Loading...
Permit ` CITY OF TIGARD BUILDING PERMIT `x; COMMUNITY DEVELOPMENT Permit #: BUP2010 00080 s Date Issued: 06/25/2010 tt GARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Parcel: 1S1260000300 Jurisdiction: TIGARD Site address: 9771 SW WASHINGTON SQUARE DR D08 Subdivision: Lot: 0 Project: CCS Project Description: TI (2548 Sq Ft) Owner: FEES PPR WASHINGTON SQUARE LLC Description Date Amount 2235 FARADAY AVE STE #O Permit Fee - Additions, Alterations, 06/25/2010 $2,313.95 CARLSBAD, CA 92008 Demolition PHONE: Plan Review 04/20/2010 $915.17 Plan Review - Fire Life Safety 04/20/2010 $563.18 Plan Review 06/25/2010 $588.90 Contractor: Plan Review - Fire Life Safety 06/25/2010 $362.40 HORIZON RETAIL CONSTRUCTION 12% State Surcharge - Building 06/25/2010 $277.67 1500 HORIZON DR Metro Const. Excise Tax - Commercial 06/25/2010 $360.00 STURTEVANT, WI 53177 Use PHONE: 262 - 638 -6000 FAX: 262 -638 -6015 Specifics: Type of Use: COM Class of Work: ALT Dwelling Units: 0 Stories: 1 Height: 0 ft Bedrooms: 0 Bathrooms: 0 Value: $300,000 Floor Areas: Total Area: 0 Accessory Struct. 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $5,381.27 Required: Required Items and Reports (Conditions) Fire Sprinkler: Yes Parapet: Fire Alarm: Yes Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issu subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done i ccordance wi Reapproved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. TENTION: Oregon law re s u follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952- 01 -0010 through OAR 95 1 -01 0 may obtain a copy of the rules or direct questions to OUNC by calling 503.246.6699 or 1.800.332.2344. Iss d By: ° \ - Permittee Signature: • Call 503.639.4175 by 7:00 a.m. for an inspection that burin s day. This permit card shall be kept in a conspicuous place on the job site un • completion of the project. Approved plans are required on the job site at the time of a ch inspection. Building Permit Application RECEIVED • Commercial FOR OFFICE USE ONLY City of Tigard APR 1 5 2010 Received L i li Permit No4id /a -0008v Date /B � / Ay _ ° 13125 SW Hall Blvd.. Tigard. OR 97223 PIan Review I � /' ' .. Phone: 503.639.4171 Fax: 503.598.19 OF TIGARD Date /B I �(! Other Permit: TIGARD Inspection Line: 503.639 BUILDING DIVISION late ' ea.y ly: q � / M � 0 See Page 2 for Internet: www.tigard- or.gov �,� 1 ethod: A' of M Supplemental Information _ Ner r lu .stunt` TYPE OF WORK / ' EQU ED DATA: I- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees ' re based on the value of the work performed. X °I. Indicate the va (rounded to the nearest dollar) of all Addition /alteration /replacement El Other: equipment. maters.. s, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work incated on the application. 1:1 1- � r � 1 -and2- family dwelling Commercial /industrial ar a r ❑ Accessory building El Multi-family Number of bedrooms: ❑ Master builder ED Other: Number of bathrooms: tifl I JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: C' . ^jiivG. 4 G Q New dwelling area: square feet City /State /ZIP: 24 6\92 Garage /carport area: square feet Suite /bldg. /apt. no.:T Of) Project name: CC .of Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet Li ,�e��,� REQUIRED DATA: CONIMERCIAL -USE CHECKLIST E. Subdivision\J� 1xve� 1 VV�( Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no:: Indicate the value (rounded to the nearest dollar) of all equipment. materials. labor. overhead. and the profit for the DESCRIPTION OF WORK work indicated on this application. ML i(2 J • „cML.�! • • Valuation: � S ` 5 1 S . LE < � am �,,� ,� ' Existing building area: ,')square feet p � l � ffTENANT � ` New building area: square feet ❑ PROPERTY OWNER Number of stories: I ame: N \ L C Type of construction: Address: k \ 2 1) ,... 3 , k1t \ f c.r Occupancy groups: City /State /ZIP: `M20 Existing: M Phone: 242.) - i- 1,12� Fax: ( ) New: PAN CONTACT PERSON NOTICE Business nam XA,1_,PPLICANT i - l•�IL�S All contractors and subcontractors are required to be Contact name: licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: ` iQuD6--t_t, la_ jurisdiction in which work is being performed. If the City /State /ZIP: �'y 1T applicant is exempt from licensing. the following reasons ( " S a pp l y : Phone Ss(p.� 1/4.... i Fax: : (Zak = L " L � E-mail: "F4��� —(Zr \ N_ k_-r U c rvA/\ CONTRACTOR �" Business nanie: g am ^ p er , ------- „ _ ST & ,r 77 A) /jLC BUILDING PERMIT FEES* Address: ^ Y (Please refer to fee schedule) Structural plan review fee (or deposit): City /State / "LIP: Phone: ( ) ( ) FLS plan review fee (if applicable): Fax: CCB lic.: 9g , 8( Total fees due upon application: -s Amount received: `1� 8 Authorized sigi a re: " iLLA 1 This permit application expires if a permit is not obtained I within 180 days after it has been accepted as complete. ,7 Print name: ��"T Date: * Fee methodology set by Tri- County Building Industry Service Board. 1: \Building \Permits \BUP -COM PermitApp.doc 10/01/09 440- 46131'(11 /02 /COM /WEB) This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. BUILDING DIVISION T I G A R D TRANSMITTAL LETTER TO: , � /S DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUN 10 2010 FROM: L %- , -G !icy CITY OF TIGARD COMPANY: f?T r I (1 l I mo, t � BUILDING DIVISION PHONE: I _ Wv"5 5(9 r( 9 I By. RE: 2 22) I (/�ci5 1 / C A rmi C e umber (Project name o subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. a _ Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: FOR FF CE USE ONLY Routed to Permit Techn l0 Date: 1 - 1 i c j Initials: �r Fees Due: El Yes LSNo Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: 1:\Building\ Forms \TransmittalLetter- Revisions.doc 4/4/07 This form is recognized by most Building Departments in the Tri- County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. BUILDING DIVISION T I G A R D TRANSMITTAL LETTER TO: OCAAJ DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED JUN 2 3 2 010 CITY OF TIGARD FROM: Ore (� ‘ ^ I BUILDING DIVISION COMPANY: 6) ✓✓ P o-Fezc)No 1 CN ,�nlee r PHONE: --' By: RE: (JJ-SS 11'v llie r / � i a.C ZX XJ 1 J C S rte ddress / ( it/ ase Num er) (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: 1 Description: Copies: Description: 0 Additional set(s) of plans. Revisions: c�/ 1O1_ Cross section(s) and details. Wall bracing and /or lateral analysis. Floor /roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): REMARKS: FOR qFFIcE USE ONLY Routed to Permit Technician: Date: (, f124110 Initials: 40 ' Fees Due: ❑ Yes [a'No Fee Description: Amount P ue: Special Instructions: Reprint Permit (per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: 1:\Building\ Forms \TransmittalLetter- Revisions.doc 4/4/07 April 28, 2010 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2010 -00080 Construction Type: 2 -B Address: 9771 SW Washington Sq. ' Occupancy Type: M Area: 2548 Sq. Ft. Stories: 1 Name: CCS Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code Interpretations dated 4/20/2007. (see interpretations {structural} at www.bcd.oregon.gov) 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). 5) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, - 1 , Acto kkif-Yd Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard- or.gov RETAIL PERMIT SERVICES, INC. A National Permit Service Company June 9, 2010 Contact / Applicant DAN NELSON — PLAN REVIEW Kent Fahey City of Tigard 800 - 556 - 8641 BUILDING DEPARTMENT Fax 281 579 - 2227 503 - 639 - 4171 rtlpermits@yahoo.com RE: CCS (CORRECTIONS) WASHINGTON SQUARE PERMIT #BUP 2010 -00080 Dan, Enclosed are 2 COPIES of the REVISED SHEETS, a copy of the PLAN REVIEW COMMENTS and a RESPONSE LETTER, from the Architect. Please REVIEW and APPROVE, so we can obtain a BUILDING PERMIT. The GC will be in to pick up and pay for the Permit, when approved. If you have any questions /problems, please call me at 800 -556 -8641. Thank you. Kent Fahey 3019 Hollinwell Drive • Katy, Texas 77450 • Tel: (281) 579 -2226 • Fax: (281) 579 -2227 June 7, 2010 RE: TENANT IMPROVEMENT – REVISION SUMMARY #1 Project Information Building Permit: BUP2010 -00080 Construction Type: 2 -B Address: 9771 SW Washington Sq. Occupancy Type: M Area: 2548 Sq. Ft. Stories: 1 Name: CCS Sprinklers: Yes Attn: Dan Nelson Senior Plans Examiner (503) 718 -2436 dann tigard- or.gov Attached you will find revised plans that have been submitted to show a slight change at the storefront entry. All the architectural drawings have been revised to show a smaller grille opening than originally submitted. These architectural drawings are for reference & coordination purposes only. Also attached are structural drawings (51, S2, & S3), along with 8'/2" x 11" structural calculations as per your previous review comments. Please reference the separate structural revision summary for clarification on how these revised structural drawings have addressed all of your review comments. Likewise, revised shelving drawings/ calc's have been submitted. These were previously submitted under a separate permit. Item #4 of your comments addressed these drawings/ calc's. Should you need anything else – just let us know. We hope that this will satisfy all requirements & comments. Thanks for all your help! Sincerely, t —i r i 5 James M. Hamill, AIA (Architects of Record) • April 28, 2010 RE: TENANT IMPROVEMENT Project Information Building Permit: BUP2010 -00080 Construction Type: 2 -B Address: 9771 SW Washington Sq. Occupancy Type: M Area: 2548 Sq. Ft. Stories: 1 Name: CCS Sprinklers: Yes The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; 2007 Oregon Fire Code. Please respond to conditions below. 1) Construction requirements for suspended ceiling systems are found in the Oregon Building Codes Division website under Statewide Code Interpretations dated 4/20/2007. (see interpretations {structural} at www.bcd.oregon.gov) 2) Provide calculations and construction details (including seismic bracing details for non full height partitions) for all walls. Note: The roof structure may be approximately 30' above the finished floor. OSSC 106.1 3) Please provide calculations and construction details for the soffits and storefront construction. Every structure, and portion thereof, including non structural components that are permanently attached to structures and their supports and attachments, shall be designed and constructed to resist the effects of earthquake motions in accordance with ASCE 7 as modified by Section 1613.7. The seismic design category for a structure is permitted to be determined in accordance with Section 1613 or ASCE 7. OSSC 1613.1 4) Please submit plans and calculations for steel storage racks that comply with the design requirements of ASCE7 (15.5.3). 5) Please provide a permit valuation based on the total work being performed. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and any fixture attached to the building. If, in the opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. When responding, provide an itemized letter stating in what way each numbered issue has been addressed in the revision. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. `. Respectfully, Dan Nelson Senior Plans Examiner (503) 718 -2436 dann @tigard - or.gov RETAIL PERMIT SERVICES, INC. S A National Permit Service Company Contact / Applicant Kent Fahey April 14, 2010 800 556 - 8641 Fax 281- 579 - 2227 r tlpermits@yaho o.com DAN NELSON — PLAN REVIEW City of Tigard BUILDING DEPARTMENT 503- 639 -4171 RECEIVE I t APR 1 5 2010 RE: CCS (retail store) CITY OFTIGARD WASHINGTON SQUARE BUILDING DIVISION Dan, Enclosed are 2 SETS of plans, a check for the PLAN REVIEW FEE and a BUILDING PERMIT APPLICATION. Please review and approve, so we can obtain a Building Permit. The GC will pick up and pay for permit, when ready to be issued. If you have any questions /problems, please call me at 800 -556 -8641. Thank you. Kent Fahey 3019 Hollinwell Drive • Katy, Texas 77450 • Tel: (281) 579 -2226 • Fax: (281) 579 -2227 COMcheck Software Version 3.6.1 Interior Lighting Compliance CEIvE)) Certificate APR 1 5 ?010 2006 IECC CITY OF TIGARD BUILDING DIVISION Section 1: Project Information Project Type: Addition Project Title : CCS Construction Site: Owner /Agent: Designer /Contractor: WASHINGTON SQUARE Footlocker, Inc. Don Penn, P.E. 9585 SW WASHINGTON SQUARE #D08 112 West 34 th Street 635 Westport Parkway PORTLAND, OR 97223 Store Planning #300 New York, NY 10120 Grapevine, TX 76051 212- 720 -4612 817 -410 -2858 Section 2: General Information Building Use Description by: Activity Type Activity Type(sl Floor Area Retail 2548 Section 3: Requirements Checklist Interior Lighting: • 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 3822 3469 YES Controls, Switching, and Wiring: • 2. Independent controls for each space (switch /occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. o 3. Master switch at entry to hotel /motel guest room. D 4. Individual dwelling units separately metered. • 5. Each space provided with a manual control to provide uniform light reduction by at least 50 %. Exceptions: Only one luminaire in space; An occupant- sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Watts / sq.ft. • 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. ❑ 7. Photocell /astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. • 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high- frequency ballasts; Luminaires on emergency circuits or with no available pair. Project Title: CCS Report date: 03/31/10 Data filename: C: \Documents and Settings\CCS\857\857---1.CCK.cck Page 1 of 3 Section 4: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The pro..sed lightin system has been designed to meet the 2006 IECC requirements in COMcheck Version 3.6.1 and to comply with the man ato req ements in the Requirements Checklist. n Penn, '' APR 0 7 2010 Name - Title Signature Date Project Notes: Tenant finish out (interiors only) of new lease space. Building shell by Landlord under previous permit. RED PROFto ca � O NE F,9 s / 0_ t y • PE r ; _, ;11 1 10 p O OREGON 2 + � 1/211 0 l Q� � �� JAPfl .- lc.v Project Title: CCS Report date: 03/31/10 Data filename: C: \Documents and Settings \CCS \857 \857-- 1.CCK.cck Page 2 of 3 COMcheck Software Version 3.6.1 Interior Lighting Application Worksheet 2006 IECC Section 1: Allowed Lighting Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Retail 2548 1.5 3822 Total Allowed Watts = 3822 Section 2: Proposed Lighting Power Calculation A B C D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. Retail (2548 sq.ft ) ... HID 1: J6: DOWNLIGHT / Metal Halide 25W / Standard 1 6 25 150 HID 2: THC: TRACK HEAD / Metal Halide 25W1 Standard 1 77 25 1925 Linear Fluorescent 3: F1-4: 4' FLUORESCENT STRIP / 48" T8 32W / Electronic 1 11 32 352 Incandescent 1: EF: TOILET FAN /LIGHT / Incandescent 60W 1 1 60 60 Linear Fluorescent 4: F1: 8' FLUORESCENT STRIP / 48" T8 32W / Electronic 2 1 64 64 Compact Fluorescent 1: A16: SALES PENDANT / Triple 4 -pin 42W / Electronic 1 11 42 462 Incandescent 2: ST4: FITTING RM. FIXTURE / Incandescent 100W 1 2 100 200 Linear Fluorescent 5: F3: INDUSTRIAL FLUOR. / 48" T8 32W / Electronic 2 4 64 256 Total Proposed Watts = 3469 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 3822 Total Proposed Watts = 3469 Project Compliance = 353 InteriorLightinglyASESp esigr2 %betterthancode ::.,,. • Project Title: CCS Report date: 03/31/10 Data filename: C: \Documents and Settings \CCS \857\857-- 1.CCK.cck Page 3 of 3 .: COMcheck Software Version 3.6.1 ; CEIVED Interior Lighting Compliance APR 15 2010 Certificate clTY OF TIGARD BUILDING DIVISION 2006 IECC Section 1: Project Information Project Type: Addition Project Title : CCS Construction Site: Owner /Agent: Designer /Contractor: WASHINGTON SQUARE Footlocker, Inc. Don Penn, P.E. 9585 SW WASHINGTON SQUARE #D08 112 West 34 th Street 635 Westport Parkway PORTLAND, OR 97223 Store Planning #300 New York, NY 10120 Grapevine, TX 76051 212 - 720 -4612 817 -410 -2858 Section 2: General Information Building Use Description by: Activity Type Activity Tyae(sl Floor Area Retail 2548 Section 3: Requirements Checklist Interior Lighting: Li 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 3822 3469 YES Controls, Switching, and Wiring: o 2. Independent controls for each space (switch /occupancy sensor). Exceptions: Areas designated as security or emergency areas that must be continuously illuminated. Lighting in stairways or corridors that are elements of the means of egress. • 3. Master switch at entry to hotel /motel guest room. • 4. Individual dwelling units separately metered. Li 5. Each space provided with a manual control to provide uniform light reduction by at least 50 %. Exceptions: Only one luminaire in space; An occupant- sensing device controls the area; The area is a corridor, storeroom, restroom, public lobby or sleeping unit. Areas that use less than 0.6 Watts /sq.ft. o 6. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. • 7. Photocell /astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. o 8. Tandem wired one -lamp and three -lamp ballasted luminaires (No single -lamp ballasts). Exceptions: Electronic high- frequency ballasts; Luminaires on emergency circuits or with no available pair. Project Title: CCS Report date: 03/31/10 Data filename: C: \Documents and Settings \CCS \857 \857-- 1.CCK.cck Page 1 of 3 Section 4: Compliance Statement • Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed ighting s tem has been designed to meet the 2006 IECC requirements in COMcheck Version 3.6.1 and to comply with the mandato re ire nts in the Requirements Checklist. ion Penn, RE. APR 0 7 2010 Name - Title Signature Date Project Notes: Tenant finish out (interiors only) of new lease space. Building shell by Landlord under previous permit. ? �i F9 s oy 41C. PE V O OREGON 2 O 4' 0 7/2119 1 Q 4, �' JAMES 1 It ° l o ) Project Title: CCS Report date: 03/31/10 Data filename: C: \Documents and Settings \CCS \857 \857-- 1.CCK.cck Page 2 of 3 w " f COMcheck Software Version 3.6.1 ^ N Interior Lighting Application Worksheet 2006 IECC Section 1: Allowed Lighting Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts / ft2 (B x C) Retail 2548 1.5 3822 Total Allowed Watts = 3822 Section 2: Proposed Lighting Power Calculation A BC D E Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast Lamps/ # of Fixture (C X D) Fixture Fixtures Watt. HID 1: J6: DOWNLIGHT / Metal Halide 25W / Standard 1 6 25 150 HID 2: THC: TRACK HEAD / Metal Halide 25W I Standard 1 77 25 1925 Linear Fluorescent 3: F1-4: 4' FLUORESCENT STRIP / 48" T8 32W / Electronic 1 11 32 352 Incandescent 1: EF: TOILET FAN /LIGHT / Incandescent 60W 1 1 60 60 Linear Fluorescent 4: F1: 8' FLUORESCENT STRIP / 48" T8 32W / Electronic 2 1 64 64 Compact Fluorescent 1: A16: SALES PENDANT / Triple 4 -pin 42W / Electronic 1 11 42 462 Incandescent 2: ST4: FITTING RM. FIXTURE / Incandescent 100W 1 2 100 200 Linear Fluorescent 5: F3: INDUSTRIAL FLUOR. / 48" T8 32W / Electronic 2 4 64 256 Total Proposed Watts = 3469 Section 3: Compliance Calculation If the Total Allowed Watts minus the Total Proposed Watts is greater than or equal to zero, the building complies. Total Allowed Watts = 3822 Total Proposed Watts = 3469 Project Compliance = 353 Interior Ljghting?PASSES :iDesign %jbetterithan code ; ;a ' 6'`. cr ^' f "` r ;a� `r ,, ^` ; #_'. Project Title: CGS Report date: 03/31/10 Data filename: C: \Documents and Settings \CCS \857 \857-- 1.CCK.cck Page 3 of 3 g Commercial Application Checklist ,zr City of Tigard ° 13125 SW Hall Blvd., Tigard, OR 97223 Phone: 503.639.4171, Fax: 503.598.1960 T /GAR9 Internet address: www.tigard - or.gov r PR CT IN a F ,f a S U �.,� f 1,! A 4� . it � V� ! P � 1 1 � '.c I✓ '+ f li I r ' i I v ��� \1�lAZ1 �l\ 7 ,P •' ect nam-: C S - l✓ /l1/► o) S1iJk /..k /via Date: /S l0 .0 • 'S � Address. T, .S7v hats ) Ss' 1440- Oar City: PORTLAND State: 0 ZIP: 97221 Scope of work: T17 i/7 /N/s' AX /ST /N t5; Reference no.: Map and tax -lot no.: Contact person name: law F ,44I Company: Ag7 /,j "anfrr3 Phone: 2(1 -J 79- 2226 Fax: 2e / s79 222 Cellular phone: E -mail: r f / eymiT,s adr ©cr �Co�Yr I ' NOTES 'AND> INSTRUCTIONS z ® The purpose of this checklist is to help define a complete submittal package for the scope of work. Plan review will not take place until a complete package is submitted. This checklist can be used for all commercial construction projects, including new construction, additions, alterations and tenant improvements. For complex projects, applicants should use the "location" space to note the item's location and page number from the plans or the specification book. It is not necessary to duplicate submittal information, even if it is asked for in multiple sections. In the checklist, "Required" means that the applicant must provide this information for plan review. ® In the checklist, "P" means • if checked by the applicant -- the information is provided for the plan review. • if checked by the plans reviewer — this information is required for the plan review. ® In the checklist, "NA" means that the information does not apply. ® Choose only those sections of the checklist that apply to your scope of work. Section 1.0, "General Project Data," must be included with each •roject submitted. ;''PRE-SUBMITTAL, PROCESS. An applicant may request a pre - submittal meeting with representatives of the jurisdiction in which the project will be built. The meeting may take place during the conceptual, schematic, or in- progress phase, or when the applicant has completed plans. INDEX' OF CHECKLIST SECTIONS J i 1 1.0 General project data Page 2 7.0 Mechanical data (Types I and 11 2.0 Civil data Page 2 kitchen -hood permits) Page 6 3.0 Architectural data Page 3 8.0 Plumbing data Page 7 4.0 Structural data Page 4 9.0 Electrical data Page 8 5.0 Mechanical data (new construction, tenant 10.0 Fire - suppression data Page 9 improvement, gas- piping permits) Page 5 11.0 Fire - detection and fire -alarm data Page 9 6.0 Mechanical data (additional or replacement 12.0 Re -roof installation data Page 10 rooftop- equipment installation permits) Page 6 13.0 Jurisdictional requirements Page 10 This checklist is for building department jurisdictions in Clackamas, Multnomah, and Washington counties. 440 -2734 (8 /01/WEB /COM) I:\ Building \Forms\COM- Checklist.doc 04/14/10 r . ' SECTION - ' GENERAL ' PROJECT, DATA l ` Construction documents Location (sheet number or spec section) 1.1 Required No. of sets of plans: New: 1 TI: 2 1.2 ■ Required Cover sheet title block 6-1. 1.3 ® Required Cover sheet vicinity map gy. D 1.4 ® Required Cover sheet plan index 0.0 1.5 [J1 P ❑ NA Code summary ate. o 1.6 ❑ P ❑ NA Deferred submittal summary 1.7 2 P ❑ NA Professional stamp and signature 1.8 ❑ P Er NA Fire and life- safety plan SMI/44r PImlr 1.9 11 P [+ ( NA Landscape plan 1.10 ❑ P E NA Landscape specifications Supporting documents Notes 1.20 ❑ P El NA Land -use or planning actions 1.21 ❑ P [r NA Required fire -flow calculations 1.22 ❑ P d NA Fire - hydrant flow -test report 1.23 ❑ P d NA Fire department or fire district building survey report 1.24 ❑ P [Jf NA Material safety data sheets (MSDS) CIVIL' . DATA'' SECTION 2 0.; � . .. -� r. . t .:: � � ,�� � ..._. �° Construction documents Location (sheet number or spec section) 2.1 ® Required Site plan 41 A 2.2 ® Required Site utility plan /`/ birit i41 2.3 ® Required Grading plan N/A SaC, W hI.Q 2.4 ® Requirpd Erosion - control plan N/A 2.5 ❑ P ler NA Utility -vault location and details Supporting doc ments Notes 2.20 ❑ P RE NA Geotechnical/soil engineer report 2.21 ❑ P I2 NA Storm -water calculations 2.22 ❑ P ELIA NA Site retaining -wall structural calculations 2.23 El P [f NA "Assurance of Compliance" with environmental rules .... 440-2734 (8/O /WEB /COM) Tri- County Commercial Application Checklist 2 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I: 1BuildinglForms \COM- Checklist.doc SECTION 3 0 : - :ARCHHECTURAL DATA - , :1 ,+ _ _ _ Construction documents Location (sheet number or spec section) 3.1 ® Required Floor plan(s) Al, 0 q 4 3.2 ® Required Transverse and longitudinal cross sections . 707/ 3.3 >4 Required OSSC Chapter 11 accessibility requirements / 4/•3 3.4 [1 P ❑ NA Interior elevations "I fig o 3.5 ❑ P Ni NA Exterior elevations 3.6 ❑ P 14 NA Roof plans 3.7 ❑ P [f NA Exterior wall sections and details 3.8 E6 P ❑ NA Reflected ceiling plan(s) ,1G, o 3.9 ❑ P [ NA Fire -rated construction details 3.10 ❑ P M NA Energy code compliant construction details and specifications 3.11 12( P ❑ NA Door schedule 41 3.12 Ei P ❑ NA Glazing schedule AZg 3.13 g P ❑ NA Furniture plan AS, 0 Suppog documents Notes 3.20 01 P ❑ NA Energy code compliance forms /calculations Cv/h‘f/ ' Aeds 477,0/027 3.21 ❑ P E A' NA Material safety data sheets (MSDS) 3.22 ❑ P R' NA Hazardous materials inventory statement (HMIS) 3.23 ❑ P E 1' NA Hazardous materials management plan (HMMP) 3.24 ❑ P Q NA Written fire and life- safety evacuation plan for area Of rescue assistance 3.25 ❑ P d NA Active and passive smoke control information 440 -2734 (8/0l/WEB /COM) Tri -County Commercial Application Checklist 3 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties W is\ Building \Forms\COM- Checklist.doc SECTION 4 0 STRUCTURAL. ; DATA , Construction documents Location (sheet number or spec section) 4.1 ® Requi ed Structural cover sheet Sf/� /. o ° .S/fEG✓4' 4.2 ❑ P RI NA Foundation plan 4.3 ❑ P [r NA Under -slab mechanical plan 4.4 ❑ P Rf NA Under -slab electrical plan 4.5 ❑ P d NA Under -slab plumbing plan 4.6 ❑ P E NA Floor framing plan 4.7 ❑ P Q �NA Roof framing plan 4.8 ❑ P [ ,7f NA Structural elevations 4.9 ❑ P [c NA Structural details and cross sections 4.10 ❑ P El / NA Standpipe information 4.11 ❑ P [2I NA Special inspector /structural observation matrix Supporting documents Notes 4.20 ❑ P Er NA Geotechnicallsoil engineer report 4.21 ❑ P [ NA Site - specific seismic hazard report 4.22 0, P a NA Design narrative 4.23 � � P ❑ NA Structural calculations y l likaiNN 440-2734 (8/01 /WEB/COM) Tri- County Commercial Application Checklist 4 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\ Building \Fonns\COM- Checklist.doc SEC`T'ION 5 0 MCCHANICAt DATA.(New construction, tci ant iMptovc ncut gas piping permits) Construction documents Location (sheet number or spec section) 5.1 ® Required Floor plan /11/.a 5.2 e Required Equipment schedule 42.0 5.3 ❑ P g NA Site plan 5.4 ❑ P [21 NA Under -slab mechanical plan 5.5 ❑ P g NA Roof plan 5.6 ❑ P @f NA Fuel gas piping plan 5.7 [T P ❑ NA HVAC equipment and duct plan(s) AZ 5.8 ❑ P ® NA Roof access details 5.9 ❑ P [a' NA Duct smoke detector plans 5.10 ❑ P NA Fire /smoke damper locations 5.11 ❑ P 121 NA Smoke control plan 5.12 ❑ P g NA Outside air (OSA) table 5.13 ❑ P [t NA Refrigeration equipment and piping plan 5.14 ❑ P [•1 NA Kitchen equipment plan 5.15 ❑ P g NA Type I and/or Type II kitchen hood plan (see Section 7.0 - Mechanical Data) 5.16 ❑ P d NA Fume /vapor hood plan 5.17 ❑ P NA Process piping/product and/or exhaust - conveying / duct plan 5.18 ❑ P I NA Fire -rated construction details 5.19 ❑ P NA Equipment hanger /fastener details Supporting documents Notes 5.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 5.21 [c P [ NA Equipment manufacturers' catalog "cut sheets" or specifications Ali 0 5.22 ❑ P d Outside air (OSA) calculations 5.23 ❑ P 1 NA Smoke - control calculations 5.24 ❑ P Leg NA Combustion air calculations 5.25 ❑ P NA Fuel gas piping sizing calculations 5.26 ❑ P NA Make -up air calculations 5.27 ❑ P NA Energy code compliance forms 5.28 ❑ P NA Boiler information 440 -2734 (8/01/WEB/COM) Tri- County Commercial Application Checklist 5 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\ Building \Forms'COM- Checklist.doc SECTION 6 0; — MECHANICAL °DATA,,(Additionall or,`'replacenient' °rooftop installation;; permits), ,. _ ,, Construction documents Location (sheet number or spec section) 6.1 ► � Required Roof plan NA 'N7 "f - ✓oh• Sy.Stom 6.2 ❑ P P NA Roof framing plan 6.3 ❑ P d NA Fuel gas piping plan 6.4 ❑ P 12i NA Roof access details Supporting documents Notes 6.20 ® Required Structural calculations for vertical loads and lateral 0 loads for equipment weighing over 400 pounds 6.21 ❑ P dNA Equipment manufacturers' catalog "cut sheets" or specifications 6.22 ❑ P ZNA Fuel gas piping sizing calculations 6.23 ❑ P d NA Energy code compliance forms N „7 0 MECHANICAL DA1 A '( - �I'IO MECHANICAL. (Type I and Type. IL'.l�lchen. hood,;perinits)�, ' , , , ' ;� `�' SLC -- Construction documents Location (sheet number or spec section) 7.1 ® Required Site plan Ayil 7.2 ® Required Floor plan(s) 7.3 ►i Required Kitchen equipment plan 7.4 r Requited Kitchen equipment and hood elevations 7.5 ❑ P DI, NA Roof plan E 7.6 ❑ P NA Cross sections through hoods, ducts and shafts 7.7 ❑ P E' Fire -rated construction details 7.8 ❑ P BA NA Fire suppression details Supporting documents Notes I 7.20 A Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 7.21 ® Requi d Make -up air calculations 7.22 ❑ P all NA Equipment manufacturers' catalog "cut sheets" or specifications 7.23 ❑ P 4 NA Hood/grease extractor listing documentation 7.24 ❑ P la Hood/grease duct sizing calculations 7.25 ❑ P [�d A Fire suppression information 440 -2734 (8/01/WEB/COM) Tri-County Commercial Application Checklist 6 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:1 Building \Fomis\COM- Checklist.doc CTION 8 0 PLUF 1BiNC;.D Construction documents .Location (sheet number or spec section) 8.1 ® Required Floor plan(s) M 8.2 ® Required Piping and material schedule _?Z _ o 8.3 ® Required Equipment layout plan 44 2, 49 8.4 ® Required Fixture schedule /112 • 0 8.5 El P I NA Site utility plan 8.6 El P d NA Building cross section 8.7 P ❑ NA Rise diagram /h O 6' 8.8 ❑ P 1 NA Roof plan 8.9 Er P ❑ NA Back flow prevention location 8.10 ❑ P PINA Irrigation plan 8.11 ❑ P iJ NA Fire -rated construction details 8.12 ig P ❑ NA Under -slab plumbing plan Supporting documents Notes 8.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 8.21 d P ❑ NA Equipment manufacturers' catalog "cut sheets" or specifications m 2. D 8.22 ❑ P ['+(NA Utility maintenance agreements 8.23 ❑ P [ 'NA Water supply calculations 8.24 ❑ P [7� NA Sanitary system calculations 8.25 ❑ P [ Jf NA Irrigation demand calculations 8.26 ❑ P a NA Roof drain and storm water calculations 440 -2734 (8/01 /WEB /COM) Tri -County Commercial Application Checklist 7 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Bu i lding\Pomu \COM- Checklist doc SECTION 0.,.— ELECTRICAL, DATA 4.. ,,. ` ' :1.; Construction documents Location (sheet number or spec section) 9.1 ® Required No. of sets of plans: 2 9.2 ® Required Floor plan(s) 00 9.3 ® Required Electrical load calculations E3� 9.4 ® Required One line diagram -3. a 9.5 ® Required Feeder riser diagram c,,0 9.6 ® Required Available fault current information X3.0 9.7 ® Required Panel schedule(s) L 9.8 ❑ P Er NA Site electrical plan 9.9 0 P f NA Fire -rated construction details 9.10 l ( ❑ NA Lighting plan li 2� e 9.11 [�?( P ❑ NA Emergency power system and emergency lighting plan L 9.12 Ri P ❑ NA Under -slab electrical plan El. 0 Supporting documents Notes 9.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds iV /A 9.21 [(P ❑ NA Energy code compliance forms and calculations for lighting Sfh1Y 2 [Makes ) 9.22 Ii /P CI NA Emergency power system specifications �Z 9.23 4 P ❑ NA Feeder riser information P.3, 0 9.24 EJ P 0 NA Lighting equipment manufacturers' catalog EZO AGED "cut sheets" or specifications 440 -2734 (8/01/WEB /COM) Tri- County Commercial Application Checklist 8 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties I:\ Bui lding\Forms \COM- Checklist.doc 1 GC1 ION 10.0` . FIREf SUPPRESSION DATA , , ., ; '.: - , Construction documents Location (sheet number or spec section) 10.1 ® Required Floor plan(s) 10.2 ® Required Sprinkler piping plan(s) 10.3 ❑ P ❑ NA Site plan 10.4 ❑ P ❑ NA Standpipe information 10.5 ❑ P ❑ NA Back flow prevention information UNtIt 10.6 ❑ P ❑ NA Reflected ceiling plan(s) Salt 10.7 ❑ P ❑ NA Transverse and longitudinal cross sections /260/(4 10.8 ❑ P ❑ NA Fire -rated construction details � /i 10.9 ❑ P ❑ NA Specialty fire suppression system plans and list of systems Supporting documents Notes 10.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 10.21 ® Required Equipment manufacturers' catalog "cut sheets" 10.22 ❑ P ❑ NA Hydraulic calculations 10.23 ❑ P ❑ NA Specialty fire suppression system information SECTION 11.0 FIRE ;DETECTION AND .ALARM DATA r, , , ' ', - i .. Construction documents Location (sheet number or spec section) 11.1 Required Floor plan(s) 11.2 ❑ P ❑ NA Site plan 11.3 ❑ P ❑ NA Reflected ceiling plan(s) 11.4 ❑ P ❑ NA Transverse and longitudinal cross sections 11.5 ❑ P ❑ NA Wiring schematic 11.6 ❑ P ❑ NA Elevator recall information OA/ Pt/- 11.7 ❑ P ❑ NA Operational matrix 5 �� 11.8 ❑ P ❑ NA Fire -rated construction details 11.9 ❑ P ❑ NA Standard electrical notes p f/r Supporting documents Notes SO /71/Q't 11.20 ® Required Structural calculations for vertical loads and lateral loads for equipment weighing over 400 pounds 11.21 ►t Required Equipment manufacturers' catalog "cut sheets" 11.22 ® Required Installer certification information 11.23 ❑ P ❑ NA Battery calculations 11.24 ❑ P ❑ NA Sample fire alarm log book 11.25 ❑ P ❑ NA Emergency power system specifications 11.26 ❑ P ❑ NA Monitoring station information 11.27 ❑ P ❑ NA Voltage drop calculations 440 -2734 (8 /01/WEB /COM) Tri-County Commercial Application Checklist 9 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties i:\Building \Forms \COM- Chceldist.doc , SECTION 12.0', , RE ROOF INSfALLATION DATA y._ Construction documents Location (sheet number or spec section) 12.1 i1 Required Site plan or building location map 12.2 0 Required Occupancy classification 12.3 ® Required Type of construction 12.4 ® Required Minimum roof class required 12.5 ® Required Class of roofing to be installed 12.6 ® Required Roof plan 12.7 ❑ P ❑ NA Parapet and scupper cross section(s) Supporting documents Notes 12.20 ■ Required Pre -re -roof inspection report 12.21 ® Required Roofing system listing information 12.22 ►I Required Roofing manufacturer's catalog "cut sheets" 12.23 ❑ P ❑ NA Structural calculations 12.25 ❑ P ❑ NA Structural engineer's report SECTION 43.0. , °JURISDICTIONAL. ` SPECIFIC ,RE ! UIREIVIENTS Construction documents Item Location (sheet number or spec section) 13.1 ❑ P ❑ NA El Required 13.2 ❑ P ❑ NA ❑ Required 13.3 ❑ P ❑ NA ❑ Required 13.4 ❑ P ❑ NA ❑ Required 13.5 ❑ P ❑ NA ❑ Required 13.6 ❑ P ❑ NA ❑ Required 13.7 ❑ P ❑ NA ❑ Required 13.8 ❑ P ❑ NA ❑ Required 13.9 ❑ P ❑ NA ❑ Required 13.10 ❑ P ❑ NA ❑ Required 440 -2734 (8/01 /WEB /COM) Tri -County Commercial Application Checklist 10 For use in building department jurisdictions in Clackamas, Multnomah, and Washington Counties is\ Building \Forms\COM- Checklist.doc