Loading...
VAR2005-00102 4 Adikk Ask CITY OF TIGARD OREGON February 6, 2006 Alameda Equities LLC w/o Mildren Design Group 7650 SW Beveland St., #120 Tigard, OR 97223 Re: Permit No. VAR2005-00102 Dear Sir/Ms.: The City of Tigard has canceled the above referenced permit(s) and enclose a refund for the following: Site Address: 11930 SW 72"d Ave. Project Name: Kroo Job No.: N/A Refund: Check #43461 in the amount of $467.20. Credit card "return" receipt in the amount of $N/A. Notes: Per applicant's request to withdraw as SDR was required for this adjustment; refund 80% of application fee. If you have any questions please contact me at (503) 718-2430. Sincerely, Dianna Howse Permit Specialist Enc. is\Building\Refunds\LtrRefund-CancelPermit.doc 05/04 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639-4171 TDD (503) 684-2772 City of Tigard Check Refund Request City o Tigard This form is used for refund requests of permit application fees paid by check transactions only. Receipts, documentation and applicant's request for refund, if applicable, must be attached to this form. Approved request due to Tidemark System Administrator by Friday at 5:00 PiVI for processing each Monday. Accounts Payable will route refund checks to Tidemark System Administrator for distribution and refund of case fees. VENDOR NO.: DATE: January 26, 2006 PAYABLE TO: Alameda Equities LLC REQUESTED BY: Dianna Howse c/o Mildren Design Group CAC 7650 SW Beveland St. #120 Tigard, OR 97223 TRANSACTION Receipt 2005-6474 Case VAR2005-00102 INFORMATION: Receipt Date: 12/22/05 Site Address: 11930 SW 72"d Ave. Check 2190 Project Name: Kroo EXPLANATION: Per applicant's request to withdraw as a SDR is required for this adjustment. Refund 80% of application fees. EXPENDITURES: Fee Description From Receipt Revenue Account No. $ Amount Example: BUILD Permit Fee Example: 245-0000-432000 LANDUS Admin Variance 100-0000-438000 $407.20 LRPF LR Planning Surcharge 100-0000-438050 $60.00 TOTAL REFUND: $467.20 APPROVALS: If under $500 Professional Staff If under $5,000 Division Manager If under $22,500 Department Manager If under $50,000 City Manager If over $50,000 Local Contract Review Board FOR TIDEMARK SYSTEM ADMINISTRATION USE ONLY Case Refund Processed: Date: g : I rlAk-, /C;;iE ccfYf 3* i:\Building`Refunds\RefundCheckRequest.doc 10/27/05 .'':l=~.r`iN'rr^ fi-.. ~ r>~ 'r . rt:t~h.i ?'r:~'S,s},~it'.` .:~~;:ci•,~'}-,,..,,:'}'+~^r-,:•~ r ~,x 'a a,~~;_...,~yc~ ` m ti...,,i1T~sN...r,:,a ^s t a.,~s. w - r; n ~ C.c['k,~ 't. s,~ ..i'`. ~ 'v ~ ~ l y .rs 3 s ; W ~ ~ d.a~i.. 7' r- y ~ ~ rt r• •n.. 1: s ~ . •w s ~ 'r T r 'E '1 i:y ~ t yam. r r r f Y, ~'i i` A ^e ~ ~ R z s, ~~y, r.-'~ 5'. ~ ~ 6 ~ iii: i,..n. r~ j i`x .t + f lA• 1 L MILDREN DESIGN GROUP, P.C. Architecture • Space Planning January 16, 2006 rMAEOENED Cheryl Caines, Assistant Planner City of Tigard ]AN 8 2004 13125 SW Hall Blvd. tap TK3AAD Tigard, Oregon 97223 Re: Withdrawal of adjustment application for New Office Building SW 72°d Avenue and SW Dartmouth Street e Cheryl: Please consider this letter a written request to withdraw the adjustment application 1"' the above mentioned project originally submitted on 19 December, 2005. Do not hesitate to contact me with any comments or questions. Thank you, Dan Vasquez Project Manager DAV/dav cc: Jim Lampus, Norwest Contractors, Inc. 7650 SW Beveland Street, Suite 120 Tigard, Oregon 97223 503 244 0552 Fax 503 244 0417 Case Activity Listing 1/18/2006 ~ 3:19:40PM T I D E M A R K Case VAR2005-00102 COMPUTER SYSTEMS, INC. Assigned Done Updated Activity Description Date 1 Date 2 Date 3 Hold Disp To By By Notes VAR1020 Application received 12/19/2005 None DONE KJP 12/23/2005 KJP VAR1030 Case created 12/22/2005 None DONE KJP 12/23/2005 KJP VAR1050 Planner assigned 12/23/2005 None 12/23/2005 KJP VAR1110 Application 1/16/2006 None WDRN CAC PLL 1/18/2006 1/16/06 application was withdrawn as withdrawn PLL an adjustment is not allowed without a Site Development Review in this situation. The application would be denied, so the applicant withdrew. • Page 1 of 1 CaseActivity..rpt MILDREN DESIGN GROUP, P.C. Architecture • Space Planning January 16, 2006 ~1~ FO) MEN) ILr Cheryl Caines, Assistant Planner City of Tigard JAN 13125 SW Hall Blvd. U>J Tigard, Oregon 97223 Re: Withdrawal of adjustment application for New Office Building SW 72' Avenue and SW Dartmouth Street Cheryl: Please consider this letter a written request to withdraw the adjustment application for the above mentioned project originally submitted on 19 December, 2005. Do not hesitate to contact me with any comments or questions. Thank you, Dan Vasquez Project Manager DAV / day cc: Jim Lampus, Norwest Contractors, Inc. 7650 SW Beveland Street, suite 120 Tigard, Oregon 97223 503 244 0552 Fax 503 244 0417 AOL Planning Division Request for Permit Action or Refund City o Tigard TO: CITY OF TIGARD Permit System Administrator 13125 SW Hall Blvd., Tigard, OR 97223 Phone: 503.718.2430 Fax: 503.598.1960 FROM: ❑ Owner ® Applicant ❑ Contractor ❑ City Staff (check one) Name: Mildren Design Group, P.C. (Business or Individual) Dan Vasquez Mailing Address: 7650 SW Beveland St., Suite 120 City/State/Zip: Tigard, OR 97223 Phone No.: (503) 244-0552 PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED ® CANCEL PERMIT APPLICATION. 016 ® REFUND PERMIT FEES (attach receipt, if available). ❑ REMOVE CONTRACTOR FROM PERMIT (do not cancel permit). Permit VAR2005-00102 Site Address or Parcel 1S136DC-04300 Project Name: Kroo Subdivision Name: Lot EXPLANATION: An adjustment is not allowed without a Site Development Review in this situation. The application would be denied, so the applicant is withdrawing. Signature: C:i'~.~--~•-~ Date: 1/18/05 Print Name: Cheryl Carnes Refund Policy 1. The Director may authorize the refund of a) any fee which was erroneously paid or collected. b) not more than 80 percent of the application fee when an application is withdrawn or canceled before any review effort has been expended. 2. Refunds will be returned to the original Payer in the same method in which payment was received. FOR OFFICE USE ONLY Rte to Sys Admin: Date t 3y to Bld Admin: Date B Refund Processed: Date B Invoice Processed: Date B Permit Canceled: Date B Parcel Tag Added: Date B Receipt # Date Method Amount $ I:\Building\Forms~RegPennitAction-Ping.doc Rev 10/17/05 P~~Iel~/C~1 CITY OF TIGARD PLANNING DIVISION 13125 SW HALL BOULEVARD TIGARD. OR 97223-8189 DEC 19 2005- 503.639.41711503.684.7297 CITY OF TIGARD CITY 13l'T"M OREGON LAND USE PERMIT APPLICATION PLANiVtNRR~N F119V bola Cher Case # Date ► d~ By Receipt 205' 04 T~o City 1~ ❑ Date Complete TYPE OF PERMIT YOU ARE APPLYING FOR (KAAdjustmenWariance (I or-!1- Q Minor Land Partition (II) ❑ Zone Change (III) Q Comprehensive Plan Amendment (IV) Q Planned Development (III) Q Zone Change Annexation (IV) Q Conditional Use (III) Q Sensitive Lands Review (1,11 or 111) ❑ Zone Ordinance Amendment (IV ❑ Historic Overlay (II or III) Q Site Development Review (11) ❑ Home Occupation (II) Q Subdivision (II or 111) A~ / esa ava 1415 b 3a7 a,~n 2 e Nth I S D -f S) (0 4- 5 . rr. ti CcFi-~7 A Me~a.. ITEs ZL v a 'r ~,b P,~ ~w q 4 tqAmt Mv. FM 14v. _ql T4 -FK1MrVKVAV#1 VtKbU Mnig Nu. va -12- 6 -e-B;- a. q- D s ` cn more vion one 5 V~/ 1'. 1?643 CfthSE ~oRtZ.~ CA 91325 PHO14t: Nu. S18 - ?&1 - Z;o4 8149- S+S - 34919 'When the owner and the applicant are different people, the applicant must be purchaser of record or a lessee possession with written authorization from the owner or an agent of the owner. The~ners must sign this application In th space vided on the back of this form or submit a written authorization with this application. sse be WON) APPLICATIONS WILL NOT BE ACCEPTED WITHOUT ALL OF THE REQUIRED SUBMITTAL ELEMENTS A DESCRIBED IN THE "BASIC SUBMITTAL REQUIREMENTS" INFORMATION SHEET. 2~ T ' d 89W-01920<3: 01 28212t,9E0S 0-10H3Sn0H AW11tA4 -'W0dJ d60 : t70 t7002-22-Nnf THE APPLICANT SHALL CERTIFY THAT: If the application is granted, the applicant shall exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. All the above statements and the statements in the plot plan, attachments, and exhibits transmitted herewith, are true; and the applicants so acknowledge that any permit Issued, based on this application, map be revoked if it is found that any such statements are false. 'The applicant has read the entire contents of the application, including the policies and criteria, and understands the requirements for approving or denying the application(s). , SIGNATURES OF EACH OWNER OF THE SUBJECT PROPERTY ARE REQUIRED, Ow is Signatu Date . zz Owner's Signature Date Owner's Signature Date Owner's Signature Date Owner's Signature Date pplt anUAgentiitepresentative's Signature Date T" Applicant/Agent/Representative's Signature Date 2/2*d 89040L9£0S:01 2ezT2b9z0S TIOHMMH A80 1HW*WDad d0Z,170 b002-22--Nnr • • Dec 15 05 12:08p Steven A •8-345-3498 p,1 THE APPLICANT SHALL CERTIFY THAT: ♦ li Iho application is granted, the applicant shall exercise the rights granted in accordanc(: with, thy. ~rrn; and sul~ject to all the conditions and limitations of the approval. ♦ Ali the above statements and the statements in the plot plan, attachments, and exh:bits transmitted herewith, are true; and the applicants so acknowledge that any permit issued, based or this application, map be revoked if it is found that any such statements are false. ♦ 'The applicant has read the entire contents of the application, including the policies and criter;a, ar.d understands the requirements for approving or denying the application(s). SIGNATURES OF EACH OWNER OF THE SUBJECT PROPERTY ARE REQUIRED. Owner's Signature Date Owner's Signature Date Owner's Signature Date _ Owner's Signature Date Owner's Signature Date ppli ant/AgenVRepresentative's Signature Date At)pticant/Agent/F eo resentative's Signature Date CITY OF TIGARD 12(CL%LUU3 13125 SW Hall Blvd. 4:32:30PM Tigard, Oregon 97223 (503) 639-4171 Receipt 27200500000000006474 Date: 12/22/2005 Line Items: Case No ' Tran Code Description Revenue Account No Amount Paid VAR2005-00102 [LANDUS] Admin Variance 100-0000-438000 509.00 VAR2005-00102 [LRPF] LR Planning Surcharge 100-0000-438050 75.00 Line Item Total: $584.00 ~ments: Method Payer User II) AcctJCheck No. Approval No. How Received Amount Paid Check ALAMEDA EQUITIES LLC KJP 2190 In Person 584.00 Payment Total: $584.00 2190 ALAMEDA EQUITIES, LLC P. O. BOX 25716 503-291-6986 • PORTLAND, OR 97298-0716 'L^ ~24-6B0 3257 DATE JYrC 1 1230 PAY l - TO THE ~ s ORDER OFL~ W IBC • ~VG ~.L bid-rte Tr U(~.... ~A~ DOLLARS Wells Fargo Bank Northwest, NA 6785 Southwest Beaverton Hillsdale • Portland, OR 97225 4 www.weillarggo.ccoomm FOR • • cReceipt.rpt Page 1 of 1 CITY OF TIGARD ADJUSTMENT NARRATIVE DECEMBER 13, 2005 Description of Proposal: This is a proposal for an adjustment to the access and egress standards of Chapter 18.705, as allowed by Chapter 18.370.020C(5). The specific section related to the adjustment is 18.705.030H(3), which requires a minimum spacing of access points onto collector streets of 200 feet, and 600 feet for arterials. The site is located at the northeast comer of SW 72"d Avenue and SW Dartmouth Street. The combined tax lots 4300 and 4402, on map 1S1-36D, have 200 feet of frontage on SW Dartmouth Street, and 215 feet of frontage on SW 72"a avenue. The access proposed for redevelopment of .this site includes two right-in/right-out access points, with one located approximately 150 feet east .of the street intersection on the Dartmouth frontage, and one located approximately 190 feet north of the street intersection on 72"d. Both of these locations meet the criteria of Section 18.705.030H(2), which requires that a driveway must be at least 150 feet from collector or arterial street intersections. However, it is not possible to meet the access spacing requirements on either street frontage. The access onto SW Dartmouth will be a permanent location since there is no opportunity for alternative driveway locations that more closely meet the Code standard. The right-in/right-out operation will be implemented by a center barrier in S.W. Dartmouth Ave. This access will be the "primary" site access, as required by Code section 18.810.030(Q)5, since it is located on the street of the lesser classification. A Site Design Review application, which will follow this Adjustment application, will provide building orientation to this frontage and primary signage will emphasize that the Dartmouth access is primary for the site. The access onto SW 72nd may be affected by the future improvement of 72"d Avenue, and the development of property north of the subject site. Consequently, while there will be permanent site access to 72"d for northbound and eastbound traffic by way of the proposed right/in-right-out access, the location and configuration of this access point may be revised by the street improvement or development of the site to the north of the subject property. The site development plan for the subject site will provide for a cross-driveway to the site to the north, and a cross easement will be provided. Operation of the right-in/right-out restriction will be implemented by a center barrier in SW 72 "d Avenue. City of Tigard Adjustment Narrative December 13, 2005 Page 2 Both of the proposed access points are needed to provide adequate access to the subject site since it is recognized that neither can provide full movement access due to vehicle stacking requirements for the 72"d/Dartmouth intersection. The 72"d Ave. access provides ingress for west-bound traffic, and egress for other directions, while the access onto Dartmouth provides ingress for northbound and eastbound traffic, and egress for northbound traffic. Without both accesses, at least one direction of travel for both ingress and egress would be required to either execute a "U" turn, or travel out of direction around the large block to resume original direction. Neither of these alternatives is consistent with efficient traffic management since many drivers will simply make illegal "U" turns or cut through adjacent parking lots via private driveways to avoid out of direction travel. Adjustment Criteria: Section 18.370.020C(5) provides for Adjustments to access and egress standards based on certain criteria contained in subsection (b). Since this project cannot meet the access spacing standards, an Adjustment for each driveway is proposed. Each of the approval criteria is addressed as follows: "(1) It is not possible to share access;" Comment: With respect to the Dartmouth access, the abutting site to the east has been approved through the City Site Design Review process for development without a shared access with the site in question. While the abutting property has not been developed, there is no benefit to redesigning the approved plans to provide access to Dartmouth, since that property has alternative access onto SW 70th Avenue. With respect to the access onto 72"d, it is understood that the proposed location may be shared with the property to the north if possible as a function of future development of that site. "(2) There are no other alternative access points on the street in question or from another street;" Comment: There clearly is no alternative access point onto Dartmouth for the reasons noted above. Similarly, the access onto 72"d is located as far north as possible. If there are future opportunities to improve access onto 72nd by sharing access with the abutting site development, such opportunities can be considered at that time. In any case, access to 72nd as a permanent right-in/right-out with a center barrier will improve accessibility to both the subject site and the site to the north even if there may be alternative access to SW Clinton through the adjoining development. City of Tigard Adjustment Narrative December 13, 2005 Page 3 "(3) The access separation requirements cannot be met;" Comment: The site frontage on Dartmouth is approximately 200 feet, which is the access spacing standard for collectors. Therefore, a driveway onto Dartmouth could not meet the standard under any, circumstances. Similarly, the distance between Dartmouth and Clinton is approximately 390 feet, so no access could meet the 600 foot spacing standard for arterials. "(4) The request is the minimum adjustment required to provide adequate access;" Comment: The proposed access points are located as far from the intersection as possible, so the proposed adjustments are the least necessary to provide adequate access to the site. "(5) The approved access or access approved with conditions will result in a safe access, and;" Comment: The Traffic Report accompanying this application confirms that the access points meet safety standards. "(6) The visual clearance requirements of Chapter 18.795 will be met." Comment: The Traffic Report also certifies that vision clearance standards will be met. Impact Study Section 18.390.040B(2)(e) requires that Type H Applications include an Impact Study. The only element of public infrastructure that could be impacted by this Adjustment is the transportation system. However, since there is no actual site development included in this Adjustment application there is no impact. A traffic analysis, which will expand upon the accompanying Traffic Report, will be prepared for the entire project and will address the proposed driveways and other intersections. The recommendations in this forthcoming study, and the resulting conditions of approval will address the overall impacts of the project. Attachments: Traffic Report dated December 8, 2005 Site Plan (11"x17") dated December 8, 2005 MEMORANDUM O PROFESS ~~5 ~GINF~9 ip~ engineering I OREGON G po To: Kim McMillan, City of Tigard ~p ~k9,2 MD~~ 12~8'0~ From: Todd E. Mobley, PE EXPIRES: IZ 3• T-n Date: December 8, 2005 Subject: 72"d Avenue at Dartmouth Street - Access Spacing Adjustment This memorandum is, written to address the traffic operations associated with the requested ad- justment to the City of Tigard's access spacing. The adjustment is needed to serve a proposed development in the northeast comer of the intersection of Dartmouth Street and 72"d Avenue. This document is intended to serve as support for an application for adjustment, which will pre- cede the actual development application. Accordingly, the analysis described here is intended to address the operation of the proposed accesses. A full traffic impact study will accompany the future development application. Location Description The property in question has approximately 200 feet of frontage along Dartmouth Street and 215 feet of frontage along 72"d Avenue. Dartmouth Street is classified as a Collector and 72"d Ave- nue is an Arterial. Since Dartmouth Street is the lesser classification, the primary access is re- quired to be on this street per City of Tigard code 18.810.030. However, with the limited amount of frontage, traffic queues from the intersection of Dartmouth Street and 72"d Avenue extend beyond the property frontage. As such, the driveway is proposed to be limited to right- turn in and right-turn out movements. Having a single access that does not provide for left-turning movements is problematic not-only from a marketability standpoint, but also with respect to traffic operations. Forcing drivers out of direction generally results in violation of the left-turn restriction or undesirable cut-through traffic and illegal U-turns in other locations. This activity can compromise the safety and effi- ciency of the transportation system. Given the problems associated with a single right-in, right-out access, a second access is pro- posed along 72"d Avenue. Like the Dartmouth Street driveway, there is insufficient frontage to avoid traffic queues from the intersection of Dartmouth Street and 72"d Avenue, and this drive- way is also proposed to be limited to right-in and right-out movements. The possibility does ex- Union Station, Suite 206 ■ 800 NW 6th Avenue ■ Portland, OR 97209 ■ Phone 503.248.0313 ■ Fax 503.248.9251 Kim McMillan December 8, 2005 Page 2 of 5 ist for shared access with properties to the north as they develop, which is addressed in more de- tail later in this memo. The City of Tigard has long been planning the installation of a traffic signal at the intersection of Dartmouth Street and 72°d Avenue, which I understand is slated for construction sometime next year. SW 72°d Avenue is planned to be a five-lane facility and Dartmouth Street is currently a three-lane facility east of 72nd Avenue and a five-lane facility to the west. The City's Transpor- tation System Plan (TSP) classifies Dartmouth Street as a five-lane collector. Right-of-way is currently being collected and preserved through development along its frontage. Planned Site Development Although a specific development plan is not yet proposed on the site, a conceptual site plan ac- companies this access spacing adjustment request. The plan shows a single two-story building with a total of 15,400 square feet of floor area. This building will likely be a mix of office and retail space, but for the purpose of this report, the building was assumed to be occupied entirely with retail tenants. The trip generation associated with the development was estimated using data from the manual Trip Generation, Seventh Edition, published by the Institute of Transportation Engineers (ITE). Trip rates were used from land-use code 820, Shopping Center. The trip rates are based on the building floor area. The trip generation calculations show that the conceptual site development will result in a total of 58 evening peak hour trips with 28 entering and 30 exiting the site. To the extent that some of the building space is occupied by office uses, the trip generation will be lower than what is re- ported here. Detailed trip generation calculations are included in the attached technical appen- dix. Future Traffic Volumes To examine the long-term operation of the proposed site driveways, year 2015 traffic volumes were estimated. These volumes were estimated by including traffic volumes from several sur- rounding developments and applying an annual growth rate. Traffic volumes were included from Dartmouth Square and Tigard Triangle Commons, both of which are approved but unbuilt developments. Traffic was also included for development on the property in the southeast corner of the intersection of Dartmouth Street and 72nd Avenue, as well as development on site of the former Tri-County Center. Traffic volumes from the 1999 traffic impact study prepared by Lan- caster Engineering were used. The actual development of this property will be different than that Kim McMillan December 8, 2005 Page 3 of 5 assumed in the 1999 study, although for this analysis adding the considerable traffic from Tri- County Center will provide a reasonable approximation of traffic volumes. In addition to specific developments, the traffic volumes were increased using a growth rate of three percent per year for 10 years. This growth rate accounts for overall growth in the area as well as development of smaller surrounding properties. The estimated 2015 traffic volumes are shown in the attached technical appendix. Operational Analysis The operation of the intersection of Dartmouth Street at 72nd Avenue was examined, primarily to determine future traffic queues on the north and east approaches as they may affect the operation . of the proposed accesses. The intersection was analyzed using the signalized intersection analy- sis methodology contained in the 2000 Highway Capacity Manual, published by the Transporta- tion Research Board. Since the future configuration of the intersection is not certain at this time, several scenarios were examined with different lane configurations. The scenarios are illustrated graphically in the attached appendix and are described as follows: 1. A five-lane section on 72nd Avenue with the existing three-lane section on Dartmouth Street. For this scenario, it was assumed that 72nd would be built to full width by 2015 but Dartmouth Street would remain in its current configuration. 2. The lane configuration from Scenario 1 with the addition of a second northbound left- turn lane on 72nd Avenue. The traffic volumes show this northbound left-turning move- ment to be very heavy and with a single lane, it will be a significant detriment to the ca- pacity of the intersection. 3. A five lane section on both 72nd Avenue and Dartmouth Street. This was done since the City's TSP identifies Dartmouth Street a five-lane collector. 4. The lane configuration from Scenario 3 with the addition of a northbound left-turn lane. The results of the analysis show that traffic queues for all scenarios will extend beyond the pro- posed accesses. However, since these accesses will only allow right-turning movements, the queue blockages will only result in on-site delays to drivers exiting the driveways. The drive- ways are not expected to cause operational problems with the adjacent streets since the restric- tion of left turns will prevent conflicts that could occur with queue blockages. Included in the appendix is a figure that summarizes the queuing on the north and east approaches for all scenar- ios. The queue lengths are illustrated on an aerial photograph that shows their relation to the site and the proposed accesses. Kim McMillan December 8, 2005 Page 4 of 5 Also, the level of service at the intersection is expected to be F during the evening peak hour for Scenario 1. Each subsequent scenario results in improving levels of service with Scenario 2 be- ing E, Scenario 3 being D and Scenario 4 being C. Detailed capacity analysis outputs with level of service and queuing results are provided in the technical appendix. Given the relatively equal distribution of traffic volumes at the intersection, this location would be a valid candidate for in- stallation of a roundabout rather than a traffic signal. Given the City's immediate plans for sig- nalization, a roundabout option was not explored in this analysis. As mentioned previously, it is expected that with development north of the site, access to 72nd Avenue could be made available to this site farther north through access agreements with adja- cent development. Some consideration was given to the possibility of a future full-movement access being located opposite the Winco driveway. However, the analysis clearly shows that for nearly all scenarios, queues will extend beyond this location. It may be necessary to locate the first full movement intersection north of Dartmouth Street at Clinton Street. It is expected that to effectively restrict left turns at the site accesses, raised concrete curbs will be needed in both 72nd Avenue and Dartmouth Street. The design of these curbs can be ad- dressed in more detail later in the development process, but it is expected that they will need to be constructed as temporary features. The presence of a curb or barrier to restrict left turns will be permanent, but the near-term barriers themselves may be temporary. The upcoming capital project at the intersection of 72nd Avenue and Dartmouth Street may in- clude raised curbs, access control, and some amount of lane realignment at the intersection. This will affect any barriers or curbs that would be placed prior to the capital improvements. Given the likelihood of access restrictions on most if not all driveways near the intersection of Dartmouth Street and 72nd Avenue, it is recommended that when designing the intersection im- provements, the City give consideration to allowing U-turns on some approaches. This practice is becoming more prevalent on arterial and collector facilities near major intersections where ac- cess control exists. The Oregon Department of Transportation (ODOT) has design guidelines for allowing U-turns at signalized intersections. Sight Distance Sight distance measurements were conducted at the proposed site access locations. The meas- urements were done in accordance with the intersection sight distance standards contained in the Fifth Edition of A Policy on Geometric Design of Highways and Streets, published by AASHTO. The driver's eye height and the height of an oncoming object were both taken to be 3.5 feet and the measurements were taken from a point 15 feet behind the edge of the adjacent travel lane. The posted speed on Dartmouth is 35 mph, requiring 390 feet of sight distance. The posted Kim McMillan December 8, 2005 Page 5 of 5 speed on 72nd Avenue is 30 mph, requiring at least 335 feet. Since both accesses only allow right-turns out of the site, sight distance is only needed for one direction. Looking to the east from the Dartmouth Street access, sight distance is available well in excess of 390 feet. Looking to the south from the 72"d Avenue access, the intersection at Dartmouth Street is clearly visible. The proposed access will be over 200 feet from the intersection, afford- ing drivers exiting the driveway adequate separation from vehicles turning northbound onto 72nd Avenue. Looking through the Dartmouth Street intersection, sight distance is in excess of 335 feet. It is recommended that the necessary sight distance triangles be maintained through site design and construction. Parking and building locations should not block line of sight from the drive- ways and any vegetation near the driveways should be limited in height. Summary & Conclusions The results of the analysis show that traffic queues from the intersection of Dartmouth Street at 72nd Avenue will extend beyond both proposed access locations. However, since these accesses will only allow right-tuming movements, the queue blockages will only result in on-site delays to drivers exiting the driveways. The driveways are not expected to cause operational problems with the adjacent streets, even in the future when queues routinely extend beyond the driveways during the peak hours. The analysis also shows that the intersection of the Winco driveway with 72nd Avenue will be blocked by traffic queues in the future. This intersection may need to be limited to right turns in and right turns out if the City wishes to restrict left-turning movements within the influence of the traffic signal. Since access along both streets will likely need to be restricted, it is also recommended that the City examine the possibility of allowing U-turns at the intersection of Dartmouth Street and 72nd Avenue when the traffic signal and associated improvements are designed and constructed next year. If you have any questions or need anything further, please don't hesitate to call. NOTE. Traffic volumes derived assuming development of the subject site, the adjacent Dartmouth Square, Tigard Triangle Commons, the site of the former Tri-County Center (based on trip generation used in 1999 traffic study by Lancaster Engineering), and the property in the SE corner of 72nd Avenue and Dartmouth Street. Additionally, a 37. per year growth rate was applied for 10 years to account for other surrounding development. f r r..... ,r.+ # t M+ t. Y } s4. ~r I iw' a:}{(f u ( +r y '~I F + ww CC'' ~ _ ~ L. ;i llJJ77 1 `PY ~1 } a7:7 7=. f er 1, r • _ s r n F.; ~ «z ~ } .r.•J-•v. e t~ ~ .Y f nrye .i~ , ,x s a ~k~~~ *?7(r 'e 14 L-,? a~ a wa i ~L~'r•: rY • 3. ~i•i L.. _.P•JY~' vN~ ~ Y~, ~tj~ • i ~t, . a r T f~ ~~{+p ~ • ~ " i't~alm,~ ti ~IAN `'y ~ : A-11 T ~ ~ f i L fs l+q" L t#• ~ ~w I . f 1 v N4 •t ~ -f K• iy ~ ~ `✓l"•",1...u!WliRt-°'~F 1yl,•, S w~ t •1~1. 10 rfi M1` 1•, M O, 4LK r lie 7Q~` Oh 2.105 t'S' 19 0 "tai 19 v~` r ' N S7, 011 C . • Y'. 'S; tY, A.. r. ACCESS SPACING ADJUSTMENT REQUEST RGU RE Traffic Volumes - Estimated 2015 Conditions PM Peak Hour no scale PAGE NOTE: O The circled numbers and queue lengths shown 4- a 49- in the diagram &4~ correspond to the four o {ty lane configuration 4 alternatives shown to the ~ right. c ,SF. .rY~~ ~ :i s •~11 ~ (t * N + s S~ r+ ~"t.S t ~~wwr Y? "T r~e~ar' +,,y vi • ~Py~~.}•C~ - ♦ rt ~ a`t a , MLL t , ,.TS S, r.,. 2s k °+~,;1 rt 26 4 . mss'. t Air 4.1 ` ~ t ,1 ti ~ ~ ~ ~ 1 I 1 t . ,i {ifi a v , R ~1,',?~4l~Tilul?lit i ~ t f .h - FT~"TURNS N p kk t c i d au" f' r + Uk 37W i..5~ ACCESS SPACING ADJUSTMENT REQUEST FIGURE 95th Percential Queuing - Estiamted 2015 Conditions PM Peak Hour no scale PAGE TRIP GENERATION CALCULATIONS Land Use: Shopping Center Land Use Code: 820 Variable: 1000 Sq Ft Gross Leasable Area Variable Value: 15.4 AM PEAK HOUR PM PEAK HOUR Trip Rate: 1.03 Tn'p Rate: 3.75 Enter Exit Total Enter Exit Total Directional 61% 39% Directional 48% 52% Distribution Distribution Trip Ends . 10 G! Trip Ends 30~' ~S$ WEEKDAY SATURDAY Trip Rate: 42.94 Trip, Rate: 49.97 Enter Exit Total Enter Exit Total Directional 50% 50% Directional 50% 50% Distribution Distribution x e qjim 6 i I~t qj. IIiy4111iD aryjTMC ` ,y{: hji~ cTrip Ends 33 iw 1KTrip Ends Source: TRIP GENERATION, Seventh Edidon Lampus Office 12/08/05 72nd & Dartmouth, 3x5 09:14:52 2015 PM Peak Hour • SIGNAL2000/TEAPAC[Ver 2.02.141 -Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.90 Vehicle Delay 82.9 Level of Service F Sq 65.1 Phase 1 Phase 2 Phase 3 1 Phase 4 Phase 5 Phase 6 * * * v A A v v North + + + * + + + + + * + + + + v G/C=0.116 G/C=0.093 G/C=0.159 G/C=0.122 G/C=-.031 G/C=0.340 G= 13.9" G= 11.20 G= 19.1" G= 14.6" G= -3.7" G= 40.8" Y+Ra 4.0" Y+R= 4.0" Y+R= 4.0" Y+Ra 4.0n. Y+Ra 4.0" Y+R= 4.0" OFF= 0.0% OFF=14.9% OFF=27.6% OFF=46.8% OFF=62.4% OFF=62.7% C=120 sec G= 96.0.sec = 80.0% Y=24.0 sec = 20.0% Peda 0.0 sec = 0.0% I Width/ g/C Service Rate Adj HCM L Queue Group Lanesl Reqd used I @C .(vph) ®E IVolumel v/c I Delay 1 S I Model 31 N Approach 112.0 F ' ¢eaca===aaa=¢=aaaaaaa=aaa¢a¢¢aaasicaa¢==aa==aaa=aaaaaaa==aaa=a=a=aoaaacaaaaaaaaa RT+TH 24/2 0.309 0 159 1 511 567 1 056 1 12/1 10.290 10.116 I 1 1 177 I 217 11.053 1 1104 9 30.5 I *F 1 4507 78 ftI S Approach 65.4 E+ aaaaaaaaa¢=as==aa¢¢aaaa¢aaaaaaaaaa=a=aacaaaaaaaataaaaaaaaaaaaa¢a=aa==aa=m===aa= IRT+LT 1 12/1 10.370 10.243 1 427 1 4911 16 1 4622 50 11.049 1102.3 I*l F+8393 04 ft1 .R Approach 100.6 F aaaaasaaaaoaaaaaa==a====aaaaaa=aaaaaa=aaa==aaaaamaoaaa=aaaaa==aaaaaa¢aaaaaaea=a I RT+LT 1 12/1 10.295 10.125 I 391 1 1622 92 1 2656 33 11.054 1 12go 8 8.1 J*F *F (1503 ft1 W Approach 59.7 E+ aaaa¢aaaaaaaaaaaaacaa=aaa==aaa¢=a=aaa=acaa==a=aaaaaaa=aaaa¢=aaaa=====aaaaa~=ca RT 12/1 0.296 10:340 329 538 211 0.392 30.6 C 272 ft TH 12/1 0.344 0340 393 633 406 0.641 35.6 D+ 516 ft LT 12/1 0.293 0.122 1 187 228 1.056 129.3 *F 497 ft Lampus- Office 12/08/05 72nd & Dartmouth, 3x5 w/ dual NBL O 09:18:03 2015 PM Peak Hour w SIGNAL2000/TEAPAC[Ver 2.02.14] - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.85 Vehicle Delay 58.6 Level of Service E+ Sq 45 Phase 1 Phase 2 1 Phase 3 Phase 4 1 Phase 5 - * + + * + + + v v v North * + * * + * * v G/C=0.145 G/C=0.191 G/C=0.151 G/C=-.034 G/C=0.365 G= 16.0° G= 21.00 G= 16.7" G= -3.8" G= 40.10 Y+Ra 4.0" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% OFF=18.2% OFF=40.9% OFF=59.7% OFF=59.9% C=110 sec G= 90.0 sec = 81.8% Y=20.0 sec = 18.2% Ped= 0.0 sec 0.0% -------------------------------------------------------------------------------ane I LGroup IWLanesl Regdg/CUsed 10Cr(vph)R®EeIvolumel v/c I Del y I S I Modele3l• N Approach 59.7 E+ a=aaaa=a=aaaaaaa==aaa==aaaa==aaaaaaaaaaaaaaaaaa=coo=aaaaaa==caaaaaa==aeeaa==a== ' 1RT+LT 1 124/2 0 283 0 191 1 644 567 0880 567 382 ft 2/1 10.261 10.145 1 1 1 235 1 217 10.844 1 67.7 I*EE+l 349 ftI S Approach 66.7 E+ aaaa===aaaaa=aaaa==aaaaaaaaaa==aaaaaaaaa=aaa=aaa=aaaanaoa====aaaaa=aaa==a=aaaa= RT+TH 24/2 0 291 1 24/2 10.261 10.145 I 1 I 4656 85 1 4622 50 10.904 1 667.1 6.0 J *E+I 3433 21 ftl E Approach 66.5 E+ aaaaaaaaaaaaa=aaaaaaaaa=a=aaaaaaaaaaaaaaaea=aaaaaaaaaaaa==aeaaaa=aaaaacaa®aaaaa I RT . +TH 12/1 0.435 0367 665 656 0 986 1 659 I*1.912 ftj LT 1 12/1 10.265 10.154 1 491 1 251 1 233 10.857 68.1 *E+371 ft----------------------------------------------- W Approach 39.1 D+ aaaaaaaaa==aaaaa===a=aaaaaaaa=aaaaaca=aaaaaaa==aaaaaaaaaa=aaaaa=aaa=aaaaaaaaaa= RT 12/1 0.267 0..365 422 577 211.0.366 26.0 JC244 ft TH 12/1 0.325 0.365 507 679 406 0.598 29.9 C 466 ft LT 12/1 0.264 0.151 1 246 228 0.851 67.6 *E 363 ft Lampus Office e ~ 12/08/05 72nd & Dartmouth, 5x5 O 09:20:59 2015 PM Peak Hour .3 t11 ~y T SIGNAL2000/TEAPAC(Ver 2.02.141 - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of.Saturation (v/c) 0.84 Vehicle Delay 49.0 Level of Service D Sq 65 1 Phase 1 Phase 2 1 Phase 3 1 Phase 4 1 Phase 5 1 Phase 6 1 * * * A v , v v North + + + * + + + + + * + + + + v G/C=0.151 G/C=0.081 G/C=0.184 G/C=0.157 G/C=-.042 G/C=0.202 G= 13.6" G= 7.3" G= 16.6" G= 14.1" Gc -3.7" G= 18.2" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% OFF=19.5% OFF=32.1% OFF=54.9% OFF=75.1% OFF=75.4% C= 90 sec G= 66.0 sec a 73.3% Y=24.0 sec a 26.7% Peda 0.0 sec 0.0% Lane Width/ g/C Service Rate Adj HCM L Queue Group Lanesl Reqd Used I @C (vph) OE 1VolUMej v/c I Delay I S I Model 31 N Approach 54.3 D aaaaaccacc=acecaaaaeaea=aaccaac=cca=a=e==ccc=caaa=aa=ccccaaaaa===caaaooa RT+TH 24/2 0.234 0 184 63 620 5670915 1 12/1 10.206 10.151 1 392 l 255 i 217 10.813 1 5M==:; 54.2 1*D 1 293 ftl S Approach 38.5 D+ aa=a=ac=caa=ac==aaaaaaoaacacccc=vcc=naIIacca=ccaaaa=aacc=aaaa=occcca=caaaanvacaa 1RT+LT 1 12/1 100:244322 1310 1 3892 57 1 1489 1' 450 10.920 1 54.3 1*D+1 548 ftl E Approach 54.1 D acaccccaaaa=eoenoaa==a=e=ccaaaaaaaocaca=aaaoocac=c=aa~amcac=aao=a===aoacacaaoao 24/2 0 1RT+LT 1 12/1 10.214 10.160 1 118 1 272 1 2656 33 10.823 1 554.1 4.2 1 *D 1 3382 ft 11 ft1 W Approach 52.3 D occcco=ac=caa=aac=ccc==cc=aaaaaac=ccc=ac=cacc=ccaaaaaccc=caaaaaaa=aaacaaaaaaa==• . I RT+TH 24/2 0.247 0 202 431 1 678 1 617 10.910 1 51.5 J*D 1 358 ftj LT 1 12/1 10.212 10.157 110 267 228 0.820 54.2 D 305 ft------------------------------------------------------------------------------- Lampus Office 12/08/05 72nd & Dartmouth, 5x5 w/ dual NBL~ 2015 PM Peak Hour 09z23s20 SIGNAL2000/TEAPAC[Ver 2.02.141 - Capacity Analysis Summary Intersection Averages for Int # 1 - Degree of Saturation (v/c) 0.82 Vehicle Delay 35.5 Level of Service D+ Sq 45 Phase 1 Phase 2 f Phase 3 1' Phase 4 Phase 5 * + + * + + + v A * * * # tktktk* v v North * + * * + * * v G/C-0.166 G/C=0.212 G/C=0..172 G/Ca-.054 G/Ca0.218 Go 11.6" G= 14.8" G= 12.1" Ga -3.8" G= 15.3" Y+Ra 4.0" Y+R= 4.00 Y+R= 4.0" Y+R= 4.0" Y+R= 4.0" OFF= 0.0% OFF-22.3% OFF=49.2% OFF=72.2% OFF-72.5% C= 70 sec G= 50.0 sec - 71.4% Y=20.0 sec a 28.6% Ped= 0.0 sec a 0.0% Lane Width/ g/C Service Rate Adj HCM L Queue 1 Group Lanesl Reqd Used I ®C (vph) OE lVolumel v/c I Delay I S I Model 31 7 Approach 33.6 C ===aaa=oaaoaaoo=aaaaaa=.=====aaaaa=aaa=oa=Ca====a==aaaaa=a==.=aaa=======oaaaaa= RT+TH l 12/1 10.172 10.166 1 2518 08 1 2715 93 l 2567 17 10.738 l 332.3 7.2 1'~Cj D+2257 26 ft1 S Approach 35.9 D+ __=====aaaaaaaaaaaa=aaa=a=a======c=aaaaa=aaaaa=.===aaaaa=====aaaaa====oaaoa===a RT+TH 1 224/2 0.215 0 212 611 728 622 0854 363 286 ft 4/2 10.167 10.166 1 447 l 570 1 450 10.789 l 35.4 ID+l * 212 ftl E Approach 36.4 D+ a===aaaaaaaa=aaa======aaoaaaaaaaoaa======ao=aaaaaaaaaa=aaaaa===aaaaa======aaaaa RT+TH 1 12/1 10.181 10.175 I 223 l 310 1 233 10.752 I 37.3 I*D+l 241 ft1 W Approach 35.6 D+ ===aaaaa=aaa=a=aaaaa==-=====aaa=aaaac=========aaa=aaaaa==ao=a=====aaoa===c=aaa= 1RT+LT 1 124/2 2/1 100..172188 100:172 218 1 2618 18 I 373 05 I 228 100..748428 I 37.3 I*DC+l 236 ftI i i • i i o SW CLINTON STREET 0 • o I I ~n l/JZZ~1/J I- I i ADJACENT PROPERTY I i (FUTURE DEDICATION: 3187.97 SF REMAINING SITE AREA: 11246.95 SF) PROPOSED RAISED MEDIAN 46 BARRIER i I I I • i ADJACENT PROPERTY ..I (FUTURE DEDICATION: 2476.23 SF i REMAINING SITE AREA: 11958.69 SF) EXISTING WINCO ACCESS I FUTURE JOINT i ACCESS TO ADJACENT l PROPERTY I I I I • l P ROPos 4- I RIGHT-1 I-7 RIGHT-0 - - - r--- r - - I I I DEDICATION: 7829 SF I 4 ; . I (REMAINING SITE I I AREA: 35,816.48 SF) 1 I I ~ I I i 1 I I ; I PROPOSED BUILDING I FOOTPRINT AREA: 7,700 SF I ; 1 t t (2 STORY - 15,400 TOTAL SF) i ; I ; I ' I I I ~ 7e 7c 0 ' rrl ' 1 I 1 I 8 4- ; ;0 1 r z 1 m 1 '9'9 - 4 13c i I N i ~ I 1 i 'I•V I I I . z I ~ I. It I I 6 .•...•.•.•.•.•.•I'....' ; .5 L------ - . ! /l e. n . . . . . . . . .1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PROPOSE, It. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ~•RIGHT-IN. . . . . . . . . . . . . . . . . . . . . . RIGHT-OUT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CENT iRLINE OF SW DARTMOUTH STREET . . ~ . • . ~ . • . • . PRO'PO5~b ~ RAISED .MEDIAN. . . . . . . . . . . . . . . . . . . . . . . . . . . . . BARRIER . . . . . . . . . . . . ® r Site Plan D sb S f0 20 40' Adjustment Application - December 2005 Owner. Pro)- Sheet Title Revisiom MaDRErtDECt~IGROUP,P.C Date: 12-8-05 Sheet 1 of: I ARCHrrO M2 , IPAa F ANNaa Norwest Contractors Inc. 72nd and Dartmouth Site Plan Drawn by: Checked by. b Number. 105185 7650S.W.BevelanQ Suite 120 • Tigard Oregon 972298692 DAV GRCN DESIGN WP, M. ALL ro~ ~ Voice 509.244-0552 • Faro 509-244.0417 ronr~enae DAV RESERVEDGR