Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT 71 c COMMUNITY DEVELOPMENT Permit #: MEC2009 -00670 F , Date Issued: 12/18/2009 'TIGARD. 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Parcel: 1S1260000300 Jurisdiction: TIGARD Site address: 9595 SW WASHINGTON SQUARE DR B12 Subdivision: Lot: 0 Project: True Religion Blue Jeans Project Description: New fan powered box, ductwork, registers. Owner: FEES PPR WASHINGTON SQUARE LLC Description Date Amount 2235 FARADAY AVE STE #O Permit Fee 12/18/2009 $355.33 CARLSBAD, CA 92008 Plan Review 12/16/2009 $88.83 PHONE: 12% State Surcharge - Mechanical 12/18/2009 $42.64 Contractor: ARROW MECHANICAL 10330 SW TUALATIN RD TUALATIN, OR 97062 PHONE: 503 - 692 -1565 FAX: 503 - 691 -1879 Type of Use: COM Class of Work: ALT Type of Const: IIB Occupancy Grp: M Occupancy Load: Stories: 1 Fuel Air Handlers Fuel Types: Units < 10000 cfm: Gas Pressue: Units > 10000 cfm: Furnaces Boilers & Compressors Furnaces < 100K BTU: 0 -3 HP: Furnaces >= 100K BTU: 3 -15 HP: Floor Fumaces: 15 -30 HP: Unit Heaters: 30 -50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $486.80 Hoods: Comm Incinerators: Required Items and Reports (Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: VAV Duct Work: 1 Fire /Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of the rules or direct questions to OUNC by calling 503.246.6699 or 1.800.332.2344. Issued By: l A e r , j---j< Permittee Signature: / /L / Call 503.639.4175 by 7:00 a.m. for an inspection that busin / ay. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. .� -± �s {f -.!'F� Yc t .� � t' I 1 ,r ' t let ? `v o- 8 ttilr.4 r w^ 5 r-1 �' ;,. ! -, _, a, Mechanical Permit Application 6 � -:� , 1vX `4, _ .1.t_!!,`.` ,.,! .l,c.,-,1,1s}-)( t � ,v" -e s �, , -:„, . 0 City of 'Tigard g ee t' Permit No.: . 13125 SW Hall Blvd., Tigard, OR 97223 RECEIVE :l r e'i 70 Plan Review Phone: 503.639.4171 Fax: 503.598.1960 / 1 ter Permit ► MM Date/By: ������ Oh P i r s 6 • • '%J t i 1 •'R I ) E inspection Line: 503.639.417 DE 16 2009 Date Ready :y; Fa See Page 2 for ^ast Internet: www.tigard- or.gov Notified/Method: Supplemental information CITY OF TIG it ° 1 i•. , t. . , : ": ;y ,� y , !a ±. < p s t a r r �yt^ur { i tai .... d �t� �u : -_?, a �r#S +fi ''. � r�s tt^ .srr a r asx ? �g^ta(r; mr....�^rrr �;:��. . ";M �tfr a. ... 4% , w a , - u A• ' a. � '(r' r. a - IX', 'lt Ictltnc � � ''i : x;i ., . , N. .y. ,•_n •,,,,• r,� F y @. / X • . , ;.'iii ai`: ; u rY.0 l' �Y.. ,s .. :w e nd. .,, 't ❑ ®Addition/alterat ion /replacement Mechanical permit fees* are based on the value of the work New construction performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition 0 Other: mechanical materials, equipment, labor, overhead, and profit. �,; �r ' ;fin 5d ? I tom, r+h. '* :zot mitt r t. rh .. Value S : r - . t Ij t . s ,, I t • . ( t W uitl� [.. a f U t% U , a a, • i r, t ' -. r e * ,t O a6 „, i..ie. .:74t. .. > ,,,,.:fx„.. lhlY Z„. .,w7L„..r..,„,„:.e 6 d'J..>} .x ��h . y .?.... ,.,<.u, ,. M( utltt,'� :,3. fg „,„ � y „ G � r i . } kili VF ' J,. :, ,1,-L '11: i �li c ,t � d rr � I it .. n l . id , I I , ! I t t El 1 - and 2- family dwelling i` Commercial /industrial 0 Accessory building .Ji�T"tFi.�i S.,iN;i'd/�5 tiL�d:,.a1i+@ ?rttG,.2t<L,.. ,. d,.:..u.i;...vurrv,; In Multi family ❑ Master builder ❑ Other For special information use checklist. Description I Qty. I Ea. I Total F S qY 5 'w;IK F 1-. ,u, I 1 , . F PT :. IET ld a .� t r t.i iera .,>,<p} .11 � w1;: SBAh 1 - , (1'. h. od (l � 1,d.t . n , �hx . ti t ? fif .3 . , ' Airc B � ,e ���,.• ..- J.< ;S rs....,....n r•'.,... ,..iz...a,.�}u,ce9taEit�.9s�r>. S rin. 1 - !+ � R 6 ho tlf, TO,4 lr c l7 Air conditioning Job site address: 9 /�� 2o4- d7 - rZ (requires site plan showing placement) 46.75 City /State /ZIP: j /G4 02 97 22.3 Furnace 100,000 BTU (ducts/vents) 46.75 , Pro name: Furnace 100,000+ BTU (ducts /vents) 54.91 Suite/bldg. /apt. no.: p -(1 �]r � ( Gf 35.44.15 Heat,pumy 61.06 Cross street/directions to job site: . Auct woik _ 23.32 Hydronic hot water system 23.32 Residential boiler (radiator or hydronic) 23.32 Unit heaters (fuel -type, not electric), in -wall, in-duct, suspended, etc. 46.75 Subdivision: I Lot no.: Flue/vent for any of above 23.32 Other: , 23.32 Tax map /parcel no.: Other fuel appliances 1: � s < r :rt . y l i i � 7 a fk j , 1j r. - , ,i74 . 7 s i .7 -c 9rp,T.i" Vi m, , 1 . . r t � t)� } 1 P f p , r, Water heater 23.32 t ql tl... 4 t ;i, e.:askAn fl. ?Y:i . . i + 24,1 : .ii 4' + „... ,....',^ ,.. .. _.;1 , r . • Gas fireplace 33.39 a s � i,G�? � I K�iST Flue vent for water heater or gas fireplace 23.32 Log lighter (gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 � T h , r Ayc ,, ;,I, • } r "= Chimney /liner /flue/vent 23.32 ' ' I t,r ., i:..i �i f ' ', t l . � .r ' . h ; ii i, + t •r ' r Y '' , • "hf'' m Other: 23.32 Name: Environmental exhaust and ventilation Range hood/other kitchen Address: equipment 33.39 City /State /ZIP: Clothes dryer exhaust 33.39 Single -duct exhaust (bathrooms, Phone: ( ) Fax: ( ) toilet compartments, utility rooms) 23.32 ..�. i ' .C fs¢,-ts?x ir,: Z . t .._ a .... P 4 i 15 .4 -A z 9 7 ° c < .,,, Attic/crawl fans 23.32 Other: 23.32 Business name• (nc) l te a /N C Fuel piping Contact name: KgVt.J e )5 )5 514.15 for first four; $4.03 for each additional Furnace, etc. Address: /0330 , J TO fr- x/4-7 Gas heat pump City /State /ZIP: '7V "-) / Qg /'a6' . Wall /suspended/unit heater Phone: (j'3 ) CIA - /5'45- I Fax:: ( 3) 11/_ /377 Water heater Fireplace E -mail: ,Q.- -Zat -) At/yCl' (// - 42./ZAO i /I tz-/ Range (, Y al E '^ g' ' 'uf .r41 le7iF r , :',", , h"i ,1e 1.. f !. 3f•'��` ('. ei'. 9 `F xaa'�1. ;AS` . •I y ' I d, • • w • t tfi P '1 i ai t 1 0 , , r , t r r;. 14 �Y 1iY i. � I„t to- Yr, r .$ `'. n,. * BBfbCCnC �F- O�s'LJ �jr I *_ e. A... � PZI�za5, C. Other: /� .,. dryer (gas) Business name: J . � � ] i g { 4 / V� 5t. T ,�' df - t Q , ,,�� I '` : d Ii 'rt �t i � ,�� [ �.t >it >�i fit _F/ Address: D !� / L�/ (N /� v/ 7 J! t ,, I , s ,: " i 1 1 .. Q 1 P ! � t , i I . ,iry F r . , W ." i...s,A7 r...+ • •.a,f ..,..1.«.s. �..4 , , ... f tQ;u City /State/ZIP: .! v4U4.77 ,J / OP- 17cZ subtotal Minimum permit fee ($90.00) Phone: (503 4, i Z - - (,r65 I Fax: ( ,;3) L' 1'_ f' 77 - Plan review (25 %of permit fee) � '- cca tic,: Sj9 3 State surcharge (12% of permit fee) ) �� TOTAL, PERMIT FEE G � This permit application expires if a permit is not obtained within ISO Authorized sign:1 f�i�i �� days after it has been accepted as complete. Print name: G ✓� , , �/L• ` Date �j I • Fec methodology set by Tri- County Buuilding'Industry Service Board , r Form 2a Project Name: True Religion Jeans Page: 1 SUMMARY Project 1. Project Name True Religion Jeans 2. Project Address _ 9585 Washington Square Road, Space B -12 3. City/Town Tigard 5. County Washington 11 4. Building, Gross Area (ft2) 1,485 6. No. of Floors 1 7. Construction Site Elevation Above 2,000 ft? ❑ YES l2O Attached Chapter Type ID Description Attach Forms and Building Enve lope Form 3a Building Envelope - General ❑ Worksheets 3b Prescriptive Path - All Climate Zones ❑ CodeComp Report for Simplified Trade -off ❑ * In lieu of 3b * Floppy disc with .occ CodeComp file ❑ Check boxes to Worksheet 3a Wall U- factor ❑ indicate attached 3b Roof U- factor ❑ forms and 3c Floor U- factor ❑ worksheets 3d Window /Skylight Schedule ❑ Systems Form 4a Systems - General ❑ 4b Complex Systems El Worksheet 4a Unitary Air Conditioners - Air Cooled ❑ 4b Unitary Air Cond. - Water & Evap Cooled ❑ 4c Unitary Heat Pump - Air Cooled ❑ 4d Unitary Heat Pump - Water Cooled ❑ 4e Packaged Terminal A.C. - Air Cooled ❑ 4f Packaged Terminal Heat Pump - Air Cooled ❑ RECEIVED 4g Water Chilling Pkgs - Water & Air Cooled ❑ 4h Heat Rejection Equipment ❑ DEC 16 2009 4i Boiler - Gas -Fired and Oil -Fired ❑ 4j Furnace & Unit Heaters - Gas and Oil-Fired ❑ CITY OF TIGARD 4k Simultaneous Heating and Cooling ❑ BUILDING DIVISION 41 Air Transport Energy ❑ 4m Natural Ventilation ❑ Lighting Form 5a Lighting - General ❑ 5b Interior Lighting Power - Tenant Method ❑ 5c Int. Ltng. Power - Space -by -Space Method ❑ Worksheet 5a Lighting Schedule ❑ 5b Interior Lighting Power ❑ Applicant 7. Name Kevin Kruszewski 10. Telephone 503 692 -1565 8. Company Arrow Mechanical 11. Date 12/08/09 9. Signature Attached No. of Pages Description of Documentation Document- ation Compliance with O55c, effective U1 /01/Ub s. -► Form 4b Project Name: True Religion Jeans Page: 1 COMPLEX HVAC SYSTEMS 7 7, 1 :?° .,tom. ..+a., .e;�; ,' �9 ,.. .., rr5 �r- s:,. Applic 1. Simple or Complex Systems (Section 1317.9, 1317.10 and 1318) ability Note: This form is required for complex systems only. If your plans qualify as a simple system as Discussion of defined by the code, this form is not required. qualifying excep- tions in instructions 2. Air Transport Energy (Section 1318.4.2) section. g Not Regulated. Each HVAC system does not have total fan nameplate horsepower of 7.5 HP or Fan Motor greater (include sum of all supply, return, & exhaust fans operating at design conditions). Energy ❑ Brake Horsepower Complies. The energy demand of all HVAC fan systems meets code See Section 1318.4.2 for requirements. Complete and attach Worksheet 41. maximum horse- ❑ Nameplate Horsepower Complies. Selected fan motors have nameplate ratings no larger than power allowed is allowed by Section 1218.4.2.3. (Complete Worksheet 4L.) ❑ Exception. Section 1318.4.2, Exception ❑ -t ❑ -2 ❑ -3 ❑ - Portions of the building that qualify: The plans /specs show compliance in the following locations: Cooling 3. Cooling Tower Fans (Section 1317.5.4.1) Tower ❑ No Cooling Tower There is no cooling tower in this project. Fans ❑ Complies. Cooling tower fans have control devices that vary flow by controlling leaving fluid temperature or condenser temperature /pressure of the heat rejection device. The plans /specs show compliance in the following locations: 4. Simultaneous Heating and Cooling (Section 1318.2.1) ❑ No Cooling. The building HVAC system has no cooling. El Complies. Controls prevent reheating, recooling or mixing of mechanically heated and mechanically cooled air. ❑ Exception. Code exception is Section 1318.2.1, Exception ❑ -t ❑ -2 ❑ -3 ❑ -4 ❑ -5 If exception 1 is used, complete and attach Worksheet 4k Portions of the building that qualify: The plans /specs show compliance in the following locations: 5. Electric Motor Efficiency (Section 1317.10.3 8z Table 13 - T) l21 Not Regulated. There are no NEMA Design A &B squirrel cage,T -frame induction, permanently wired polyphase motors of one horsepower or more which serve built up HVAC systems. ❑ Complies. The efficiency of all regulated motors meets code requirements. Exceptions ❑ Exception. Section 1317.10.3, Exception ❑ -t ❑ - Discussion of qualifying Portions of the building that qualify: exceptions in instructions section. The plans /specs show compliance in the following locations: 6. VAV System Static Pressure Reset Controls (Section 1318.2.3) • Not Regulated. The building plans or specifications do not call for a VAV system controlled by a static pressure sensor or direct digital control of individual zone boxes. ❑ Complies. The system static pressure set point automatically resets to the lowest point possible '� o while still providing the required air flow to the zones with the greatest demand. Q r ❑ Exception. Section 1318.2.3, Exception The plans /specs show compliance in the following locations: 4-7 ., t;.::?- .'vt,_`a ..: 4 : sfSc,_7'".. :, +>'. �-:.._ .!.. _#r. ," ...,._,; "tea "'_x�"tC''�..,: _.r t'r` +±3'�:..?:.'�e�:, „n_.t:�,[e - ._�r,,:_; �'^�.J.•. _.'#"�,. >.i',.;,,... Compliance with OSSC, effective 04/01/07 Form 4b Project Name: True Religion Jeans Page: 2 COMPLEX HVAC SYSTEMS 7. VAV Terminal Units (Section 1317.4.2.1) ❑ Not Regulated. Project does not contain VAV terminal units. ® Complies. VAV terminal units are programmed to operate at the minimum airflow setting without addition of reheat when the zone temperature is within the set deadband. Complete Worksheet 4k. ❑ Exception. Section 1317.4.2.1, Exception ❑ 1 ❑ -2 The plans /specs show compliance in the following locations: 8. Supply - Air Temperature Reset Controls (Section 1318.2.5) © Not Regulated. The building plans or specifications do not call for multiple zone HVAC systems. ❑ Complies. Multiple zone HVAC systems include controls that automatically reset the supply -air temperatures in response to building loads or outside air temperature. ❑ Exception. The building qualifies for an exception to the supply -air reset controls requirement. Applicable code exception is Section 1318.2.5, Exception ❑ -1 ❑ -2 ❑ -3 Portions of the building that qualify: The plans /specs show compliance in the following locations: 9. Chilled and Hot Water Temperature Reset Controls (Section 1318.2.4) O Not Regulated. The building plans or specifications do not call for chilled or hot water systems with a design capacity exceeding 300,000 Btu /hr. ❑ Complies. Chilled and hot water systems include controls that automatically reset supply water temperatures by representative building loads or by outside air temperature. ❑ Exception. Section 1318.2.4, Exception ❑ -1 ❑ -2 Portions of the building that qualify: The plans /specs show compliance in the following locations: 10. Separate Air Distribution Systems (Section 1318.2.7) O Not Regulated. The building plans or specifications do not call for zones with special process temperature or humidity requirements. ❑ Complies. Separate air distribution systems serve zones with special process temperature or humidity requirements from those zones serving only comfort conditions, or supplementary control provisions are included so primary systems are specifically controlled for comfort purposes only. ❑ Exception. Section 1318.2.7, Exception ❑ - ❑ -2 Identify zones with special process requirements: The plans /specs show compliance in the following locations: 11. Zone Isolation Controls (Section 1318.2.6) O Not Regulated. Building plans or specifications do not call for HVAC systems serving multiple occupancies or floors with >240,000 Btu /hr cooling capacity, or >300,000 Btu /hr heating capacity. ❑ Complies. HVAC systems serving multiple occupancies or floors with >240,000 Btu /hr cooling capacity, or >300,000 Btu /hr heating capacity are equipped with isolation devices capable of automatically shutting off supply air to and from each isolated area. Each isolated area is controlled independently and satisfies temperature setback (Section 1317.4.2) and optimum start control requirements. Central fan system air volume is reduced through fan speed reduction. The plans /specs show compliance in the following locations: tF2 �: � ,,..x� ...� . max,..,...._.. r .`i ���,,.K 5,r;°-v,+?' .! . ,�. �- ..,..y .. �:�?� . t �.,F.:.," $1.�... a "`..�' . ,- :'-mow- l! .. �'�+ ._..• . _ ._ •.� -..�,. �. .. ....e - c"s'�:'�r' .' '`,�....�.'�:v� -�S._. ^?: 4-8 :, Compliance with OSSC effective 04/01/07 Form 4b Project Name: True Religion Jeans Page: 3 COMPLEX HVAC SYSTEMS .... .. ... r.,._ f•. ::'L � d_J.i .:..f:: a�.,v -. ?. J! .._ � F. , -`_ „she. l:?: ... .,. {r.. -"t _., _"�}1. .1 .� .u_.- .. _, )s .,- ,9., t * -.� .r�..a ,.. __ .. 'vl.«. 12. Humidity Controls (Section 1318.2.2) ❑ No Moisture Added to Building. The building plans do not call for means to add moisture to maintain specific humidity levels. ❑ Complies. All new humidity control systems equipped with a humidistat when required. All humidifier preheating devices have an automatic value to shut off preheat when humidification is The plans /specs show compliance in the following locations: 13. Hydronic System Controls (Section 1318.2.8) ❑ No Hydronic System. The building plans or specifications do not call for a new hydronic system. ❑ Complies. The hydronic system complies as follows: 13.1 Variable Flow Controls (Section 1318.2.8.4) ❑ System does not have a 10 hp or greater motor ❑ Complies. System has controls capable of varying pump flow The plans /specs show compliance in the following locations: 13.2 Three -Pipe System (Section 1318.2.8.1) ❑ System does not have a common return system (a three -pipe system) for both hot water and chilled water. 13.3 Two -Pipe Changeover System (Section 1318.2.8.2) ❑ System is not a Two -Pipe Changeover System ❑ Complies. System is: a. Designed to allow a deadband between changeover from one mode to the other of at least 15 °F outside air temperature. b. Designed to operate and provided with controls that will allow operation in one mode for at least four hours before changing over to the other mode. c. Provided with reset controls that allow heating and cooling supply temperatures at the changeover point to be no more than 30 °F apart. The plans /specs show compliance in the following locations: 13.4 Hydronic (Water Loop) Heat Pump System (Section 1318.2.8.3) ❑ System is not a Hydronic (Water Loop) Heat Pump System ❑ Complies. Hydronic heat pumps connected to a common heat pump water loop with central devices for heat rejection (e.g., cooling tower) and heat addition (e.g., boiler) have the following: a. Controls installed capable of providing a heat pump water supply temperature deadband of at least 20 °F between initiation of heat rejection and heat addition by the central devices (e.g., tower and boiler). b. Closed- circuit tower (fluid cooler) has either an automatic valve installed to bypass all but a minimal flow of water around the tower (for freeze protection), or low- leakage positive closure dampers. c. Open- circuit tower installed directly in the heat pump loop has an automatic valve installed to bypass all heat pump water flow around the tower. Open - circuit towers used in conjunction with a separate heat exchanger to isolate the tower from the heat pump loop are controlled by shutting down the circulation pump on the cooling tower loop. ,F :: d. A two - position valve at each hydronic heat pump for hydronic systems having a total pump system power exceeding 10 hp. 2' The plans /specs show compliance in the following locations: h - : i f ..1.. r„:h X e,... L} ..re_r4� _ .. 'e �.,47e . f;tr 5 ' J .M ✓ f;?.; � . .... t' /St:. j .L.., .+ R r dk .� 4 -9 Compliance with OSSC, effective 04/01/07 Worksheet 41 - Project Name: True Religion Jeans Page: 10 AIR TRANSPORT ENERGY Complete one worksheet for each fan system > 7.5 horsepower. Fan system horsepower is the sum of motor brake horsepower of all supply, return, and exhaust fans (including series fan - powered terminal units) that operate during design conditions. Fan System ID: VAV -1 Areas Served: Sales Floor ❑ System serves hospital or laboratory and include flow control device for maintaining precise pressure control. Maximum Fan Type (Supply, Nameplate Fan Identifier Return, Exhaust, Series Constant Volume Motor Brake Nameplate Motor HP (Tag) VAV) CFM or VAV HP Motor HP Allowed VAV - 1 Supply 1,773 VAV 0.75 0.75 1.5 The Plans /Specs show brake hp, nameplate hp, and CFM in the following locations: Total System Total Total System Supply Fan Constant Volume, VAV, System Max Brake HP Brake HP Nameplate CFM or Hospital /Lab Brake HP Allowed Complies HP Complies 1,773 VAV 0.8 2.6 Additional Pressure Drop Credit (all systems). Complete the section below if system contains filtration with a pressure drop at design flow in excess of 1" w.c. ( when filters are clean), heat recovery, or direct evaporative humidifier /cooler. Additional Pressure Drop Credit for Hospitals and Laboratories. Complete the section below if system serves a hospital or laboratory and contains rully ducted return /exhaust, return /exhaust air flow control devices, or individual filter system efficiencies. Additional Pressure Drop Credits Pressure Drop, Inches, W.C. ❑ Filtration Pressure Drop >1" w.c. All Systems ❑ Heat Recovery in Direct Evaporative Humidifier /Cooler Hospital and ❑ Fully Ducted Return /Exhaust (0.5" credit) Laboratory ❑ Return /Exhaust Flow Control Device (0.5" credit) Systems Only ❑ Individual Filter Efficiency > or = 85% (0.5" credit) Total Additional Pressure Drop Credit: ® Manufacturer's product data sheet(s) is attached and design values are shown in plans /specs in the following locations Adjusted Total Brake Constant Volume or VAV (Use VAV Total Additional Max Allowed HP (from Adjusted Brake Supply CFM for Hospital or Lab Systems) Pressure Drop Brake HP above) HP Complies Add New Worksheet 41 4 -22 .1 Compkance with OSSC, effective 04/01/07 12/18/2009 08:59 5036911879 ARROW MECHANICAL PAGE 01/02 ARROW MECHANICAL CONTRACTORS, INC. 10330 SW TUALATIN RD. TUALATIN, OREGON 97062 PHONE: (503) 692 -1565 FAX: (503) 691-1879 DATE: 12 -18 -2009 NUMBER OF PAGES: 2 (including cover sheet) COMPANY: City of Tigard ❑ Please call ® Fax transmittal ❑ Mail transmittal ATTENTION: Dan Nelson ❑ Hand delivered transmittal PHONE: 503 - 639 -4171 ❑ Please return sets of approved FAX: 503- 624-3681 drawings and / or submittals to our office FROM: Kevin K. PROJECT: True Religion Jeans Washington SQ. COMMENTS: Dan, Here is the detail you requested for the VAV box seismic bracing. Thank You, Kevin Kruszewski