Loading...
Report • Main Office Salem Office Bend Office a arls ®n Test � 9 Inc. 8430SWIfunziker 40h0 Hudson St,NF. 63025 OR Riley RA ll Y G I ■1 l li■ ■c 8430 S , OR 97223 Sa /em OR 97301 Rend OR 97702 Phone: (503) 684 -3460 Phone: (.503)589-1252 Phone. (541) 330 - 9155 Fax (503) 684 -0954 Fax (503) 589 -1309 Far (541) 330 -9163 Construction Materials Testing & Inspection 0U2cz Special Inspection FINAL SUMMARY LETTER June 4, 2009 T0808617 City of Tigard Building Division 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Struvite Recovery Facility 16580 SW 85 Avenue — Tigard, OR Permit No.: BUP2008 -00290 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors Structural Welding All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Keith R. Gauvin Project Manager KRG /rc cc: Clean Water Services (Durham) — Tim Rondeau City of Tigard Building Division CH2M Hill (Corvallis) — Alex Firth Stettler Supply Company — Randy Stebner U p 6e, 94,6, Office Salem Office Bend Office Carlson Testing I nc. 430SIS'Xwzuter 4060 Hudson $, NF.' 630750 97 70 2 Rll ■O/ 8430 OR 97723 Safem..OR 97301 BenQ OR 97707 Phone (503) 684 -3460 Phone: (503) 389.1257 Phone: 011) 330.9155 F (503) 684.0951 F. (503) 589-1309 F (541) 330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER June 3, 2009 T0808617 City of Tigard Building Division 13125 SW Hall Blvd Tigard, OR 97223 -8199 • Attn: Building Department Re: Struvite.Recovery Facility 16580 SW 85 Avenue — Tigard, OR Permit No.: BUP2008 -00290 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following itern(s) per our inspection reports only: Reinforced Concrete Installation of Adhesive Anchors Structural Welding All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. eith R. Gauvin Project Manager KRG /rc - cc: Clean Water .Services (Durham) — Tim Rondeau City of Tigard Building Division CH2M Hill (Corvallis) — Alex Firth Stettler Supply Company — Matt Rasch