Loading...
City of Tigard - Pubilc Works Tier 1 FCA Final Report Facility Condition Assessment Services Tier 1 Report of Facility Condition Assessment For City of Tigard Public Works 8777 SW Burnham Street Tigard, OR 1 Date of Report: October 12,2016 Provided By: Faithful+Gould, Inc. Provided For: City of Tigard FAITHFUL GOULD --TAll OF CONTENTS ExecutiveSummary........................................................................................................................................3 Introduction................................................................................................................................................3 LimitingConditions....................................................................................................................................3 ProjectDetails...........................................................................................................................................4 BuildingDetails..........................................................................................................................................4 BuildingDescription...................................................................................................................................5 PropertyExecutive Summary....................................................................................................................5 Architectural Structure Executive Summary..............................................................................................5 Mechanical Executive Summary...............................................................................................................5 Electrical Executive Summary...................................................................................................................5 SiteExecutive Summary...........................................................................................................................6 Summaryof Findings................................................................................................................................7 Building Expenditure Summary.................................................................................................................7 Distribution of Immediate(Year 1) Needs by Building System..................................................................9 Distribution of Future(Year 2-Year 10)Needs by Building System........................................................ 10 Facility Condition Needs Index................................................................................................................ 11 Needs Sorted By Prioritization of Work................................................................................................... 13 NeedsSorted By Plan Type.................................................................................................................... 14 ASubStructure Systems..............................................................................................................................15 A10FOUNDATIONS.............................................................................................................................. 15 BShell Systems............................................................................................................................................16 B20 EXTERIOR ENCLOSURE............................................................................................................... 16 B30ROOFING........................................................................................................................................ 18 CInteriors Systems.......................................................................................................................................19 C10 INTERIOR CONSTRUCTION.......................................................................................................... 19 C20STAIRS............................................................................................................................................20 C30INTERIOR FINISHES......................................................................................................................21 DServices Systems......................................................................................................................................24 D20PLUMBING......................................................................................................................................24 D30HVAC...............................................................................................................................................28 D40 FIRE PROTECTION SYSTEMS......................................................................................................30 D50 ELECTRICAL SYSTEMS................................................................................................................31 EEquipment&Furnishing Systems...........................................................................................................34 E10EQUIPMENT....................................................................................................................................34 E20 FURNISHINGS................................................................................................................................35 GBuilding Sitework Systems......................................................................................................................36 G20 SITE IMPROVEMENTS ..................................................................................................................36 G40 SITE ELECTRICAL UTILITIES.......................................................................................................38 Appendices....................................................................................................................................................39 City of Tigard Public Works October 12,2016 EXECUTIVE SUMMARY INTRODUCTION In accordance with the agreement held between The City of Tigard, agreement C170007 and Faithful+Gould Inc, this completed report provides a comprehensive Facility Condition Assessment of the Public Works located at 8777 SW Burnham Street, Tigard, OR, (The Property). This report provides a summary of the facility information known to us at the time of the study,the scope of work performed,an equipment inventory,evaluation of the visually apparent condition of The Property together with a forecast of capital expenditures anticipated over the next 10 years. The expenditure forecast does not account for typical preventative maintenance items such as changing filters to fan coil units. Our cost rates to produce life cycle and replacement cost estimates are based on our knowledge of the local regional market rates. Our line item costs assume that the work will be undertaken by either in-house or direct sub-contract labor. If the work is procured through public general contractor bids, we recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. The report provides a summary of the anticipated primary expenditures over the 10-year study period.Further details of these expenditures are included within each respective report section and within the 10-year expenditure forecast, in Appendix A. The report also calculates the Facility Condition Needs Index(FCNI)which is used in Facilities Management to provide a benchmark to compare the relative condition of a group of facilities.The FCNI is primarily used to support asset management initiatives of federal,state, and local government facilities organizations. LIMITING CONDITIONS This report has been prepared for the exclusive and sole use of the City of Tigard.The report may not be relied upon by any other person or entity without the express written consent of Faithful+Gould. Any reliance on this report by a third party,any decisions that a third party makes based on this report,or any use at all of this report by a third party is the responsibility of such third parties. Faithful+Gould accepts no responsibility for damages,if any,suffered by any third party as a result of decisions made,or actions taken, based on this report. The assessment of the building/site components was performed using methods and procedures that are consistent with standard commercial and customary practice as outlined in ASTM Standard E 2018-015 for PCA assessments. As per this ASTM Standard, the assessment of the building/site components is based on a visual walk-through site visit,which captured the overall condition of the site at that specific point in time only. No legal surveys, soil tests, environmental assessments, geotechnical assessments, detailed barrier-free compliance assessments, seismic assessments,detailed engineering calculations,or quantity surveying compilations have been made. No responsibility,therefore, is assumed concerning these matters. Faithful+Gould did not design or construct the building(s)or related structures and therefore will not be held responsible for the impact of any design or construction defects,whether or not described in this report.No guarantee or warranty, expressed or implied,with respect to the property,building components,building systems,property systems,or any other physical aspect of The Property is made. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 The recommendations and our opinion of probable costs associated with these recommendations, as presented in this report, are based on walk-through non-invasive observations of the parts of the building which were readily accessible during our visual review. Conditions may exist that are not as per the general condition of the system being observed and reported in this document.Opinions of probable costs presented in this report are also based on information received during interviews with operations and maintenance staff. In certain instances, Faithful+Gould has been required to assume that the information provided is accurate and cannot be held responsible for incorrect information received during the interview process. Should additional information become available with respect to the condition of the building and/or site elements, Faithful+Gould requests that this information be brought to our attention so that we may reassess the conclusions presented herein. The opinions of probable costs are intended for global budgeting purposes only. Faithful+Gould has no control over the cost of labor and materials, general contractor's or any subcontractor's method of determining prices, or competitive bidding and market conditions.The data in this report represent an opinion of probable cost of construction and is made on the basis of the experience, qualifications, and best judgment of the professional consultant familiar with the construction industry. Faithful+Gould cannot and does not guarantee that proposals, bids,or actual construction costs will not vary from this or subsequent Cost Estimates.The scope of work and the actual costs of the work recommended can only be determined after a detailed examination of the site element in question, understanding of the site restrictions, understanding of the effects on the ongoing operations of the site/building, definition of the construction schedule, and preparation of tender documents. PROJECT DETAILS On Aug 23,2016,Stefan Matwijiw BSc(Hons)of Faithful+Gould visited The Property to observe and document the condition of the building and site components. During our site visit, Faithful+Gould was assisted by Kevin Cole(Facilities Supervisor)who is associated with City of Tigard. BUILDING DETAILS Item Description Project Name Public Works Property Type GOVOFF Full Address 8777 SW Burnham Street Tigard, OR Onsite Date Aug 23,2016 Historic District No Historic Building No Year Built 1989 Occupancy Status Occupied Number of Stories 1 Gross Building Area(GSF) 20,773 Current Replacement Value(CRV) $4,777,790 ARV/GSF($/Sq Ft) $230.00/Sq Ft F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 BUILDING DESCRIPTION PROPERTY EXECUTIVE SUMMARY The City of Tigard Public Works building located at (8777 SW Burnham Street, Tigard, Oregon) was built in 1989. It is assumed that the office/ancillary areas were refurbished in circa 2006. The Property consists of a single story building with; an office area to the east of the building, and the water district operations center to the west of the building. ARCHITECTURAL STRUCTURE EXECUTIVE SUMMARY I The Property contains a reinforced slab-on-grade with concrete spread strip footings which supports the structure. The exterior walls are comprised of facing brickwork with a light metal stud framing.The building is enclosed with a combination of gable and hip roofs clad with a standing seam metal covering, with perimeter polyester powder-coated metal box gutters and downspouts. The exterior walls contain aluminum double glazed windows, overhead doors,glazed doors,and hollow metal doors. MECHANICAL EXECUTIVE SUMMARY The heating and cooling for the office/ancillary portion of the building is I _ provided by seven split-systems with natural gas energy efficient furnaces, and outdoor condenser units. In addition to this, two electric baseboard heaters are provided to the multi-use hall and breakout areas, and - supplemental cooling is provided by two mini split-system units. • Heating for the water district operations center portion of the building is . provided via a combination of four natural gas furnace units,one electric wall mounted unit heater,and one gas wall mounted unit heater. r Hot water is provided by three Domestic Water Heaters (DWH) located throughout the Property;two natural gas units with capacities of 50-Gal and 40-Gal,and on electric unit with a capacity of 50-Gals. ' The Property is protected with a wet-pipe fire suppression system. + ' ELECTRICAL EXECUTIVE SUMMARY ' The electrical system consists of; a General Electric 120/208-Volt main distribution panel (MDP) located within the main electrical room and secondary switchboards located throughout the Property. ' The property is protected with a fire alarm system with a Fire Alarm Control Panel(FACP)manufactured by Honeywell. F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 SITE EXECUTIVE SUMMARY The Property contains two large asphalt paved parking lots connected with interior roadways which serve maintenance, staff and visitor parking located to the northwest of the building. ADA parking spaces are provided adjacent to the office/ancillary main entrance. The asphalt paved parking lot and interior roadways are generally bound with cast-in-place concrete curbs and sidewalks. In addition to this, the facility is provided with one flagpole, and ' perimeter wood clad chain-link fencing. '. Backup power is provided by a 200 kW diesel generator manufactured by Cummins located within a designated generator set room to the northeast of the water district operations center portion of the building with one transfer switch manufactured Cummins located within the main electrical room. � � F a� F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 SUMMARY OF FINDINGS This report represents summary-level findings for the Property Condition Assessment.The deficiencies identified in this assessment can be combined with potential new construction requirements to develop an overall Long Term Capital Needs Plan that can be the basis for a facility wide capital improvement funding strategy.Key findings from the Assessment include: FindingsKey Current Year Facility Condition Needs Index 1.95 Immediate Capital Needs(Year 1) $93,127 included in FCNI Future Capital Needs(Year 2 to Year 10) $3,040,190 BUILDING EXPENDITURE SUMMARY The building expenditure summary section provides an executive overview of the findings from the assessment.The chart below provides a summary of yearly anticipated expenditures over the study period for the Public Works building. In addition, we have scheduled key findings highlighting items greater than$5,000 and their anticipated failure year. Further details of these expenditures are included within each respective report section and within the expenditure forecast, in Appendix A of this report. The results illustrate a total anticipated expenditure over the study period of approximately$3,133,317. Expenditure Forecast Over Study Period s1,2M $800K dod a $600K L $404K a 20OIC $0 2015 2017 2018 2019 2020 2021 2022 2023 2024 2025 0 Expenditure $93,131[ $D 5325.45K 5187.&2 5202.57K 5153.21KC 592%29K $D 5117,57K 51.12M F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 • B Shell: Replace Expansion Joints at an estimated cost of$20,586 in year 2016 • B Shell: Replace Double Aluminum Glazed Doors at an estimated cost of$18,528 in year 2019 7 B Shell: Replace Single Aluminum Glazed Doors at an estimated cost of$12,979 in year 2019 B Shell: Replace Aluminum Window Units at an estimated cost of$148,034 in year 2019 A B Shell: Replace Standing Seam Metal Roof Panels at an estimated cost of$1,094,327 in year 2025 7 B Shell: Replace Aluminum Perimeter Gutters&Downspout at an estimated cost of$29,253 in year 2025 C Interiors: Replace Interior Single Wood Door(s)at an estimated cost of$35,112 in year 2022 A C Interiors: Replace Carpet Tiles-Standard at an estimated cost of$668,763 in year 2022 C Interiors: Replace Ceramic Tile at an estimated cost of$8,384 in year 2022 C Interiors: Replace Ceramic Wall Tiles at an estimated cost of$17,335 in year 2022 A C Interiors: Replace Vinyl Composite Tile(VCT)at an estimated cost of$34,387 in year 2022 C Interiors: Replace Painted Finish-Standard at an estimated cost of$108,665 in year 2022 C Interiors: Replace Acoustic Ceiling System-Standard at an estimated cost of$47,993 in year 2024 A D Services: Replace Card Access System at an estimated cost of$65,061 in year 2016 7 D Services: Replace Split-System(Outdoor and Indoor Unit)at an estimated cost of$11,827 in year 2020 D Services: Replace Fire Alarm System(Full System Inc. Panel)at an estimated cost of$182,470 in year 2020 A D Services: Replace Emergency Generator Transfer Switch at an estimated cost of$8,400 in year 2021 D Services: Replace Unit Heater-Gas Fired Suspended-100 MBH at an estimated cost of$5,047 in year 2021 D Services: Replace Gas Fired Suspended- 100 MBH at an estimated cost of$5,047 in year 2022 A D Services: Replace Gas Fired Suspended- 100 MBH at an estimated cost of$5,047 in year 2022 D Services: Replace Gas Fired Suspended-100 MBH at an estimated cost of$5,047 in year 2022 D Services: Replace Gas Fired Suspended- 100 MBH at an estimated cost of$5,047 in year 2022 A D Services: Replace Drainage Pipework(Below ground)-2"at an estimated cost of$69,681 in year 2024 E Equipment&Furnishing: Replace Floor Mounted Base Cabinet(s)-Standard at an estimated cost of$24,840 in year 2022 G Building Sitework: Replace Chain Link Galvanized Fence at an estimated cost of$38,520 in year 2018 A G Building Sitework: Replace Asphalt Mill&Overlay including Re-Striping at an estimated cost of$284,235 in year 2018 -~ G Building Sitework: Replace Generator Sets, Diesel Engine-100 to 200 kW at an estimated cost of$138,442 in year 2021 1 All costs presented in present day values 2 Costs represent total anticipated values over the 10 year study period 3 Budget for additional project costs of between 25%-35%to allow for professional fees and general contractor overhead/profit and management costs F+G Project No.100051118 '. Powered by iPlan—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 DISTRIBUTION OF IMMEDIATE (YEAR 1) NEEDS BY BUILDING SYSTEM Distribution of Inimediate feeds by Building System Security and Deteetion5ystem Exterior Wall Construction Hot Water Senn Hardeners and Sealers Building System Estimated Cost Percentageof • Exterior Wall Construction $20,586 22.1% Hardeners and Sealers $2,755 3.0% Hot Water Service $4,725 5.1% Security and Detection Systems $65,061 69.9% Total $93,127 100% F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 DISTRIBUTION OF FUTURE (YEAR 2-YEAR 10) NEEDS BY BUILDING SYSTEM Distribution of Capital Needs by Building System 1130 HVAC D20 Plum-bin D50 Electrical Systems E10 Equipment E20 Furnishings JG20 Site Improvements C30 Interior Finishe i i i i i f 0 Sibe Electrical Utilities 1324 Exterior EnClasure CID Interior Construction 830 Raoiing Building System Estimated Cost Percentage of Total Cost B20 Exterior Enclosure $179,540 5.9% B30 Roofing $1,123,581 37.0% C10 Interior Construction $39,325 1.3% C30 Interior Finishes $885,527 29.1% D20 Plumbing $84,876 2.8% D30 HVAC $42,816 1.4% D50 Electrical Systems $190,870 6.3% E10 Equipment $3,292 0.1% E20 Furnishings $29,166 1.0% G20 Site Improvements $322,755 10.6% G40 Site Electrical Utilities $138,442 4.6% Total $3,040,190 100% F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 FACILITY CONDITION NEEDS INDEX In this report we have calculated the Facility Condition Needs Index(FCNI)for the facility; illustrating the likely condition of the systems, equipment and building needs should the required funding not be expended over the cost study period. The FCNI is used in Facilities Management to provide a benchmark to compare the relative condition and needs of a group of facilities. The FCNI is primarily used to support asset management initiatives of federal,state,and local government facilities organizations. The FCNI is the ratio of accumulated Deferred Maintenance (DM) (total sum of required and recommended works) and Needs(ADA)to the Current Replacement Value (CRV)for a constructed asset. Calculated by dividing DM and Needs by CRV(in this instance we have applied an Adjusted Replacement Value(ARV)to the CRV to reflect to value of the partial building assessment).The range is from zero for a newly constructed asset,to one for a constructed asset with a DM value equal to its CRV.Acceptable ranges vary by Asset Type,but as a general guideline,the FCNI scoring system is as follows: Maintenance, Repair, Needs and FCN I= Replacement Deficiencies of the Facility(s) Current Replacement Value of the Facility(s) (CRV) If the FCNI rating is 60%or greater then replacement of the asset/building should be considered instead of renewal. Condition Definition In a new or well-maintained condition with no visual evidence of wear, GOOD soiling or other deficiencies. 0%to 5% FAIR Subject to wear and soiling but is still in a serviceable and functioning 5%to 10% condition. POOR Subjected to hard or long-term wear. Nearing the end of its useful or Greater than 10% serviceable life. Subjected to hard or long-term wear. Has reached the end of its Greater than 60% useful or serviceable life. Renewal now necessary. The chart below indicates the current FCNI ratio of the Public Works building. �7 0% 10°1a 20% 30% 40% 50% 60°la 70% 80°1a 90"l0 100°la ■ FCI Good Fair Poor 0 Very Poor Public Works, FCNI: 1.95% F+G Project No.100051118 '.•- Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 The chart below indicates the effects of the FCNI ratio per year,assuming the required funds and expenditures ARE made to address the identified actions each year. Year by Year Effects of FCI Over the Study Period 2 5"/a 20% Ilya 10% ]¢3 cut% 2016 2017 2018 2019 2020 2021 2022 1 2023 2024 2025 ■ FCI 1.95°/'6 0°/a 6.82°r6 3.93°/a 4.24°/a 3.21-A 19.45°A6 0% 1 2.469% 23.52% ■ FCI i Very Poor 0 Poor Fair 0 Good The Chart below indicates the cumulative effects of the FCNI ratio over the study period assuming the required funds and expenditures are NOT provided to address the identified works and deferred maintenance each year. Cumulative Effects of FCI over the Study Period 8c¢� 60% 40% 20% 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 ■ FCI 1.95°la 1.95°l0 8.77°r6 12.70la 16.9411% 20.15°{a 39.6°{a 39.6% 42.061,10 65.58°la ■ FCI Very Poor M Poor Fair 0 Good F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 NEEDS SORTED By PRIORITIZATION OF WORK Faithful+Gould has prioritized the identified work in order to assist with analyzing the deficiencies found during the assessment. The following Priorities are shown below: Priority 1 -Systems requiring immediate action that have failed,compromises staff or Currently Critical public safety or requires to be upgraded to comply with current codes and accessibility Priority •A system or component is nearing end of useful life,if not addressed will Potentially Critical: cause additional deterioration and added repair costs Priority -Lifecycle replacements neccessary but not critical or mid-term future replacements to maintain the integrity of the facility or component The chart below illustrates the breakdown of expenditure according the priority coding providing an opportunity to strategically plan and effectively direct funding to the highest priority. Planning Horizon Needs by System and Priority $1,400,000.00- $1,200,000.00- M 1,400,000.00$1,200,000.00x a $1,000,000.00 rt C 5 $800,000.00 C SJS Q $600,000.00 O d $400,000.00 C S15 $200,000.00- $0.00- 1) 200,000.00$0.00D Services B Shell C Interiors E Equipment G Building &Furnishing Sitework Priority ■ Priority 1 ■ Priority 2 ■ Priority 3 Building System Priority 1 Priority 2 Priority 3 Total B Shell $0 $20,586 $1,303,121 $1,323,707 C Interiors $0 $2,755 $924,853 $927,608 D Services $182,470 $69,786 $136,092 $388,348 E Equipment&Furnishing $0 $0 $32,458 $32,458 G Building Sitework $0 $0 $461,197 $461,197 Totals $182,470 $93,127 $2,857,720 $3,133,317 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 NEEDS SORTED BY PLAN TYPE Faithful+Gould has prioritized the identified work according to the Plan Type or deficiency categories in order to assist with analyzing the deficiencies found during the assessment.The following Plan Types are shown below: Plan •- 1 •Maintenance that was not performed when it was scheduled or past its Deferred useful life resulting in immediate repair or replacement Plan • •Maintenance that is planned and performed on a routine basis to maintain and preserve the condition L Routine Maintenance Ad Plan •- 3 •Planned replacement of building systems that have or will reach the end of Capital Renewal their useful life Plan •- ' •When the repair or replacement of equipment or systems are Energy&Sustainability recommended to improve energy and sustainability performance Plan •- 5 •When the repair or replacement of equipment or systems are recommended to comply with ADA The chart below illustrates the breakdown of expenditure according to the Plan Type or deficiency categories providing an opportunity to strategically plan and effectively direct funding. Planning Horizon Needs by Category $s,s oo,000 $s,000,aoo $2,soo,OGO $2,o00,OGO $1,sna,000 $1,000,aoo $s oo,aoo $0 Capital Renewal Deferred Routine Maintenance Maintenance TotalBuilding System . Deferred Maintenance $93,127 Capital Renewal $3,036,898 Routine Maintenance $3,292 Total $3,133,317 F+G Project No.100051118 '.• Powered by iPlan—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 I SUBSTRILIETURE SYSTEMS A10 FOUNDATIONS A1011 Wall Foundations DESCRIPTION The exterior wall construction is supported by reinforced concrete spread footings around the perimeter of the building.The compressive strength of the concrete is unknown. CONDITION The footings were not visible due to their location below the exterior wall construction. However,we observed no major movement to the structure that they are supporting,therefore we assume them to be in fair condition and free from defects.We do not anticipate replacement during the study period. A1031 Standard Slab on Grade DESCRIPTION The building contained a cast-in-place concrete slab-on-grade which is reinforced with welded wire fabric.We assume that the floor slab was placed over a vapor barrier and compacted gravel fill, with the thickness of the slab being approximately 6", laid over a crushed aggregate base and compacted sub-grade.The compressive strength of the concrete is unknown. CONDITION The slab-on-grade was observed to be in fair condition.While the majority of the slab was not visible there were no signs of undue settling or major cracks noted.We do not anticipate any requirements for replacement during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 B SHELL SYSTEMS B20 EXTERIOR ENCLOSURE B2011 Exterior Wall Construction DESCRIPTION Exterior wall systems consist of 4"thick facing brickwork with an air gap cavity, assumed to be tied to a 6" light metal stud framing with exterior gypsum board sheathing, batt insulation and gypsum board sheeting to the internal wall face. The brick veneer is laid in a stretcher bond with standard mortar joints and expansion joints spaced at regular intervals. CONDITION The exterior wall construction was observed to be in fair-to-good condition with no obvious bulging or cracking present,therefore no actions will be generated during the study period.The deteriorated sealant at some point will allow air and water to enter the building.Sealant such as this has a typical EUL of fifteen-years therefore we anticipate it will need replacement with a suitable polyurethane sealant near-term in the study period to maintain water integrity and prevent any water penetration B2021 Windows DESCRIPTION The Property contained anodized aluminum-framed double-glazed window units with gaskets between glazing and aluminum frame, and elastomeric sealant between window frames and exterior masonry elements. CONDITION The windows were observed to be in poor-to-fair condition with deterioration of the frames and localized moisture noted within the double glazed window units. The window systems are twenty-seven-years old with a typical EUL of thirty-years; therefore, we recommend that the widows are replaced with double-glazed Polyester Powder Coated(PPC)aluminum windows and frames early in the study period. B2031 Glazed Doors&Entrances DESCRIPTION There are two sets of double,and two single leaf anodized aluminum glazed doors and door frames with insulated tempered glass glazing at the main entrance, and egress doors of the Property.The doors generally contain panic hardware and closers at the interior and pull plates/handles at the exterior. CONDITION The aluminum glazed doors appeared to be in fair condition generally.They operated satisfactory with the hardware performing as required; however,we recommend that the doors are replaced with insulated tempered glazed PPC aluminum doors and frames at the same time as the window replacement work early in the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 B2034 Overhead Doors DESCRIPTION The building contains eight overhead doors at the water district operations center portion of the building. The overhead doors are all electrically operated and are guided via a metal track located on either side of the door panels. CONDITION The overhead doors appeared to be in fair-to-good condition,and we are not aware of any operating issues. It was reported to us that,the electric motors were scheduled for replacement in 2016. This type of equipment has an EUL of thirty years; however based on our observations we have extended the RUL beyond the study period.We recommend that the doors are regularly serviced and maintained. The caulking surrounding the overhead door openings contained cracks similar to that at the expansion joints and window units and therefore will require replacement with a suitable polyurethane sealant mid-term in the study period to maintain water integrity and prevent any water penetration.The cost of this work has been included within the amount to undertake the expansion joint sealant replacement. B2039 Other Doors&Entrances DESCRIPTION The building contains six leaf hollow metal doors and door frames with a factory applied finished. The doors generally contain panic hardware at the interior and lever handles at the exterior. CONDITION The door sets appeared to be in fair-to-good condition operating satisfactory with the hardware performing as required. No actions are necessary during the study period. PROJECTED EXPENDITUREF Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. MIL&�nmmonrinfinn Priority Year Expenditures 154061 B2010 Replace Expansion Joints Priority 2 2016 $20,586 154062 B2020 Replace Aluminum Window Units Priority 3 2019 $148,034 154063 B2030 Replace Double Aluminum Glazed Doors Priority 3 2019 $18,528 154064 B2030 Replace Single Aluminum Glazed Doors Priority 3 2019 $12,979 TOTALS BY YEAR Year Total Expenditures 2016 $20,586 2019 $179,540 F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 B30 ROOFING B3011 Roof Finishes DESCRIPTION The Property is enclosed with a combination of gable and hip roofs supported by light metal roof trusses and steel lattice beams,overlaid with a profiled steel deck, rigid insulation and a standing seam metal. CONDITION The metal roof covering appeared to be in fair condition. The typical EUL of this type of roof covering is thirty years,therefore based on our limited observed conditions and evidence of minor leaks we anticipate replacement will be necessary in the late term of the study period. It should be noted that, if the roof covering is monitored during the study period and repairs are undertaken when needed,deferral could be possible beyond the study period. B3016 Gutters and Downspouts DESCRIPTION The gable and hip roofs collects storm water at the perimeter within polyester powder-coated metal box gutters mounted to the aluminum clad wood fascia which discharge into anti-climb box downspouts and below ground into municipal sewers. CONDITIL The gutters and downspouts were generally in fair condition; however, poor gutter joints and downspout fixings were noted at isolated locations. We recommend replacement of the rainwater goods in the far-term of the study period, and in conjunction with the roof replacement works to benefit from economies of scale. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 154065 B3010 Replace Standing Seam Metal Roof Panels Priority 3 2025 $1,094,327 154066 B3010 Replace Aluminum Perimeter Gutters&Downspout Priority 3 2025 $29,253 TOTALS BY YEAR 2025 $1,123,581 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 E: INTEFRIE]IFRS SYSTEMS C10 INTERIOR CONSTRUCTION C1021 Interior Doors DESCRIPTION Interior doors at the Property primarily consist of a combination of single and double leaf wood doors and frames and single leaf hollow metal doors and frames. CONDITION The doors were generally found to be in fair working condition and original to construction.The typical EUL for wood doors is thirty years; however we have extended the RUL and we recommend replacement after the mid-term of the study period.The typical EUL for hollow metal doors is fifty years;therefore no actions will be generated during the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID Type Recommendation 154067 C1020 Replace Interior Single Wood Door(s) Priority 3 2022 $35,112 154068 C1020 Replace Interior Double Wood Door(s) Priority 3 2022 $4,213 TOTALS BY YEAR Year Total Expenditures 2022 $39,325 F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 C20 STAIRS C2011 Regular Stairs DESCRIPTION The Property is a single story building,however,additional storage has been added above the water district operations center offices.This is accessed via one painted steel staircase. CONDITION The staircases was found to be in good condition,therefore we do not anticipate any replacement works during the study period. C2014 Stair Handrails and Balustrades DESCRIPTION The staircase has steel handrails consisting of tubular metal pipe. CONDITION The staircase handrails were in fair condition structurally;due to the nature of the staircase we do not recommend replacement with ADA compliant handrails be installed, however,this should be addressed if required by the City of Tigard. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 C30 INTERIOR FINISHES C3012 Wall Finishes to Interior Walls DESCRIPTION Interior walls/partitions throughout the Property typically consist of a combination of gypsum board and masonry with a paint finish. In addition to this, restroom walls are finished with ceramic wall tiles. CONDITION Paint finishes throughout the Property were generally observed to be in fair condition and redecorated on an 'as needed' basis, with localized marking and minor impact damage observed.The typical EUL for painted walls/partition,ceilings,and door/window frame finishes is eight-years, however, based on our observations we have extended the RUL to after mid-term of the study period, and in conjunction with holistic refurbishment works to benefit from economies of scale. The ceramic tile finishes to restrooms were generally found to be in fair but outdated condition,therefore we recommend replacement after mid-term of the study period. C3023 Hardeners and Sealers DESCRIPTION The water district operations center toilet areas have an epoxy applied finish to the cast-in-place concrete slab. CONDITION The epoxy finish is worn and replacement is recommended early within the study period. In addition to this,we recommend that an epoxy finish is applied to the water district operations center'wet area',which is used by employees for cleaning equipment. This would extend the life of the cast-in-place concrete slab and improve the aesthetics/cleanliness of the area. C3024 Flooring DESCRIPTION Interior flooring throughout the public areas, restrooms, office, and ancillary spaces is typically finished with a combination of carpet, ceramic tiling,and Vinyl Composite Tile(VCT). CONDITION The VCT, and ceramic tile flooring was found to be in fair but outdated condition and assumed to be original to the construction. We recommend budgeting for replacement of the floor finishes after the mid-term of the study period, and in conjunction with holistic refurbishment works to benefit from economies of scale. F+G Project No.100051118 EM - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 C3025 Carpeting DESCRIPTION The office and ancillary space floors to the office/ancillary portion of the building are typically clad with 2'x 2' carpet tiles adhered to the cast-in-place concrete slab. CONDITION The carpet finishes throughout the Property were generally found to be in fair-to-good condition and assumed to have been replaced during the office/ancillary refurbishment in circa 2006. The typical EUL for standard carpet finishes with this level of foot-traffic is ten years; however, based on our observations we have extended the RUL to the mid-term of the study period. C3031 Ceiling Finishes DESCRIPTION In addition to various suspended ceiling systems, painted gypsum board ceilings are provided throughout the Property. CONDITION The painted gypsum board ceilings were generally found to be in fair-to-good condition with localized scuff marking noted. We do not anticipate the requirement for replacement of the gypsum board ceilings during the study period.The typical EUL for standard paint finishes is eight-years, however, as ceilings are typically less susceptible to `wear and tear', and based on our observations we recommend budgeting an allowance for the redecoration in the late-term of the study period, and in conjunction with holistic refurbishment works to benefit from economies of scale. C3032 Suspended Ceilings DESCRIPTION The office,ancillary,and breakout,typically consists of 2'x 2'suspended acoustical ceiling tiles in a pre-formed metal grid. CONDITION The suspended ceiling systems to the Property were generally found to be in fair condition,with;localized water staining and scuff marking noted. The ceiling systems will surpass the EUL during the study period, therefore, we recommend replacement in the late-term of the study period and in conjunction with holistic refurbishment works to benefit from economies of scale. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 154069 C3010 Replace Painted Finish-Standard Priority 3 2022 $108,665 154070 C3010 Replace Ceramic Wall Tiles Priority 3 2022 $17,335 154071 C3020 Replace Ceramic Tile Priority 3 2022 $8,384 154072 C3020 Replace Epoxy Floor Coating Priority 2 2016 $2,755 154073 C3020 Replace Vinyl Composite Tile(VCT) Priority 3 2022 $34,387 154074 C3020 Replace Carpet Tiles-Standard Priority 3 2022 $668,763 154075 C3030 Replace Acoustic Ceiling System-Standard Priority 3 2024 $47,993 TOTALS BY YEAR Year Total Expenditures 2016 $2,755 2022 $837,534 2024 $47,993 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D SERVICES SYSTEMS D20 PLUMBING D2011 Water Closets DESCRIPTION There are ten floor mounted vitreous china water closets with plastic seats within the Property. These are all tank-less type units with manual flush valves. CONDITION The water closets were observed to be in fair condition generally. The water closets flushed properly and did not have any cracks in the china. Based on the observed conditions,we do not anticipate a requirement for their replacement during the study period.We anticipate that the flush valves may fail during the study period;therefore,to maintain function they may need to be rebuilt or in some cases replaced. This work has not been included in this study as we anticipate it will be carried out on an as needed basis as part of routine maintenance. D2012 Urinals DESCRIPTION There are four stall type vitreous china urinals with automatic flush valves within the men's restrooms of the Property. CONDITION The urinals were observed to be in fair condition generally.The urinals flushed properly and did not have any cracks in the china;therefore, no actions will be generated during the study period.We anticipate that the flush valves may fail during the study period and therefore to maintain function,they may need to be replaced.This work has not been included in this study as we anticipate it will be carried out on an as-needed basis as part of routine maintenance. D2013 Lavatories DESCRIPTION The Property contained three wall mounted, and four vanity top vitreous china lavatories within the restrooms with single lever handles and non-metered faucets. CONDITION The wall mounted and vanity top lavatories appeared to be in fair condition generally.The lavatories drained properly and did not have any cracks in the china; therefore, no actions will be generated as we anticipate that they are suitable to last beyond the study period. We anticipate that the faucets may fail during the study period and therefore to maintain function,they may need to be replaced.This work has not been included in this study as we anticipate it will be carried out on an as-needed basis as part of routine maintenance. F+G Project No.100051118 Em - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D2014 Sinks DESCRIPTION The Property contained two single bowl stainless steel kitchen sinks with a single lever handles and non-metered faucets located within staff breakout area. In addition to this,the Property contained two floor mounted janitor sinks within the janitor closets. CONDITION The stainless steel kitchen sink appeared to be in fair-to-good condition. It functioned properly with no leaks; therefore, no actions for replacement are anticipated during the study period. The janitor sinks appeared to be in fair condition considering age and use. We do not anticipate replacement and have extended the RUL past the end of the study period. We anticipate that the faucets may fail during the study period and therefore to maintain function they may need to be replaced.This work has not been included in this study as we anticipate it will be carried out on an as-needed basis as part of routine maintenance. D2017 Showers DESCRIPTION The building contained one three wall ceramic tile shower system, and one three fiberglass system. The shower systems contained the associated shower components and valve. CONDITION The shower enclosures were in a generally fair condition. They are showing signs of deterioration attributable to age such as staining and general wear. Considering their current condition and that they are reaching the end of the EUL,replacement should be considered during the near-to mid-term of the study period. It should be noted that,consideration should be given to replacement with ADA compliant units. D2018 Drinking Fountains and Coolers DESCRIPTION There is one stainless steel wall mounted refrigerated drinking fountain set at duel height for ADA compliance located adjacent to the main gang restrooms at the office/ancillary portion of the building. CONDITION The water fountains were observed to be in good condition and operating properly therefore no actions will be generated during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D2021 Cold Water Service DESCRIPTION The domestic cold water system to the building is supplied directly from local utilities. CONDITION The domestic water heaters appeared to be in poor-to-fair and fair condition generally.There were no signs of rust and corrosion noted at this time; however with a typical EUL of fifteen years an action for replacement would occur for all units during the study period to maintain efficiency. The recommended timeline for DWH replacement is as follows: 50-Gal Energy Saver DWH to be replaced immediately as a deferred maintenance;the second 50-Gal DWH—before the mid-term of the study period and the 40-Gal DWH—after the mid-term of the study period. D2022 Hot Water Service DESCRIPTION The Property contained three Domestic Water Heaters(DWH)s located throughout;one gas unit manufactured by American Water Heater Company in 2005 with a capacity of 50-Gal, one electric unit manufactured by Energy Saver in 1992 with a capacity of 50-Gal, and one gas unit manufactured by General Electric in 2007 with a capacity of 40-Gal. CONDITION The domestic water heaters appeared to be in poor-to-fair,to fair condition generally.There were no signs of rust and corrosion noted at this time,however with a typical EUL of fifteen-years an action for replacement would occur for all units during the study period to maintain efficiency. D2031 Waste Piping DESCRIPTION Waste piping is assumed to be a combination of cast iron and PVC piping throughout the Property. CONDITION No visually apparent problems with the sanitary waste piping were observed or reported by the maintenance personnel.The waste system can be serviceable through the end of the study period with regular maintenance. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. AM 154076 D2010 Replace Shower-Three Wall Fiberglass Priority 3 2019 $3,478 154077 D2010 Replace Shower-Three Wall Ceramic Tile Priority 3 2019 $2,469 154078 D2010 Replace Shower System-Head,Arm,Bypass,Stops, Priority 3 2019 $2,335 Handles 154079 D2020 Replace Domestic Hot Water Heater-Gas Priority 3 2022 $3,072 154080 D2020 Replace Domestic Hot Water Heater-Gas Priority 3 2020 $3,841 154081 D2020 ce Domestic Hot Water Heater-Electric Priority2 2016 $4,725 154082 D2030 +Mepllaace Drainage Pipework Below round -2" Priority 3 2024 $69,681 TOTALS BY YEAR Total Expenditures��l 2016 $4,725 2019 $8,282 2020 $3,841 2022 $3,072 2024 $69,681 F+G Project No.100051118 Powered by iPlan"O 4tell""Solutions, LP City of Tigard Public Works October 12,2016 D30 HVAC D3012 Gas Supply System DESCRIPTION The building has natural gas piping for the split-system furnaces. This is fed from a 2" main located at the east elevation of the Property.The gas main and diaphragm is equipped with seismic shut off valves. CONDITION The gas main and seismic shut off valves appeared to be in fair condition and replacement is not anticipated during the study period. It is recommended to undertake routine testing and maintenance of the shut off valves. D3023 Auxiliary Equipment DESCRIPTION The office/ancillary portion of the building contains two electric baseboard heaters at the multi-use hall and breakout area. The heaters were reportedly installed in 2015. CONDITION The baseboard heaters appeared to be in good condition.Based on a typical EUL of twenty-years for this type of equipment and based on their observed condition,we do not anticipate any replacement expenditure during the study period. D3032 Direct Expansion Systems DESCRIPTION The buildings heat/cool systems consisted of seven natural gas Carrier energy efficient furnaces;they are single stage fan controlled with air conditioning capabilities provided by outdoor condenser units manufactured by Carrier. Five units have a capacity of 80,000 BTU and two units have a capacity of 70,000 BTU.The manufacturer's information and capacities can be found in the following HVAC mechanical table. There are two mini split-system present at Property manufactured by Fujitsu,installed circa 2000.The split-system provides supplemental cooling and is with capacities of 0.75-Ton and 2-ton. CONDITION The indoor furnaces/evaporator coil split-system units were in fair-to-good condition for their age. Furnace units were manufactured in 2006/07. Based on the typical EUL of twenty years we do not anticipate any actions during the study period. The split-system outdoor condenser units appeared to be in fair-to-good condition and well maintained.Based on their observed conditions and an EUL of twenty years and their age and condition,we do not anticipate any actions during the study period. The mini split-system units appeared to be in fair condition. Based on a typical EUL of twenty years we anticipate that these units will require replacement in the mid-term of the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D3051 Terminal Self-Contained Units DESCRIPTION The water district operations center portion of the building utilizes four natural gas furnace units manufactured by Pulse, so that fresh and heated air is distributed throughout various sections within the building. In addition to this,two wall mounted unit heaters are provided;one gas unit manufactured by Modine with an assumed capacity of 1000,00 BTU, and one electric unit manufactured by QMark with an assumed capacity of 10,00 BTU. CONDITION The furnaces and wall mounted unit heaters appeared to be in fair condition.The units are not original to the building and we understand installation was circa 2006107.With an EUL of fifteen-years for this type of equipment we anticipate their replacement mid-term in the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID •. tion Priority Year Expenditures 154083 D3030 Replace Split-System(Outdoor and Indoor Unit) Priority 3 2020 $4,435 154084 D3030 Replace Split-System(Outdoor and Indoor Unit) Priority 3 2020 $11,827 154085 D3050 Replace Gas Fired Suspended-100 MBH Priority 3 2022 $5,047 154086 D3050 Replace Gas Fired Suspended-100 MBH Priority 3 2022 $5,047 154087 D3050 Replace Unit Heater-Electric(Small) Priority 3 2021 $1,317 154088 D3050 Replace Gas Fired Suspended-100 MBH Priority 3 2022 $5,047 154089 D3050 Replace Unit Heater-Gas Fired Suspended-100 MBH Priority 3 2021 $5,047 154090 D3050 Replace Gas Fired Suspended-100 MBH Priority 3 2022 $5,047 TOTALS BY YEAR Year • . l Expenditures 2020 $16,262 2021 $6,364 2022 $20,189 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D40 FIRE PROTECTION SYSTEMS D4011 Sprinkler Water Supply DESCRIPTION The building is protected with an automatic wet-pipe fire suppression system utilizing standard pendent commercial sprinkler heads fixed to fire-line pipes which are supported via the upper structure. The system is monitored by water flow and tamper switches connected to the fire alarm system.The sprinkler main enters at the east elevation of the building.The water main incoming is a 6"line at the point of service. CONDITION The fire suppression systems and components appeared to be in fair-to-good condition with inspections up to date. Assuming the completion of continued proactive maintenance as an operational expense we do not anticipate the need for significant expenditure of the fire suppression systems during the study period. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D50 ELECTRICAL SYSTEMS D5012 Low Tension Service&Dist DESCRIPTION The Property contains a Main Distribution Panel(MDP) rated at 120/208-Volts at 800-amp located in the main electrical room,secondary switchboards with a capacities of 120/208-Volts at 225-amp. In addition to this, panelboards rated at 120/208-Volts,and under 400-amps are provided throughout the Property.The electrical service and distribution equipment is typically manufactured by General Electric The emergency generator transfer switch manufactured by Cummins is wall mounted within the main electrical room. CONDITION The building main electrical distribution system was upgraded in 2006 and appeared to be in fair-to-good condition.There were no signs of deterioration or issues noted at any of the panels.The typical EUL for electrical switchboard gear such as this is thirty-years;therefore there will be no requirement for replacement during the study period. The electrical equipment should receive preventive maintenance consisting of cleaning the interiors of all enclosures, and infrared scans of connections,fuses, and breakers in switches, panel boards, and motor starters beginning at the start of the study period and repeated no more than every three-years thereafter.Any items identified as abnormal during the infrared scans should be corrected at that time. The transfer switch appears to be in fair condition. The typical EUL for this type of equipment is twenty-years; therefore we anticipate replacement in the mid-term of the study period. D5021 Branch Wiring Devices DESCRIPTION The branch wiring devices including switches, receptacles, GFCI and other devices were observed to be commercial grade in standard non-decor format. Branch wiring was observed to be distributed in Electrical Metallic Tubing (EMT) conduit except in locations that may vibrate where flexible metal clad cable is typically used. CONDITION The branch wiring was observed to be in fair condition with no broken outlets or switches therefore no actions will be generated during the study period. D5022 Lighting Equipment DESCRIPTION The interior lighting is provided by a combination of recessed 2'x 2'fluorescent fixtures within the office/ancillary areas,4'strip fluorescent fixtures, and pendant mounted fixtures within the water district operations center portion of the building. The light fittings are typically controlled with a combination of manual switches and room sensors adjacent to entrance doors. The exterior lighting consisted of a combination of localized wall pack light fixtures and recessed soffit circular light fixtures. F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 CONDITION The interior lighting was observed to be in fair condition,assuming ongoing lamping and replacement of defective fixtures as a maintenance expenditure.We do not anticipate that any major works are required to the lighting systems during the study period. The exterior light fixtures appeared to be in fair condition with no visible deterioration observed, therefore no actions will be generated during the study period. D5033 Telephone Systems DESCRIPTION The telephone and data system is located within the telecommunications room at the office/ancillary portion of the building.The telephone system provides voice lines to the telephone switch panel and is patched to the structured voice cabling to the various telephone voice plates throughout the building.The data system contains a tower rack with voice and data patch panels, routers, switches, modems and structured data cabling to the various data plates located throughout the building. CONDITION The existing telephone and data equipment/infrastructure was observed to be in fair-to-good condition. We assume that over time the systems have under gone regular upgrades due to changing and innovating technology requirements. There are no reported operating issues at this time which will require immediate action;therefore we do not anticipate any major replacement during the study period. D5037 Fire Alarm Systems DESCRIPTION The Property contains a Gamewell-FCI intelligent fire detection system by Honeywell,with addressable Fire Alarm Control Panel(FACP). The FACP is wall mounted and located within the main electrical room. The FACP monitors manual pull stations and smoke detectors throughout the building interior. CONDITION The fire alarm system and FACP appeared to be in fair but antiquated condition. It was noted that this panel is approaching obsolesce which will make replacement parts difficult to obtain. We anticipate the system and FACP will require replacement in the middle-term of the study period due to the lack of available replacement parts and to insure it provides its intended function. F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 D5038 Security and Detection Systems DESCRIPTION The building contains a door card access system which monitors individuals gaining access to the building. CONDITION The door card access system appeared to be in fair condition generally, however, it was reported that, failures of the system were a concern due to the age of the system, and that the system was obsolete and replacement parts not available for purchase.The security access system has a typical EUL of ten years; therefore, we recommend replacement of the security access system in the near-term of the study period. D5092 Emergency Light&Power Systems DESCRIPTION There are standard wall mounted exit signs at all egress points from the Property. The signs are white plastic with green lettering and local battery backup. CONDITION The exit signs were generally observed to be in fair condition. We recommend that the exit signs are updated in conjunction with the fire alarm system early in the study period.The cost for this has been considered within the fire alarm system replacement. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID Type Recommendation 154243 D5010 Replace Emergency Generator Transfer Switch Priority 3 2021 $8,400 154244 D5030 Replace Card Access System Priority 2 2016 $65,061 154245 D5030 Replace Fire Alarm System(Full System Inc. Panel) Priority 1 2020 $182,470 TOTALS BY YEAR Year Total Expenditures 2016 $65,061 2020 $182,470 2021 $8,400 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 E10 EQUIPMENT E1031 Vehicular Service Equipment DESCRIPTION The site contains approximately 12 reinforced steel bollards upon isolated cast-in-place concrete footings. Bollards are located to the exterior perimeter of the water district operations center portion of the building; typically at corners and adjacent to overhead doors, and protect the exterior wall construction from vehicular impact. CONDITION The bollards appeared to be in fair condition with only aesthetical damage noted,including; minor impact damage and delamination of the paint finish causing corrosion of the metal;therefore,we recommend repainting of the bollards in the near-term of the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overheadiprofit and management costs. ID Type Recommendation 154094 1 E1030 Repaint Bollards Priority 3 2018 1 $3,292 TOTALS BY YEAR Year Total Expenditures 2018 $3,292 F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 E20 FURNISHINGS E2012 Fixed Casework DESCRIPTION The Property contains fixed laminate finished countertops and base units throughout. CONDITION The countertops and base units were generally found to be fair condition and assumed to have been replaced during the office/ancillary refurbishment in circa 2006,therefore we anticipate that all casework will be replaced after mid-term of the study period,and in conjunction with holistic refurbishment works to benefit from economies of scale. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. 71154095 E2010 Replace Floor Mounted Base Cabinet(s)-Standard Priority 3 2022 $24,840096 E2010 Replace Fixed Casework-Counter Top-Laminated Priority 3 2022 $4,326 TOTALS BY YEAR Year Total Expenditures 2022 $29,166 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 E5 BUILDINC5 SITEWORK SYSTEMS G20 SITE IMPROVEMENTS G2021 Bases and Sub-Bases DESCRIPTION The Property contains two parking lots accessed off SW Burnham Street with interior roadways;one which serves staff and visitor parking adjacent to the office/ancillary portion of the building, and one secure parking lot which serves maintenance vehicle parking adjacent to the water district operations center portion of the building.The staff and visitor parking lot contains approximately 42 spaces, including two accessible spaces adjacent to the main entrance, and the secure parking lot contains approximately 78 spaces. We were not provided with sectional details of the asphalt-paved areas, however, such elements typically consist of a 2"deep asphaltic top course over a 4"thick bituminous concrete base and a 6"deep compacted aggregate sub-base. CONDITION The parking areas, interior roadways,and road markings were generally in fair structural condition; however,the asphalt wearing course had a number of hairline and minor cracks in addition to other deteriorated sections.The typical EUL for this type of buildup is twenty-years and based on observed conditions,we recommend that these areas are milled and overlaid in the near-term of the study period. It should be noted that,due to the nature and scale of this work consideration could be given to a phased/prioritized approach. G2031 Paving &Surfacing DESCRIPTION The asphalt-paved areas are bordered by cast-in-place concrete curb sections. The perimeter of the Property is provided with sidewalk sections assumed to consist of; 4"thick cast-in-place concrete with expansion joints provided at driveways, curbs and adjacent to the building structure. In addition to this, saw-cut contraction joints are provided at approximately 5'on center. CONDITION Concrete curb sections were found to be in good condition and assuming curbs are cleaned and repaired as a maintenance expenditure, we do not anticipate that replacement will be required during the study period. Sidewalk sections throughout the Property were generally found to be in fair-to-good condition;however,localized cracking of the concrete was noted.Assuming these areas are cleaned and repaired as a maintenance expenditure,we do not anticipate that replacement will be required during the study period. G2041 Fences&Gates DESCRIPTION The secure portion of the parking lot to the northwest of the site is secured with 6' high wood clad chain linked fence upon isolated cast- in-place concrete footings. F+G Project No.100051118 Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 CONDITION The fencing appeared to be in poor-to-fair condition with;deterioration of the wood cladding,vegetation growth through the fencing, and significant impact damage noted throughout,therefore,we recommend replacement of the fencing in the near-term of the study period to maintain the integrity of the site. G2048 Flagpoles DESCRIPTION The facility is provided with one flagpoles to the east of the office/ancillary portion of the building adjacent to the main entrance which consists of an approximately 20'high aluminum pole,countersunk with concrete footings. CONDITION The flagpole appeared to be in fair-to-good condition,therefore no actions will be generated during the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. ID Type Recommendation 154097 G2020 Replace Asphalt Mill&Overlay including Re-Striping Priority 3 2018 $284,235 154098 G2040 Replace Chain Link Galvanized Fence Priority 3 2018 $38,520 TOTALS BY YEAR Year Total Expenditures 2018 $322,755 F+G Project No.100051118 '. - Powered by iPlon—0 4tell-Solutions, LP City of Tigard Public Works October 12,2016 G40 SITE ELECTRICAL UTILITIES G4092 Site Emergency Power Generation DESCRIPTION The Property power is backed up by a diesel emergency generator located within a designated generator set room to the northeast of the water district operations center portion of the building. It was manufactured by Cummins and has a capacity of 200 kW at 250 M.The transfer switch is wall mounted within the main electrical closet. CONDITION The age of the emergency generator and transfer switch could not be determined, however; they appeared to be in fair condition and regularly maintained.The typical EUL of such equipment is twenty years and based on the likely manufacture date,we recommend the replacement in the mid-term of the study period. PROJECTED EXPENDITURES Identified recommended works that are required during the 10-year study period are scheduled below. We recommend budgeting for additional project costs of between 25%-35% to allow for professional fees and general contractor overhead/profit and management costs. We—commendation Pr: Year Expenditures F1 5-409 7_71 Replace Generator Sets, Diesel Engine-100 to 200 kW Priority 3 2021 $138,442 TOTALS BY YEAR Year Total Expenditures 2021 $138,442 F+G Project No.100051118 '. Powered by iPlon—0 4tell-Solutions, LP APPENDIX A: Capital Expenditures APPENDIX B: Photographic Record APPENDIX C: Document Review and Warranty Information APPENDIX D: Equipment Tables APPENDIX E: Glossary of Terms APPENDIX A : CAPITAL EXPENDITURES Deficiency Report Public Works GSF: 20,773 Year Built: 1989 Renew Year : Replacement Cost: $4,777,790 Materials r Fiscal Year $ ID CSI Type Name Description Off Qty Units Cost Assessed Estimate Cost 2016 $93,127 154213 B2010 Deferred Replace Expansion Joints 308 LF $66.84 $20,586 $20,586 Maintenance 154224 C3020 Deferred Replace Epoxy Floor Coating 164 SF $16.80 $2,755 $2,755 Maintenance — — — — — —— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —— — — — — — — — — — — - 154233 D2020 Deferred Replace Domestic Hot Water Heater-Electric 50 GALS $94.50 $4,725 $4,725 Maintenance - - — — — — — — — — — — — — — — — — — —y — — — — — — — — — - - — — — — — — — — — —— — — — — — — — — — — - 154244 D5030 Deferred Replace Card Access System 20773 SF $3.13 $65,061 $65,061 Maintenance - - — — — — — — — — — — — — —— — — — — — — — — — — — — — — — — — — — — — — — — - - - - - - - - - - -- - - - - - - - - - - - 2018 $326,047 154246 E1030 Routine Repaint Bollards 12 EACH $274.31 $3,292 $3,292 Maintenance 154249 G2020 Capital Renewal Replace Asphalt Mill&Overlay including Re- 10791 SY $26.34 $284,235 $284,235 Striping - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154250 G2040 Capital Renewal Replace Chain Link Galvanized Fence 1070 LF $36.00 $38,520 $38,520 - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 2019 $187,822 154214 B2020 Capital Renewal Replace Aluminum Window Units 1792 SF $82.61 $148,034 $148,034 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154215 B2030 Capital Renewal Replace Double Aluminum Glazed Doors 2 EACH $9,263.93 $18,528 $18,528 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154216 B2030 Capital Renewal Replace Single Aluminum Glazed Doors 2 EACH $6,489.45 $12,979 $12,979 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154228 D2010 Capital Renewal Replace Shower-Three Wall Fiberglass 1 EACH $3,478.28 $3,478 $3,478 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154229 D2010 Capital Renewal Replace Shower-Three Wall Ceramic Tile 1 EACH $2,468.81 $2,469 $2,469 10/12/2016 4:30:52 PM FGould FCA Reports Page 1 of 3 Deficiency Report Materials J Fiscal Year $ ID CSI Type Name Description Qty Units Cost Assessed Estimate _ _ Cost JL_ 2019 $187,822 154230 D2010 Capital Renewal Replace Shower System-Head,Arm, Bypass 2 EACH $1,167.48 $2,335 $2,335 Stops,Handles 2020 $202,573 154232 D2020 Capital Renewal Replace Domestic Hot Water Heater Gas 50 GALS $76.81 $3,841 $3,841 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154235 D3030 Capital Renewal Replace Split-System(Outdoor and Indoor Unit) 0.75 TON $5,913.60 $4,435 $4,435 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154236 D3030 Capital Renewal Replace Split-System(Outdoor and Indoor Unit) 2 TON $5,913.60 $11,827 $11,827 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154245 D5030 Capital Renewal Replace Fire Alarm System(Full System Inc. 20773 SF $8.78 $182,470 $182,470 Panel) - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 2021 $153,206 154241 D3050 Capital Renewal Replace Unit Heater-Gas Fired Suspended- 1 EACH $5,047.36 $5,047 $5,047 100 MBH - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154239 D3050 Capital Renewal Replace Unit Heater-Electric(Small) 1 EACH $1,316.70 $1,317 $1,317 - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154243 D5010 Capital Renewal Replace Emergency Generator Transfer Switch 1 EACH $8,400.00 $8,400 $8,400 154251 G4090 Capital Renewal Replace Generator Sets,Diesel Engine-100 to 200 KW $692.21 $138,442 $138,442 200 kW 2022 $929,288 154219 C1020 Capital Renewal Replace Interior Single Wood Door(s) 20 EACH $1,755.60 $35,112 $35,112 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154220 C1020 Capital Renewal Replace Interior Double Wood Door(s) 2 EACH $2,106.72 $4,213 $4,213 - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154221 C3010 Capital Renewal Replace Painted Finish-Standard 41349 SF $2.63 $108,665 $108,665 - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154222 C3010 Capital Renewal Replace Ceramic Wall Tiles 768 SF $22.57 $17,335 $17,335 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154226 C3020 Capital Renewal Replace Carpet Tiles-Standard 8230 SY $81.26 $668,763 $668,763 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154225 C3020 Capital Renewal Replace Vinyl Composite Tile(VCT) 3980 SF $8.64 $34,387 $34,387 154223 C3020 Capital Renewal Replace Ceramic Tile 320 SF $26.20 $8,384 $8,384 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154231 D2020 Capital Renewal Replace Domestic Hot Water Heater-Gas 40 GALS $76.81 $3,072 $3,072 - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154240 D3050 Capital Renewal Replace Gas Fired Suspended-100 MBH 1 EACH $5,047.36 $5,047 $5,047 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154237 D3050 Capital Renewal Replace Gas Fired Suspended-100 MBH 1 EACH $5,047.36 $5,047 $5,047 10/12/2016 4:30:52 PM Mould FCA Reports Page 2 of 3 Deficiency Report Materials Fiscal Year $ ID CSI Type Name Description Qty Units Cost Assessed Estimate Cost 2022 $929,288 154242 D3050 Capital Renewal Replace Gas Fired Suspended-100 MBH 1 EACH $5,047.36 $5,047 $5,047 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154238 D3050 Capital Renewal Replace Gas Fired Suspended-100 MBH 1 EACH $5,047.36 $5,047 $5,047 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154248 E2010 Capital Renewal Replace Fixed Casework-Counter Top- 46 LF $94.05 $4,326 $4,326 Laminated - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154247 E2010 Capital Renewal Replace Floor Mounted Base Cabinet(s)- 46 LF $540.00 $24,840 $24,840 Standard - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 2024 $117,674 154227 C3030 Capital Renewal Replace Acoustic Ceiling System-Standard 7842 SF $6.12 $47,993 $47,993 - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154234 D2030 Capital Renewal Replace Drainage Pipework(Below ground)-2" 630 LF $110.60 $69,681 $69,681 — — — — — — — — — — — — — — —— - - - - - — — — g- - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 2025 $1,123,581 154217 B3010 Capital Renewal Replace Standing Seam Metal Roof Panels 24930 SF $43.90 $1,094,32 $1,094,327 7 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - 154218 B3010 Capital Renewal Replace Aluminum Perimeter Gutters& 1620 LF $18.06 $29,253 $29,253 Downspout - - - - - - - - - - — — — — — — — — — — - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - Total Total: $3,133,317 10/12/2016 4:30:52 PM FGould FCA Reports Page 3 of 3 APPENDIX B : PHOTOGRAPHIC RECORD � r 1. . f' k 'w �J& { A1031 Standard Slab on Grade:-View of Slab-on-Grade B2011 Exterior Wall Construction:-View of Expansion Joints- Reinforced Concrete View of cohesive and adhesive sealant failure _ r } B2011 Exterior Wall Construction:-View of Veneer Brick B2021 Windows:-View of Aluminum Window Units-View of typical gasket and sealant condition ,r 5 � 1 B2021 Windows:-View of Aluminum Window Units-View of B2034 Overhead Doors:-View of Rolling Overhead Doors, typical window unit Electric F a{ r _ SII B2039 Other Doors&Entrances:-View of Single HM Doors B3011 Roof Finishes:-View of Standing Seam Metal Roof Panels-Overview of roof arrangement and standing seam covering .5 B3016 Gutters and Downspouts:-View of Aluminum Perimeter B3016 Gutters and Downspouts:-View of Aluminum Perimeter Gutters&Downspout Gutters&Downspout-View of vegetation blocking gutters p r -r 1p C1021 Interior Doors:-View of Interior Single Wood Door(s) C2011 Regular Stairs:-View of Regular Stairs-Steel Construction 4 J6 .: 4d S y — �. yy4ii4 fyf� I —k . r 'f C3012 Wall Finishes to Interior Walls:-View of Ceramic Wall C3023 Hardeners and Sealers:-View of Epoxy Floor Coating Tiles 1 I . C3024 Flooring:-View of Vinyl Composite Tile(VCT) C3025 Carpeting:-View of Carpet Tiles—Standard . r C3032 Suspended Ceilings:-View of Acoustic Ceiling System D2011 Water Closets:-View of Floor Mounted Water Closets -Standard-View of typical interior finishes i D2012 Urinals:-View of Stall Type Urinals D2013 Lavatories:-View of Vanity Top Lavatories r� z 4 1 D2013 Lavatories:-View of Wall Hung Lavatories D2014 Sinks:-View of Service Sink Floor Mounted D2017 Showers:-View of Shower-Three Wall Ceramic Tile D2017 Showers:-View of Shower-Three Wall Fiberglass r P 5f' D2018 Drinking Fountains and Coolers:-View of Wall Mounted D2022 Hot Water Service:-View of Domestic Hot Water Heater Standard Drinking Fountain(Dual/Bi-Level) Electric . - D2022 Hot Water Service:-View of Domestic Hot Water D3012 Gas Supply System:-View of Gas Main-2" Heater-Gas I ■ r f D3023 Auxiliary Equipment:-View of Baseboard Convection D3032 Direct Expansion Systems:-View of Split-System Heaters-Electric (Indoor Furnace Unit)60,000 BTU/HR t 5 I I D3032 Direct Expansion Systems:-View of Split-System D3032 Direct Expansion Systems:-View of Split-System (Outdoor and Indoor Unit) (Outdoor and Indoor Unit) a 4 i rr x D3051 Terminal Self-Contained Units:-View of Unit Heater- D5012 Low Tension Service&Dist:-View of Switchboard- Electric(Small) 120I208volts,400 to 2000amp s s �N -x r _ — W i D5033 Telephone Systems:-View of Telephone&Data D5037 Fire Alarm Systems:-View of Fire Alarm System(Full System System Inc. Panel) N 1+ L I E1031 Vehicular Service Equipment:-View of Bollards E2012 Fixed Casework:-View of Fixed Casework-Counter Top-Laminated G2021 Bases and Sub-Bases:-View of Asphalt Mill&Overlay G2021 Bases and Sub-Bases:-View of Asphalt Mill&Overlay including Re-Striping including Re-Striping-View of pitting to asphalt pavement G2021 Bases and Sub-Bases:-View of Asphalt Mill&Overlay G2031 Paving&Surfacing:-View of Concrete Curb including Re-Striping-View of alligator cracking to asphalt pavement A. 4.1 G2041 Fences&Gates:-View of Chain Link Galvanized G2041 Fences&Gates:-View of Chain Link Galvanized Fence Fence-View of defective fencing V II A G2048 Flagpoles:-View of Flag Pole,Aluminum-20'High G4092 Site Emergency Power Generation:-View of Generator Sets, Diesel Engine-100 to 200 kW APPENDIX C : DOCUMENT REVIEW AND WARRANTY INFORMATION The following documents were reviewed as part of the facility condition assessment of the Public Works facility: HVAC Due Diligence Report APPENDIX D : EQUIPMENT TABLES Table D20 Summary of Domestic Water Heating Equipment Capacity/Location Equipment Manufacturer Model Serial Tag Type No. No. Rating Type Interior Domestic Energy Saver M-I EE 6920706 Unknown 50 Gallons Electric 1992 Water Heater 5055DS-9 Domestic General GG40T06A GELN407V Natural Interior Water Heater Electric VG01 G01 Unknown 40 Gallons Gas 2007 Domestic American FF6150T4 Natural Interior Water Heater Water Heater 03NO 0505103392 Unknown 50 Gallons Gas 2005 Company Table D30 Summary of HVAC Equipment Location Equipment Manufacturer Model Serial Tag Capacity/ Fuel Year Type No. No. Rating Type Interior Furnace Carrier 58MXB080 350060639 Unknown 80 MBH Gas 2006 Interior Furnace Carrier 58MXB060 3506A06387 Unknown 60 MBH Gas 2006 Split-System Exterior Outdoor Carrier 24ABA336 1207E32390 Unknown 28 Ton Electric 2007 Condenser A318 Unit Split-System Exterior Outdoor Carrier 24ABA348 1207E12192 Unknown 29 Ton Electric 2007 Condenser A310 Unit Interior Furnace Carrier 58MXB080 3306A03726 Unknown 80 MBH Gas 2006 Interior Furnace Carrier 58MXB080 Unknown Unknown 80,000 Gas 2006 BTU/HR Split-System Exterior Outdoor Carrier 24ABA336 Unknown Unknown 28 Ton Electric 2007 Condenser A310 Unit Interior Furnace Carrier 58MXB060 3506A06390 Unknown 60 MBH Gas 2006 Exterior Split-System Fujitsu AOU24RL CNT 005843 Unknown 2 Ton Electric 2000 (Full System) X Split-System Exterior Outdoor Carrier 24AHA348 1207E1218 Unknown 29 Ton Electric 2007 Condenser A0031010 Unit Split-System Exterior Outdoor Carrier 24AHA348 1207E32539 Unknown 29 Ton Electric 2007 Condenser A0031010 Unit Exterior Split-System Mitsubishi MU09NW2 0000652T Unknown 0.75 Ton Electric 2000 (Full System) Interior Furnace Carrier 58MXB080 4006A02316 Unknown 80 MBH Gas 2006 Interior Furnace Carrier 58MXB080 Unknown Unknown 80 MBH Gas 2006 Split-System Exterior Outdoor Carrier 24AHA348 Unknown Unknown 29 Ton Electric 2007 Condenser A0031010 Unit Split-System Exterior Outdoor Carrier 24ABA360 Unknown Unknown 30 Ton Electric 2007 Condenser A310 Unit Interior Unit Heater Pulse Unknown Unknown Unknown Unknown Gas 2007 Interior Unit Heater Modine Unknown Unknown Unknown Unknown Gas 2006 Interior Unit Heater Pulse Unknown Unknown Unknown Unknown Gas 2007 Interior Unit Heater Qmark MUH 0381 Unknown Unknown 3 kW Electric 2006 Interior Unit Heater Pulse Unknown Unknown Unknown Unknown Gas 2007 Interior Unit Heater Pulse Unknown Unknown Unknown Unknown Gas 2007 Table G40 Summary of Site Emergency Power Generation Location Equipment Manufacturer Model Serial Tag Capacity/ Voltage Year Type No. No. I Rating Exterior Generator Cummins 2000FBC I J910431283 Unknown 200 Unknown 1989 APPENDIX E : GLOSSARY OF TERMS Acronyms&Glossary of Terms ABC Aggregate Base Course BUR Built-Up Roof CIP Cast-In-Place CMU Concrete Masonry Unit EIFS Exterior Insulation and Finish System EPDM Ethylene Propylene Diene Monomer HM Hollow Metal Doors MH Man Holes SC Solid Core Doors TPO Thermoplastic Polyolefin AHU Main Air Handling Units EF Exhaust Fan EMC Electrical Metallic Conduit EMT Electrical Metallic Tubing FACP Fire Alarm Control Panel FCC Fire Command Center FCU Fan Coil Unit FSS Fuel Supply System MDP Main Distribution Panel NAC Notification Appliance Circuit RTU Roof Top Unit SES Service Entrance Switchboard's VAV Variable Air Volume VFD Variable Frequency Drives CRV Current Replacement Value DM Deferred Maintenance EOL End of Life EUL Estimated Useful Life FCI Facility Condition Index HVAC Heating Ventilating and Air conditioning RUL Recommended Useful Life AMP Amperage BTU/HR British Thermal Units per Hour FPM Feet per Minute(Elevator Speed) GPF Gallons Per-Flush HID High-Intensity Discharge HP Horse Power KVA kilovolt-Ampere kW Kilowatt PSF Pounds-Per-Square-Foot PSI Pounds-Per-Square-Inch RO Reverse Osmosis SF Square Foot SY Square Yards NEMA National Electrical Manufactures Association NFPA National Fire Protection Association Acronyms&Glossary of Terms BTU—British Thermal Unit;the energy required to raise the temperature of one pound of water by one degree. Building Envelope-The enclosure of the building that protects the building's interior from the outside elements,namely the exterior walls, roof and soffit areas. Building Systems — Interacting or independent components or assemblies, which from single integrated units, that comprise a building and its site work,such as, pavement and flatwork,structural frame, roofing,exterior walls,plumbing, HVAC,electrical,etc. Caulking—Soft,putty-like material used to fill joints,seams,and cracks. Codes—See building codes. Component—A fully functional portion of a building system,piece of equipment,or building element. Deferred Maintenance—Physical deficiencies that cannot be remedied with routine maintenance, normal operating maintenance, etc.,excluding de minimis conditions that generally do not present a material physical deficiency to the subject property. Expected Useful Life(EUL)—The average amount of time in years that an item,component or system is estimated to function when installed new and assuming routine maintenance is practiced. Facility—All or any portion of buildings,structures,site improvements,complexes,equipment, roads,walks, passageways, parking lots,or other real or personal property located on site. Flashing—A thin, impervious sheet of material placed in construction to prevent water penetration or to direct the flow of water. Flashing is used especially at roof hips and valleys, roof penetrations,joints between a roof and a vertical wall,and in masonry walls to direct the flow of water and moisture. Remaining Useful Life(RUL)—A subjective estimate based upon observations,or average estimates of similar items,components, or systems,or a combination thereof, of a number of remaining years that an item, component,or system is established to be able to function in accordance with its intended purpose before warranting replacement.Such period of time is affected by the initial quality of an item,component,or system,the quality of the initial installation,the quality and amount of preventative maintenance exercised, climatic conditions,extent of use,etc. Structural Frame—The components or building systems that support the building's non-variable forces or weights(dead loads)and variable forces or weights(live loads). Thermal Resistance(R)—A unit used to measure a material's resistance to heat transfer.The formula for thermal resistance is: R =Thickness(in inches)/K. Warranty — Legally enforceable assurance of quality or performance of a product or work, or of the duration of satisfactory performance.Warranty guarantee and guaranty are substantially identical in meaning;nevertheless,confusion frequently arises from supposed distinctions attributed to guarantee(or guaranty)being exclusively indicative of duration of satisfactory performance or of a legally enforceable assurance furnished by a manufacturer or other third party.The uniform commercial code provisions on sales (effective in all states except Louisiana)use warranty but recognize the continuation of the use of guarantee and guaranty.