Loading...
Permit MASTER PERMIT cITy' OF TIGARD d DATE I ISSUED: 4/`'x/9 6- 190 ' COMMUN DEVELOPMENT DEPARTMENT PARCEL_ : 2S1 1 i AA -GPO49 SIT 3 7- tl?nt�' v d.Te9 rd, in°3 -p72 a a > a» , � 3 57 s/o 1D a SUBD I V I S I ON....: GREENSWARD PARK NO. ZONING : R-4.5 BLOCK........... LOT ° 049 Remarks: PATH I --- -- - - -- BUILDING --- — REISSUE: STORIES • 2 FLOOR AREAS --- BASEMENT...: 0 sf REQUIRED SETBACKS - - -- REQUIRED- - CLASS OF WORK.:NEW HEIGHT • 32 FIRST : 1213 sf GARAGE • 714 sf LEFT • 10 SMOKE DETECTRS: Y TYPE OF USE...:SF FLOOR LOAD • 40 SECOND...: 1127 sf FRONT • 26 PARKING SPACES: 1 TYPE OF CONST.:5N DWELLING UNITS: 1 FINBSMENT: 0 sf RIGHT • 7 OCCUPANCY GRP.:R3 BDRM: 4 BATH: 3 TOTAL - - - --: 2340 sf VALUE..8: 163513 REAR • 36 -------- - - - --- PLUMBING ---- - - - - -- -- -- SINKS • 1 WATER CLOSETS.: 3 WASHING MACH..: 1 LAUNDRY TRAYS.: 1 RAIN DRAIN ft: 0 TRAPS • 0 LAVATORIES : 5 DISHWASHERS...: 1 FLOOR DRAINS..: 0 SEWER LINE ft: 0 SF RAIN DRAINS: 1 CATCH BASINS..: 0 TUB /SHOWERS...: 3 GARBAGE DISP..: 1 WATER HEATERS,: 1 WATER LINE ft: 100 • BCKFLW PREVNTR: 1 GREASE TRAPS..: 0 OTHER FIXTURES: 0 -- -- - - -- -- MECHANICAL --- - - - - -- ---- FUEL TYPES---- -- - - -- FURN i 100K ..: 0 BOIL /CMP ( 3HP: 0 VENT FANS • 4 CLOTHES DRYERS: 1 /GAS/ / / FURN ) =100K ..: 1 UNIT HEATERS..: 0 HOODS • 1 OTHER UNITS...: 1 MAX INP.: 0 BTU FLOOR FURNACES: 0 VENTS..........: 0 WOODSTOVES....: 0 GAS OUTLETS...: 1 ----- - - - --- ----- - - - - -- ELECTRICAL ---- ---- -- - RESIDENTIAL UNIT - -- -- SERVICE /FEEDER - -- —TEMP SRVC /FEEDERS -- - -- BRANCH CIRCUITS -- - -- MISCELLANEOUS - -- - -ADD'L INSPECTIONS— 1000 SF OR LESS: 1 0 - 200 amp..: 0 0 - 200 amp..: 0 W /SVC OR FDR..: 0 PUMP /IRRIGATION: 0 PER INSPECTION: 0 EA ADD'L 500SF.: 5 201 - 400 amp..: 0 201 - 400 amp..: @ 1st W/O SVC /FDR: 0 SIGN /OUT LIN LT: 0 PER HOUR • 0 LIMITED ENERGY.: 0 401 - 600 asp..: 0 401 - 600 amp..: 0 EA ADDL BR CIR: 0 SIGNAL /PANEL...: 0 IN PLANT 0 NANF HM /SVC /FDR: 0 601 - 1000 amp.: 0 601 +amps -1000 v: 0 MINOR LABEL -10: 0 10v amp /volt.: 0 ------ - - - - -- PLAN REVIEW SECTION --- — Reconnect only.: @ ) =4 RES UNITS..: SVC/FDR)=225 A.: ) 600 V NOMINAL: CLS AREA /SPC OCC: - -- ------------- ---- -- ELECTRICAL - RESTRICTED ENERGY — A. SF RESIDENTIAL --- -- B. COMMERCIAL ---- - - ---- AUDIO & STEREO.: VACUUM SYSTEM..: AUDIO & STEREO.: FIRE ALARM INTERCOM /PAGING: OUTDOOR LNDSC LT: BURGLAR ALARM..: 0TH: :: X BOILER • HVAC , LANDSCAPE /IRRIG: PROTECTIVE SIGNL: GARAGE OPENER..: • CLOCK • INSTRUMENTATION: MEDICAL • OTHR: :: HVAC DATA /TELE COMM.: NURSE CALLS TOTAL # SYSTEMS: 0 Owner: --- Contractor: - - - - - -- TOTAL FEES:f 4617.20 ROSEWOOD HOMES INC ROSEWOOD HOMES INC 7140 SW 209TH 7140 SW 209TH BEAVERTON OR 97007 BEAVERTON OR 97007 Phone #: 642 -4049 Phone #: 642 -4049 Reg #..: 69173 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore. Specialty Codes and all other applicable laws. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. -- ------------- -- - - -- REQUIRED INSPECTIONS -- -- Footing Insp PLM /Underfloor Shear Wall Insp Insulation Insp Appr /Sdwlk Insp Erosion Control Foundation Insp Mechanical Insp Low Voltage Gyp Board Insp Electrical Final Post /Beam Struct Plumb Top Out Fireplace Insp Rain drain Insp Mechanical Final Post /Beam Meehan Electrical Servi Gas Line Insp Water Line Insp Plumb Final Crawl Drain Framing Insp - ir• ace Water Service In Building Final Permittee Signature iL / / % / / issued By:`; ,' ,i ft .` i ddi s_ ,r2 Call for inspection - 639 -4175 / q O 9 i ,.... ) Residential Building Permit Application City of Tigard 13125 SW Hall Blvd. Co- 5 4 Tigard, OR 97223 4 (503) 639 -4171 Jobsite Address: '" /L5 7 �.S' ,:r� 9' /fie . ::......... Office U Only';:.::: ; :::.: • Subdivision: r' s ee v Lot # �y G �����ll�r ' 4 k � Contact i. • •,-/-: Initials = = ;:::; Valuation: /63 -5/ /., . • . :::.:Result °r New Construction Only: (Square Footage) Pi n i c House: Garage: �f,�/ :.. Permit; #'::/'lt5� =6�� / a . ..::.:.:::::`:..:� ::�.; rcyd Gara e: . Reissueof N . Map • &:;:TL #, ::.::e:5./ ir:. -- . &J 2 O'9. :,: Corner Lot? Y t (y Flag Lot? Y Owner: R e Sr :..4-) <10 cJ r`/ 01 s , /1--e____ ... . Address: 7 / //>>S'cf) le `77 • _:Approvals Required.::::-:°:. . - .. :... - c?i/C, -�' � .7 ae / p 71 -�� Planning,Sett Solar::... K C7 �Q ;::: Engineering "h PPAUL- • y _ : Oth er:;;:. ;':;:;.<:;:. <. --,,.:<::.:. :: . ........ .. . ... -: Phone: ([ SU. ) - y,-,l- / e)gj? :: `. Ite ms :'Req u i re d . >:.:: >« , _ • . ..... Contractor: 'cy�,e : . . :!' ...`.:..: - .:::..:.. Address: ii* -%, ..us. - Details . ='; Other ;= . • Phone: C.5 ) Gq/ P _ �i 6T--- • Not <.. /� s al? : 4c - f''-.iti •.•.. /% %, '• /----.._5 :: tee: . �Y 1gC, . •( 0/ Contractor's License # 16 g,/ , • (attach copy of current Oregon license) :. . . Contact Name: (,/_oZ) /p/7 . . Contact Phone: („5 6 c?.96 F Subcontracto prt c p Architect/Engineer: 44�/r /r, Plumbing: ,,,....17 /�ls.7/ ',9 it 0 71.1" Address: % �a �,-* 2 /-5 / 3- as -96ccg Mechanical:) 6 CZ/ .�/G 7- =� A i- '��� /,U - a 7,77 (99 (attach cop ' of current Or Co License) Phone: (5Z2 ) r ac 5 - 9/z/ JOB DESCRIPTleN: ,/f/<_57/- 1 'V/ Ls� Y C • - 9 - Applica•i Signature Applicant Phone number Received by: � Date Received: ( it' (o/ H ^Joginidsts■resaoo . Permit 4 Account Description Amount Amt. Pd. Bal. Due ' Mit x-01 / 0 Bldg. Permit (BUILD) Str` -3 ' Plumb. Permit (PLUMB) .22 /-* 072 Mech. Permit (MECH) e/) _. f/ S tate Tax (TAX) go aX _ Bldg: �-9 li)` S"6,f c -i 9 _ Plumb: //r 2 ; Mech: 0 241-- Etc // 7; Cc 2._ s Plan Check (PLANCK) Bldg: 316: 41 5 ...- �� � �� 5 -�/ /J , 00 .E Plumb: . Mech: 1/' Z j , ,, /AZ J / � � 4, Xy ( - 0/ Ft Sewer Connection (SWUSA) vU 7.2 v � .r Sewer Inspection (SWINSP)��� g� Parks Dev Charge (PKSDC) /05 f p S U Residential TIF (TIF -R) / / V71) Mass Transit TIF (TIF -MT) / Z / 7-0/ Commercial TIF (TIF -C) Industrial TIF (TIF -1) Institutional TIF (TIF -1S) Office TIF (TIF -0) Water Quality (WQUAL) /V ---6) /I' Water Quantity (WQUANT) / " / i'lJ Fire Life Safety (FLS) Erosion Cntrl Permit (ERPRMT) c/ 6e,... Erosion Planck/USA (ERPLAN) .20 GC,h Erosion Planck/CO T (EROSN) go,n ol TOTALS: 6,1o Lo , 5 . A - 61 Z' 2-c' • 6/16/00 Activities for Case #: MST96 -00190 1:38:20 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA005 Application received 414/96 JH PASS BT2 4/22/96 MSTA008 Permit Created 4/22/96 RT PASS BT2 4/22/96 MSTA010 Check for prcl. restrict. 4/9/96 JH PASS BT2 4/22/96 MSTA012 Plans routed to Plans Examiner 4/9/96 JH PASS BT2 4/22/96 MSTA026 Plans approved by Plans Exmr 4/22/96 RT PASS BT2 4/22/96 MSTA030 Reviewed plans routed to DSTS - 4/22/96 RT PASS BT2 4/22/96 MSTA705 Footing Insp 5/29/96 KS A/N KBS 5/30/96 #-1- electrical ground rod inplace #-2- provide low point drain #-3- remove soft material prior to placement of concrete #-4- positive keyway #-5- reinforcement at holdowns MSTA706 Foundation Insp 5/30/96 KS APP KBS 6/3/96 MSTA710 Post/Beam Structural • 6/19/96 RB FAIL RB 6/19/96 treat cut ends of PT sill; secure mud sill w /in 12 "; insulate wrap heat duct- over -lay- bare metal showing; plenum box must be . R -8 value insulation; No plans on site! MSTA711 Post/Beam Mechanical 6/19/96 RB FAIL RB 6/19/96 see structural this date MSTA717 PLM %Underfloor 6/13/96 MS PASS MRS 6/14/96 MSTA720 Mechanical Insp 9/20/96 KS A/N KBS 9/23/96 # -1- TLP correction list • completed MSTA722 Plumb Top Out 8/16/93 TLP PASS TLP 8/26/96 MSTA723 Electrical Service 9/11/96 TLP PASS TLP 10/9/96 MSTA725 Framing lnsp 9/12/26 KS DIS KBS 9/12/96 #-1- no plans on site #-2- provide installation manual for gas fireplace MSTA726 Shear Wall Insp 8/9/96 GL PASS BT2 8/15/96 MSTA735 Gas Line lnsp 9/13/06 TLP PASS TLP 9/24/96 MSTA740 Insulation Insp 9/20/96 KS APP KBS 9/23/96 MSTA745 Gyp Board Insp 9/30/96 RB PASS RB 9/30/96 pending- b -vent clearance MSTA755 Rain drain Insp 6/20/96 MS PASS MRS 6/20/96 MSTA760 Water Line Insp 6/20/96 MS PASS MRS 6/20/96 MSTA765 Appr /Sdwlk Insp 10/8/96 PI PASS JT 11/15/96 felt at cold joint Page 1 of 2 6/16/00 Activities for Case #: MST96 -00190 1:38:20 PM Assigned Hold Updated Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes MSTA790 Electrical Final 11/12/96 MJR DIS MJR 11/12/96 flex to furnace against B -vent Kit. island plug has open neutral rear grade plug on Kit. cifrcuit gap around bath fixture and plug tub light not listed for use MSTA795 Mechanical Final 11/15/96 TLP PASS TLP 12/9/96 MSTA797 Plumb Final 11/15/96 TLP PASS TLP 12/9/96 • MSTA799 Building Final 11/15/96 TLP PASS TLP 12/9/96 MSTA080 (F) Ready to issue 4/24/96 CJS PASS CJS 4/24/96 MSTA092 (F) Issue combination permit 4/25/96 CJS PASS CJS 4/25/96 MSTA097 Issue plumbing signature form 4/25/96 CJS PASS CJS 4/25/96 MSTA09B Issue electric signature form 4/25/96 CJS PASS CJS 4/25/96 MSTA097 Issue plumbing signature form 4/25/96 JMH PAID J *H 4/25/96 MSTA711 Post/Beam Mechanical 6/25/96 6/24/96 TLP PASS TLP 6/25/96 MSTA725 Framing Insp 9/13/96 TLP PASS TLP 9/24/96 tlp pass MSTA720 Mechanical Insp 9/13/96 TLP PASS TLP 9/24/96 MSTA765 Appr /Sdwlk Insp 11/22/96 11/15/96 PI PASS RB 11/22/96 MSTA970 Case Finaled 11/15/96 TLP PASS TLP 12/9/96 MSTA960 (F) Issue Cert. of Occupancy 11/15/96 JT 12/9/96 Page 2 of 2 CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4 Footing Rain Drain Cover /Service • Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. Plbg.Und/FIr/Slab • To• Out Insulation - Elect. Post/Beam Struct. ' ech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line ` Appr /Sdwlk Reins. Other: _ r i'Q' (}� (. " - t, ., /�a-es-� � Date: ��� �, k Co A.M. P.M. Entry: 2 Address: / ? S. 90 7 Tenant: Ste: MST: ` BUP: Con /Own: `t e 7 - ----1- 7 �o �� MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Inspector: Date .- C / 4 ‘ APPROVED D OVED /CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service F : Foundation Water Line Ceiling - Plum.. Post/Beam Mech. Shear /Sheath raming -Mech. PIbg.Und /Flr /Slab -r^E -p Out ' a ion - Elect. Post/Beam Struct. Rough -in Gyp. Bd. -Bldg San. Sewer —� Appr /Sdwlk 4110 Other: / Date: 73 / A.M. (/ P.M. Entry: Address: MST: Ste: MST: L — O ` ?Q P: Con /Own: . «i �, � U ' EC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: /Ar7c .,9?77C /1 /'5 • C! tek.e /e qr ,ci 4 - C _ a I Inspector %l Date: 767 ROVED DISAPPROVED /CALL FOR REINSP. CF C O • CITY OF TIGARD BUILDING INSPECTION NOTICE, Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumbl Post/Beam Mech. Shear /Sheath Framing 41:0 PIbg.Und /FIr /Slab Plbg. Top Out Insulation +4211 Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bid MIA. i San. Sewer Gas Line Appr /Sdwlk Reins. Other: ? Date: /t' 1 A.M. P.M. Entry: Address: io /n_ ` ! _ ! `�' Tenant: Ste: MST: -6 lq l ! J �/q- (? G,� C/ BUP: Con /Own: (p `T 1S / (3 MEC: PLM: ELC: , ?,- -,T LE- FOLLOWING CORRECTIONS ARE REQUIRED: ELR: r --- ."- , ', - // s i LzT C � � '1C ! /P G ,.r lr�� Ili A/4 Cc:- C ,/ ST Op l T e- ‹, / '-' -e/z_ �Ud/l • c LASS / ri _ rL06 h f / 7 Z Ara - 2d ,c� / ,-.6 4 44 1- 7/ 5 Sir I) 1 .40 f •�si.)/Crib 4 v l/ ,i' 1 /' /L _ - e y oU e 6 ti w /. e/z .Vcccs Sc V u / 2 � _ 'i Inspector: (v ` • V' DatV4/7 ‘ APPROVED 0 SAPPROVED /CALL FOR REINSP. CF CO • CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINAL: Foundation Water Line Ceiling - Plumb. Post/Beam Mech. Shear /Sheath Framing -Mech. PIbg.Und /FIr /Slab Plbg. Top Out Insulation - Elect. Post/Beam Struct. Mech. Rough -in Gyp. Bd. -Bldg. San. Sewer Gas Line Appr /Sdwl Reins. Other: Date: / I I i,6 i9, A.M. P.M. Entry: Address: I g 3 S / ! d / � Tenant: Ste: MST: f ( 0 / C BUP: Con /Own: MEC: PLM: ELC: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: f Q_ U /2 Inspector: Date: U(' I S APPROVED DISAPPROVED /CALL FOR REINSP. CF CO CITY OF TIGARD BUILDING INSPECTION NOTICE Inspection Line: 639 -4175 Business Phone: 639 -4171 Footing Rain Drain Cover /Service FINA Foundation Water Line Ceiling - Plumb.e Post/Beam Mech. Shear /Sheath Framing ech. PIbg.Und /FIr /Slab Plbg. Top Out Insulation Post/Beam Struct. Mech. Rough -in Gyp. Bd. :.g San. Sewer Gas Line Appr /Sdwlk r�s Other: / / R p Date: / / l �`� l f 4 A.M. P.M. Entry: Address: / 3g- 7 76 Q Tenant: / Ste: MST:? f - i d Con /Own: i � ' f7 (] I pq (° O Q' MEC: PLM: THE FOLLOWING CORRECTIONS ARE REQUIRED: ELR: Inspector: Date: // /7 `r � _7PROVED _ DISAPPROVED /CALL FOR REINSP. CF CO