Loading...
Plans (574) JOB NAME: Tigard Triangle Building CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR Copt BUILDING DEPARTMENT DATE: August 8, 2006 13125 HALL BOULEVARD MCE Project No.: 060593 TIGARD, OR 97223 SHEET 1 OF 4 Tigard Building Permit BUP2006 -00206 STRUCTURAL PLAN REVIEW #3 Plans Dated 7/21/06; Calculations Dated 7/6106 Corr. Item Page No. Comments Code Section Made No. 7128/06 1 Sht. A1.3 Submit calculation including seismic for trash 106.1.1 Detail 9/A1.3 enclosure walls. Deferred 2 Sht. A1.2.2 Submit calculations and details for canopy 106.1.1 Submittal Detail 1/A1.2.2 including wind. Deferred 3 Sht. A4.2 Submit calculations and details for glazed 106.1.1 Submittal Detail 1/A4.2 storefront system.' Deferred 4 Sht. M.3 Submit calculations and details for glazed 106.1.1 submtal Detail 1/A4.3 storefront system. 7/28/06 5 Sht. S1.0 Seismic criteria, site class 'C' to be verified by 106.1.1 soils report. 8/8/06 6 Sht. S1.0 Submit when or how often for type of work 1704 Special Inspection listed as periodic. Program 7/28/06 7 SM. S1.0 Special Submit method of tightening for high strength 1704 Inspection Program bolting. 7/28/06 8 Sht. S2.1.1 Submit calculations for foundation retaining 106.1.1 Detail 1/S2.1.1 walls. 7/28/06 9 Sht. S2.1.2 Submit calculations for foundation retaining 106.1.1 Detail 1/S2.1.2 walls. 7/28/06 10 Sht. S2.2.1 Submit calculations and details for length of 106.1.1 Detail 1/S2.2.1 W16x31 @ grids 3.0 between B.5 and C, W16x26 grids 2.7 between A and A.5, etc. 7/28/06 11 Sht. S2.2.1 Submit calculations and details for 106.1.1 Detail 1/S2.2.1 connections of 40 VG6N, rolled HSS 10x4x1/4 and connections and HSS 5x5x3/16 connections. 7/28/06 12 Sht. S2.2.1 Submit calculations and details for framing 106.1.1 Detail 1/S2.2.1 grids 2 to -2 from D to E. 7/28/06 13 Sht. S2.2.1 Submit calculations for expansion and 106.1.1 Detail 1/S2.2.1 shrinkage on grid -2.0 for full length member. 7/28/06 14 Sht. S2.2.2 Clarify detail 14/S5.1 a@ grids -3.3 and B.5 106.1.1 Detail 1/S2.2.2 and Detail 14/S5.3 @ grids -31 and C. JOB NAME: Tigard Triangle Building CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR BUILDING DEPARTMENT DATE: August 8, 2006 13125 HALL BOULEVARD MCE Project No.: 060593 TIGARD, OR 97223 SHEET 2 OF 4 Tigard Building Permit BUP2006 -00206 STRUCTURAL PLAN REVIEW #3 Plans Dated 7121106; Calculations Dated 716106 Corr. Item Page No. Comments Code Section Made No. 7/28/06 15 Sht. S2.2.2 Submit calculations and detail for connection 106.1.1 Detail 1/S2.2.2 @ grids -3.0 and C.7. 7/28/06 16 Sht. 2.3.1 Clarify detail 9/S5.4 © grids 3.2 and C and 106.1.1 Detail 1/S2.3.1 detail 14/S5.1 © grids -2.0 and E. 7/28/06 17 Sht 2.3.1 and Clarify snow load at mechanical screen. 106.1.1 Sht. 2.3.2 7/28/06 18 Sht. S3.2 Submit calculations for bent plate 1/8. 106.1.1 Detail 17/S3.2 8/8/06 19 Sht. S3.2 Submit Detail 8/S5.5 106.1.1 Details 17/S3.2 7/28/06 20 Sht. S4.1 Clarify difference between reinforcing steel 106.1.1 Detail 9/S4.1 per calculations page CF 53 and noted on detail. 7/28/06 21 Sht. S4.1 Clarify 4 inches of weld on 3'/: inch plate. 106.1.1 Detail 13/S4.1 7/28/06 22 Sht. S4.1 Submit calculations for edge distance of 106.1.1 Detail 15/S4.1 embedded anchors and reinforcing on bottom plate. 7/28/06 23 Sht. S5.1 Clarify use of 6 inch wide face plate at 8° 106.1.1 Detail 3/S5.1 HSS or larger. 7/28/06 24 Sht. S5.1 Submit calculations and details for torsion 106.1.1 Detail 6/85.1 effects on concrete panel. 7/28/06 25 Sht. S5.2 Submit calculations and details for torsion 106.1.1 Detail 2/S5.2 effects on concrete panel. 7/28/06 26 Sht. S5.2 Clarify use of 5 inch face plate at HSS 8x8. 106.1.1 Detail 5/S5.2 7/28/06 27 Sht. S5.2 Clarify 3/8x4x1-0° plate and typical weld at 106.1.1 Detail 16/S5.2 each end. 8/8/06 28 Sht. S5.3 Submit calculations and details for weld on 106.1.1 Details 1/S5.3 and knife plate to embedded plate. 3/S5.3 • JOB NAME: Tigard Triangle Building CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR BUILDING DEPARTMENT DATE: August 8, 2006 13125 HALL BOULEVARD MCE Project No.: 060593 TIGARD, OR 97223 SHEET 3 OF 4 Tigard Building Permit BUP2006 -00206 STRUCTURAL PLAN REVIEW #3 Plans Dated 7/21/06; Calculations Dated 716/06 Corr. Item Page No. Comments Code Section Made No. 7/28/06 29 Sht. S5.3 Submit calculations and details for bearing 106.1.1 Detail 2/S5.3 plate and vertical plates with welds. 7128/06 30 Sht. S5.3 Submit calculations for headed stud anchor 106.1.1 Detail 4/S5.3 combination 7/28/06 31 Sht. S5.3 Submit calculations for headed 106.1.1 Detail 5/S5.3 stud/reinforcing steel anchors. 7/28/06 32 Sht. S5.3 Submit calculations and details for 106.1.1 Detail 12/S5.3 mechanical screen including height. 8/8/06 33 Sht. S5.3 Submit calculations and details for weld on 106.1.1 Detail 18/S5.3 knife plate to embedded plate. 7/28/06 34 Sht. S5.3 Submit calculations and details for embedded 106.1.1 Detail 19/S5.3 plate. 7/28/06 35 Sht. S5.3 Clarify weld at W12x26. 106.1.1 Detail 20/S5.3 7/28/06 36 Calculations Submit calculations for 10 PSF snow load 106.1.1 RFI with mechanical screen. 7/28/06 37 Calculations L1, L4, Submit calculations for lateral with brick load 106.1.1 P56, P57, P64 and and load distribution which agree with applied P71 Toads. 38 Special Inspection Special inspection is required for concrete, 1704 welding, reinforcing steel, bolting, welded 1705 studs, embed plates, bolts in concrete, 1707 masonry, soils, structural steel fabrication 1708 and erection, adhesive and expansion anchor installation. 39 Structural Observation Structural observation is required for 1709 concrete foundation, retaining walls, reinforcing steel in tilt -up panels, before concrete placement at second floor, placement of floor joist and girders and roof deck welding. 40 General (Shop Submit one set of reinforcing steel shop Drawings) drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. JOB NAME: Tigard Triangle Building CITY OF TIGARD JOB ADDRESS: 11850 SW 67th, Tigard, OR BUILDING DEPARTMENT DATE: August 8, 2006 13125 HALL BOULEVARD MCE Project No.: 060593 TIGARD, OR 97223 SHEET 4 OF 4 Tigard Building Permit BUP2006 -00206 STRUCTURAL PLAN REVIEW #3 Plans Dated 7/21106; Calculations Dated 716/06 Corr. Item Page No. Comments Code Section Made No. 41 General Submit one set of steel open web joist and (Deferred Submittal girders shop drawings, which have been Shop Drawings) reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 42 General Submit one set of light gage metal (Shop Drawings) framing shop drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 43 General Submit one set of steel decking shop (Deferred Submittal drawings, which have been reviewed and Shop Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 44 General Submit one set of stair framing shop (Shop Drawings) drawings, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 45 General Submit one set of miscellaneous steel shop (Deferred Submittal drawings, which have been reviewed and Shop Drawings) initialed by the project engineer, to be filed with the City of Tigard before placement. 46 General Submit one set of electrical and mechanical component anchorage, which have been reviewed and initialed by the project engineer, to be filed with the City of Tigard before placement. 47 General Approved resolution of the above items shall be incorporated into submittal plans before a permit will be issued. Submit four (4) sets of revised plans to the city of Tigard.