____ ________ - --- -------------- ---- --------------- --- ----' . } 4 Solar Balance Worksheet Address ) - !3 f 6 ?1 ' Box A calculations: North -South dimension for the lot. Box A: This dimension is determined by finding the midpoint of the North lot line and drawing an intersecting line perpendicular to that point. Measure the distance from the midpoint of the North lot line to the South lot line along the described line. // (oq ft Box B calculations: Shade point height from your structure. Box B: 1. Determine whether measurements will be based on the peak or eave of your structure. The orientation of the ridge is also important. Which la: If the roof line runs North - South, measurements will be describes based on the peak of the roof. your lot? lb: If the roof line runs East -West and the roof pitch is less (Circle one) than 5/12, measurements will be based on the eave. lc: If the roof line runs East -West and the roof pitch is 5/12 la lb lc or steeper, measurements will be based on the peak. 2. Measure change in elevation from front property line to finished floor elevation. - 7 ft 3. Measure distance from finished floor elevation to the affected peak /eave. + 2(P ft 4. If the roof line runs North - South, deduct three feet. If the roof line runs East -West, deduct nothing. ft 5. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line, if the lot slopes up from the front to the rear. If the lot has no slope or slopes up from the rear to the front, - ft deduct nothing. 6. Total figure for box B: 2 ft Box C. Distance to the shade reduction line. Box C: 1. Measure the distance from the North property line to the foundation. \7.5 ft 2. Measure the distance from the foundation to the affected + 2(p ft peak or eave. 3. Total figure for box C: H 5 ft Solar Balance Point Standard Box A. North -South dimension for the lot Box B. Shade point height from your structure: measured perpendicular to the midpoint of the Change in elevation from front property line to north lot line the finished floor elevation added to the height of the building from finished floor elevation to // ��yy, the affected peak /eave. If the roof line runs (P `I feet N /S, subtract 3 feet from the figure. Subtract one foot for each foot of difference in elevation from the front property line to the rear property line. 2- 1 feet Box C. Distance to the shade reduction line Distance from North property line to foundation added to the distance from the foundation to the affected roof peak /eave. 5 Feet The following helps explain the graph below: The horizontal axis (rows) represents box "C" figures. The vertical axis (columns) represents box "A" figures. It is most useful to draw a vertical line to represent the appropriate figure found in box "A" and a horizontal line to represent the appropriate figure found in box "C ". The intersection of the vertical and horizontal lines determines the value found in box "D ". The value in box "D" should be compared to the value in box "B "; if the value in box "B" is less than or equal to the value found in box "D ", the building is in compliance with the solar balance code. Distance to shade 100+ 95 90 85 80 75 70 65 60 55 50 45 40 reduction line from northern lot line in feet 70 40 40 40 41 42 43 44 65 38 38 38 39 40 41 42 43 60 36 36 36 37 38 39 40 41 42 55 34 34 34 35 36 37 38 39 40 41 50 32 32 32 33 34 35 36 37 38 39 40 41 42 4 5 10 10 3 () 31.-_ 3 . 3 _ _ 3 4 . 3 5 _ 3 6 3 _ 7 3 8 _3.9 4 0 40 28 28 28 29 30 31 32 33 34 35 36 37 38 35 26 26 26 27 28 29 30 31 32 33 34 35 36 30 24 24 24 25 26 27 28 29 30 31 32 33 34 25 22 22 22 23 24 25 26 27 28 29 30 31 32 20 20 20 20 21 22 23 24 25 26 27 28 29 30 15 18 18 18 19 20 21 22 23 24 25 26 27 28 10 16 16 16 17 18 19 20 21 22 23 24 25 26 5 14 14 14 15 16 17 18 19 20 21 22 23 24 Box "D" Maximum allowed shade point height J feet CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4).. Inspection: Footing Susp. Ceiling Sprink. Rough -in App wlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in AMP Post /Beam Mech. San. Sewer Gas Line . -Bid.. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date, Requested: 3 /z77/4 Time: X.AM PM Address: /y 1 / 8U Builder: Permit #: /Lc 57 THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector:. Date: ROVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. r CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. .4 Post/Beam Mech. Shear /Sheath Framing PIbg.Und /Flr /Slab Plbg. Top Out Insulation G f-- Post/Beam Struct. Mech. Rough -in Gyp. Bd. -; d• o lC____ San. Sewer Gas Line Appr /Sdwlk Reins. Other: Date: 3 - A.M. 4_ P.M. Entry: Address: /T 41 Tenant: Ste: MST: q5 1 S 0 / l f (� —t� �y BUP: Con /Own: (0 ( �] ( 3 MEC: PLM: ELC: - pn(7 THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: : 09e mtc--c-,4.<0.c-r- ,k 0 Kw., , ry 0 i' _ ( "eery 1A//- re/2 G 2 Inspector: �/ ` Date: 1 111 APPROVED _ DISAPPROVED /CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 - 4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in 11 Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: I l J Time: AM PM Address: / � ! ( 3 v Builder: Permit #: 75 � f THE FOLLOWING CORRECTIONS ARE REQUIRED: t elle(a . 4"ed fe pitrtect ‘ r-'5d,- Inspecto - Vtoo d Date: Y-1 - c cL _DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec- O- Phone): 639 -4175 Business Phone: 639 -4171 - Inspection: Footing Susp. Ceiling Sprink. Rough -in ppr /Sdw Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: T AM PM Address: 1 1 13 t» g . Builder: Permit #: � J �! l THE FOLLOWING CORRECTIONS ARE REQUIRED: 6/Y/,DZE7E W /A/ 6 (Emms) fe,. ✓ E/vEGV4 y Z) /0/E04' of ,WJ7 .c /V /$N 3) //5 / D, /A1 ,4T �vE57_ 4 / Goj eaACAI T e A/ /ion /.ors Every Inspector: 40 y f& t9_ Date: _APPROVED _DISAPPROVED n,� E _Call For Reinsp. )(A/ "��vil� CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line su atio -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: b- ��. S' - Time: AM PM Address: / l i ( )-____ Builder: Permit #: — P THE FOLLOWING CORRECTIONS ARE REQUIRED: -3, Inspector: j/7-57 R OVED _DISAPPROVED _APPROVED SUBJECT TO ABOVE t _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: • 71 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab ,Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer -Bldg. Plbg. Underfloor Rain Drain rmin - Plumb. Alarm Water Line Insulation -Mec . Underflr. Insul. 4P Gyp. Bd. ( ect. 7/1 7 1 i ' Date Requested: Q Time: AM PM Address: 1 y3 Y( V O �' ` N-u-Q Builder: Permit #: g5 ----0 ( / THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector:c Date:77/ `kri<IVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639- 71 Inspection: Footing Susp. Ceiling Sprink. Rough -in Ap•r /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. g. Top Out Elec. Rough -in FINAL: Post /Beam Mech. r- Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. 7 all Gyp. Bd. - Elect. Date Requested: / / / %5 Time: AM - PM Address: /V3 7 / $ gg7' Builder: Permit #4 % THE FOLLOWING CORRECTIONS ARE REQUIRED: • *Yr ec..Q 7 - Tr/ dS O•e B∎ c4 d ,c Spey J9' so �a k7e(f/ V 4/e ,4-b rsrrir 9 /eX Inspector: Date: CPPROVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE C`P/X Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 71 14457f Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace st /Be Plbg. Top Out Elec. Rough -in FINAL: ost /Beam ec San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall / .-- Bd. - Elect. Date Requested: "2- ( 7S" Time: PM Address: j 1- ( 3 -1 ( g g y` p er _ J Builder: Permit #: l 5 "' 0 ( G 1 THE FOLLOWING CORRECTIONS ARE REQUIRED: l/Ai" ;r,,it coeia/ -40X.././v • Inspector: 7 Date: Z L T ROVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. v CITY OF TIGARD BUILDING INSPECTION NOTICEY `' 7 Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4 / 71 Inspection: I Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab - Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in • FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. ... Underfloo Rain Drain Framing - Plumb. •m Water Line Insulation -Mech. Underflr. Insul. Shear WaII Gyp. Bd. - Elect. Date Requested: 5 / 9S Time: AM PM Address: ( 3 Li( F 0 ) "`' 5 Builder: Permit #: 9 5---- oI 7 THE FOLLOWING CORRECTIONS ARE REQUIRED: t .. 0 Inspector: Date:5�/ 7 //15 JBRtTD _DISAPPROVED _APPROVED SUBJECT TO ABOVE _Call For Reinsp. .x. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 39 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in ppr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. '.an. Sew -r Gas Line -Bldg. Plbg. Underfloor ".in Dr Framing - Plumb. Alarm Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: 5//e2 �r / Time: AM PM Address: / 4 1 ' 3/ g Builder: Permit #: THE FOLLOWING CORRECTIONS ARE REQUIRED: 5 &%/4- -6 / 61- • Inspector. �/� Date: 'PROVED DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 9 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in ' ppr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. B•. - Elect. Date Requested: 7/,-2,/ �7�j Time: AM PM Address: I 1 71 7 2 ) 4 // Builder: Permit #: 9:5 —/ f THE FOLLOWING CORRECTIONS ARE REQUIRED: .Inspector: Date: LOVED _DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp. U CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone: 639 -4171 Inspection: Footing Susp. Ceiling Sprink. Rough -in Appr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. d Gas Line -Bldg. Plbg. Underfloor ".in Dr.•• Framing - Plumb. Alarm vI - Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. - Elect. Date Requested: ' (� (7, Time: AM PM Address: l 3qt F Builder: Permit #: THE FOLLOWING CORRECTIONS ARE REQUIRED: flIWASV LI Inspector: /� ��/ Date _APPROVED _DISAPPR VED< APPROVED SUBJECT TO ABOVE Call For Reinsp. V / CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line (Rec -O- Phone): 639 -4175 Business Phone 6 s -4171 Inspection: '! 'ooting Susp. Ceiling Sprink. Rough -in ppr /Sdwlk Foundation Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. lect. Date Requested: 5 ( C Tim . AM PM Address: I 3 I Rs-0_ Builder: Permit #: � j 5 d (1 ( THE FOLLOWING CORRECTIONS ARE REQUIRED: Inspector: Date: / "PROVED DISAPPROVED APPROVED SUBJECT TO ABOVE Call For Reinsp. CITY OF TIGARD BUILDING INSPECTION NOTIC Inspection Line (Rec -O- Phone): 639 -4175 Business Phon: 6 �1 Inspection: s Footin Susp. Ceiling Sprink. Rough -in Appr /Sdwlk oundatio Plbg. Underslab Mech. Rough -in Fireplace Post /Beam Struct. Plbg. Top Out Elec. Rough -in FINAL: Post /Beam Mech. San. Sewer Gas Line -Bldg. Plbg. Underfloor Rain Drain Framing - Plumb. Alarm Water Line Insulation -Mech. Underflr. Insul. Shear Wall Gyp. Bd. 4 - lect. Date Requested: S ( (? S Tim me\ : ,, AM PM Address: I (4 7i 1Tu"____ Builder: Permit #: ? —Q (. c i ( THE FOLLOWING CORRECTIONS ARE REQUIRED: 9 Inspector: P- - Date: j �J /rs ROVED _DISAPPROVED APPROVED SUBJECT TO ABOVE _Call For Reinsp.