Loading...
Plans (9) PLM2019 -00119 ABBREVIATIONS PLUMBING SYMBOL LEGEND VALVES PIPING GENERAL PLUMBING NOTES AFF ABOVE FINISHED FLOOR S OR W SANITARY OR WASTE PIPING ABOVE SLAB GENERAL SOIL,WASTE,AND VENT PIPING 1. PLUMBING CONTRACTOR SHALL COORDINATE WITH THE GENERAL RECEIV AHJ AUTHORITIES HAVING JURISDICTION PLUMBING CONTRACTOR TO PROVIDE VALVES WHERE INDICATED ON SEE THE PROJECT MANUAL FOR PIPE MATERIALS. ALL HORIZONTAL CONTRACTOR TO PATCH AND REPAIR ALL EXISTING WALLS, FLOORS, APPROX APPROXIMATE -------- S OR W SANITARY OR WASTE PIPING BELOW SLAB PLANS AND AS NECESSARY FOR PROPER SYSTEM OPERATION AND RUNS SHALL DRAIN AT A GRADE OF 1/4" PER FOOT (21MM PER METER) CEILINGS OR OTHER SURFACES IDENTIFIED TO REMAIN THAT MAY MAR 7 201 V VENT PIPING COMPONENT ISOLATION. SEE PROJECT MANUAL FOR TYPES, INSTALL WHERE POSSIBLE BUT IN NO CASE LESS THAN 1/8" PER FOOT (10MM BECOME DAMAGED DURING THE COURSE OF WORK. BLDG BUILDING VALVES FOR EACH FIXTURE AND ITEM OF EQUIPMENT. PROVIDE BRAIDED PER METER)WHERE ALLOWED & SIZED PER AHJ AND CODE. CITY OFTIGA GW GW GREASE WASTE STAINLESS STEEL HOSE (UNLESS OTHERWISE NOTED) BETWEEN VALVE 2. EXPOSED/SURFACE MOUNTED PIPING IS ONLY ALLOWED IN THE BARWILDING DMS (� CLG CEILING AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S COORDINATE WITH LOCAL AUTHORITIES FOR DRAINAGE AREA UNDER COUNTERTOPS, WHERE IT DOES NOT OBSTRUCT CONST CONSTRUCTION CD CD CONDENSATE DRAIN SPECIFICATIONS. LOCATE SHUT-OFF VALVES ADJACENT TO EQUIPMENT REQUIREMENTS FOR EQUIPMENT DESIGNATED WITH INDIRECT WASTE CABINETS/DEVICES AND WHERE APPROVED BY STARBUCKS CW DOMESTIC COLD WATER FOR EASY ACCESS SUCH THAT VALVES CAN BE REACHED WITHOUT TO FLOOR SINKS. INDIRECT DRAIN LINES ARE TO MAINTAIN MIN. 1" CONSTRUCTION MANAGER. IF ROUTED THROUGH CABINETS, IT CXA COMMISSIONING AGENT CW COLD WATER PIPING MOVING EQUIPMENT. SHUT OFF VALVES TO BE BALL TYPE. VALVES SHALL (25MM)AIR GAP ABOVE FLOOR SINKS. PROVIDE PIPED DRAIN (P-TRAP SHALL BE ROUTED TO MAXIMIZE STORAGE SPACE AND BE HW HOT WATER PIPING BE LISTED/APPROVED FOR USE PER AUTHORITIES HAVING JURISDICTION AND VENT)TO SANITARY IF REQUIRED BY LOCAL JURISDICTION. PROTECTED FROM DAMAGE. ©2018 STARBUCKS COFFEE COMPANY DEG DEGREES (AHJ)AND CODE REQUIREMENTS. PROVIDE VALVE IDENTIFICATION PER DN DOWN CWF— CWF COLD WATER FILTERED THE PROJECT MANUAL FOR MAIN WATER SERVICE SHUT-OFF AND ANY CONDENSATE DRAINAGE PIPING 3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL INTENT OR DTL DETAIL —CWN CWN COLD WATER NANO FILTERED OTHER VALVES WHICH ARE NOT CLEARLY EVIDENT WHAT THEY SERVE. THE PLUMBING CONTRACTOR SHALL PROVIDE CONDENSATE DRAINS ARRANGEMENT OF SYSTEM(S). FURNISH AND INSTALL ALL STARBUCKS DWG(S) DRAWING(S) FOR AIR HANDLING UNITS AND STARBUCKS EQUIPMENT (REFER TO COMPONENTS NEEDED WHETHER INDICATED OR NOT TO PROVIDE A 2401 UTAH AVENUE SOUTH CWS CWS COLD WATER SOFTENED SUPPLY WATER SERVICE SCHEDULE). CONDENSATE DRAINAGE PIPING SHALL BE TYPE "M" EA EACH IF WATER PRESSURE SUPPLIED TO STORE IS GREATER THAN 65 PSI, COPPER TUBING WITH WROUGHT COPPER SWEAT FITTINGS JOINED COMPLETE AND OPERATING SYSTEM. OVERALL CASEWORK SEATTLE, WASHINGTON 98134 EC ELECTRICAL CONTRACTOR TW TW TEMPERED WATER PROVIDE A PRESSURE REGULATOR IN MAIN SUPPLY TO REDUCE WATER WITH 50/50 SOLDER. COMPONENT DIMENSIONING ON PLUMBING DETAILS ARE SHOWN (206) 318-1575 ELEC ELECTRICAL RO RO REVERSE OSMOSIS WATER PRESSURE. PROVIDE BACKFLOW PREVENTION ON WATER SERVICE FOR REFERENCE AND COORDINATION ONLY. EMER EMERGENCY IF REQUIRED BY LOCAL CODES. HANGERS AND SUPPORTS THESE DRAWINGS AND THE PROJECT MANUAL EXIST EXISTING G G GAS PIPING THE PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL ALL PIPE 4. CONTRACTOR TO VERIFY ALL DIMENSIONS, INCLUDING CLEARANCES ARE CONFIDENTIAL AND SHALL REMAIN THE EXT EXTERIORTHERMOSTATIC MIXING VALVE SUPPORTS REQUIRED FOR EQUIPMENT AND MATERIAL IN ACCORDANCE REQUIRED BY OTHER TRADES, AND NOTIFY STARBUCKS SOLE PROPERTY OF STARBUCKS RD RD REFRIGERANT DISCHARGE PIPING PROVIDE A SINGLE THERMOSTATIC MIXING VALVE (TMV) LOCATED AT HOT WITH SPECIFICATIONS. ALL HORIZONTAL RUNS OF PIPING SHALL BE CONSTRUCTION MANAGER OF ANY DISCREPANCIES PRIOR TO CORPORATION, WHICH IS THE OWNER OF THE FD FLOOR DRAIN RS RS REFRIGERANT SUCTION PIPING WATER TANK AND SET FOR 120° (OR AS REQUIRED BY AHJ) TO SERVE SUPPORTED BY PIPE HANGERS INSTALLED AS REQUIRED BY LOCAL PROCEEDING WITH THE WORK. ALL DIMENSIONS ARE TO THE FACE COPYRIGHT IN THIS WORK. THEY SHALL NOT FS FLOOR SINK HAND SINKS. MIXING VALVE TO BE INSTALLED PER MANUFACTURER'S CODES. ADDITIONAL SUPPORTS SHALL BE PROVIDED WHERE OF THE FINISHED SURFACE UNLESS NOTED OTHERWISE. ALL BE REPRODUCED (IN WHOLE OR IN PART), F&I FURNISH & INSTALL REQUIREMENTS WITH CHECK VALVES AT SUPPLY INLETS, PROVIDE REQUIRED TO PREVENT SAGGING. DIMENSIONS TO BE TAKEN FROM ACTUAL BUILDING DIMENSIONS. SHARED WITH THIRD PARTIES OR USED IN ANY FOIC FURNISHED BY OWNER, BV BALL VALVE THERMOMETER ON OUTLET OF TMV. SEE THE PROJECT MANUAL FOR MANNER ON OTHER PROJECTS OR INSTALLED BY CONTRACTOR REQUIREMENTS. CONNECTIONS 5. THE PLUMBING CONTRACTOR SHALL COORDINATE PLUMBING WORK EXTENSIONS TO THIS PROJECT WITHOUT THE F010 FURNISHED BY OWNER, �r GV GATE VALVE INSTALL UNIONS ADJACENT TO EACH VALVE AND AT FINAL CONNECTION WITH OTHER TRADES. THE ARCHITECTURAL DRAWINGS AND PRIOR WRITTEN CONSENT OF STARBUCKS INSTALLED BY OWNER TO EACH PIECE OF EQUIPMENT. INSTALL DIELECTRIC COUPLINGS TO SPECIFICATIONS SHALL TAKE PRECEDENCE OVER ALL OTHER CORPORATION. THESE DRAWINGS AND FLR FLOOR ^ter— CONNECT PIPING MATERIALS OF DISSIMILAR METALS. DRAWINGS. SEE AFCH:TECTURAL DRAWINGS FOR FIXTURES IN SPECIFICATIONS ARE INTENDED TO EXPRESS FT FOOT/FEET -� CH.V CHECK VALVE PLUMBING FIXTURES CASEWORK AND PLUMBING DETAILS. SEETHE PROJECT MANUAL DESIGN INTENT FOR A PROTOTYPICAL FCO FLOOR CLEANOUT CLEANOUTS FOR PLUMBING SPECIFICATION SECTIONS. STARBUCKS STORE (WHICH IS SUBJECT TO RV RELIEF VALVE PROVIDE FLOOR AND WALL CLEANOUTS AS INDICATED ON THE CHANGE AT ANYTIME)AND DO NOT REFLECT GC GENERAL CONTRACTOR WATER HEATER DRAWINGS OR WHERE REQUIRED BY CODE IN ALL SOIL, WASTE, AND 6. ALL PIPING AND/OR PLUMBING DEVICES SHALL BE SUPPORTED FROM ACTUAL SITE CONDITIONS. NEITHER PARTY GFCI GROUND FAULT CIRCUIT INTERRUPTER SIZE WATER HEATER PER STARBUCKS STANDARD AND PER AUTHORITIES DRAIN LINES. SEE THE PROJECT MANUAL FOR TYPES. CLEANOUTS STRUCTURE (NOT FROM HVAC DUCTS OR OTHER PIPES/CONDUITS). SHALL HAVE ANY OBLIGATION NOR LIABILITY TO GW GREASE WASTE HB HOSE BIBB HAVING JURISDICTION (AHJ), WHICHEVER IS MORE STRINGENT. PROVIDE A SHALL BE SAME SIZE AS PIPE EXCEPT THAT CLEANOUTS LARGER THAN THE OTHER (EXCEPT STATED ABOVE) UNTIL A Q GLASS-LINED, ENERGY EFFICIENT, GAS FIRED (OR ELECTRIC EQUIVALENT) 4"WILL NOT BE REQUIRED. WRITTEN AGREEMENT IS FULLY EXECUTED BY HR HOUR SHOCK ABSORBER WATER HEATER. PROVIDE INSTALLATION COMPLETE WITH FITTINGS AS BOTH PARTIES. HVAC HEATING, VENTILATION, AND AIR SHOWN IN THE DRAWINGS. SET HOT WATER TEMPERATURE AT 140' F OR INSTALLATION GENERAL NOTES CONDITIONING ADJUST AS REQUIRED BY AHJ. PROVIDE THERMOMETER ON HOT WATER INSTALL PIPING FREE OF SAGS AND BENDS. PROVIDE BRACKET STARBUCKS TEMPLATE VERSION i2018.10.16 HW HOT WATER } STRAINER PIPE LEAVING WATER HEATER. STANDOFFS FROM MOUNTING SURFACES SUFFICIENT TO ALLOW 1" HS HANDSINK (25MM) OF CLEANING SPACE ALL AROUND PIPING, INCLUDING ANY SCOPE HWS HOT WATER SUPPLY i WCO WALL CLEANOUT WATER FILTRATION ADDED PIPING INSULATION. INSTALL FITTINGS FOR CHANGES IN THE INTENT OF THE PROJECT MANUAL AND THE DRAWINGS IS TO HWR HOT WATER RETURN STARBUCKS WATER FILTRATION VENDOR WILL PROVIDE FILTRATION DIRECTION AND BRANCH CONNECTIONS. INSTALL SLEEVES FOR PIPES PROVIDE A COMPLETE AND FULLY OPERATIONAL PLUMBING SYSTEM. FCO FLOOR CLEANOUT SYSTEM, CONTRACTOR SHALL CONFIRM WITH STARBUCKS CONSTRUCTION PASSING THROUGH CONCRETE AND MASONRY WALLS, GYPSUM BOARD THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, AND LL LANDLORD MANAGER WHETHER VENDOR OR PLUMBING CONTRACTOR IS TO INSTALL PARTITIONS, CONCRETE FLOOR AND ROOF SLABS. SEAL PIPE EQUIPMENT RELATED TO THE INSTALLATION OF THE PLUMBING WORK. LV LOW VOLTAGE ® FILTRATION SYSTEM. PROVIDE AND COORDINATE INSTALLATION COMPLETE PENETRATIONS THROUGH RATED CONSTRUCTION WITH FIRE STOPPING ._ FS FLOOR SINK WITH ALL PIPING, FITTINGS, AND EQUIPMENT AS INDICATED ON THE SEALANT MATERIAL PER CODE REQUIREMENTS. DO NOT INSTALL PEX SITE EXAMINATION GPD Engineering and Architecture MAX MAXIMUM DRAWINGS. PIPING IN RATED WALLS OR THROUGH RATED FLOORS. INSTALL PER THE CONTRACTOR SHALL THOROUGHLY EXAMINE ALL AREAS WHERE S B MC MECHANICAL CONTRACTORProfessional Corporation MANUFACTURER'S INSTRUCTIONS AND ENSURE PROPER PROTECTION FIXTURES, EQUIPMENT,AND PIPING WILL BE INSTALLED AND WILL MDP MAIN DISTRIBUTION PANEL M❑ WM WATER METER 520 SOUTH MAINST, ,OH44311 CONNECTIONS OF PEX PIPING FROM METAL EDGES. UNDERGROUND WATER AND REPORT ANY CONDITION THAT, IN HIS OPINION, PREVENTS THE PROPER AKRON,OH M311 MECH MECHANICAL THE PLUMBING CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS TO SEWER LINES SHALL BE LAID IN SEPARATE TRENCHES WITH A MINIMUM INSTALLATION OF THE PLUMBING WORK. P:330-572-2100 F:330-572-2101 MEP MECHANICAL, ELECTRICAL, AND PLUMBING POC CONNECT TO EXISTING EQUIPMENT INCLUDING REQUIRED MATERIAL SUCH AS PIPING, VALVES, HORIZONTAL SPACING AS REQUIRED BY CODE, EXCAVATED TO THE MFG MANUFACTURER FILTERS, TRAPS, CHECKS VALVES, VACUUM BREAKERS,AND FLEXIBLE AND PROPER DEPTH AND GRADED TO PRODUCE THE REQUIRED FALL. STANDARDS I GPD PROJECT NO: 2016355.42 MIN MINIMUM RIGID TUBING. EQUIPMENT AND MATERIALS SHALL CONFORM WITH THE APPROPRIATE MS MOP SINK TESTING PROVISIONS OF CSA, ULC, ASME, ASTM, UL, NEMA, ANSI, ASHRAE, NFPA, �Ep PROp SCHEDULES ALL PIPES SHALL BE TESTED BY AN APPROVED METHOD BEFORE THEY AS APPLICABLE TO EACH INDIVIDUAL UNIT OR ASSEMBLY. E S NL NIGHTLIGHT REFER TO SCHEDULES ON DRAWINGS FOR A DESCRIPTION OF LISTED ITEMS ARE GIN 6F NTS NOT TO SCALEAND FURNISH ANY AND ALL PLUMBING FIXTURES LISTED AS "GC". ANY BACKFILLED OR CONCEALED. AFTER TESTING IS COMPLETE, THE CODES y_ DISCREPANCIES ABOUT WHO IS TO PROVIDE PLUMBING FIXTURES IN THE PLUMBING ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL 89 08PE PC PLUMBING CONTRACTOR SCHEDULE SHALL BE BROUGHT TO STARBUCKS ATTENTION FOR CONTRACTOR SHALL DISINFECT THE POTABLE WATER SYSTEM AS APPLICABLE PROVINCIAL AND LOCAL CODES AND ORDINANCES. IN CASE � PS PREP SINK CLARIFICATION. INSTALL ALL FIXTURES LISTED REGARDLESS OF WHO REQUIRED BY LOCAL AUTHORITY. TEST WATER PURITY ACCORDING TO OF CONFLICT BETWEEN THE DRAWINGS AND SPECIFICATIONS AND THE RE GO POC POINT OF CONNECTION SUPPLIES. LOCAL REQUIREMENTS AND SUBMIT CERTIFIED TEST RESULTS TO CODES AND ORDINANCES THE HIGHEST STANDARD SHALL APPLY. THE 1 ENGINEER FOR REVIEW AND APPROVAL. CONTRACTOR SHALL SA ,FY CODE REQUIREMENTS AS A MINIMUM sA REF REFERENCE HAND SINK STANDARD WITHOUT ANY EXTRA COST TO STARBUCKS. Fp 9 20 t}� U REQ'D REQUIRED IF FAUCET HAS A TEMPERATURE LIMIT STOP, IT IS TO BE REMOVED SO THAT IDENTIFICATION M.MPP REV REVISION TEMPERED WATER FROM THE WATER HEATER IS NOT FURTHER REDUCED. PROVIDE PIPE IDENTIFICATION EVERY 10 FT (EXCEPT WHERE PIPES ARE PERMITS AND FEES 02/2$/1 OnHOT WATER 100'- 110' F (34°-43° C) MUST BE ABLE TO REACH SINK WITHIN EXPOSED TO PUBLIC) IN ACCORDANCE WITH SPECIFICATIONS. THE CONTRACTOR SHALL PROCURE AND PAY FOR ALL PERMITS, FEES, fXF4RES: 12/1,2020 w SHT SHEET 15 SECONDS. AND INSPECTIONS NECESSARY TO COMPLETE THE PLUMBING WORK. Q SF SQUARE FEET = 4 SPECS SPECIFICATION(S) UTILITY SINKS WARRANTY W SST STAINLESS STEEL UTILITY SINKS ARE TO DELIVER A WATER TEMPERATURE RANGE OFTHE CONTRACTOR SHALL UNCONDITIONALLY WARRANT ALL WORK TO W T. 110°- 120° F (43°-49° C). CARBONATION BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP FOR A PERIOD ONCE COPY = TEL TELEPHONE OF ONE (1) YEAR FROM THE DATE OF FINAL ACCEPTANCE BY �t U TEMP TEMPORARY DISHWASHER IF APPLICABLE TO PROJECT SCOPE FOR CBE STATION, STARBUCKS STARBUCKS AND WILL REPAIR OR REPLACE ANY DEFECTIVE WORK Q TMV TEMPERATURE MIXING VALVE G.C. TO FURNISH AND INSTALL POWER CORD FOR DISHWASHER PER CARBONATION VENDOR WILL PROVIDE AND INSTALL EQUIPMENT, CO2 PROMPTLY AND WITHOUT CHARGE AND RESTORE ANY OTHER EXISTING O TW TEMPERED HOT WATER JURISDICTIONAL REQUIREMENTS. IF EQUIPMENT IS SPECIFIED AS TANKS AND FITTINGS. STARBUCKS SHALL PROVIDE AND CONTRACTOR WORK DAMAGED IN THE COURSE OF REPAIRING DEFECTIVE MATERIALS Ch TYP TYPICAL HOBART ADVANSYS, THE UNIT IS TO BE PLUMBED WITH COLD, NOW SHALL INSTALL CO2 TANK MOUNTING BRACKET, PROTECTIVE SHELVING AND WORKMANSHIP. r'�( N 3 N I FILTERED WATER. IF THE WATER FILTRATION SYSTEM IS A PENTAIR UNIT AND CO2 GAS TUBING AS SHOWN ON DRAWINGS AND PER �•J UC UNDER COUNTER CONFIGURATION II OR III, THEN THE COLD, NON-FILTERED WATER MUST MANUFACTURER'S INSTRUCTIONS. MAXIMUM TUBING LENGTH '- j LINO UNLESS NOTED OTHERWISE ALSO BE SOFTENED. INCLUDING COILED ENDS IS 100 FT (30 M)AND MAXIMUM BEND IS TO 3 1V VENT INCH (75 MM) MINIMUM RADIUS. ROUTE CO2 TUBING PREFERABLY W THROUGH WALL AND/OR CEILING CAVITIES, WITHOUT KINKS AND SO AS Z C W SANITARY WASTE TO NOT TOUCH ANY HOT SURFACE (BALLAST, STEAM PIPE, ETC.) OR RUB 3: WCO WALL CLEANOUT INSULATION AGAINST A SHARP EDGE THAT MAY ABRADE OR CUT TUBING. ALL HOLES > U N O MUST BE SEALED WITH A GROMMET OR ESCUTCHEON. TUBING IS TO BE 1- WH WATER HEATER IL N SECURED TO APPROPRIATE PERMANENT SURFACES TO KEEP IT OFF THE d WP WEATHER PROOF O U I� � WATER PIPING FLOOR OR CABINET BOTTOMS AND AWAY FROM OTHER EQUIPMENT. Uj � rn PROVIDE THERMAL INSULATION PER THE SPECIFICATIONS. UNLESS LABEL BOTH ENDS OF TUBING AND REGULARLY AT TEN (10) FOOT c/) Q H OTHERWISE REQUIRED BY THE LOCAL AUTHORITY OR ENERGY CODES, THE INTERVALS ALONG ROUTE AS "CO2." WW a 0) MINIMUM INSULATION LEVELS SHALL BE AS FOLLOWS 2 0 D A PIPE SIZE (DIAMETER) INSULATION THICKNESS Z Q Q oLESS THAN OR EQUAL TO 11/2" (38MM) = 1" (24MM) NITROGENATION W Q W p� Q w 2"(51MM) OR GREATER = 1 1/2" (38MM) STARBUCKS NITROGENATION VENDOR WILL PROVIDE AND INSTALL O O N Ut EQUIPMENT AND FITTINGS IF APPLICABLE TO PROJECT SCOPE FOR d d E (INSULATION VALUE = K VALUE NOT EXCEEDING 0.27 BTU' INCH (H'FT2'F) NITRO STATION. GENERAL CONTRACTOR SHALL COORDINATE NITRO SYSTEM INSTALLATION WITH STARBUCKS VENDOR. p SAFETY COVERS STORE #: 418 0 FURNISH AND INSTALL SPECIFIED NO SCALD SAFETY COVERS WITH O INSULATED FOAM LINER AND TAMPER PROOF STRAP AT ALL EXPOSED ADA PROJECT #: 04753-029 Q SINK P-TRAPS AND WATER SUPPLIES AND AS REQUIRED BY JURISDICTION . ISSUE DATE: 02.25.19 SUBMITTAL 0_ DESIGN MANAGER: JOHN PARK U LEEDC AP: PRODUCTION DESIGNER: GUY RIPLEY N CHECKED BY: 0 U CITY OF TIGARD Revision Schedule a`) Approved............................... Rev Date By Description to Conditionally Approved.............. 0 [ ] See Letterto: Follow.................. [ ] U Attached---------------- [ ] Permit Number: LM -00 Addres W, Poui#L R3 2 By: Date: 4- _ SHEET TITLE: PLUMBING NOTES 0 «i L. CV SCALE: AS SHOWN rn O N SHEET NUMBER: to N P001 SYSTEM COMMISSIONING CONTRACTOR RESPONSIBILITIES FOR BUILDING COMMISSIONING _ CONTRACTOR SHALL PROVIDE SUPPORT AND WORK AS SPECIFIED, NEEDED AND REQUIRED TO CONDUCT AND FACILITATE STARBUCKS STAFF BUILDING COMMISSIONING EFFORTS. THIS WORK WILL BE COMPRISED OF THREE DISTINCT EFFORTS: 1) SUPPORT STARBUCKS COMMISSIONING AGENT (CXA) DURING INSTALLATION VERIFICATION AND CORRECT DISCLOSED DEFICIENCIES; 2) PERFORM TESTING, ADJUSTING, BALANCING AND SYSTEM STARTUP AND SUPPORT FUNCTIONAL PERFORMANCE TESTING BY STARBUCKS ©2018 STARBUCKS COFFEE COMPANY CXA; 3) CORRECT DEFICIENCIES DISCLOSED BY FUNCTIONAL PERFORMANCE STARBUCKS' TESTING AND SUBMIT REPORTS. CONTRACTOR SHALL PERFORM AND PROVIDE THE FOLLOWING: 2401 UTAH AVENUE SOUTH A. SYSTEMS SUBJECT TO COMMISSIONING MAY INCLUDE, BUT ARE SEATTLE, WASHINGTON 98134 NOT LIMITED TO, DOMESTIC HOT WATER GENERATION, HVAC (206) 318-1575 SYSTEMS, ROOFTOP UNITS, EXHAUST FANS, HVAC CONTROLS, LIGHTING CONTROLS, AIR CURTAINS, BUILT-IN REFRIGERATION THESE DRAWINGS AND THE PROJECT MANUAL EQUIPMENT, AND RENEWABLE ENERGY SYSTEMS. ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS B. CONTRACTOR SHALL INCLUDE COMMISSIONING ACTIVITIES IN CORPORATION, WHICH IS THE OWNER OF THE PROJECT SCHEDULE AND SHOW INTERVALS FOR PERFORMANCE COPYRIGHT IN THIS WORK. THEY SHALL NOT OF WORK FOR WHICH CONTRACTOR IS RESPONSIBLE AND BE REPRODUCED (IN WHOLE OR IN PART), INTERVALS FOR WORK PERFORMED BY STARBUCKS CXA. SHARED WITH THIRD PARTIES OR USED IN ANY CONTRACTOR SHALL SHOW RESOURCES FOR PERFORMING ALL MANNER ON OTHER PROJECTS OR WORK RELATED TO COMMISSIONING ACTIVITIES ON A LINE ITEM EXTENSIONS TO THIS PROJECT WITHOUT THE IN THE SCHEDULE OF VALUES. PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND C. CONTRACTOR SHALL INSTALL EQUIPMENT IN ACCORDANCE WITH SPECIFICATIONS ARE INTENDED TO EXPRESS THE MANUFACTURER'S REQUIREMENTS AND ALL CONTRACT DESIGN INTENT FOR A PROTOTYPICAL DOCUMENTS. ENSURE THAT ALL EQUIPMENT IS INSTALLED STARBUCKS STORE (WHICH IS SUBJECT TO TOTALLY COMPLETE, AND ACCESSIBLE TO STARBUCKS CXA FOR CHANGE AT ANYTIME)AND DO NOT REFLECT INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE ACTUAL SITE CONDITIONS. NEITHER PARTY TESTING PRIOR TO THE SCHEDULED START OF INSTALLATION SHALL HAVE ANY OBLIGATION NOR LIABILITY TO VERIFICATION. THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY D. INSTALLATION VERIFICATION SHALL BE PERFORMED BY BOTH PARTIES. STARBUCKS CXA. CONTRACTOR SHALL SUPPORT STARBUCKS CXA INSTALLATION VERIFICATION EFFORTS AS NECESSARY. STARBUCKS TEMPLATE VERSION i2018.10.16 PROVIDE ALL ACCESS AND EQUIPMENT NECESSARY FOR STARBUCKS STAFF TO VERIFY THAT THE EQUIPMENT IS INSTALLED CORRECTLY. E. CONTRACTOR SHALL BE READILY AVAILABLE DURING INSTALLATION VERIFICATION TO CORRECT ANY DEFICIENCIES OR DEFECTS DISCLOSED BY THE INSTALLATION VERIFICATION ._ PROCESS. CORRECTIONS SHALL BE MADE IN A TIMELY MANNER GPD Engineering and Architecture WITHOUT DISRUPTION OF THE CONSTRUCTION SCHEDULE. Professional Corporation F. ALL HVAC, EXHAUST FAN, AND AIR CURTAIN EQUIPMENT SHALL 520 SOUTH MAIN ST, 1 AKRON,,OOHH/44314311 BE TESTED, ADJUSTED AND BALANCED BY THE CONTRACTOR'S P:330-572-2100 F:330-572-2101 TESTING, ADJUSTING AND BALANCE AGENT( SEE TESTING, ADJUSTING AND BALANCING)AFTER THE SYSTEM IS VERIFIED TO GPD PROJECT N0: 2016355.42 BE COMPLETE AND CORRECT BY STARBUCKS CXA, IN ACCORDANCE WITH THE REQUIREMENTS OF THESE EU PROF DOCUMENTS. LL HVAC CONTROL SYSTEMS SHALL BE TESTED TO SEP Fss ENSURE THAT CONTROL DEVICES, COMPONENTS, EQUIPMENT �y X01 N C /°2 AND SYSTEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN R v ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS. 89 08PE SEQUENCES OF OPERATION SHALL BE TESTED TO ENSURE THAT THEY OPERATE IN ACCORDANCE WITH THE CONTRACT REQUIREMENTS. DELIVERABLES: PRELIMINARY, WRITTEN ft G TESTING AND AIR BALANCE REPORT CONFORMING TO THE 1a REQUIREMENTS SPECIFIED HEREIN, DOCUMENTING THE 9.20 INFORMATION SPECIFIED, ETC. TO THE STARBUCKS CXA M. 02/28/19 LL IMMEDIATELY UPON COMPLETION OF THE WORK. Of : 12/3_-12020 G. CONTRACTOR SHALL INFORM STARBUCKS CXA WHEN EQUIPMENT IS READY FOR FUNCTIONAL PERFORMANCE TESTING. ALL EQUIPMENT SHALL BE READY FOR FUNCTIONAL W PERFORMANCE TESTING PRIOR TO STARTING TESTING. Uj CONTRACTOR SHALL OPERATE EQUIPMENT FOR STARBUCKS N CXA AND VERIFY BY DEMONSTRATION THE CORRECT OPERATION LL 2 OF EQUIPMENT, RESPONSE OF SENSORS, AND PROPER EXECUTION OF HVAC CONTROL AND LIGHTING SEQUENCES; INCLUDING BUT NOT LIMITED T0, AIR MOVEMENT, TEMPERATURE, Z) co 0 SOUND, AND CONTROL RESPONSE. PROVIDE ANY SECURITYNN ACCESS, HARDWARE, SOFTWARE, OR OTHER SUPPORT AS 0'^ �I NEEDED FOR THE STARBUCKS CXA TO EFFICIENTLY WITNESS V) AND DOCUMENT ALL EQUIPMENT TESTING. STARBUCKS CXA cc WILL RECORD THE EQUIPMENT OPERATION AND RESPONSE TO W TESTING SEQUENCES AND PREPARE A LIST OF ANY DEFICIENCIES DISCLOSED BY THE FUNCTIONAL PERFORMANCE (D TESTS FOR CORRECTION BY THE CONTRACTOR. EQUIPMENT (� N C INCLUDES, BUT IS NOT LIMITED TO, AIR HANDLING UNITS, 04 30 ROOFTOP AND SPLIT TYPE, CONDENSING UNITS, EXHAUST FANS, LIGHTING CONTROLS, ETC. DELIVERABLES: PROVIDE COMPLETED O ~ COPIES OF ALL START UP REPORTS, FILLED OUT ON THE U) Q pt MANUFACTURER'S FORMS, TO THE STARBUCKS CXA. . . LU a W o � O H. CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ISSUES 2 NOR DEFICIENCIES DISCLOSED DURING THE FUNCTIONAL Q �/ PERFORMANCE TESTING PROCESS. CORRECTIONS SHOULD BE Z < Q U) 0 MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO THE U U O SYSTEM AND CONSTRUCTION SCHEDULE. w /n W p < o t.J 04 I. CONTRACTOR SHALL BE READILY AVAILABLE FOR ANY RE- (0 CJ TESTING OF EQUIPMENT DEEMED NECESSARY BY STARBUCKS a d V_ �— N CXA DURING INSTALLATION VERIFICATION AND FUNCTIONAL PERFORMANCE TESTING. CONTRACTOR IS RESPONSIBLE FOR p CORRECTING ANY ISSUES OR DEFICIENCIES FOUND IN THE STORE #: 418 p SYSTEM DURING ANY AND ALL RE-TESTING. CORRECTIONS PROJECT #: 04753-029 SHOULD BE MADE IN A TIMELY MANNER WITHOUT DISRUPTION TO U OTHE SYSTEM AND CONSTRUCTION SCHEDULE. DELIVERABLES: ISSUE DATE: 02.25.19 SUBMITTAL 0 FINAL BALANCE REPORT, DEFICIENCIES LIST NOTING DESIGN MANAGER: JOHN PARK CL CORRECTIVE ACTIONS PERFORMED BY CONTRACTOR IN LEEDCAP: RESPONSE TO INSTALLATION VERIFICATION AND FUNCTIONAL PRODUCTION DESIGNER: GUY RIPLEY PERFORMANCE TEST RESULTS. CHECKED BY: 3 J. CONSTRUCTION AND POST CONSTRUCTION TESTING: Revision Schedule ADDITIONAL TESTING MAY BE REQUIRED BY LEED AND OTHER m PROCESSES THAT MAY OCCUR OUT OF SEQUENCE WITH Rev pate By Description COMMISSIONING SERVICE. CONTRACTOR SHALL CONDUCT, DOCUMENT, SUPPORT AND SCHEDULE THIS TESTING AS DIRECTED BY STARBUCKS CXA. U 2 SHEET TITLE: CL PLUMBING NOTES LO 66 LO N SCALE: AS SHOWN rn SHEET NUMBER: N N P002 N SHEET NOTES SHEET NOTES SHEET NOTES SHEET NOTES PLUMBING SUPPLY NOTES 10 WATER HEATER: 4.. SANITIZER: 8. COFFEE BREWER: 13. WORK SINK: A. SEE PLUMBING SPECIFICATIONS FOR FURTHER ROUTE 1" COLD AND HOT WATER FROM WATER HEATER, UP IN ROUTE 3/4" COLD WATER DOWN IN WALL AND STUB OUT AT 18" ROUTE 1/2" FILTERED COLD WATER DOWN IN WALL. CONTRACTOR ROUTE 1/2" HOT AND COLD WATER DOWN IN WALL AND CONNECT REQUIREMENTS. CEILING SPACE. WATER HEATER INSTALLATION SHALL BE A.F.F. PROVIDE WITH SHUT-OFF VALVE WITH 3/4" MALE HOSE-END SHALL PROVIDE AND INSTALL SHUT-OFF VALVE IN CABINET AT 24" TO WORK SINK. INCOMPLIANCE WITH APPLICABLE CODES AND ORDINANCES, REFER FITTING. SHUT-OFF TO INCLUDE PRESSURE REDUCING VALVE(SET @ A.F.F. REDUCE WATER LINE TO 3/8"AT UNIT. B. ALL PLUMBING LINES TO BE ROUTED SUCH THAT THEY TO WATER HEATER DETAIL. 20 PSIG, +/-5 PSIG), PRESSURE GAUGE , IN-LINE STRAINER, AND 14. PITCHER RINSER FAUCET: ARE NOT VISIBLE TO CUSTOMERS EXCEPT WHERE FIRST SHOCK ARRESTOR. CONNECT SANITIZER TO CW SUPPLY 9. ESPRESSO MACHINE: ROUTE 1/2" HOT AND COLD WATER DOWN IN WALL. CONNECT 1/2" CW APPROVED BY STARBUCKS AT EXPOSED CEILING AREAS. 2. MOP SINK: WITH 72" LONG BRAIDED STAINLESS STEEL HOSE. PROVIDE AND ROUTE 1/2" FILTERED COLD WATER IN CASEWORK AND CONNECT TO PITCHER RINSER FAUCET (1 HANDLE). EXTEND IN CASEWORK ROUTE 1/2" HOT AND COLD DOWN IN WALL AND CONNECT TO MOP INSTALL ANY ADDITIONAL PIPING AND DEVICES AS REQUIRED FOR TO ESPRESSO MACHINE. PROVIDE AND INSTALL BRAIDED AND CONNECT 1/2" HW AND CW TO SINK FAUCET. CONTRACTOR C. REFER TO MANUFACTURER SPECIFICATIONS FOR SINK FAUCET. PROVIDE APPROVED BACKFLOW PREVENTION COMPLETE INSTALLATION. STAINLESS STEEL HOSE FROM SHUT-OFF VALVE TO PUMP AND SHALL PROVIDE AND INSTALL AN APPROVED BACKFLOW PREVENTER. LOCATION OF CONNECTIONS UNLESS OTHERWISE DEVICE ON SERVICE FAUCET AS REQUIRED. CAULK AND SEAL BACK FROM PUMP TO ESPRESSO MACHINE'S WATER INLET. NOTED. OF SINK TO WALL. 4. ICE MACHINE: 15. ROUTE 3/4"COLD, AND FILTERED COLD WATER AND 1/2" HOT ©2019 STARBUCKS COFFEE COMPANY ROUTE 1/2" FILTERED COLD WATER DOWN IN WALL AND CONNECT 10. DIPPER WELL, HOT TAP, WATER TOWER, AND PITCHER RINSER: WATER DOWN IN WALL AND EXTEND BELOW SLAB TO BAR AREA. D. COORDINATE WITH ELECTRICAL CONTRACTOR FOR 3. WATER FILTER: TO ICE MACHINE, PROVIDE WITH REQUIRED BACKFLOW PREVENTION ROUTE 1/2" HOT, COLD, AND FILTERED COLD WATER IN CASEWORK. POWER CONNECTION TO ALL PLUMBING EQUIPMENT. STARBUCKS° ROUTE 3/4"COLD WATER DOWN IN WALL AND CONNECT TO WATER DEVICE. CONTRACTOR SHALL SUPPLY AND INSTALL 3/8" BRAIDED EXTEND 1/2" FILTERED COLD WATER UP IN CASEWORK AND 16. 1"COLD WATER BELOW GRADE. FILTER, EXTEND 3/4" FILTERED COLD WATER FROM WATER FILTER STAINLESS STEEL SUPPLY FROM SHUT-OFF TO MACHINE. CONNECT TO DIPPER WELL. EXTEND 3/8" FILTERED WATER UP IN E. DIMENSIONS ARE TO FINISH FACE UNLESS OTHERWISE 2401 UTAH AVENUE SOUTH UP IN WALL TO CEILING SPACE. PLUMBING CONTRACTOR TO CASEWORK AND CONNECT TO HOT WATER DISPENSER, 17. ROUTE NEW 1"WATER LINE UP FROM BELOW FLOOR WITH SHUT-OFF NOTED. SEATTLE, WASHINGTON 98134 FOLLOW MANUFACTURERS INSTALLATION INSTRUCTIONS AND 7. HAND SINK/LAVATORY: CONTRACTOR SHALL REDUCE WATER SUPPLY LINE TO 1/4"AT VALVE. ACTIVATION PROCEDURES FOR FILTERS. INSTALL ASSEMBLY ON ROUTE 1/2" HOT AND COLD WATER DOWN IN WALL AND CONNECT UNIT. EXTEND 3/8" FILTERED COLD WATER UP IN CASEWORK AND F. REFER TO DETAIL SHEETS FOR PLUMBING FITTINGS (206) 318-1575 WALL, REFER TO WATER FILTER DETAIL. TO HAND SINK/LAVATORY, CONTRACTOR TO PROVIDE AND INSTALL CONNECT TO WATER TOWER FAUCET. EXTEND 1/2" HOT AND COLD 18. REPLACE AERATOR PROVIDED WITH FAUCET WITH 0.5 GPM VANDAL LOCATED IN CASEWORK. THERMOSTATIC MIXING VALVE BELOW FIXTURE AND SET TO 110°F. WATER UP IN CASEWORK AND CONNECT TO PITCHER RINSER RESISTANT FLOW CONTROL AERATOR. THESE DRAWINGS AND THE PROJECT MANUAL 4. 3-COMPARTMENT SINK: MIXING VALVE SHALL BE ASSE 1070 COMPLIANT. REPLACE FAUCET (2 HANDLE). REFER TO ESP SINK PIPING DETAIL. G. GENERAL CONTRACTOR SHALL CONTACT WATER ARE CONFIDENTIAL AND SHALL REMAIN THE ROUTE 1/2" HOT AND COLD WATER DOWN IN WALL AND CONNECT AERATOR PROVIDED WITH FAUCET WITH 0.5 GPM VANDAL 19. REMOVE AND REPLACE STOCK SPRAY HEAD FLOW RESTRICTOR FILTRATION SUPPLIER TO COORDINATE SOW AND SOLE PROPERTY OF STARBUCKS TO FAUCET AND OVERHEAD SPRAY. CAULK AND SEAL BACK OF RESISTANT FLOW CONTROL AERATOR. 11. WATER CLOSET: WITH OPTIONAL 1.2 GPM FLOW RESTRICTOR PROVIDED WITH SCHEDULE PRIOR TO INSTALLATION OF WATER CORPORATION, WHICH IS THE OWNER OF THE SINK TO WALL. ROUTE 1/2"COLD WATER DOWN IN WALL AND CONNECT TO WATER FAUCET. FILTRATION SYSTEM. COPYRIGHT IN THIS WORK. THEY SHALL NOT CLOSET. PROVIDE WITH WATER HAMMER ARRESTOR IN SUPPLY BE REPRODUCED (IN WHOLE OR IN PART), LINE. CONTRACTOR SHALL CHOOSE RIGHT/LEFT HAND 20. PIPING SHALL BE BELOW FLOOR. H. INSULATE ALL PIPING INCLUDING PIPES AT BAR AND IN SHARED WITH THIRD PARTIES OR USED IN ANY ORIENTATION TO BE ADA COMPLIANT PRIOR TO ORDERING. CASEWORK PER THE REQUIREMENTS LISTED ON THE MANNER ON OTHER PROJECTS OR 21. WATER FILLING STATION: PLUMBING SPECIFICATIONS SHEET. EXTENSIONS TO THIS PROJECT WITHOUT THE 12. ROUTE 3/4"COLD, AND FILTERED COLD WATER AND 1/2" ROUTE 1/2" FCW PIPING DOWN IN WALL AND CONNECT TO PRIOR WRITTEN CONSENT OF STARBUCKS HOT WATER UP FROM BELOW GRADE THRU SLAB, PROVIDE SINK. CORPORATION. THESE DRAWINGS AND WITH BALL SHUT-OFF VALVE AT FLOOR PENETRATION. SPECIFICATIONS ARE INTENDED TO EXPRESS PIPING SHALL BE ROUTED CONCEALED BELOW COUNTER 22. ROUTE 1/2" FCW DOWN IN WALL AND CONNECT TO WATER TAP. DESIGN INTENT FOR A PROTOTYPICAL AND TIGHT TO BAR WALL (COORDINATE WITH G.C.). CONTRACTOR SHALL PROVIDE AND INSTALL APPROVED STARBUCKS STORE (WHICH IS SUBJECT TO BACKFLOW PREVENTER. CHANGE AT ANYTIME)AND DO NOT REFLECT ff P 101161 7 , ACTUAL SITE CONDITIONS. NEITHER PARTY V17: �P10597 EW. ROUTE 3/4"COLD WATER PIPING DOWN IN WALL AND CONNECT TO SHALL HAVE ANY OBLIGATION NOR LIABILITY TO WALL HYDRANT.WALL HYDRANT SHALL BE ZURN MODEL Z1321 OR THE OTHER (EXCEPT STATED ABOVE) UNTIL A EQUAL. CONTRACTOR SHALL VERIFY WALL THICKNESS IN FIELD WRITTEN AGREEMENT IS FULLY EXECUTED BY /. PRIOR TO ORDERING. BOTH PARTIES. (16) � - 3/4"CW _ $4t PROVIDE BACKFLOW PREVENTER, PRESSURE REDUCING VALVE, AND STARBUCKS TEMPLATE VERSION 12018.10.16 EXPANSION TANK AS REQUIRED BY LOCAL CODE. ROUTE RELIEF TO - 1"CW- FLOOR DRAIN WITH APPROVED AIR GAP. GPD Engineering and Architecture ration P,11871111� - ' J Pro/520 SOUTH essional MAIN ST,SUITE 2531 _ P 105971 7 1 7 AKRON,OH 44311 [Pi 10116,1/ P11871 P:330-572-2100 F:330-572-2101 I GPD PROJECT NO: 2016355.42 'CE 3s v R 7 I. -1/2"HW J -. 89 08PE ` — — —3/4"CW— — — —1/2"CW— ch ';-v = R G 7 U 4 19 P113700' En x- - 7 )P 13588 P 1oaa7 MP 02/28/19 (n Aurt� O ts: 17131/1020 P 14688 ' F. l0 # Ir=e ✓ 4 �� —1/2"HW - - d.� IP 10152 13� w P 10549/ 2 O P' 13384— N i PJ10922f 2 7 1/2"FCW- — -� - 10995Y� P502 ��/� 21 Pj 18743 ' V) �_ 4 - /-_ o �P 130$ �� P502 +l I _ = C: 5 �P 130 0 � � U z P597 7 (� P502 3 _- o - � ' - - - � LL N � .�P ;9 T ,8 PLUMBING 8 U ti SCOPE OF WORK SUMMARY � Q �' P502 ,� P 15749 vF�.,.,.-A � LU CL Of I i \ �s'�J■ P 11003 W F THE FOLLOWING SCOPE OF WORK IS BASED ON THE LANDLORDS WORKLETTER w Q O O CN I \ EXHIBIT C. THIS SCOPE OF WORK IS NOT INTENDED TO INDICATE THE FULL SCOPE, i I ( J BUT ONLY A BROAD SUMMARY. THE GENERAL CONTRACTOR SHALL REFERENCE Z Q Q A , I � THE COMPLETE WORKLETTER FOR A MORE DETAILED DESCRIPTION OF WORK BY I'_ Q � I S L BOTH PARTIES. ANY QUESTIONS REGARDING SCOPE SHALL BE BROUGHT TO U U O F v = �' P502 20 \ P 19277 10 18 MEANS FURNISHED, PERMITTED AND INSTALLED BY THE PARTY INDICATED. LOW STARBUCKS ATTENTION FOR CLARIFICATION RESPONSIBILITY INDICATED BE LLI �Il LLQ � CID .. y u- O \\ 77 a O O � C_7 iv = P 15749 ��U _ -- - E CP 176501- P 11003E �K RESPONSIBILITY RI WORK DESCPTION 0�:2� 3 I + \,_ LANDLORD STARBUCKS STORE #: 418 \5 ,,� I I WATER SERVICE AND METER x PROJECT #: 04753-029 U d '- BOOSTER PUMP FOR WATER SERVICE X ISSUE DATE: 02.25.19 SUBMITTAL d T714 ��'� P502 DESIGN MANAGER: JOHN PARK O PT1756g' — 1 — — — — X P 17565 BELOW FLOOR/SLAB WASTE,VENT AND LEEDOAP: _ I WATER PIPES PRODUCTION DESIGNER: GUY RIPLEY N J I P 17632 14, F - "` ABOVE FLOOR/SLAB WASTE,VENT ANDCHECKED BY: — f WATER PIPES X j 2 P 10215, Revision Schedule 3 I P502 I PLUMBING VENT(S)THROUGH ROOF X °1 t -- - Rev Date By Description EXTERIOR HOSE BIBB(S) X In C. - - - INTERIOR HGI GREASE TRAP X 1 / SHEET TITLE: a PLUMBING SUPPLY PLAN 1 2' 4' 8' SCALE: AS SHOWN PLUMBING PLAN 0 N scale 1/4' = 1'-0' _ — — Scale:114"-1'-0" SHEET NUMBER: Q N P101 N PLUMBING RESPONSIBILITY LEGEND SHEET NOTES SUPPLY UNDERSLAB NOTES GC GENERAL CONTRACTOR 1. 3/4" FCW STUB-UP THRU FLOOR WITH BALL SHUT-OFF A. SEE PLUMBING SPECIFICATIONS FOR FURTHER LL LANDLORD VALVE. REQUIREMENTS. SB STARBUCKS 2. 1/2" HW STUB-UP THRU FLOOR WITH BALL SHUT-OFF B. ALL PLUMBING LINES TO BE ROUTED SUCH THAT THEY VALVE. ARE NOT VISIBLE TO CUSTOMERS EXCEPT WHERE FIRST APPROVED BY STARBUCKS AT EXPOSED CEILING AREAS. ©2018 STARBUCKS COFFEE COMPANY 3. 3/4"CW STUB-UP THRU FLOOR WITH BALL SHUT-OFF VALVE. C. REFER TO MANUFACTURER SPECIFICATIONS FOR STARBUCKS" LOCATION OF CONNECTIONS UNLESS OTHERWISE 4. ROUTE 3/4"CW, 3/4" FCW,AND 1/2"HW COPPER LINE NOTED. 2401 UTAH AVENUE SOUTH UNDER FLOOR. SEATTLE, WASHINGTON 98134 D. COORDINATE WITH ELECTRICAL CONTRACTOR FOR 206 318-1575 5. EXTEND 1" COLD WATER BELOW GRADE AND CONNECT POWER CONNECTION TO ALL PLUMBING EQUIPMENT. TO EXISTING 1"OR LARGER COLD WATER PIPING, FIELD VERIFY EXACT SIZE AND LOCATION PRIOR TO START OF E. DIMENSIONS ARE TO FINISH FACE UNLESS OTHERWISE THESE DRAWINGS AND THE PROJECT MANUAL ANY WORK. NOTED. ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS 6. PROVIDE 1"COLD WATER STUB-UP WITH SHUT-OFF F. REFER TO DETAIL SHEETS FOR PLUMBING FITTINGS CORPORATION,WHICH IS THE OWNER OF THE VALVE THRU FLOOR. LOCATED IN CASEWORK. COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), G. GENERAL CONTRACTOR SHALL CONTACT WATER SHARED WITH THIRD PARTIES OR USED IN ANY FILTRATION SUPPLIER TO COORDINATE SOW AND MANNER ON OTHER PROJECTS OR SCHEDULE PRIOR TO INSTALLATION OF WATER EXTENSIONS TO THIS PROJECT WITHOUT THE FILTRATION SYSTEM. PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND H. INSULATE ALL PIPING INCLUDING PIPES AT BAR AND IN SPECIFICATIONS ARE INTENDED TO EXPRESS CASEWORK PER THE REQUIREMENTS LISTED ON THE DESIGN INTENT FOR A PROTOTYPICAL PLUMBING SPECIFICATIONS SHEET. STARBUCKS STORE (WHICH IS SUBJECT TO CHANGE AT ANYTIME)AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY BOTH PARTIES. STARBUCKS TEMPLATE VERSION 12018.10.16 /� �• GPD Engineering and Architecture - - — - - -- - Professional Corporation 520 SOUTH MAIN ST,SUITE 2531 AKRON,OH 44311 P:330.572-2100 F:330.572-2101 R GPD PROJECT NO: 2016355.42 PLUMBING FIXTURE SCHEDULE-"P" 0RE0 PROVES DESIGN ID COUNT DESCRIPTION FURN. BY INST. BY COMMENTS 4��4 ,GINCFQS/Oy 89 O8PE FCO 6 FLOOR CLEANOUT GC GC ZURN CO2449,ADJUSTABLE FLOOR M CLEANOUT, NICKEL BRONZE FRAME AND A G COVER. DO CR FD 1 FLOOR DRAIN GC GC ZURN Z211-S 2 GI 1 GREASE INTERCEPTOR 100 GPM GC GC SCHIER PRODUCTS MODELS#GB-250, 100 M MP� GPM, 1,076 GREASE CAPACITY 02/28/19 LL DRAIN EJtPIREB: 12/31/2020 10294 5 DRAIN-FLOOR SINK SQUARE- 121N 305MM GC GC ZURNFD2372-H,A.R.E., FLOOR SINK WITH Ca 6"SUMP DEPTH AND 1/2 GRATE w -- 10726 5 DRAIN-GRATE HALF SQUARE- 121N 305MM GC GC ZURNFD2372-H,A.R.E., FLOOR SINK WITH 6"SUMP DEPTH AND 1/2 GRATE Uj LLI Of FAUCET = 10152 2 FAUCET-DOUBLE LABORATORY WITH BENT RISER SB GC OfOf SPOUT Y E 10153 1 FAUCET-WATER TOWER-121N305MM Be GC = M Of (—� 10215 2 FAUCET-DOUBLE LABORATORY WITH SWING SPOUT SB GC D�( J " 10447 1 FAUCET-PRE RINSE SPRAYER WALL MOUNTED SB GC 0 �I 10597 3 FAUCET-SINGLE HANDLE SB GC U �0 10804 1 FAUCET-PRE RINSE SWING SPOUT SB GC :3 _ 10874 1 FAUCET-HOT WATER DISPENSER GOOSENECK SB GC W cn -- - 10922 1 FAUCET-MOP SINK WALL MOUNTED SB GC z c 11003 2 FAUCET-DIPPERWELL SB GC ` V 30 13588 1 FAUCET-HAND SINK WALL MOUNTED SB GC 5 LL N 1 15749 2 FAUCET-HOT AND COLD WATER DISPENSER SB GC O V GOOSENECK o) - 17569 1 FAUCET-WARE RINSER IN COUNTER-24X91N SB GC w Q 01 0 60OX235MM 1Jj a w F_ 1 2 3 17572 1 FAUCET-TAP SINGLE HANDLE SB GC 2 0 p O FILTER I Z C3 13076 1 FILTER-PREFILTRATION SYSTEM SB GC GC TO COORDINATE WITH SB VENDOR U ��_ _ 13080 1 FILTER-HEAD QUAD SB GC U Q U O CD I \ 4 13081 4 FILTER-CARBON FILTER CARTRIDGE SB GC ' ' N Q _ �a -� 13149 1 FILTER-PRESSURE GAUGE SB GC O O � OTHER d � d �- 13384 1 WATER HEATER 50GAL 190L GAS GC GC RHEEM MODEL PRO=G50S-40H RH67 PD, 50 E \\ � GALLON,40.4 GPH RECOVERT @ 90-F 0 \ \ 1 2 3 SINK RISE,40 MBH INPUT PROSTOJECT #: 04753-029 10116 2 SINK-RESTROOM WALL MOUNTED SB GC ISSUE DATE: 02.25.19 SUBMITTAL 10549 1 * SINK-RINSE DROP IN SST-12X201N 305X510MM SB GC DESIGN MANAGER: JOHN PARK 0_ 1 ik�.+� - 10995 1 SINK-MOP-24X241N 61OX610MM SB GC LEEDCAP: � �' Nom 14 - P '� C7PRODUCTION DESIGNER: GUY RIPLEY 13700 1 SINK-3 COMP WORK SST-1051N 26654444 SB GC r1n5er fau��{\ 14688 1 SINK-HAND WITH SIDE SPLASH WALL MOUNTED SST SB GC CHECKED BY: �r 17565 1 .K SINK-RINSE WITH DRAINBOARD-15X271N 380X685MM SB GC 3 ❑ 17632 1 SINK-STACKED DRAINBOARD-151N 380MM SB GC Revision Schedule 17650 1 SINK-DRAIN TRAY-9X61N 230X150MM SB GC cn Rev Date By Description 18743 1 .X SINK-WATER FILLING STATION-36X241N 915X610MM SB GC n 19277 2 * SINK-COUNTERTOP RINSER WITH DRAIN TROUGH- SB GC I 26X91N 66OX235MM C) 1 TOILET --- 11871 2 TOILET-EFFICIENT SINGLE FLUSH GC GC DRAKE II CLOSE COUPLED TOILET, BY y r�--•---; TOTO. 1.28GPF u SHEET TITLE PLUMBING SUPPLY UNDERSLAB PLAN SCALE: AS SHOWN N N PLUMBING SUPPLY UNDERSLAB PLAN SHEET NUMBER. N scale: 1/4"= 1'-0" P102 N SHEET NOTES SHEET NOTES SHEET NOTES SHEET NOTES PLUMBING WASTE NOTES 1. EXTEND AND CONNECT 4" SANITARY WASTE PIPING INTO 7. ROUTE 1" INDIRECT WASTE PIPING FROM CBS DRAIN 14. LAVATORY: 20. FLOOR CLEANOUT: A. SEE PLUMBING SPECIFICATIONS FOR FURTHER EXISTING SANITARY WASTE PIPING BELOW GRADE. FIELD BOARD TO FLOOR SINK. FIELD VERIFY EXACT ROUTE 2" SANITARY WASTE PIPING BELOW SLAB CLEANOUT SHALL BE INSTALLED FLUSH WITH FINISHED REQUIREMENTS. VERIFY EXACT LOCATION, SIZE, DEPTH OF INVERT, AND LOCATION, AND EXTEND UP IN WALL, TRANSITION TO 1-1/2"SANITARY FLOOR. DIRECTION OF FLOW PRIOR TO START OF ANY WORK. WASTE PIPING AND CONNECT TO LAVATORY. EXTEND B. ALL PLUMBING LINES TO BE ROUTED SUCH THAT THEY 8. ROUTE 1-1/2" INDIRECT WASTE PIPING FORM PITCHER 1-1/2"VENT PIPING UP IN WALL TO CEILING SPACE. 21. FLOOR DRAIN: ARE NOT VISIBLE TO CUSTOMERS EXCEPT WHERE FIRST 2. ESPRESSO SINK: RINSER SINK TO FLOOR SINK. FIELD VERIFY CONTRACTOR SHALL PROVIDE AND INSTALL PIPE ROUTE 3"GREASE WASTE UP AND CONNECT TO FLOOR APPROVED BY STARBUCKS AT EXPOSED CEILING AREAS. ROUTE 1-1/2" INDIRECT WASTE PIPING IN CASEWORK TO EXACT LOCATION. PROTECTOR FOR P-TRAP AND SUPPLIER, TRUEBRO DRAIN. EXTEND 1-1/2 SANITARY VENT UP IN WALL TO NEW FLOOR SINK, FIELD VERIFY EXACT LOCATION. LAVGUARD 2 OR EQUAL. CEILING SPACE. C. REFER TO MANUFACTURER SPECIFICATIONS FOR 9. ROUTE INSULATED INDIRECT DRAIN PIPING BEHIND LOCATION OF CONNECTIONS UNLESS OTHERWISE ©2018 STARBUCKS COFFEE COMPANY �. ICE BIN: UNDERCOUNTER REFRIGERATOR, TIGHT TO WALL. 15. 3-COMPARTMENT SINK: 22. ROUTE INDIRECT DRAIN FROM DRIP TRAY TO FLOOR SINK NOTED. ROUTE 1-1/2" INDIRECT WASTE PIPING FROM ICE BIN IN CONTRACTOR SHALL PROVIDE AND INSTALL BUMPER ROUTE WASTE PIPING FROM SINK TO FLOOR SINK WITH APPROVED AIR GAP. STARBUCKS®R CASEWORK TO FLOOR SINK, FIELD VERIFY EXACT GUARDS AS REQUIRED. THROUGH MINIMUM 2"AIR GAP, D. COORDINATE WITH ELECTRICAL CONTRACTOR FOR LOCATION. 23. ROUTE 1" INDIRECT DRAIN FROM NITRO DRIP TRAY TO POWER CONNECTION TO ALL PLUMBING EQUIPMENT. 2401 UTAH AVENUE SOUTH 10. ROUTE WASTE PIPING FROM ESPRESSO MACHINE DRAIN 16, SANITIZER: FLOOR SINK. FILED VERIFY EXACT LOCATION. SEATTLE, WASHINGTON 98134 4. HAND SINK: TRAY TO FLOOR SINK. COORDINATE EXACT ROUTE 1-1/2" INDIRECT DRAIN TO CLOSEST FLOOR SINK. E. DIMENSIONS ARE TO FINISH FACE UNLESS OTHERWISE ROUTE 2"GREASE WASTE PIPING BELOW SLAB AND REQUIREMENTS WITH EQUIPMENT MANUFACTURER'S 24. WATER FILLING STATION: S• L I NOTED. (206) 318-1575 EXTEND UP IN WALL, TRANSITION TO 1-1/2" GREASE RECOMMENDATIONS. 17. ICE MACHINE: ROUTE 1-1/2" INDIRECT WASTE PIPING FROM WATER WASTE PIPING AND CONNECT TO SINK. EXTEND 1-1/2" ROUTE (2) 3/4" INSULATED INDIRECT DRAINS TO FLOOR FILLING STATION TO FLOOR SINK, FIELD VERIFY EXACT F. REFER TO DETAIL SHEETS FOR PLUMBING FITTINGS THESE DRAWINGS AND THE PROJECT MANUAL VENT PIPING UP IN WALL TO CEILING SPACE, 11. WATER HEATER: SINK. DO NOT INTERCONNECT DRAINS. LOCATION. LOCATED IN CASEWORK. ARE CONFIDENTIAL AND SHALL REMAIN THE ROUTE 3/4" PRESSURE RELIEF TO MOP SINK. ROUTE 1" SOLE PROPERTY OF STARBUCKS 5. WORK SINK: INDIRECT DRAIN FROM WATER HEATER DRAIN PAN TO 18. FLOOR SINK: 25. FLOOR SINK: G. WHEN BUNDLING SEVERAL INDIRECT WASTE LINES TO CORPORATION, WHICH IS THE OWNER OF THE ROUTE 2" GREASE WASTE PIPING BELOW SLAB AND MOP SINK. ROUTE 3"GREASE WASTE UP AND CONNECT TO FLOOR PROVIDE 3"GREASE WASTE. DRAIN INTO A FLOOR SINK, A UNISTRUT IS REQUIRED COPYRIGHT IN THIS WORK. THEY SHALL NOT EXTEND UP IN WALL, TRANSITION TO 1-1/2" GREASE SINK, EXTEND 1-1/2"VENT UP IN WALL TO CEILING SPACE. FOR SECURING AND BRACING ALL LINES ABOVE THE BE REPRODUCED (IN WHOLE OR IN PART), WASTE PIPING AND CONNECT TO SINK. EXTEND 1-1/2" 12. MOP SINK: DRAIN. SHARED WITH THIRD PARTIES OR USED IN ANY VENT PIPING UP IN WALL TO CEILING SPACE. ROUTE 3"GREASE WASTE UP AND CONNECT TO MOP 19. GREASE INTERCEPTOR: MANNER ON OTHER PROJECTS OR SINK, EXTEND 1-1/2"VENT UP IN WALL TO CEILING SPACE. GREASE INTERCEPTOR COVER SHALL BE FLUSH WITH H. FURNISH & INSTALL ALL NEEDED INDIRECT DRAINS PER EXTENSIONS TO THIS PROJECT WITHOUT THE 6. CONTRACTOR SHALL ROUTE 3"VENT THRU ROOF. ROOF FINISH FLOOR. CONNECT 4" GREASE WASTE BELOW CODE (NOT ALL SHOWN). INSTALL DRAINS AT 2% SLOPE PRIOR WRITTEN CONSENT OF STARBUCKS PENETRATION SHALL BE MADE BY ROOFING CONTRACTOR. 13. WATER CLOSET: FLOOR TO GREASE INTERCEPTOR INLET. CONNECT WHERE POSSIBLE WITHOUT DIPS OR SAGS. ALL CORPORATION. THESE DRAWINGS AND ROOFING CONTRACTOR SHALL MAKE ROOF PENETRATION ROUTE 4" SANITARY WASTE UP AND CONNECT TO WATER GREASE INTERCEPTOR OUTLET TO 4" SANITARY WASTE INDIRECT DRAINS SHALL RUN SEPARATELY FROM EACH SPECIFICATIONS ARE INTENDED TO EXPRESS WEATHER TIGHT.VENT THRU ROOF SHALL BE A MINIMUM CLOSET, EXTEND 2"VENT UP IN WALL TO CEILING SPACE. BELOW FLOOR. PROVIDE 2"VENT DOWNSTREAM OF OTHER TO INDIRECT DRAIN RECEPTOR AND SHALL DESIGN INTENT FOR A PROTOTYPICAL OF 10'-0" FROM ANY OUTDOOR AIR INTAKES. GREASE INTERCEPTOR. FIELD VERIFY EXACT LOCATION, TERMINATE WITH AN AIR GAP PER CODE. STARBUCKS STORE (WHICH IS SUBJECT TO DIRECTION OF FLOW,AND DEPTH OF INVERT PRIOR TO CHANGE AT ANYTIME)AND DO NOT REFLECT START OF ANY WORK. J. FURNISH & INSTALL WALL CLEANOUTS AT ALL SINKS AND ACTUAL SITE CONDITIONS. NEITHER PARTY AS NEEDED AND PER CODE (NOT ALL SHOWN). SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A K. INSULATE ICE BIN DRAINAGE PIPES PER THE WRITTEN AGREEMENT IS FULLY EXECUTED BY REQUIREMENTS ON THE PLUMBING SPECIFICATION BOTH PARTIES. SHEET. STARBUCKS TEMPLATE VERSION 12018.10.16 _20 P FCO PI10116 r 21 P FD14- - - � - �� � � GPD Engineering and Architecture Professional Corporation ;P FCO 120 520 SOUTH MAIN ST,SUITE 2531 OH 44311 -2"V- — — — — — — — -2"V — — — — P 330-572-2100 AKRON, 101 - - - - - - - — —4"SAN- — GPD PROJECT NO: 2016355.42 Ij ��P 11871 I \'v, En F RC)p v 13 S� iP111871 13 ��� ��rINEF� oy k I I 89 OBPE G� cri �p SFP 9 20,A��t FCO 20 �P1 10116(14 QON M,MP - r02/28/19 P13700 C,5 (1 82) W I �P 10725 w cr �i 4 I o i aP 0294 n/ 0 0 Q -T� — — � O i l �PI FGO 201 N M i 0 NI 4 IP-46881 0 0 I P 10549 61 )♦A �./ — F Uw fA 0 16 P 13384 7 181 P 116941 �12�P 1 P 1 7 0995, ------ I 4 U 3 ozs; � � — � cV \ L � Psoz O LL N HAND SINK 4 U U i� 9 10 W CLQ 24)P''187431 F g 0 �p O NP 19277 2 Q LO ; 7 ~ ~ t` " P502 U Q U O N I U O O N o' I I 9 10 a a 1 - 0 1a — J STORE #: 418 20 P FCO _ P 10726 25 tt P 1o72s > P 1oz94 PROJECT #: 04753-029 U �P 10294 v 3 � ISSUE DATE: 02.25.19 SUBMITTAL __ DESIGN MANAGER: JOHN PARK — — P 192772 , LEED(DAP: ° I P502 PRODUCTION DESIGNER: GUY RIPLEY � I 22 CHECKED BY: 14 r3 U _3 3 PI17650 _I _ P502 Revision Schedule �P 17572 — — P 17565 -�23) ,,,r.S FIS Rev Date By Description -�CO- 20 U P 107M 18) 2 P502 © o d _ - W� SHEET TITLE: _« T4) 6N a PLUMBING WASTE & 77 in LO VENT PLAN iV 1 2' 4' 8' SCALE: AS SHOWN }PLUMBING WASTE PLAN - - - N Scala:1/4'=1' SHEET NUMBER N scale 1/4 - 1'-0" N P103 N PLUMBING SHEET NOTES WASTE UNDERSLAB NOTES 1. 4" SANITARY/GREASE WASTE PIPING BELOW FLOOR A. SEE PLUMBING SPECIFICATIONS FOR FURTHER REQUIREMENTS, 2. MOP SINK: B. FURNISH & INSTALL WALL CLEANOUTS AT ALL SINKS AND PROVIDE 3" GREASE WASTE AND 2"VENT STUB-UP THRU FLOOR . AS NEEDED AND PER CODE (NOT ALL SHOWN). 3. FLOOR DRAIN: C. ALL NEW UNLESS NOTED OTHERWISE. ©2013 STARBUCKS COFFEE COMPANY PROVIDE 3" SANITARY WASTE AND 2"VENT. STARBUCKS' 4. FLOOR SINK: PROVIDE 3" GREASE WASTE AND 2"VENT. 2401 UTAH AVENUE SOUTH 5. HAND SINK: SEATTLE, WASHINGTON 98134 PROVIDE 2" GREASE WASTE AND 2"VENT. (206) 318-1575 6. LAVATORY: THESE DRAWINGS AND THE PROJECT MANUAL PROVIDE 2" SANITARY WASTE AND 2"VENT. ARE CONFIDENTIAL AND SHALL REMAIN THE SOLE PROPERTY OF STARBUCKS 7. WATER CLOSET: CORPORATION, WHICH IS THE OWNER OF THE PROVIDE 4" SANITARY WASTE AND 2"VENT. COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), 8. WORK SINK: SHARED WITH THIRD PARTIES OR USED IN ANY PROVIDE 2" GREASE WASTE AND 2"VENT. MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE 9. FLOOR CEANOUT: PRIOR WRITTEN CONSENT OF STARBUCKS MATCH SIZE OF DRAIN LINE. CORPORATION. THESE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO EXPRESS 10. GREASE INTERCEPTOR: DESIGN INTENT FOR A PROTOTYPICAL PROVIDE GREASE INTERCEPTOR BELOW FLOOR, STARBUCKS STORE (WHICH IS SUBJECT TO GREASE INTERCEPTOR COVER SHALL BE FLUSH WITH CHANGE AT ANYTIME)AND DO NOT REFLECT FINISH FLOOR. PROVIDE 2"VENT DOWNSTREAM OF ACTUAL SITE CONDITIONS. NEITHER PARTY GREASE INTERCEPTOR. SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A 11, EXTEND 4"AND CONNECT SANITARY WASTE TO WRITTEN AGREEMENT IS FULLY EXECUTED BY EXISTING 4" SANITARY WASTE. FIELD VERIFY EXACT SIZE, BOTH PARTIES. LOCATION, DIRECTION OF FLOW AND DEPTH OF INVERT STARBUCKS TEMPLATE VERSION 12018.10.16 PRIOR TO START OF ANY WORK. 12. FLOOR SINK. PROVIDE 3" GREASE WASTE. q P 10116 6 '9 P FCOF — GPD Engineering and Architecture 1 Professional Corporation FCO 9 520 SOUTH MAIN ST,SUITE 2531 AKRON,OH 44311 3 P _ FD r P:330-572-2100 F:330-572-2101 —4"SAN— - — - GPD PROJECT N0: 2016355.42 1 P1187117 1\ l �o PRpFFss �I^lJJ\ FS P 11871 1 71 '.. '. - - V v cry �GIN[F spy 9�� ♦ ¢ X69,08PE R y z _ Ch 11 r gyp- SFP .\A 2 P; FCO P 101161 6 ti 9, 10 �' �- - �'"'.enP 02/28/19 U) P 10726 4 .0 F Fj(�$; 12/31/20)0 IP 10294 p FCO Lg) Q 10 P GI _ LU LU QEo (Y = no Q J Z) co 0 IN 3: _ a>I 5 P 14888 ' D D P 10549' 8� '��^/ j El m $ 4 _ VJ D (n) LLJ 4 P 10294 o P 10726 LL N m - HAND SINK 5 O cit U � 2 P 10995 W rn Of A - E� ' Z '+- Q w 0 P 10726112 F o P 10294 U U O Q 1 w f n W c �11 v � N �- D o STORE #: 418 O P 10726 9 P FCO PROJECT #: 04753-029 U P 10294 ISSUE DATE: JOHN SUBMITTAL DESIGN MANAGER: JOHN PARK 0 LEEDO AP: PRODUCTION DESIGNER: GUY RIPLEY N CHECKED BY: O U 3 Revision Schedule rn Rev Date By Description P FCO ! 9 fr P 10726 q P 101 294' W SHEET TITLE. N PLUMBING WASTE UNDERSLAB PLAN PLUMBING WASTE UNDERSLAB PLAN SCALE AS SHOWN 0 1 sc: 1/4"= 1'-0- SHEET NUMBER. N N P104 QD ©2018 STARBUCKS COFFEE COMPANY STARBUCKS" 2401 UTAH AVENUE SOUTH SEATTLE, WASHINGTON 98134 (206) 318-1575 THESE DRAWINGS AND THE PROJECT MANUAL ARE CONFIDENTIAL AND SHALL REMAIN THE ` SOLE PROPERTY OF STARBUCKS CORPORATION, WHICH IS THE OWNER OF THE 3" VTR COPYRIGHT IN THIS WORK. THEY SHALL NOT BE REPRODUCED (IN WHOLE OR IN PART), SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR EXTENSIONS TO THIS PROJECT WITHOUT THE 2„V PRIOR WRITTEN CONSENT OF STARBUCKS CORPORATION. THESE DRAWINGS AND i 1-1/2"V SPECIFICATIONS ARE INTENDED TO EXPRESS DESIGN INTENT FOR A" \ i STARBUCKS STORE WHICH IS SUBJECT E TTO / CHANGE AT ANYTIME) AND DO NOT REFLECT ACTUAL SITE CONDITIONS. NEITHER PARTY SHALL HAVE ANY OBLIGATION NOR LIABILITY TO THE OTHER (EXCEPT STATED ABOVE) UNTIL A WRITTEN AGREEMENT IS FULLY EXECUTED BY 2 V BOTH PARTIES. �i STARBUCKS TEMPLATE VERSION i2018.10.16 2"V FLOOR CLEANOUT -\ I FLOOR LAVATORY GPD Engineering and Architecture DRAIN ,✓ �/ Professional Corporation 1 520 SOUTH MAIN ST,SUITE 2531 AKRON,OH 44311 1-1/2"V 2" .SAN 4" SAN�I P'330-572-2100 F 330-572-2101 1 - / -112"V 2"V / GPD PROJECT NO 2016355.42 I FLOOR f EREo Roes , \ CLEANOUT + �� INCF S%2 I - 3"SAN �� y - 2..V I I 89 08PE .. 2„ - � ' �I 4" SAN 4" SAN EG I �� HAND 4"SAN - FLOOR �NM.MP 02/2 /1g w 2"V i I SINK CLEANOUT WATER LAVATORY NXplREg: V ,uu 2"V I I CLOSET nLU I I I � r i I zco '� I Y I 2" GW i Cpl y / I i GREASE _�� WATER M2--V O I I I INTERCEPTOR 2"SAN CLOSET N z"v I I FLOOR I I �V�//�� �I SINK vJ 2"V / I 4" SAN W a� I U) / I FLOOR T- 4" 4.. GW I I J SINK Z IIY�� FLOOR O CLEANOUT > LL, f- 3 GW _ I I I WORK \ 3"GW O 0O [� 4 SINK -.� U) Q / w !— CL FLOOR S NKD \ 2„ GW / _\\ _ 4 GW 6 Q 0 O rn SINK A FLOOR \ LL (n SINK / U U O Of It C:) < 2" GW 3" GW 0 O 04 0 N ` \ E 4" GW 4., GW o / STORE #: 418 \ PROJECT #: 04753-029 Q 3" GW 3" GW FLOOR \ �- ISSUE DATE: 02.25.19 SUBMITTAL FLOOR DESIGN MANAGER: JOHN PARK 0FLOOR CLEANOUT SINK PRLEEDCAP PRODUCTION a� CLEANOUT PRODUCTION DESIGNER: GUY RIPLEY 3" GW 0 CHECKED BY. U 3 Revision Schedule rn Rev Date By Description O 75 PLUMBING RISER DIAGRAM SHEET TITLE N sem: s"= V-0" PLUMBING ISOMETRIC N tT LIDN SCALE: AS SHOWN rn N SHEET NUMBER: CN P105 FLOOR GRATE - d MOUNT FLUSH - DRAIN LINE WITH FLOOR - FINISHED FLOOR d (SEE ARCHITECTURAL FOR FLOOR SLOPES) \ AIR GAP = 2 X "d" a ' ©2018 STARBUCKS COFFEE COMPANY - LIFT OUT ALUMINUM SEDIMENT BUCKET STARBUCKS" 2401 UTAH AVENUE SOUTH --------------- _---- SEATTLE, WASHINGTON 98134 - � FASTEN @ (206) 318-1575 1/2"COPPER CW FASTEN @ CENTER OF BOTTOMS FLOOR SINK DETAIL SUPPLY TO TOILET CENTER LINE CORD. THESE DRAWINGS AND THE PROJECT MANUAL 1 O _ - - - - " - -- - - II OF BOTTOM \ ARE CONFIDENTIAL AND SHALL REMAIN THE Scale: NTS II CORD. SOLE PROPERTY OF STARBUCKS FLEX HOSE II 1/2" DIA. COPPER - HANGER ROD CORPORATION, WHICH IS THE OWNER OF THE KADET-AF CLEANER - KADET-AF CLEANER COPYRIGHT IN THIS WORK. THEY SHALL NOT - MALE HOSE END II CW SUPPLY CHEMICAL DISPENSER II HANGER ROD BE REPRODUCED (IN WHOLE OR IN PART), DISHWASHER 1-1/2"ABS DRAIN -MOUNT BRACKET ON MOUNT TO BACK WALL ADJUSTABLE CLEVIS SHARED WITH THIRD PARTIES OR USED IN ANY DIRECT DRAIN CONNECTION CENTER W/BOTTOM OF OF MOP SINK II MANNER ON OTHER PROJECTS OR CLEANER DISPENSER SURROUND II HANGER TO RUN EXTENSIONS TO THIS PROJECT WITHOUT THE f ADJUSTABLE CLIP TYPE PARALLEL OR MOP SINK FAUCET PRIOR WRITTEN CONSENT OF STARBUCKS (W/ATMOSPHERIC BREAK) HANGER TO RUN � � y� PERPENDICULAR TO PARALLEL JOISTS OR CORPORATION. THESE DRAWINGS AND KADET-AF CLEANER SEE ARCH DETAILS FO 177 `F OR PERPENDICULAR TO BEAMS SPECIFICATIONS ARE INTENDED TO EXPRESS CHEMICAL-MOUNT FURTHER IDETAILNFOR TIO JOISTS OR BEAMS DESIGN INTENT FOR A PROTOTYPICAL RE (WHICH IS SUBJECT TO BRACKET ON CENTER W/ NOTES: CHANGE AT ANYSTARBUCKS TIME)ME)AND DO NOT REFLECT BOTTOM OF CLEANER 1. REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS FOR PROPER ACTUAL SITE CONDITIONS. NEITHER PARTY 2 DISPENSER -- -- . SELECT IN DIMENSIONS.CT TANK FOR ADA COMPLIANT TRIP LEVER LOCATION. SHALL HAVE ANY OBLIGATION NOR LIABILITY TO FLOOR FRESH WATER HOSE W/ 2. SELETHE OTHER (EXCEPT STATED ABOVE) UNTIL A 2" P-TRAP AND TRAP ARM ' QUICK DISC. FITTING WRITTEN AGREEMENT IS FULLY EXECUTED BY - � NOTE: SEE PLANS FOR DRAINAGE TO DROP IN WALL BEHIND MOP SINK BASIN BOTH PARTIES. RELIEF FLOOR DRAIN. INSTALL I ALL PER CODE &AHJ. BRANCH LINE MAIN LINE STARBUCKS TEMPLATE VERSION 12018.10.16 II III DISHWASHER DRAIN DETAIL CHEMICAL MIXER DETAIL TANK TOILET SUPPLY DETAIL PIPE HANGER DETAIL scale. NTS scale:NTS scale:NTS _..- scale:NTS �` GPD Engineering and Architecture BRAIDED STAINLESS STEEL HOSE. - Professional Corporation 520 SOUTH MAIN ST,SUITE 2531 DETAIL NOTES 9/16-24 UNEF COMPRESSION AKRON,OH 41311 CONNECTION 150 PSIG MIN. , 5/8"WIRE REINFORCED DRAIN SEE ESPRESSO MACHINE P:330-572-2100 F:330-572-2101 RATING. (TYP. 2) / HOSE TO INDIRECT PIPE RISER 1 THIS DETAIL IS SCHEMATIC ONLY. SEE THE PLAN PIPING CONNECTION DETAIL (TYP. 2) DRAWINGS. (WHERE APPLICABLE) GPD PROJECT NO: 2016355.42 ESPRESSO ESPRESSO 2. ALL WATER HOSES SHALL BE THE MINIMUM HOT TAP COUNTER TOP \ MACHINE MACHINE 2"ABS DWV INDIRECT WASTE LENGTH NEEDED AND SUPPORTED AS NEEDED �191Eo PRopFss \ PIPE TO FLOOR SINK SLOPE TO AVOID STRESSING CONNECTIONS AND T \r C IN[F iv HORIZONTAL AT 1/4" PER FOOT COILING EXCESSIVE HOSE. ROUTE TO AVOID 2 p 2 \ KINKING AND ALLOW SPACE FOR UNDER COUNTER WATER TOWER ----- -- y� 712, ¢ X89 08PE y REFRIGERATOR AND ACCESS TO EQUIPMENT AND WATER PUMP. INSTALL TO ALLOW ACCESS TO - \ VALVES. FAUCET c�\ - INTEGRAL PUMP FILTER. SEE PUMP ATTACHMENT 3. ALL PIPING SHALL BE HELD TIGHT TO WALLS, � Ft HOLD PIPING TIGHT TO BACK G / WALL(TYP.) SLOPED WHERE NEEDED AND ROUTED TO ALLOW ESP SINK DETAIL IN ARCH PLANS (TYP.2) 01 ri V � ;" ACCESS TO EQUIPMENT AND VALVES. RIGHT HAND � � � • 8,2 a�y� 4. ROUTE HORIZONTAL PIPING A MINIMUM OF 6"ABOVE SHOWN PITCHER RINSE F' BRAIDED STAINLESS STEEL HOSE . --- - 9/16-24 UNEF COMPRESSION PUMP PUMP BACK FLOW PREVENTION DEVICE FLOOR. (LEFT HAND SIM.) + FAUCET M'0 02/28/19 N CONNECTION 150PSIG MIN. / WHERE REQUIRED. VERIFY TYPE AND 5. COORDINATE LOCATION AND ELEVATION OF ALL w RATING. (TYP.2) HUB DRAIN LOCATION WITH LOCAL JURISDICTION. AS NIEEDED 0PMENT 1 TH AL OW MAINTENANCE.OTHER TRADES. IENT PUMP EJtPIREB: 1213-1/2020 p� 1/2" NPT TO HOSE 3/4" W COMPRESSION CONNECTION - ------- -- BACKFLOW PREVENTER w Q (TYP.2) FCW FCW 3/4"FCW—� (TYP.) 1/2" BALL VALVE (TYP. 2) i 3/4" -' 3/4" - /1 2 Y AIR GAP PER CODE. METERED FAUCET - FLOOR MINIMUM 1" BALL VALVE @ STUB UP (TYP.) (v) - - 0 - - N FLOOR SHUT OFF VALVE - 0ail (TYP.) Iv I m W ESPRESSOMACHINE PIPING CONNECTION DETAIL - ESP SINK PIPING DETAIL W = C .. Scale. NT$ _. - \ / Scale:NTS -_ U 04 � PIPE HANGER SUPPORT ( OR [z_ CV -p PIPE CLAMP SUPPORT AS NEEDED.) O V � m _rn H ABS INDIRECT DRAIN PIPE W n- VENT IF REQUIRED BY CODE/AHJ CONNECT TO EQUIPMENT N SINK/ICE BIN (SEE PLAN FOR SIZES) TO OUTSIDE (DO NOT CONNECT TO ANY Q O F&I ADDITIONAL OFFSETS AS SEWER VENT) Z Q M MAY BE NEEDED. �� U) L0 / - INDIRECT DRAINS -TRAP IF REQUIRED F- ~ V / PROVIDE CLEANOUTS IN PER CODE OR AHJ. U U 0 Q C) PIPE CLAMP SUPPORT AT / W /n W ABS THREADED COUPLING / TURNS/ENDS OF PIPE �i CONDENSATE DRAINS-TRAP REQUIRED 0 t.J 0 rn N / DRAIN TERMINATION INSTALL PER MANUF./CODE REQUIREMENTS d d TO BASKET STRAINER - (& BLOCKING - NOT SHOWN) w Ir 41)E / PIPE MATERIAL SHALL BE PER THESE %- HT. AND LOCATION PER CODE CLEANOUTS AT ALL CHANGES / LISTED - - PLANS AND/OR PER CODE. USE - - TYPE B VENT THROUGH ROOF 0 B DIRECTION (ORAS ALLOWED DISCHARGE INTO OPEN AREA DWV FITTINGS IF REQUIRED BY CODE/AHJ. VENT CAP STORE #: 418 p BY AHJ) / OF FLOOR SINK W/2"AIR GAP - WATERPROOFPENETRATION ROOF PROJECT #: 04753-029 ABS DWV FITTINGS (TYP.) -' SLOPE PIPE PER CODE. '. DIELECTRIC - \ — EXPANSION TANK SIZED AND INSTALLED ISSUE DATE: 02.25.19 SUBMITTAL SEE PLAN(S) FOR SIZE UNIONTYP p FINISHED FLOOR DISCHARGE INTO OPEN AREA , . c o PER MANUF. RECOMMENDATIONS AND CODE. DESIGN MANAGER: JOHN PARK OF FLOOR SINK W/2"AIR GAP LEEDOAP: C9 / FLOOR SINK (OR AS ALLOWED BY CODE) APPROVED - - -- VACUUM RELIEF VALVE PRODUCTION DESIGNER: GUY RIPLEY GAS SHUT- N -- -- O --- COMBINATION P & T RELIEF VALVE CHECKED BY: OFF VALVE DOMESTIC 3/4" RELIEF DRAIN TO MOP SINK FLOOR SINK (OR FUNNEL DRAIN) GAS WATER -- STRAP TO WALL STRUCTURE Revision Schedule ` NOTES: HEATER W/2"WIDE 16 GA STEEL BAND w 1. F&I ALL WORK PER CODE AND AHJ REQUIREMENT EVEN IF NOT SPECIFICALLY SHOWN. DIRT LEG DRAIN VALVE Rev Date BY Description 2. ALL PIPES SHALL BE RIGIDLY SUPPORTED AND ALL SUPPORTS & PIPING SHALL BE MOUNTED NOTES: DRIP PAN WITH INDIRECT DRAIN TO () OFF THE FLOOR FOR CLEANING PURPOSES. MOP SINK BELOW 3. ALL INDIRECT DRAIN DISCHARGES SHALL OCCUR OVER CLEAR AREA OF FLOOR SINK AND NOT 1. F&I ALL WORK PER CODE AND AHJ REQUIREMENT EVEN IF NOT SPECIFICALLY SHOWN. MOP SINK OVER GATE. 2. ALL PIPES SHALL BE RIGIDLY SUPPORTED AND ALL SUPPORTS & PIPING SHALL BE MOUNTED - SUPPORT PLATFORM 4. SLOPE ALL PIPES PER CODE AND F&I TRAPPED INDIRECT DRAIN AND VENT IF REQUIRED BY OFF THE FLOOR FOR CLEANING PURPOSES. FLOOR BY OTHERS (SEE DETAIL") CODE AND/OR AHJ. (NOT SHOWN) 3. ALL FLEXIBLE INDIRECT DRAIN LINES FOR APPLIANCES SHALL BE INSTALLED PER CODE/AHJ 3/4" INDIRECT DRAIN AND MANUF. REQUIREMENTS. SUPPORT LINES SO THERE ARE NO SAGS OR DIPS IN LINE. TO MOP SINK SHEET TITLE: PLUMBING DETAILS SINK INDIRECT DRAIN DETAIL TYPICAL CONDENSATE/EQUIPMENT INDIRECT DRAIN- DETAIL GAS WATER HEATER DETAIL 04 scale: NTS scale:NTS scale. NTS SCALE: AS SHOWN rn o SHEET NUMBER: N N P501 N - INDIRECT DRAIN LINES FROM _ ESPRESSO MACHINES TO 8" (200 MM) MIN. FLOOR SINK - FILTERED BACK WALL CLEAR TO BACK COLD WATER TXT' (180MMX75MM) STUB-UP WALL SUPPLY FOR r L---__---_ � PENETRATION AREA. SEE I FILTERED TOWER WATER I II PLUMBING PLAN FOR FINAL I COLD WATER LOCATION. INSTALL SHUT-OFF 0 ----_ FOR ICE I j I _ -_ __ - , r --- --- __ __ I VALVES AND EQUIPMENT. STUB-UPS FILTERED -- -- - -- L J MACHINE - di COLD WATER I 11 I I INDIRECT DRAIN T 6" (150 MM) MIN. SUPPLY FOR I I I r----- LINE FROM ICE ( I Fi 1 1 I CLEAR INSTANT HOT �I N 1 II O O 1 I r O O MACHINE TOUO� III 11 1 I C 2073STARBUCKSCOFFEECOMPANY I I WATER TAP � I I III j UNDERCOUNTER FLOOR DRAIN II II II CABINET HOT D COLD WATERSUPPLY --r-7--� ' II I I I �_ _ I FOR PITCHER 111 II Or-�J-10 T 111 I CE BIN ABOVE STARBUCKS RINSER FAUCET I 0) 0 L — — J SEE PLUMBING PLAN - SHELVING — _ _ _ _ _ _ _ _ - III llr I _ I 11 II 2401 UTAH AVENUE SOUTH FOR FINAL FLOOR ABOVE II o oil , Io II 1 II SEATTLE, WASHINGTON 98134 DRAIN LOCATION 11 1110 OI L__ ______ - -L LL___ I I L. _ . I LL__- (206) 318-1575 AND TYPE ABOVE COUNTERTOP — --- / ------------- - Z--, UNDERCOUNTER r�----------------- \/ �� L� �-+ /� REFRIGERATOR (TYP.) 4' 7„ — - INDIRECT AND INSULATED THESE DRAWINGS AND THE PROJECT MANUAL 4 ICE MACHINE - PLUMBING ��� WATER FILLING STATION - PLUMBING UNDERCOUNTER DRAIN LINE FROM ICE BIN ARE CONFIDENTIAL AND SHALL REMAIN THE �L/ �� ABOVE TO FLOOR DRAIN SOLE PROPERTY OF STARBUCKS CABINET CORPORATION, WHICH IS THE OWNER OF THE scab:NTS scab:NTS - SEE PLUMBING PLAN FOR COPYRIGHT IN THIS WORK. THEY SHALL NOT FINAL FLOOR DRAIN BE REPRODUCED (IN WHOLE OR IN PART), UNDER COUNTER LOCATION AND TYPE SHARED WITH THIRD PARTIES OR USED IN ANY MANNER ON OTHER PROJECTS OR - / EXTENSIONS TO THIS PROJECT WITHOUT THE FILTERED COLD WATER SUPPLY FOR WATER FONT PRIOR WRITTEN CONSENT OF STARBUCKS ATION. THESE DRAWINGS AND 9'-3" SPEOIFICAT ONS ARE INTENDED TO EXPRESS-- --- - — f FILTERED COLD WATER SUPPLY FOR ESPRESSO MACHINE DESIGN INTENT FOR A PROTOTYPICAL INDIRECT LINE FROM DRIP TRAY TO (TYP. 1 OF 2) STARBUCKS STORE (WHICH IS SUBJECT TO INDIRECT LINE FROM DRAINBOARD FLOOR SINK - - - -- ____-__ CHANGE AT ANYTIME) AND DO NOT REFLECT ILTEREF COLD WATER ACTUAL SITE CONDITIONS NEITHER PARTY TO FLOOR SINK - __.___ ----- �� - SHALL HAVE ANY OBLIGATION NOR LIABILITY TO \ _ _ __ l i I SUPPLY FOR HOT/COLD HOT AND NON-FILTERED COLD \\ \ ° 0 ° WATER DISPENSER FAUCET THE OTHER (EXCEPT STATED ABOVE) UNTIL A WATER FOR SINK FAUCET AT \ \ (TYP.) WRITTEN AGREEMENT IS FULLY EXECUTED BY 20 1/2" (520MM) A.F.F. SHUT-OFF Z \ ° °°°o ° INDIRECT LINE FROM IN-COUNTER - 1 BOTH PARTIES. VALVES AT WALL AND 4" (100MM) cq \ ° RINSER TO FLOOR SINK ° ° I NON-FILTERED COLD ° WATER SUPPLY FOR STARBUCKS TEMPLATE VERSION 12018.10.16 EITHER SIDE OF WASTE LINE O O \ \ 0 ° NON-FILTERED COLD WATER SUPPLY 1 1 O METERED SPOON RINSER 11 FOR IN-COUNTER RINSER AT 201/2" -- ---- - - tv I I D ° (520MM) A.F.F. (TYP.) ti INDIRECT DRAIN LINE FROM 1 J, I ( ° 0 SINK TO FLOOR SINK I °- . 1 NON-FILTERED COLD — UNDERCOUNTER CABINET ►i I I WATER SUPPLY FOR NON-FILTERED COLD WATER SUPPLY f--- SEE PLUMBING PLAN FOR FINAL ___ _-- - -,L L----- 1 L L _ PITCHER RINSER (TYP.) GPD Engineering and Architecture FOR BLENDER PITCHER RINSER L - J FLOOR SINK LOCATION AND TYPE. ICE BIN RINSER SINK (TYP. 1 OF 2) Professional Corporation INDIRECT DRAIN LINE FROM ICE✓ 10" 520 SOUTH MAIN ST,SUITE 2531 BIN TO FLOOR SINK - UNDERCOUNTER CABINET AKRON,OH 44311 (FLOOR SINK) ABOVE COUNTER - UNDERCOUNTER P'330-572-2100 F:330.572-2101 ✓ REFRIGERATOR (TYP.) GPD PROJECT NO: 2016355.42 CBE 01 -03 PLUMBING NESP 07-01 PLUMBING scab: 3/4"= V-0" - r . scab:NTS - n c1Rof. Fss cry INLF �o k R v- T- 9,. ¢ 89>89 08PE SFS'. 9,2 p1A C0 01 Of ---- IL ----------- ��NM.MP w 71/2" -- (n -11 2" (51 mm) INDIRECT DRAIN F_ _ __ - -- -- I _ DIAMETERTOP S_ ;_ ;: ; t1 LINE FROM 1 I CUUTOUTCOUNTEFOR TAP ❑ UNDERCOUNTER I I I W DIRECT DRAIN LINE FROM REFRIGERATOR Of 3/4" (20mm) BY-PASS l" TO FLOOR SINK. 7 VALVE (NORMALLY I INDIRECT DRAIN I REFRIGERATOR SINK. ROUGH-IN SINK UNDERCOUNTER Uj WASTE STUB AT 15 1/2" I I CLOSED) (394 MM) A.F.F. AND LINE FROM DRIP Y 36" (915mm) ROUGH-IN 1'-6" (460mm) 3/4" 20mm CENTERLINE OF SINK � ( ) / / / I TRAY TO FLOOR � ._ - NITROGEN Q BY-PASS LINE SINK AS REQ'D. - GENERATOR Z) CY) 3/4" (20mm) CWF OUT O TEMPERED HOT AND COLD 000 000 CHROME f� WATER FOR SINK FAUCET O O FILTERED COLD WATER `^ } � ESCUTCHEON AT 20 1/2" (520 MM)A.F.F. V J TO FILTERED FIXTURES SHUT-OFF VALVES AT WALL Cr (ESPRESSO MACHINES, AND 4" (102 MM) EITHER NOTE WORKSTATION IS TO SHARE FLOOR SINK WITHIN 10'-0" (3050 MM) W BREWERS, HOT TAP, In SIDE OF WASTE LINE. ADJACENCY. SEE PLUMBING PLAN FOR LOCATION. W WATER TOWER FAUCET, 7 3 CBE CHILLER, ICE MACHINE) z U 72 (162amm)A.F.F. -----A ----- 1- ADD 02-01 PLUMBING NIT 04-01 2-TAP PLUMBING N 0 - --- ---- --------- ------- - 3 ( - 1 _ 1--- g - 4-3/1C t105mm) FROM ab:NTS scare:NTS" O U � UNION (TYP.) WALL TO CENTER OF CO Q H /) PIPE CONNECTION W oDOMESTIC WATER IN _ - -� Q ❑ > O � FULL PORT - - I-- THREADED, BRASS T _6„ O Q / W / n W o BALL SHUT-OFF `J N VALVE (TYP.) 3-3/8" (85mm) FROM - - — 0 N 7 1/2" 0 of Cfl E WALL TO CENTER OF 0- d V PIPE CONNECTION DIRECT DRAIN M SINK. STORE #: 418 O 62" (1575mm) A.F.F. - - - - - Fite \nTION SYSTEM 1 1 ROUGH-LINE -IIN SINK O O / / O PROJECT #: 04753-029 C) FILTERED �_ WASTE STUB AT COLD WATER 15 1/2" (395MM) ISSUE DATE: 02.25.19 SUBMITTAL IL SUPPLY FOR I A.F.F. AND DESIGN MANAGER: JOHN PARK BREWER WITH I CENTERLINE OF LEED(DAP: SHUT-OFF IN SINK. PRODUCTION DESIGNER: GUY RIPLEY oCABINET AT 24" HOT AND COLD CHECKED BY: 610MM) A.F.F. WATER FOR 3 _ - SINK FAUCET AT Revision Schedule 20 1/2" (520MM) NOTES: - - A.F.F. SHUT-OFF Rev Date BY Description - - - - 1. ALL COMPONENTS DRAWN IN BOLD ARE GC RESPONSIBILITY. GC TO COORDINATE INSTALLATION OF ALL OTHER COMPONENTS SHOWN WITH FILTER VENDOR. VALVES AT WALL AND 4" (100MM) U 2. ALL PIPING SHALL BE COPPER EXCEPT PEX TYPE PIPING WHICH IS ACCEPTABLE BETWEEN FILTER SYSTEM COMPONENTS WHERE ALLOWED BY CODE. EITHER SIDE OF 3. COMPONENTS ARE TO BE POSITIONED TO MAXIMIZE ACCESS FOR REGULAR SERVICING. PRE-FILTER, BYPASS VALVES, AND SOFTENER TANKS MUST BE INSTALLED 72" (1828MM) AFF OR LOWER. WASTE LINE. a CONFIGURATION I, BASE WATER FILTRATION 4 �S-aie: 3/4" 01 -02 PLUMBING SHEET TITLE 0 scale S'= ,'o"cy) PLUMBING DETAILS Lo N rn SCALE: AS SHOWN T N SHEET NUMBER. N P502