Loading...
Permit CITY OF TIGARD BUILDING PERMIT • INI - g COM MUNITY DEVELOPMENT Permit #: BUP2010 00267 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 12/09/2010 • Parcel: 2S102AA00600 Jurisdiction: Tigard Site address: 11940 SW PACIFIC HWY A Project: Pacific Plaza Subdivision: Lot: 0 Project Description: New freestanding pole sign. Contractor: CUSTOM SIGN CO INC Owner: ALPROP CO 9316 SW 12TH DRIVE 6149 SW SHATTUCK RD PORTLAND, OR 97219 PORTLAND, OR 97221 PHONE: 503 - 201 -8469 PHONE: 503 - 519 -1111 FAX: 503 - 245 -4483 FEES Specifics:, Description Date Amount Type of Use: COM Permit Fee - Additions, Alterations, 12/09/2010 $225.80 Class of Work: OTR Demolition Dwelling Units: 0 12% State Surcharge - Building 12/09/2010 $27.10 ` Stories: 0 Height: 20 ft Plan Review 12/08/2010 $146.77 Bedrooms: 0 Bathrooms: 0 Value: $10,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $399.67 Required: Required Items and Reports (Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -0D1 -0010 through OAR 952- 001 -0090. You may o• a co•• direct questions to OUNC by calling 503.232.1987 or 1. 0 332.23 Issued By: `� � j /� = ` ittee Signature: \ \� Call 503. .51 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application , .. . 7 - c._ �" ,, .:c Commercial C1� FOR OFFICE USE ONLI' City of Tigard $ 20 Date/By: 2 $ f0 Permit No.: ° 131 SW Hall 13125 � Blvd., Tigard, OR 97223 10 Plan Review P�o�o—ooa� �©� C Phone: 503.718.2439 Fax: 503.598.1960 '�Gtli�" Date/By: 1 (� Other Permit: T I G A R D Inspection Line: 503.639 ®F iQN Date Ready/IIy: Juris: ® See Page 2 for Internet: www.tigard- or.gov WOW D" Notified/Method: c9...,ci / v &Pr Supplemental Information T O x l• l r rep Ctrl. Zst TYPE OF WORK REQUIRED DATA: 1 - AND 2- FAMILY DWELLING ew construction (j , i ✓� ❑ Demolition Permit fees* are based on the value of the work performed. l i Indicate the value (rounded to the nearest dollar) of all ❑ Addition/alteration/replacement ❑ Other: • equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ 1- and 2- family dwelling ommercial/industrial CI Accessory building El Multi-family Number of bedrooms: El Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 1' -1 Li 0 '9& ''" u "CtL -.1, New dwelling area: square feet City /State /ZIP: I t Cj (4 ,01 O/'t'cc v o Garage /carport area: square feet Suite/bldg. /apt. no.: Project name: � to - JL 0,4-7_, Covered porch area: square feet Cross street/directions to job site: Deck area: square feet 1 ._ 1 (' { „qq '1 1 Other structure area: square feet REQUIRED DATA: COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all Tax map /parcel no.: equipment, materials, labor, overhead, and the profit for the 1 DESCRIPTION OF WORK work indicated on this appl�ilation. �(�� t ►l1 .c.,0 - C ItP s %1.volt c_ si c iil Valuation: ' 1 0 1 `W ' i Existing building area: I square feet New building area: square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: Name: V `O 'n ` C L L Type of construction: Address: 4 S Wit N uck V-oa Occupancy groups: Cit /State /ZIP: y� ` n Y 3Y'1'i,1i1, � (/Y��F✓'1 1 �`Z�' Existing: Phone: (c/1)) S iil 411 1 I Fax: ( ) New: ❑ APPLICANT ❑ CONTACT PERSON NOTICE Business name: All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: jurisdiction in which work is being performed. If the City /State /ZIP: applicant is exempt from licensing, the following reasons apply: Phone: ( ) Fax: : ( ) E -mail: CONTRACTOR Business name: Cu 56, ,., S ` •- c i” Cii� p( ,t`;' vt (, BUILDING PERMIT FEES* • Address: zi 3� S L„, .' \ I r - 0 r ((Please refer to fee schedule) to ' Structural plan review fee (or deposit): City /State /ZIP: f-�– „QA, Ofe 01 OCl `� FLS plan review fee (if applicable): Phone: (50)) .2. ,9:At (, el Fax: (5ci9 vi 5-- 4'1'-/ :33 7 CCB lic.: 12 7 a C Total fees due upon application: ( � ` 1 `° — � n��� /� J i Amount received: 1//116 ' ai 7 Authorized signature: 1 flli/� d, This permit application expires if a permit it not C is not obtained within 180 days after it has been accepted as complete. • Print name: `� �� 1:' � � f `� Date: 124 r� 1C) * Fee methodology set by Tri- County Building Industry �,�' Service Board. 1:\Building\Permits \BUP -COM PermitApp.doc 09/09/10 440- 4613T(11 /02 /COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ I:\ Building \Permits \BUP -COM PermitApp.doc 06/25/08 No Building Division • Plan Submittal Requirements T I G A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning El applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Building \Permits \BUP -COM PermitApp.doc 06 /25/08 .S. IN Building Division Plan Submittal Requirement Matrix T l GA RD Commercial & Multi- Family - New, Additions or Alterations o '' Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 2 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 2 Fire Protection System 2 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue) I: \Building \Permits \BUP -COM PermitApp.doc 06/25/08