Loading...
Correspondence (706) DEC 05 '00 12 :02PM VLMK ENGINEERS P.1 /1 _ _ VLMK Consulting Engineers PRINCIPALS • �– — 3933 SW KELLY AVENUE / PORTLAND, OREGON 97201.4393 ALFRED N. VAN DOMEI.EN, RE JAMES E. KNALIF, RE. _ — — (503) 222 -4453 / FAX (503) 248.9263 / email: vlmk ©vlmk.com GREGORY J. BLEFGEN, PE. HAVUN G. KEMP, P.E. f o JOHN 7 BROOKS 6.01 / Z- ASSOCIATES Darrel Watkins j KEVIN M. KAPLAN, P.E. City of Tigard FILE 13125 SW Hall Blvd. Tigard, OR 97223 -8199 RECEIVED Project: Tigard Corporate Center Parking Garage DEC - 6 2000 12125 SW 69th Ave., Tigard, OR. Permit No.: BUP2000 -00112 COMMUNITY DEVELOPMENT p Subject: Structural Observation Final Summary Letter � / Dear Mr. Watkins l/ This is to certify that in accordance with Section 1702 of the 1998 Oregon Structural Specialty Code (OSSC), VLMK Consulting Engineers has performed Structural Observations on the above noted project as follows: 1. Footing reinforcing 2. Wall reinforcing 3. Post- tension slab tendons and mild reinforcing 4. Misc. Steel Observations were performed on these elements and reports of observations were submitted to the City of Tigard Building Department. In addition, VLMK has also reviewed the applicable Special Inspection reports as submitted by Carlson Testing. To the best of our knowledge, the work on this project has been performed in accordance with the approved plans and specifications, including any supplemental instructions provided by VLMK. If you have any additional questions regarding the Structural Observations performed on this project, please do not hesitate to contact me at (503) 222.4453. Sincerely, . t PRIG , VLMK Consulting Engineers �, a i(4104e/ „or 8 482 Amy, • James E. Knauf, P.E. 0111140N Principal / ,� 88 �� cc: Bob Burns - Specht Development 6-0 6. ?e51- Mike Gorman - LRS Architects John Lawrence - Baugh Construction 00 `` � Chris Hartson - Baugh Construction c C E aft •l red7#.3 *- 31 ± NVLMK\SYS USERS \TRENT199277 TCC Parking Garagffinalaummaryleaer.Doc MEMBER