Loading...
Report (612) P 5 - vG Z-3 ?--- rA pea mm isk July 6, 1999 CM' OF 1G� Carlson Testing Inc. OREG PO Box 23814 Tigard, Oregon 97223 PERMIT NO: BUP # 1999 - 00232/233/234 OWNER: Specht Properties PROJECT ADDRESS: 12123 SW 69 ' PROJECT DESCRIPTION: Office Shell TYPES OF SPECIAL INSPECTION: As per Program attached The owner has notified us that he/she will retain your services to perform Special Inspections in accordance with the provisions of the State Building Code, permit documents and special inspection requirements. The owner or the owner's agent must also confirm with you that they have authorized you to do the special inspection work. As the regulatory agency, the City requires that you do the following: 1. Submit copies of all inspection reports promptly to the building division, Architect, engineer, and the contractor. 2. Maintain one copy of each field report at the job site. 3. Submit a final report at the completion of each category of work that you Inspect. (See UBC Appendix Chapter 13 for soils special inspection final report requirements.) If you fail to comply with the above requirements, there may be cause for the City to revoke your authority as special inspector for this job. Should you have any questions, please call me at (503) 639 -4171 X 392. Sincerely, 'diael-g R o ert D. Poskin, C.B.O. Senior Plans Examiner 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 A CITY OF TIGARD A Program for Inspection Services and/or Material Testing Date: C 1 t1 194 ,19 94 — eoz3Z City of Tigard: Plan Ck. No. Bup No. 44' 'hi "5 Sit No. Project Title: Ttr ) t1Lp. C-s—rrs= Address 1- 2 -123 sw `q- C aLbtac 4 "II' a. Architect of Record L2-5 Aar-J, ifs Ph. 22t — t 2 - address: 11 24 sc.) SAc.sen 4 too 442 .r3 Ors_ • Structural Engineer of Record: ut-mk Ph. 2.2z A-457 address: 3133 St.- Kej - e��►- -» Geo- Technical Engineer of Record: Ph. address: Provide the following information for the testing agency chosen to provide inspection senzces and/or testing. - - } Testing Agency: ( , Q k ' i ' T h l Ph. (o?-i - 10 0 Fax. (004- ail SA address ' P o 1 3 0 ) c 2 14 1 I i d , 012 qri - z.3 Geo- Technical Agency: Ph. Fax. address The owner certifies that the above noted Agency has been employed to conduct the spec%; inspec ' ns or observations required herein. z 7 l � Signature of Owner one No. e • to T ) lAil .�/l $ v nv t e, h w Print name Company acde The following is a list of special inspection and/or services required by the 1996 Oregon Structural Specialty Code and Tigard's Municipal Code 14.06.010 through 14.06.040. The special inspections and/or testing services required for this project to be provided by the Testing Agency, Structural Engineer or Geo-Technical Engineer of Record are as follows: • Special Inspectors for the Testing Agency shall be qualified, to the satisfaction of the Building Official, for inspections of the particular type of construction or operation. • Special inspectors shall observe the work assigned herein for conformance with the approved plans and specifications and, submit copies of all inspection reports and, a final signed report in accordance with OSSC, Section 1701.3 to the building official. • Structural Inspections Services and Material Testing Category Description of 5er ices Re4 By .Yes / 1�1q 1. Concrete. OSSC, Section 1701.5.1 and Section 1903, 1904 and 1905 S Review concrete mix designs �( b Inspect the placing of reinforced concrete. yL C Observe the taking of test specimens. d. 2. Bolts Installed in concrete. OSSC, Section 1701.5.2 Prior to and during the placement of concrete around bolts when stresses a ' permitted by section 1925 are utilized. b. 0.1 11SF Je +�¢A �. 3. Special Moment - resisting Frame. OSSC, Section 1701.5.3 and section 1921.9 a Provide continuous inspection of the placement of reinforcing steel and concrete, and submit a certificate indicating compliance. b. 4. Reinforcing Steel and Pre- Stressing Steel Tendons. OSSC, Section 1701.5.4 8 Inspection of reinforcing steel and pre stressing tendons before stressing and grouting of tendons in pre stressed concrete b Observe and record results of all tendon stressing in pre stressed concrete. C Observe grouting of all tendons in pre stressed concrete d. 5. Structural Welding. OSSC, Section 1701.5.5 and Section 1703 a Observe the welding of any member or connection designed to resist loads and forces required by the OSSC. b Visually inspect floor and roof deck welding. C. Visually inspect welded studs when used for structural diaphragm or composite systems. (shear walls) d Visually inspect welding of stairs and railing systems. e Check certification of welders doing work on site. f Visually inspect the welding of studs and joist. (part of a.) Observe the welding of special moment - resisting steel frames, and g' conduct non -destructive testing required by OSSC, section 1703. h Observe the welding of reinforcing steel. 1. Category hescrtption of Services eq :_ yr Y es /:Na 6. High Strength Bolting. OSSC, Section 1701.5.6 The installation of A325 and A490 bolts shall be in accordance with Chapter 22,Division IV a. Verify bolt types, diameter and installation Periodic inspection shall be in accordance with OSSC, Section 1701.6 b. c . 7. Structural Masonry. OSSC, Section 1701.5.7 and 2105 Other than fully grouted open -end hollow -unit masonry. a. Visually verify placement of masonry units, reinforcing steel, inspection of grout spaces and taking any required prisim or test specimens, and be present during all grouting operations. For fuI4 grouted open -end hollow -unit masonry . b Visually verify the start of laying units, placement of reinforcing steel, taking prisms or test specimens, inspect grout spaces and be present during all grouting operations. C. Verify that grout and mortar materials and proportions are in accordance with OSSC, Table 21-A for Mortar and 21 -B for grout. d. e . 8. Spray - applied fireproofing. OSSC, Section 1701.5.10 a. Visually verify the substrate condition, thickness determination and confirm density report are all in accordance with UBC, Standard 7-6 b. 9. Piling, Drilled Piers and Caissons. OSSC, Section 1701.5.11 a. Present during driving of piles and subsequent testing, b. Inspect the construction of cast -in -place drilled piles or caissons. C. Observe placing of reinforced concrete. d. Observe placement of reinforcement steel e . 10. Shotcrete. OSSC, Section 1701.5.12 a. Observe taking of test specimens b. Observe the placement of all shotcrete used for structural members. Submit a statement of compliance with plans and specifications. C. Visual examination of completed shotcrete work. Submit a report of the three test specimens required. d. SOILS Inspection Services and Materials Testing Special Grading, excavation and filling Category Descr,pton af'ervaces • Yes /Na 1. Footings adjacent to slopes steeper than 33 % OSSC, Section 1806.4 a. Confirm building footings are properly set back from descending slope b t. Sub cipmpae.&4O4 Z. >�omr►�J� Foe",00tz, A..D 12..ev cbdze- erne -kr 2. Grading OSSC, Section 3309 a• Regular grading [less than 5,000 cu. yds. but considered unusual] * * Requirements for engineered grading apply. b. Engineered grading [exceeds 5,000 cu. yds.] • Submit: 1. Geo- technical engineers report and, 2. a engineering geology report. 3. an as -built grading plan and, 4. a fmal report prepared by the soils engineer and, 5. the final report prepared by the geologist. FiPmrnwl6r JA -& 4 -D Cmmr014410.4 3. Fills OSSC, Section 3313 1 � a• Preparation of ground. for fill on slopes exceeding 1 to 5 (20 %) Includes benching and proper termination at the toe of the slope b. Acceptance of fill materials C• Compaction of fill material to minimum 90% of maximum density. 13125 SW Hall Blvd., Tigard, OR 97223 [503] 639 -4172 FAX [503] 684 -7297 I:\BLDGISPLINSP I.DOC