City of Tigard - Fanno House Tier 1 FCA Final Report Facility Condition Assessment Services Tier 1 Report of Facility Condition Assessment For City of Tigard Fanno House 13335 SW Hall Boulevard Tigard, OR 97223 1 Date of Report: October 12,2016 Provided By: Faithful+Gould, Inc. Provided For: City of Tigard FAITHFUL '1GOULD --TAll OF CONTENTS ExecutiveSummary........................................................................................................................................3 Introduction................................................................................................................................................3 LimitingConditions....................................................................................................................................3 ProjectDetails...........................................................................................................................................4 BuildingDetails..........................................................................................................................................4 BuildingDescription...................................................................................................................................5 PropertyExecutive Summary....................................................................................................................5 Architectural Structure Executive Summary..............................................................................................5 Mechanical Executive Summary...............................................................................................................5 Electrical Executive Summary...................................................................................................................6 SiteExecutive Summary...........................................................................................................................6 Summaryof Findings................................................................................................................................7 Building Expenditure Summary.................................................................................................................7 Distribution of Immediate(Year 1) Needs by Building System..................................................................9 Distribution of Future(Year 2-Year 10)Needs by Building System........................................................ 10 Facility Condition Needs Index................................................................................................................ 11 Needs Sorted By Prioritization of Work................................................................................................... 13 NeedsSorted By Plan Type.................................................................................................................... 14 ASubStructure Systems..............................................................................................................................15 A10FOUNDATIONS.............................................................................................................................. 15 A20 BASEMENT CONSTRUCTION....................................................................................................... 16 BShell Systems............................................................................................................................................17 610 SUPERSTRUCTURE...................................................................................................................... 17 B20 EXTERIOR ENCLOSURE............................................................................................................... 19 B30ROOFING........................................................................................................................................21 CInteriors Systems.......................................................................................................................................22 C10 INTERIOR CONSTRUCTION..........................................................................................................22 C20STAIRS............................................................................................................................................23 C30 INTERIOR FINISHES......................................................................................................................24 DServices Systems......................................................................................................................................26 D20PLUMBING......................................................................................................................................26 D30HVAC...............................................................................................................................................29 D50 ELECTRICAL SYSTEMS................................................................................................................30 E Equipment&Furnishing Systems...........................................................................................................32 E20 FURNISHINGS................................................................................................................................32 GBuilding Sitework Systems......................................................................................................................33 G20 SITE IMPROVEMENTS..................................................................................................................33 Appendices....................................................................................................................................................35 City of Tigard Fanno House October 12,2016 EXECUTIVE SUMMARY INTRODUCTION In accordance with the agreement held between The City of Tigard, agreement C170007 and Faithful+Gould Inc, this completed report provides a comprehensive Facility Condition Assessment of the Fanno House located at 13335 SW Hall Boulevard ,Tigard, OR, 97223 (The Property). This report provides a summary of the facility information known to us at the time of the study,the scope of work performed,an equipment inventory,evaluation of the visually apparent condition of The Property together with a forecast of capital expenditures anticipated over the next 10 years. The expenditure forecast does not account for typical preventative maintenance items such as changing filters to fan coil units. Our cost rates to produce life cycle and replacement cost estimates are based on our knowledge of the local regional market rates. Our line item costs assume that the work will be undertaken by either in-house or direct sub-contract labor. If the work is procured through public general contractor bids, we recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. The report provides a summary of the anticipated primary expenditures over the 10-year study period.Further details of these expenditures are included within each respective report section and within the 10-year expenditure forecast, in Appendix A. The report also calculates the Facility Condition Needs Index(FCNI)which is used in Facilities Management to provide a benchmark to compare the relative condition of a group of facilities.The FCNI is primarily used to support asset management initiatives of federal,state, and local government facilities organizations. LIMITING CONDITIONS This report has been prepared for the exclusive and sole use of the City of Tigard.The report may not be relied upon by any other person or entity without the express written consent of Faithful+Gould. Any reliance on this report by a third party,any decisions that a third party makes based on this report,or any use at all of this report by a third party is the responsibility of such third parties. Faithful+Gould accepts no responsibility for damages,if any,suffered by any third party as a result of decisions made,or actions taken, based on this report. The assessment of the building/site components was performed using methods and procedures that are consistent with standard commercial and customary practice as outlined in ASTM Standard E 2018-015 for PCA assessments. As per this ASTM Standard, the assessment of the building/site components is based on a visual walk-through site visit,which captured the overall condition of the site at that specific point in time only. No legal surveys, soil tests, environmental assessments, geotechnical assessments, detailed barrier-free compliance assessments, seismic assessments,detailed engineering calculations,or quantity surveying compilations have been made. No responsibility, therefore, is assumed concerning these matters. Faithful+Gould did not design or construct the building(s)or related structures and therefore will not be held responsible for the impact of any design or construction defects,whether or not described in this report.No guarantee or warranty, expressed or implied,with respect to the property,building components, building systems, property systems,or any other physical aspect of The Property is made. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 The recommendations and our opinion of probable costs associated with these recommendations, as presented in this report, are based on walk-through non-invasive observations of the parts of the building which were readily accessible during our visual review. Conditions may exist that are not as per the general condition of the system being observed and reported in this document.Opinions of probable costs presented in this report are also based on information received during interviews with operations and maintenance staff. In certain instances, Faithful+Gould has been required to assume that the information provided is accurate and cannot be held responsible for incorrect information received during the interview process. Should additional information become available with respect to the condition of the building and/or site elements, Faithful+Gould requests that this information be brought to our attention so that we may reassess the conclusions presented herein. The opinions of probable costs are intended for global budgeting purposes only. Faithful+Gould has no control over the cost of labor and materials, general contractor's or any subcontractor's method of determining prices, or competitive bidding and market conditions.The data in this report represent an opinion of probable cost of construction and is made on the basis of the experience, qualifications, and best judgment of the professional consultant familiar with the construction industry. Faithful+Gould cannot and does not guarantee that proposals, bids,or actual construction costs will not vary from this or subsequent Cost Estimates.The scope of work and the actual costs of the work recommended can only be determined after a detailed examination of the site element in question, understanding of the site restrictions, understanding of the effects on the ongoing operations of the site/building, definition of the construction schedule, and preparation of tender documents. PROJECT DETAILS On Aug 22,2016,Johnnie Yates of Faithful+Gould visited The Property to observe and document the condition of the building and site components. During our site visit, Faithful+Gould was assisted by John Sager(Facility Manager)who is associated with City of Tigard. BUILDING DETAILS Item Description Project Name Fanno House Property Type MISC Full Address 13335 SW Hall Boulevard Tigard, OR 97223 Onsite Date Aug 22,2016 Historic District Yes Historic Building Yes Year Built 1938 Occupancy Status Vacant Number of Stories 2 Gross Building Area(GSF) 2,505 Current Replacement Value(CRV) $463,425 ARV/GSF($/Sq Ft) $185.00/Sq Ft F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 BUILDING DESCRIPTION PROPERTY EXECUTIVE SUMMARY The City of Tigard Fanno House building is located at 13335 SW Hall Boulevard, Tigard, Oregon) and was built in 1938. The building has been * _. refurbished many times following construction, and most recently in circa 2006, although this could not be confirmed on site. The following capital k improvements were reported to us:structural shoring of the basement wood joist and beam construction, a half bathroom addition to the building located adjacent to the kitchen area, and the addition of a painted wood ramp and 4 deck added to the exterior access. The main building is supported by one standalone garage structure to the east of the main building which is used for storage. ARCHITECTURAL STRUCTURE EXECUTIVE SUMMARY f The two story building construction contains a reinforced slab-on-grade with - concrete spread footings which support the concrete basement walls, and wood framed structure and walls. The upper floors are constructed of wood beams and joists with a plywood deck. The wood framed exterior walls support a 3/4 pitched rafter roof, finished with wood decking and an asphalt ` 3; shingle finish. Exterior walls are clad with vinyl siding and the sloped roof : drains storm water into gutter and downspout system. UPVC windows to the 1st, 2nd, and the roof level shed dormers allow for natural light to enter the w rooms. The building contains a combination of; double leaf wood 'French' doors at the north elevation,one single leaf wood door at the main entrance,and three single leaf glazed wood doors. Interior partitions consist of panted and textured gypsum board. IL MECHANICAL EXECUTIVE SUMMARY The buildings heating,ventilation and air conditioning (HVAC)is provided by one split-system consisting of one natural gas energy efficient furnace with evaporator coil, and one exterior heat pump located to the south elevation of + the building. The buildings domestic hot water is provided by one natural gas direct-vent ' instantaneous water heater located in the basement. I I Ell 11111111 F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 ELECTRICAL EXECUTIVE SUMMARY The Main Distribution Panel (MDP) located in the basement serves kitchen appliances, HVAC equipment,interior and exterior lighting. The interior lighting consists of surface mounted fixtures throughout the building. The exterior lighting also consists of surface mounted fixtures located adjacent to the building entrances. The building contains a fire alarm panel that monitors smoke detection - devices and communicates with the City of Tigard Fire Department SITE EXECUTIVE SUMMARY The Property contains two small block paved parking bays with asphalt interior roadways which serve staff and visitor parking located to the south, and southeast of the building. One ADA parking space is provided adjacent to the main entrance. In addition to this, cast-in-place concrete sidewalk sections, and pressed pavements are provided to the perimeter of the main building and garage. t F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 SUMMARY OF FINDINGS This report represents summary-level findings for the Property Condition Assessment.The deficiencies identified in this assessment can be combined with potential new construction requirements to develop an overall Long Term Capital Needs Plan that can be the basis for a facility wide capital improvement funding strategy. Key findings from the Assessment include: FindingsKey Current Year Facility Condition Needs Index 7.09 Immediate Capital Needs(Year 1) included in FCNI $32,855 Future Capital Needs(Year 2 to Year 10) $272,893 BUILDING EXPENDITURE SUMMARY The building expenditure summary section provides an executive overview of the findings from the assessment.The chart below provides a summary of yearly anticipated expenditures over the study period for the Fanno House building. In addition, we have scheduled key findings highlighting items greater than$5,000 and their anticipated failure year. Further details of these expenditures are included within each respective report section and within the expenditure forecast, in Appendix A of this report. The results illustrate a total anticipated expenditure over the study period of approximately$305,748. Expenditure Forecast Over Study Period $20OK $150 K — a $100 CL L 501 $0 2015 2017 201& 2019 2020 2021 2022 2023 2024 2025 Expenditure $32,85K $0 $0 $29.65K S152.25K $0 54.3K $0 $ee.7K $0 F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 • C Interiors: Replace Roll Carpet with Padding at an estimated cost of$27,384 in year 2019 • C Interiors: Replace Wood Flooring at an estimated cost of$40,786 in year 2024 C Interiors: Replace Painted Finish-Standard at an estimated cost of$29,962 in year 2024 D Services: Replace Cold Water Distribution at an estimated cost of$27,896 in year 2016 A E Equipment&Furnishing: Replace Floor Mounted Base Cabinet(s)-Standard at an estimated cost of$11,880 in year 2024 I G Building Sitework: Replace Asphalt Mill&Overlay including Re-Striping at an estimated cost of$152,245 in year 2020 1 All costs presented in present day values 2 Costs represent total anticipated values over the 10 year study period 3 Budget for additional project costs of between 25%-35%to allow for professional fees and general contractor overhead/profit and management costs F+G Project No.100051118 '. Powered by iPlan—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 DISTRIBUTION OF IMMEDIATE (YEAR 1) NEEDS BY BUILDING SYSTEM Distribution of Inimediate feeds by Building System Gas Supply System Ramps) Stair Handrails and HaJustrades Cold Water Senn Building System Estimated Cost Percentageof Total Cold Water Service $27,896 84.9% Gas Supply System $746 2.3% Ramp(s) $2,485 7.6% Stair Handrails and Balustrades $1,728 5.3% Total $32,855 100% F+G Project No.100051118 '.• Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 DISTRIBUTION OF FUTURE (YEAR 2-YEAR 10) NEEDS BY BUILDING SYSTEM Distribution of Capital Needs by Building System C20 Site Impr4vemen 1310 Superstructure 030 Rao$ng k E20 Fumishing 30 Inberinr Finishes Building System Estimated Cost Percentage of Total Cost B10 SuperStructure $1,763 0.7% B30 Roofing $4,298 1.6% C30 Interior Finishes $100,638 36.9% E20 Furnishings $13,949 5.1% G20 Site Improvements $152,245 55.8% Total $272,893 100% F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 FACILITY CONDITION NEEDS INDEX In this report we have calculated the Facility Condition Needs Index(FCNI)for the facility; illustrating the likely condition of the systems, equipment and building needs should the required funding not be expended over the cost study period. The FCNI is used in Facilities Management to provide a benchmark to compare the relative condition and needs of a group of facilities. The FCNI is primarily used to support asset management initiatives of federal,state,and local government facilities organizations. The FCNI is the ratio of accumulated Deferred Maintenance (DM) (total sum of required and recommended works) and Needs(ADA)to the Current Replacement Value (CRV)for a constructed asset. Calculated by dividing DM and Needs by CRV(in this instance we have applied an Adjusted Replacement Value(ARV)to the CRV to reflect to value of the partial building assessment).The range is from zero for a newly constructed asset,to one for a constructed asset with a DM value equal to its CRV.Acceptable ranges vary by Asset Type,but as a general guideline,the FCNI scoring system is as follows: Maintenance, Repair, Needs and FCNI_ Replacement Deficiencies of the Facility(s) Current Replacement Value of the Facility(s) (CRV) If the FCNI rating is 60%or greater then replacement of the asset/building should be considered instead of renewal. . • • Definition In a new or well-maintained condition with no visual evidence of wear, GOOD soiling or other deficiencies. 0%to 5% FAIR Subject to wear and soiling but is still in a serviceable and functioning 5%to 10% condition. POOR Subjected to hard or long-term wear. Nearing the end of its useful or Greater than 10% serviceable life. - Subjected to hard or long-term wear. Has reached the end of its Greater than 60% useful or serviceable life. Renewal now necessary. The chart below indicates the current FCNI ratio of the Fanno House building. 010 10% 20% 30% 40% 50% 50% 70% $0°116 90% 100% ■ FCI ■ Good Fair 0 Poor E Very Poor Fanno House, FCNI: 7.09% F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 The chart below indicates the effects of the FCNI ratio per year,assuming the required funds and expenditures ARE made to address the identified actions each year. Year by Year Effects of FCI Over the Study Period 4M,4 s0% 21]°Aa 2016 2017 2018 2013 2020 2021 2022 2023 2024 2025 ■ FCI 7.09°/a 0°la 0°la 6.4% 32.W'ia 0°/a .93111/6 0°/a 18.71°/a 0°/a ■ FCI Very Poor 0 Poor Fair 0 Good The Chart below indicates the cumulative effects of the FCNI ratio over the study period assuming the required funds and expenditures are NOT provided to address the identified works and deferred maintenance each year. Cumulative Effects of FCI over the Study Period 8c¢� 60% 40% 20% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ■ FCI 7.09°l4 7.09°1/6 7.09°{4 13.49°{4 46.34°l4 46.34°{4 47.27% 47.27°r6 65.9811/4 65.98°l4 ■ FCI Very Poor 2 Poor Fair 0 Good F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 NEEDS SORTED By PRIORITIZATION OF WORK Faithful+Gould has prioritized the identified work in order to assist with analyzing the deficiencies found during the assessment. The following Priorities are shown below: Priority 1 -Systems requiring immediate action that have failed,compromises staff or Currently Critical public safety or requires to be upgraded to comply with current codes and accessibility Priority •A system or component is nearing end of useful life,if not addressed will Potentially Critical: cause additional deterioration and added repair costs Priority -Lifecycle replacements neccessary but not critical or mid-term future Necessary/Not Critical: replacements to maintain the integrity of the facility or component The chart below illustrates the breakdown of expenditure according the priority coding providing an opportunity to strategically plan and effectively direct funding to the highest priority. Planning Horizon Needs by System and Priority $200'0oo.00 M x $150,000.00 CL rt C rn $100,000.00 — Q 0 a c $50,000.00- $0.00- C 50,000.00$0.00C Interiors D Services B Shell E Equipment G Building & Furnishing Sitework Priority ■ Priority 1 ■ Priority 2 priority 3 Building System Priority 1 Priority 2 Priority 3 go Total B Shell $0 $0 $8,546 $8,546 C Interiors $0 $1,728 $100,638 $102,366 D Services $0 $28,642 $0 $28,642 E Equipment&Furnishing $0 $0 $13,949 $13,949 G Building Sitework $0 $0 $152,245 $152,245 Totals $0 $30,370 $275,378 $305,748 F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 NEEDS SORTED BY PLAN TYPE Faithful+Gould has prioritized the identified work according to the Plan Type or deficiency categories in order to assist with analyzing the deficiencies found during the assessment.The following Plan Types are shown below: Plan •- 1 -Maintenance that was not performed when it was scheduled or past its Deferred useful life resulting in immediate repair or replacement Plan • *Maintenance that is planned and performed on a routine basis to maintain and preserve the condition L Routine Maintenance Ad Plan •- 3 -Planned replacement of building systems that have or will reach the end of Capital Renewal their useful life Plan •- ' *When the repair or replacement of equipment or systems are SustainabilityEnergy& recommended to improve energy and sustainability performance Plan •- 5 *When the repair or replacement of equipment or systems are recommended to comply with ADA The chart below illustrates the breakdown of expenditure according to the Plan Type or deficiency categories providing an opportunity to strategically plan and effectively direct funding. Planning Horizon Bleeds by Category $340,004 $250,064 $200,000 $Y 50,04 $1U0,06 $50,000 ADA Capital Re nL-_wal Defe rre,d Routine Piaintenance Maintenance Deferred Maintenance $28,642 Capital Renewal $272,893 Routine Maintenance $2,485 ADA $1,728 Total $305,748 F+G Project No.100051118 '.• Powered by iPlan—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 A10 FOUNDATIONS A1011 Wall Foundations DESCRIPTION The building is supported by reinforced concrete spread footings around the perimeter of the foundation wall for the basement and first floor.The compressive strength of the concrete is unknown. CONDITION The footings were not visible due to their location below the exterior wall construction. However,we observed no major movement to the structure that they are supporting,therefore we assume them to be in fair condition and free from defects.We do not anticipate replacement during the study period. A1031 Standard Slab on Grade DESCRIPTION The main building basement and standalone garage is provided with a cast-in-place concrete slab-on-grade which is reinforced with welded wire fabric.We assume that the floor slab was placed over a vapor barrier and compacted gravel fill,with the thickness of the slab being approximately 2",laid over a crushed aggregate base and compacted sub-grade.The compressive strength of the concrete is unknown. CONDITION The slab-on-grade was observed to be in fair condition with no signs of undue settling or major cracks noted. We do not anticipate any requirements for replacement during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 A20 BASEMENT CONSTRUCTION A2021 Basement Wall Construction DESCRIPTION The building contained cast-in-place concrete foundation walls within the partial basement area which we assume is supported via reinforced concrete spread footings.The compressive strength of the concrete is unknown. CONDITION The basement wall construction appeared to be in fair condition on the areas below grade viewed from the interior of the building. We believe the basement construction will last beyond the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 B SHELL SYSTEMS 1310 SUPERSTRUCTURE B1012 Upper Floors Construction DESCRIPTION The upper floor appeared to consist of wood beams and trusses covered with wood decking. CONDITION The wood floor construction was not visible due to floor/ceiling finishes being installed,however,there were no signs of warping or cracking from moisture or insect damage,therefore we assume flooring to be in fair condition and no replacement actions will be generated during the study period. B1014 Ramp(s) DESCRIPTION The main building is provided with a painted wood ramp structure and landings from ground to the 1st floor level of the building, with painted wood handrails and balustrades. CONDITION The ramp appeared to be in fair condition structurally with; deterioration of the paint finish only,therefore,we recommend painting of the ramp in the near-term of the study period to maintain the integrity of the wood. 131015 Exterior Stairs and Fire Escapes DESCRIPTION The main building is provided with painted wood stairs to the west elevation from ground to the 1st floor level of the building,with painted wood handrails and balustrades. CONDITION The stairs appeared to be in fair condition structurally with; deterioration of the paint finish and wood treads, therefore, we recommend replacing the stairs in the near-term of the study period to maintain safe access/egress to the building. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 PROJECTED EXPENDITUREF Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 154477 B1010 Paint Exterior Ramp Priority 3 2016 $2,485 154478 B1010 Replace Exterior Stair(s)-Wood Construction Priority 3 2019 $1,763 TOTALS BY YEAR Yearim Total Expenditures 2016 $2,485 2019 $1,763 F+G Project No.100051118 Powered by iPlan"O 4tell""Solutions, LP City of Tigard Fanno House October 12,2016 B20 EXTERIOR ENCLOSURE B2011 Exterior Wall Construction DESCRIPTION The building and garage exterior walls consisted of vinyl horizontal siding,which is supported by the building wood frame walls,and wood columns within the exterior and interior walls supporting the roof structure.The wood frame walls are assumed to be insulated, however, this could not be confirmed on site. CONDITION The exact date of installation of the exterior wall vinyl siding could not be determined, however,the siding appeared to be in fair-to-good condition with no noted deterioration of the frame and/or siding which would require any actions during the study period. B2021 Windows DESCRIPTION The building contained double glazed UPVC windows units at the elevations and roof level shed dormers;with gaskets between glazing and aluminum frame,and with urethane sealant provided at the perimeter of the window framing systems. CONDITION The window systems appeared to be in generally fair condition.We noted no deterioration of the frame or glass which would require any replacement action during the study period. B2034 Overhead Doors DESCRIPTION The garage building contains two manually operated overhead doors with interlocking slat sections on a guided track at each side of the door. CONDITION The overhead door appeared to be in fair condition,we are unaware of any operating issues and they will last beyond the study period. It should be noted that, we recommend considering the retrofit of an electrically operated motor in the near-term or the study period to improve operation, however,associated costs have been excluded from this report as it has been considered a discretionary expense. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 B2039 Other Doors&Entrances DESCRIPTION The building contains a combination of; double leaf wood `French' doors at the north elevation, one single leaf wood door at the main entrance, and three single leaf glazed wood doors located throughout the main building and garage. The door ironmongery typically consisted of standard knob hardware. The single and double leaf doors appeared to be in fair condition operating satisfactory with the hardware performing as required. Based on our observations we have extended the RUL;therefore no actions will be generated during the study period. It should be noted that, the knob hardware is non-compliant with ADA requirements;as they require tight grasping and twisting to turn.We recommend replacement of the knob hardware with leaver handles in the near-term of the study period,however,due to the scale of replacement this is considered to be operational as opposed to a capital expenditure and has been excluded from the report. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 B30 ROOFING B3011 Roof Finishes DESCRIPTION The main building roof consisted of a pitched structure with dormer windows at the east and west elevations,the structure is formed with wood roof trusses,which are covered with a ply board deck and asphalt shingle roof covering. CONDITION The asphalt shingles appeared to be in fair-to-good condition considering age;based on observed conditions and a typical EUL of twenty- five years we do not anticipate a requirement for replacement during the study period. B3016 Gutters and Downspouts DESCRIPTION The pitched roofs to the main building and garage collect storm water at east and west elevations within polyester powder-coated metal gutters mounted to the painted wood fascia which discharge into box downspouts and into municipal sewers. CONDITION The rain water goods at the building appeared to be in fair condition. The typical EUL for this type of equipment is twenty-years,therefore based on observed conditions and RUL we anticipate replacement will be required in the middle-term of the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. RecommendationID Type . 154479 1 B3010 Replace Aluminum Perimeter Gutters&Downspout Priority 3 2022 $4,298 TOTALS BY YEAR Year Total Expenditures 2022 $4,298 F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 E: INTERIORS SYSTEMS C10 INTERIOR CONSTRUCTION C1021 Interior Doors DESCRIPTION Interior doors at the Property primarily consist of a combination of single leaf hollow core wood panel doors,hollow core commercial wood board doors,and painted wood frames CONDITION The doors were generally found to be in fair working condition with a typical EUL of thirty years;therefore based on the observed conditions and EUL we do not anticipate replacement works during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 C20 STAIRS C2011 Regular Stairs DESCRIPTION The main building contains two staircases; one main quarter-landing staircase which provides access/egress at 1st through to 2nd floor levels,and one quarter-landing staircase which provides access/egress to the basement.Staircases are constructed from wood with wood risers/treads,and a roll carpet finish to the main stairs,and metal nosing protection to the basement stairs. CONDITION The staircases were found to be in fair condition,therefore we do not anticipate any replacement works during the study period. C2014 Stair Handrails and Balustrades DESCRIPTION The staircases are provided with a combination of wood handrails with metal mounting bracket and wood handrails and balustrades to open edges at the 1 st floor level.The basement staircase open edge is not provided with handrails/balustrades. CONDITION The staircase handrails were found to be in fair condition structurally; however, it was noted that the handrails were not compliant with ADA requirements.We recommend budgeting for the replacement of the main(1 st through to 2nd floor)handrails early in the study period. In addition to this,we recommend the installation of wood handrails and balustrades to the open edge of the basement stairs. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID �111ecommendation 154480 C2010 Replace Stair Handrails and Balustrades-Wood Priority 2 2016 $1,728 Construction TOTALS BY YEAR Year Total Expendituresm 2016 $1,728 F+G Project No.100051118 '.• Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 C30 INTERIOR FINISHES C3012 Wall Finishes to Interior Walls DESCRIPTION Interior walls/partitions throughout the Property typically consist of a combination of textured gypsum board and cast-in-place concrete with a paint finish, in addition to this,the 2nd floor restroom/shower/bathroom walls are partially clad with ceramic tiles. CONDITION Paint finishes throughout the Property were generally found to be in fair condition generally with; minor localized marking,staining,and/or minor impact penetrations observed.We recommend budgeting for repainting of the walls/partitions, ceilings, and door/window frames in the far-term of the study period,and in conjunction with holistic refurbishment works to benefit from economies of scale. The ceramic tile finishes to restrooms were generally found to be in fair-to-good condition.With the typical EUL of thirty-years we anticipate that the ceramic tiles will last beyond the study period without replacement. C3024 Flooring DESCRIPTION Interior flooring to the 2nd floor bathroom, 1 st floor kitchen areas,and ADA toilets consists of sheet vinyl,and the 2nd floor shower room is provided with Vinyl Composite Tile(VCT)flooring. In addition to this,wood flooring is provided throughout the Property. CONDITION The sheet vinyl flooring to the 2nd floor bathroom was found to be in fair-to-good condition,therefore we do not anticipate any replacement works during the study period.The sheet vinyl flooring to the 1st floor kitchen areas and ADA toilets was found to be in fair condition.We recommend budgeting for replacement of this vinyl flooring in the far-term of the study period,and in conjunction with holistic refurbishment works to benefit from economies of scale. The VCT to the 2nd floor shower area was noted to be in poor-to-fair condition with localized delamination and lifting of the tiles noted, therefore we recommend replacement of the VCT in the near-term of the study period. The wood flooring was found to be in fair condition generally with localized scuff and scratch marking noted. Based on our observations, and assuming the completion of as need maintenance we have extended the RUL to the late-term of the study period and recommend the wood flooring to be replaced at that point, in conjunction with holistic refurbishment works to benefit from economies of scale. It should be noted that, it could be possible to extend the RUL of the wood floor beyond the study period and consideration should be given to sanding/stripping and seal coating prior to replacement. C3025 Carpeting DESCRIPTION In addition to the aforementioned,roll carpet adhered to the suspended wood floor is provided through the building.Carpet is also provided to the main staircase treads/risers. F+G Project No.100051118 EM - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 CONDITION The carpet finish throughout the building was generally found to be in fair but dated condition, therefore we recommend budgeting for replacement of the carpet in the near-term of the study period. C3031 Ceiling Finishes DESCRIPTION The ceilings throughout the Property typically consist of painted gypsum board. CONDITION The painted gypsum board ceilings were generally found to be in fair-to-good condition with localized scuff marking noted. We do not anticipate the requirement for replacement of the gypsum board ceilings during the study period, however,we recommend budgeting for painting the ceilings in the far-term of the study period,and in conjunction with holistic refurbishment works to benefit from economies of scale.The cost for this is included with paint wall finishes. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overheadiprofit and management costs. ID �§Kecommendatlon Priority 154481 C3010 Replace Painted Finish-Standard Priority 3 2024 $29,962 154482 C3020 Replace Vinyl Composite Tile(VCT) Priority 3 2019 $501 154483 C3020 Replace Roll Carpet with Padding Priority 3 2019 $27,384 154484 C3020 Replace Vinyl Sheet-Kitchen/Restrooms Priority 3 2024 $2,004 154485 C3020 Replace Wood Flooring Priority 3 2024 $40,786 TOTALS BY YEAR Year Total Expenditures 2019 $27,885 2024 $72,752 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D SERVICES SYSTEMS D20 PLUMBING D2011 Water Closets DESCRIPTION There is four floor mounted vitreous china water closet with a plastic seat within the Property.These are all tank-less type units with manual flush valves. CONDITION The vitreous china water closets were observed to be in fair-to-good condition.The water closets flushed properly and did not have any cracks in the china. Based on observed conditions, we do not anticipate a requirement for replacement during the study period. We anticipate that the flush valves may fail during the study period;therefore,to maintain function they may need to be rebuilt or in some cases replaced. This work has not been included in this study as we anticipate it will be carried out on an as needed basis as part of routine maintenance. D2013 Lavatories DESCRIPTION The Property contained a combination of vitreous china lavatories,including;two wall mounted lavatories,one vanity top lavatory,and one pedestal lavatory.The lavatories are typically provided with single lever and knob handles with non-metered faucet. CONDITION The lavatories appeared to be in fair-to-good condition considering age.The lavatories drained properly and did not have any cracks in the china;therefore,no actions will be generated as we anticipate that they are suitable to last beyond the study period.We anticipate that the faucets may fail during the study period and therefore to maintain function,they may need to be replaced.This work has not been included in this study as we anticipate it will be carried out on an as-needed basis as part of routine maintenance. It should also be noted that,knob handled are non-compliant with ADA regulations,therefore, upon failure of the existing faucets should be replaced with lever handles. D2014 Sinks DESCRIPTION The Property contained one double bowl porcelain kitchen sink with a single lever handles and non-metered faucets located within the kitchen area. CONDITION The porcelain kitchen sink appeared to be in to fair-to-good condition and functioned properly with no leaks; therefore, no actions for replacement are anticipated during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D2015 Bathtubs DESCRIPTION The 2nd floor bathroom contained one freestanding prefinished cast iron 'roll top' bathtub with ball and claw feet and brushed nickel accessories. CONDITION The bathtub appeared to be in to good condition and functioned properly with no leaks;therefore,no actions for replacement are anticipated during the study period. D2017 Showers DESCRIPTION The 2nd floor shower room contained one three wall ceramic tile shower system with associated shower components and valve. C❑NDITI❑N The shower enclosure was found to be in good condition;therefore, no actions for replacement are anticipated during the study period. D2021 Cold Water Service DESCRIPTION The domestic cold water system to the building is supplied directly from local utilities. CONDITION The domestic water system at the building appeared to be in fair condition generally, however, upon review of documentation (appended to this report) provided by the City of Tigard which tested above the minimum reporting limit for lead contaminates, we recommend replacement of the domestic plumbing in the near-term of the study period. It should be noted that,the main supply from the water meter to the Property was replaced in 2010 and consists of PEX material. D2022 Hot Water Service DESCRIPTION The buildings domestic hot water for the kitchen, bathroom, shower, and restroomsltoilets is provided by one natural gas direct-vent instantaneous water heater manufactured by Rinnai in 2008. CONDITION The direct-vent instantaneous water heater appeared to be in fair-good condition and eight-years old; we are unaware of any operating issues and anticipate the units to last beyond the study period due to the RUL and observed condition. F+G Project No.100051118 EM - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D2031 Waste Piping DESCRIPTION Waste piping is assumed to be a combination of cast iron and PVC piping throughout the Property. CONDITION No visually apparent problems with the sanitary waste piping were observed or reported by the maintenance personnel.The waste system can be serviceable through the end of the study period with regular maintenance. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID Type Recommendation 154486 1 D2020 Replace Cold Water Distribution Priority 2 1 2016 1 $27,896 TOTALS BY YEAR Year Total Expenditures 2016 $27,896 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D30 HVAC D3012 Gas Supply System DESCRIPTION The building has natural gas piping for the furnace and water heater. This is fed from a 2" main located at the north side of the building.The gas main and diaphragm is not equipped with seismic shut off valves. CONDITION The gas main appeared to be in poor condition and suffering from corrosion that could be attributed to age; therefore we recommend replacement of the gas main in the near-term of the study period. It should be noted that, the new main is to be equipped with a seismic shut off valve. D3032 Direct Expansion Systems DESCRIPTION The buildings heating,ventilation and air conditioning(HVAC)is provided by one split-system consisting of;one natural gas energy efficient furnace manufactured by Carrier with evaporator coil, and an assumed capacity of 80,000 BTU, with one heat pump manufactured by Carrier and located to the south elevation of the building. The manufacturer's information and capacities can be found in the following HVAC mechanical table CONDITION The indoor furnaces/evaporator coil split-system units were in fair-to-good condition for their age, manufactured in 2008. Based on the typical EUL of twenty-years;we do not anticipate any actions during the study period. The split-system outdoor heat pump unit appeared to be in fair-to-good condition and well maintained.Based on observed conditions and an EUL of twenty-years,we do not anticipate any actions during the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID Type Recommendation 154487 1 D3010 Replace Gas Meter-2" Priority 2 2016 $746 TOTALS BY YEAR Year Total Expenditures 2016 $746 F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D50 ELECTRICAL SYSTEMS D5012 Low Tension Service&Dist DESCRIPTION The building electrical service meter loop enters the building at the south elevation.The Main Distribution Panel(MDP)is rated at 208YI120 volts at approximately 225 amps and is located at the basement and is manufactured by Siemens in 2010. CONDITION The MDP appeared to be in good condition.There were no signs of deterioration or issues noted on the panel.The typical EUL for electrical panel such as this is thirty years;therefore there will be no requirement for replacement during the study period. We recommend further evaluation of the panelboard via an infrared electrical inspection which will highlight if high temperatures, excessive electrical resistance, failing components,ground faults and short circuiting issues exist. The electrical equipment should receive preventive maintenance consisting of cleaning the interior the enclosure, and infrared scans of connections,fuses,and breakers in switches at the start of the study period and repeated no more than every three years thereafter.Any items identified as abnormal during the infrared scans should be corrected at that time. D5021 Branch Wiring Devices DESCRIPTION The branch wiring devices including switches, receptacles, GFCI and other devices were observed to be commercial grade in standard non-decor format. Branch wiring was observed to be distributed in Electrical Metallic Tubing (EMT) conduit except in locations that may vibrate where flexible metal clad cable is typically used. CONDITION The branch wiring was observed to be in fair condition with no broken outlets or switches,therefore assuming the completion of as needed localized replacement,no actions will be generated during the study period. D5022 Lighting Equipment DESCRIPTION The interior lighting is provided by a combination of surface mounted fixtures throughout the building. Interior light fittings are typically controlled with manual switches adjacent to entrance doors. The exterior lighting also consists of surface mounted fixtures, located near the entrances to the building. CONDITION The interior lighting was observed to be in fair condition with all fixtures operating properly and with no broken lenses or deteriorated housings noted.Assuming ongoing lamping and replacement of defective fixtures as a maintenance expenditure,we do not anticipate that any major works are required to the lighting systems during the study period. The exterior light fixtures appeared to be in fair condition with no visible deterioration or fogging observed, therefore no actions will be generated during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 D5037 Fire Alarm Systems DESCRIPTION The building contains one fire alarm panel that monitors smoke detection devices and communicates with the City of Tigard Fire Department CONDITION The fire alarm panel appeared to be in fair-to-good condition with no operational issues observed or reported to us.There is no action for replacement of the system,as we believe this will last beyond the study period with regular maintenance and testing. D5092 Emergency Light&Power Systems DESCRIPTION There are standard wall mounted exit signs at all egress points from the Property. The signs are white plastic with red lettering and local battery backup. CONDITION The exit signs were observed to be in fair-to-good condition with no issues,therefore no actions will be generated during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 EqUIPMENT & FURNISHING E20 FURNISHINGS E2012 Fixed Casework DESCRIPTION The kitchen area is provided with fixed laminate finished countertops and base units. CONDITION The countertops and base units were generally found to be fair but dated condition, therefore we anticipate that all casework will be replaced in the far-term of the study period,and in conjunction with holistic refurbishment works to benefit from economies of scale. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 4.It. I 154488 E2010 Replace Floor Mounted Base Cabinet(s)-Standard Priorit 3 2024 $11,880 7154489 E2010 Replace Fixed Casework-Counter Top-Laminated Priority 3 2024 $2,069 TOTALS BY YEAR Year Total Expenditures 2024 $13,949 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 E5 BUILDING SITEWORK SYSTEMS G20 SITE IMPROVEMENTS G2021 Bases and Sub-Bases DESCRIPTION The Property contains two parking bays accessed via SW Hall Boulevard to the east of the site. The parking areas combined contain approximately 9 spaces, including one accessible space adjacent to the main building. Interior roadways are typically asphalt-paved, we were not provided with sectional details of the asphalt-paved areas, however, such elements typically consist of a 2" deep asphaltic top course over a 4" thick bituminous concrete base and a 6" deep compacted aggregate sub-base. CONDITION The interior roadways,and road markings were generally in fair condition; however,the asphalt wearing course had a number of hairline and alligator cracking in addition to other deteriorated sections. The typical EUL for this type of buildup is twenty-years and based on observed conditions,we recommend that these areas are milled and overlaid in the middle-term of the study period. G2031 Paving &Surfacing DESCRIPTION In addition to the asphalt paved interior roadways,the site is provided with;sidewalk sections,and pressed pavements assumed to consist of; 4" thick cast-in-place concrete with expansion joints provided at driveways, curbs and adjacent to the building structure, and block paving at parking areas assumed to consist of a compacted aggregate base course,and sand bedding course. CONDITION The sidewalk sections and pressed pavements throughout the Property were generally found to be in fair-to-good condition; however, localized cracking of the concrete was noted.Assuming these areas are cleaned and repaired as a maintenance expenditure,we do not anticipate that replacement will be required during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Fanno House October 12,2016 PROJECTED EXPENDITUREF Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 154490 G2020 Replace Asphalt Mill&Overlay including Re-Striping Priority 3 2020 $152,245 TOTALS BY YEAR Year Total Expenditures 2020 $152,245 F+G Project No.100051118 Powered by iPlan"O 4tell""Solutions, LP APPENDIX A: Capital Expenditures APPENDIX B: Photographic Record APPENDIX C: Document Review and Warranty Information APPENDIX D: Equipment Tables APPENDIX E: Glossary of Terms APPENDIX A : CAPITAL EXPENDITURES Deficiency Report Fanno House GSF: 2,505 Year Built: 1938 Renew Year : Replacement Cost: $463,425 Fiscal Year $ ID CSI Type Name Description ses Estimate C 2016 $32,855 154477 B1010 Routine Paint Exterior Ramp 1420 SF $1.75 $2,485 $2,485 Maintenance ------------------------------------------- ------------------------------------------------------------------------------------------------------ 154480 C2010 ADA Replace Stair Handrails and Balustrades-Wood 36 LF $48.00 $1,728 $1,728 Construction ------------------------------------------------ ------------------------------------------------------------------------------------------------- 154486 D2020 Deferred Replace Cold Water Distribution 2505 SF $11.14 $27,896 $27,896 Maintenance -------------------------------------------------------------------------------------------------------------------------------------------------- 154487 D3010 Deferred Replace Gas Meter-2" 1 EACH $746.14 $746 $746 Maintenance -------------------------------------------------------------------------------------------------------------------------------------------------- •--------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2019 $29,649 154478 B1010 Capital Renewal Replace Exterior Stair(s)-Wood Construction 5 RISER $352.69 $1,763 $1,763 -------------------------------------------------------------------------------------------------------------------------------------------------- 154482 C3020 Capital Renewal Replace Vinyl Composite Tile(VCT) 58 SF $8.64 $501 $501 -------------------------------------------------------------------------------------------------------------------------------------------------- 154483 C3020 Capital Renewal Replace Roll Carpet with Padding 270 SY $101.42 $27,384 $27,384 -------------------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2020 $152,245 154490 G2020 Capital Renewal Replace Asphalt Mill&Overlay including Re- 5780 SY $26.34 $152,245 $152,245 Striping -------------------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2022 $4,298 154479 B3010 Capital Renewal Replace Aluminum Perimeter Gutters& 238 LF $18.06 $4,298 $4,298 Downspout -------------------------------------- --------- ------------------------------------------------------------------------------ ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- 2024 $86,702 154481 C3010 Capital Renewal Replace Painted Finish-Standard 11401 SF $2.63 $29,962 $29,962 ---------------------------------------------------7---------------------------------------------------------------------------------------------- 154485 C3020 Capital Renewal Replace Wood Flooring 1232 SF $33.11 $40,786 $40,786 -------------------------------------------------------------------------------------------------------------------------------------------------- 154484 C3020 Capital Renewal Replace Vinyl Sheet-Kitchen/Restrooms 232 SF $8.64 $2,004 $2,004 -------------------------------------------------------------------------------------------------------------------------------------------------- 154488 E2010 Capital Renewal Replace Floor Mounted Base Cabinet(s)- 22 LF $540.00 $11,880 $11,880 Standard -------------------------------------------------------------------------------------------------------------------------------------------------- 10/12/2016 7:28:26 PM FGould FCA Reports Page 1 of 2 Deficiency Report 154489 E2010 Capital Renewal Replace Fixed Casework-Counter Top- 22 LF $94.05 $2,069 $2,069 Laminated Total Total: $305,748 10/12/2016 7:28:26 PM Mould FCA Reports Page 2 of 2 APPENDIX B : PHOTOGRAPHIC RECORD A1031 Standard Slab on Grade:-View of Slab-on-Grade A2021 Basement Wall Construction:-View of Reinforced Cast- Reinforced Concrete in-Place Concrete .it 4 B1014 Ramp(s):-View of Ramp(s)-Wood Construction 81015 Exterior Stairs and Fire Escapes:-View of Exterior Stair(s)-Wood Construction / r r 82011 Exterior Wall Construction:-View of Vinyl Siding B2021 Windows:-View of UPVC Window Units-Fixed and Single Hung B2034 Overhead Doors:-View of Rolling Overhead Garage B2039 Other Doors&Entrances:-View of Exterior Double Doors French Wood Door(s) , r 7 B3011 Roof Finishes:-View of Asphalt Shingle Roof B3016 Gutters and Downspouts:-View of Aluminum Perimeter Gutters&Downspout 1 C1021 Interior Doors:-View of Interior Single Wood Door(s) C2011 Regular Stairs:-View of Regular Stairs-Wood Construction-View of main staircase C2011 Regular Stairs:-View of Regular Stairs-Wood C3012 Wall Finishes to Interior Walls:-View of Painted Finish- Construction-View of basement staircase Standard-Overview of typical kitchen area finishes ♦ • ♦ * 4 ♦ d u f C3024 Flooring:-View of Vinyl Composite Tile(VCT) C3024 Flooring:-View of Vinyl Sheet-Bathroom _ 4 ' I k C3024 Flooring:-View of Wood Flooring D2011 Water Closets:-View of Floor Mounted Water Closets } D2014 Sinks:-View of Countertop Double Bowl Kitchen Sinks D2015 Bathtubs:-View of Bath ,w D2022 Hot Water Service:-View of Instantaneous Water D3012 Gas Supply System:-View of Gas Meter-2" Heater D3032 Direct Expansion Systems:-View of Split-System D3032 Direct Expansion Systems:-View of Split-System (Indoor Furnace Unit) (Outdoor Unit Only-Heat Pump) I I I «� Ofl D5012 Low Tension Service&Dist:-View of Panelboard- D5092 Emergency Light&Power Systems:-View of Exit Lights 120/208volts,60 to 2000amp I-I E2012 Fixed Casework:-View of Fixed Casework-Counter G2021 Bases and Sub-Bases:-View of Asphalt Mill&Overlay Top-Laminated including Re-Striping � r � G2031 Paving&Surfacing:-View of Pressed Concrete G2031 Paving&Surfacing:-View of Block Pavers Pavement-4'Wide APPENDIX C : DOCUMENT REVIEW AND WARRANTY INFORMATION The following documents were reviewed as part of the facility condition assessment of the Fanno House facility: Alexin Analytical-Analysis Report .0r lexin ANALYSIS REPORT Professional ORELAP Accredited Lab#: OR-100013 analytical ILaboratory_ Services Reported: 09/07/2016 13035 SW Pacific Hwy Received: 08/01/2016 Tigard,OR 97223 Sampled By: K. Cole Tel.: (503)639-9311 Fax:(503)684-1588 Work Order: 6214020 Project: C Tigard,City of Project# : - L Attn: Jennifer Joe PWSID # : 4100878 1 E 13125 SW Hall Blvd N Tigard OR, 97223 Sampling Location: Fanno Creek House T Phone: (503) 718-2599 Sample Matrix: Water Lab Number Code Method Units Result MRL EPA MCL Analysis Date/Time 6214020-01 Sample Name: FCH KF Sampled:7/27/16 7:42 Metals(Total) tLead 1030 EPA 200.9 mg/L 0.0028 0.0020 0.015 09/02/16 16:15 ND= None detected at the MRL MRL= Minimum Reporting Limit MCL= Maximum Contamination Limit tAll procedures for this analysis are accredited in accordance with NELAP standards. Note: The EPA MCL for Lead in Public Drinking Water Systems is 15 ppb. For school,daycare,or non-residential building testing the EPA recommends outlets be taken out of service if the lead level exceeds 20 ppb; this is a maximum contamination level for lead in samples based on a 250 mL first-draw sample, exceedences require remediation or further sampling.This is not an acceptance level for health based exposure. Approved by: Ad Gonzalez-Gray oratory Director This report shall not be reproduced,except in full, without the written approval of the laboratory. Page 1 of 1 APPENDIX D : EQUIPMENT TABLES Table D20 Summary of Domestic Water Heating Equipment Capacity/Location Equipment Manufacturer Model Serial Tag Type No. No. Rating Type Instant 08.06- Natural Interior Domestic Riannai R75-1-Si 147763 Unknown Unknown Gas 2008 Water Heater Table D30 Summary of HVAC Equipment Capacity/Location Equipment Manufacturer Model Serial Tag Type No. No. Rating Type Interior Heat Pump Carrier 25HCB348 4608E14030 Unknown Unknown Electric 2008 A300 Natural Interior Furnace Carrier Unknown Unknown Unknown Unknown Gas and 2008 Electric APPENDIX E : GLOSSARY OF TERMS Acronyms&Glossary of Terms ABC Aggregate Base Course BUR Built-Up Roof CIP Cast-In-Place CMU Concrete Masonry Unit EIFS Exterior Insulation and Finish System EPDM Ethylene Propylene Diene Monomer HM Hollow Metal Doors MH Man Holes SC Solid Core Doors TPO Thermoplastic Polyolefin AHU Main Air Handling Units EF Exhaust Fan EMC Electrical Metallic Conduit EMT Electrical Metallic Tubing FACP Fire Alarm Control Panel FCC Fire Command Center FCU Fan Coil Unit FSS Fuel Supply System MDP Main Distribution Panel NAC Notification Appliance Circuit RTU Roof Top Unit SES Service Entrance Switchboard's VAV Variable Air Volume VFD Variable Frequency Drives CRV Current Replacement Value DM Deferred Maintenance EOL End of Life EUL Estimated Useful Life FCI Facility Condition Index HVAC Heating Ventilating and Air conditioning RUL Recommended Useful Life AMP Amperage BTU/HR British Thermal Units per Hour FPM Feet per Minute(Elevator Speed) GPF Gallons Per-Flush HID High-Intensity Discharge HP Horse Power KVA kilovolt-Ampere kW Kilowatt PSF Pounds-Per-Square-Foot PSI Pounds-Per-Square-Inch RO Reverse Osmosis SF Square Foot SY Square Yards NEMA National Electrical Manufactures Association NFPA National Fire Protection Association Acronyms&Glossary of Terms BTU—British Thermal Unit;the energy required to raise the temperature of one pound of water by one degree. Building Envelope-The enclosure of the building that protects the building's interior from the outside elements,namely the exterior walls, roof and soffit areas. Building Systems — Interacting or independent components or assemblies, which from single integrated units, that comprise a building and its site work,such as, pavement and flatwork,structural frame, roofing,exterior walls,plumbing, HVAC,electrical,etc. Caulking—Soft,putty-like material used to fill joints,seams,and cracks. Codes—See building codes. Component—A fully functional portion of a building system,piece of equipment,or building element. Deferred Maintenance—Physical deficiencies that cannot be remedied with routine maintenance, normal operating maintenance, etc.,excluding de minimis conditions that generally do not present a material physical deficiency to the subject property. Expected Useful Life(EUL)—The average amount of time in years that an item,component or system is estimated to function when installed new and assuming routine maintenance is practiced. Facility—All or any portion of buildings,structures,site improvements,complexes,equipment, roads,walks, passageways,parking lots,or other real or personal property located on site. Flashing—A thin, impervious sheet of material placed in construction to prevent water penetration or to direct the flow of water. Flashing is used especially at roof hips and valleys, roof penetrations,joints between a roof and a vertical wall,and in masonry walls to direct the flow of water and moisture. Remaining Useful Life(RUL)—A subjective estimate based upon observations,or average estimates of similar items,components, or systems,or a combination thereof, of a number of remaining years that an item, component,or system is established to be able to function in accordance with its intended purpose before warranting replacement.Such period of time is affected by the initial quality of an item,component,or system,the quality of the initial installation,the quality and amount of preventative maintenance exercised, climatic conditions,extent of use,etc. Structural Frame—The components or building systems that support the building's non-variable forces or weights(dead loads)and variable forces or weights(live loads). Thermal Resistance(R)—A unit used to measure a material's resistance to heat transfer.The formula for thermal resistance is: R =Thickness(in inches)/K. Warranty — Legally enforceable assurance of quality or performance of a product or work, or of the duration of satisfactory performance.Warranty guarantee and guaranty are substantially identical in meaning;nevertheless,confusion frequently arises from supposed distinctions attributed to guarantee(or guaranty)being exclusively indicative of duration of satisfactory performance or of a legally enforceable assurance furnished by a manufacturer or other third party.The uniform commercial code provisions on sales (effective in all states except Louisiana)use warranty but recognize the continuation of the use of guarantee and guaranty.