Loading...
Correspondence 6,.,02,40_,,, C LiveWell: 300 6 Ave., Pittsburgh PA 15222, (412)338 -8975 fax (412) 338 -8878 -^ CEIVFD E Date 09/20/10 SEP 2 2 2 010 City of Tigard BUILDING DIVISION Plan Review # BUP2010 -00189 GNC @ Washington Square To: Mr. Dan Nelson As per your letter dated 09/02/10, the following changes have been made to our plans. 1. Calculations and construction details, (including seismic bracing details for no full height partitions are attached. 2. Calculations for construction details for the soffits and storefront construction are attached. 3. Cut sheets for steel storage racks to comply with the design requirements of ASCE7 are attached. 4. Cost estimate is attached. If you have any questions please call me a -12- 338 -8975. Fax 412- 338 -8878 cerel , Robert Dobrowsky GNC Sr. Permit Expeditor L i' 1 City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 September 2, 2010 Post -it® Fax Note 7671 Date (paes Ton„�T From � �7 LLJJ M Co./Dep � 1 Co. RE: TENANT IMPR( Phone # � Phone # Fax #4Z 8878 Fax # T I GARD Project Information Building Permit: BUP2010 -00189 Construction Type: 2 -B Address: 9416 SW Washington Sq. Occupancy Type: M Area: 2670 Sq. Ft. Stories: 1 Name: GNC Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls and ceilings. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 2) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 3) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). 4) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment, flooring, ceilings and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 I i Respectfully, IW Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard - or.gov TRANSMISSION VERIFICATION REPORT TIME : 08/17/2010 08:13 NAME : CITY OF TIGARD FAX : 5035981960 TEL : 5037182449 SER.# : BROH7J690762 DATE,TIME 08/17 08:12 FAX NO. /NAME 14123388878 DURATION 00:00:14 PAGE(S) 01 RESULT OK MODE STANDARD ECM City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 Phone: 503 -639 -4171 TIGARD1 FAX 'TANSNITI'AL Date August 17, 2010 Number of pages including covcr sheet 1 To: Bob D. Froni: Brande&Taggart Co: General Nutrition Co: City of Tigard Fax #: 412- 338 -8878 Fax #: 503- 59$ -1 96Q Pb. #: 503-718,2439 SUBJECT: GNC plan review fees MESSAGE: Hello Bob, The fees requited to begin plan review are as follows: $1,700.37 (plan review) $1,046.38 (Fire & Life Safety plan $2,746.75 City of Tigard 13125 SW Hall Blvd. Tigard, OR 97223 • i Phone: 503 - 639 -4171 T I GARD FAX TRANSMITTAL Date August 17, 2010 Number of pages including cover sheet 1 To: Bob D. From: Branden Taggart Co: General Nutrition Co: City of Tigard Fax #: 412 - 338 - 8878 Fax #: 503 - 598 - 1960 Ph #: 503 718 - 2439 SUBJECT: GNC plan review fees MESSAGE: Hello Bob, The fees required to begin plan review are as follows: $1,700.37 (plan review) $1,046.38 (Fire & Life Safety plan review) $2,746.75 Thanks, Branden I: \ Building \Dorms \Fay Transmittal- "1'.doc 1/18/07 Project Cost Estimator �e,,..ccl .�� ECEIED Site Number: 12 Project Manager: Joe Karafa Footage: 2,670 S E P 2 2 2010 Site Name: Washington Sqaure Mall - "A" Format Location: Mall Length: 84 City: Portland Category: New Width: 30 CITY OF TIGARD State: Oregon Space Condition: As -Is Exit Lights: 2 BUILDING DIVISION Country: United States of America Duration: 6 Factor: 25% Pre - Construction Construction Design 56,875.00 Storefront 530,450.00 2 Architect or Engineer 51,500.00 J❑ First Storefront 513,500.00 ❑Q Site Survey 51,700.00 ❑ Second Storefront 50.00 ❑J HVAC Survey $175.00 ❑e Barricade 52,850.00 ❑e Permit Expeditor 51,200.00 2 Bulkhead 53,600.00 ❑o Permits 41,500.00 2 Glass $10,200.00 ❑o CADD Time 4800.00 ❑ Storefront Drywall $0.00 12 Storefront Sign 5300.00 Signage 58,000.00 ❑ Storefront Tile 50.00 ❑d First Storefront Sign 58,000.00 Walls $2,000.00 ❑ Second Storefront Sign 50.00 ❑ Awning $0.00 ❑ Demising Wall Studs $0.00 ❑ Blade Sign 50.00 2 Demising Wall Drywall and Finishing 51,000.00 ❑ Pylon Sign 50.00 2 Stockroom Wall 51,000.00 Fixtures $65,000.00 Ceiling 59,345.00 ❑ Reface Package 50.00 ❑ Existing Ceiling Repadding 50.00 Q Full Fixtures Package 465,000.00 2 New Ceiling $9,345.00 Lighting Materials $20,000.00 HVAC 519,321.43 ❑ Accent Lighting Package 50.00 ❑ Duct Work 40.00 ❑J Full Lighting Package 520,000.00 2 HVAC 519,071.43 ,.❑ Ughtstat 5250.00 Flooring Materials $3,204.00 Fire Supression $10,900.00 2 Flooring Tile 53,204.00 ❑ Storefront Tile Materials 50.00 ❑✓ Fire Alarm 55,500.00 2 Existing Sprinklers Modification 55,400.00 Miscellaneous 532,928.00 ❑ New Sprinklers 50.00 2 Alpha- Omega. 51,657.00 Flooring $20,525.00 2 Baw Plastics $5,000.00 2 First Grille 43,175.00 ❑ Concrete Slab $0.00 ❑ Second Grille 50.00 2 Floor Preparation 52,002.50 Q Medeco Lock $421.00 Z Floorcuts 5500.00 e❑ Trane 52,675.00 lk Sales Area Flooring 515,018.75 ❑ Freezer and Ice Machine 40.00 2 Stockroom Flooring $3,003.75 2 Cooler 56,000.00 2 Graphics 514,000.00 Demolition $5,600.00 ❑ Minor Demolition 50.00 Pre - Construction Sub - Total $136,007.00 2 Partial Demolition 55,000.00 ❑ Full Demolition 40.00 © Dumptster $600.00 Friday, May 21, 2010 Page 1 of 2 • r/.. t WELL 2010 Fnoay, Mey 21, 2010 Page 2 of 2 1 .. ,11 ._. ti 1