Loading...
PFI2022-00104 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT a COMMUNITY DEVELOPMENT Permit#: PF12022.00104 Date Issued: 04/0412022 13125 SVV Hall Blvd..Tigard OR 97223 503.718.2421 Parcel: SEG1868 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Comcast 942786 Project Description: SEG 1868/Overlash new fiber to existing span, pull new fiber through existing conduit to property Class of Work: FEES Description Date Amount Type 1 - Utilities(gas, electric, data) PFI Permit Fee 04/04/2022 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: MITCH BURGHELEA 11308 SW 68TH PARKWAY TIGARD,OR 97223 PHONE: 5037985785 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: see permit application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12022-00104 Type: Condition Name: Status: Severity: PFI—Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI—Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI—Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses,residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI—Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI—Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI—Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work. Applicant shall coordinate the work with affected utility agencies. PFI—Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Utilities 19- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Nal at<Insert Phone#>,to establish a preconstruction meeting. PFI_UtiHties 20- NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI—Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI—Utilities 26- RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI—Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI—Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civic engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other City of Tigard PPI#: PF12022-00104 ENGINEERING DEPARTMENT Public Facilities Improvement (PFI) Permit PROJECT INFORMATION 942786 - Fought & Co - SW 72nd Ave TYPE OF WORK Project name: g 8 TYPE 1—Franchise utility Work Brief description of project: Overlash new fiber to existing span; peed by NWN,PGE, or utility agency pull new fiber through existing conduit to property. ❑ TWE 2—ROW Sidewalk/Driveway/Sewer seg 1868 Work performed for the purpose of • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 14255 SW 72nd Ave, Tigard, OR 97224 main line tap ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: Comcast • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 11308 SW 68th Parkway water service area City/State: Tigard, OR Zip: 97223 ❑ TWE 4—Small Cell Technology Phone: (503) 798-5785 ❑ TYPE 5-Tigard Triangle Email: Mircea_Burghelea@comcast.com Phone: (503) 798-5785 NOTE: Type t and 2 applications may be Contact name: Mitch Burghelea emailed to rowpermitsPatigard-ongov. Phone: (503) 798-5785 Email: Mircea_Burghelea@comcast.com CONTRACTOR INFORMATION ❑ Same as applicant Name: Texstar Enterprises, LLC CCB Number: 228361 Mailing address: 14122 Arndt Rd City/State: Aurora, OR zip: 97002 Phone: (503) 793-3140 Email: scott.boyles@texstarenterprises.com ENGINEER INFORMATION Name: K&B Technical Solutions, Attn: Kyle Browning Mailing address: 6566 SE Lake Rd, Ste. F City/State: Portland, OR Zip: 97222 Phone: (719) 244-1608 Email: Permits@kbmai1.net ADDITIONAL INFORMATION Estimated value of workis required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes 51 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owners signature on the application. I,the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Kyle Browning Kyle Browning 3/20/2022 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date Case No: PF12022-00104 Permit fee: Received by: NT Date: 3/20/22 ��/3o�Z42 Approved by: �ne.�7�rU, Date: 2 Notified by: AL— Date: 3 3l 2fJ 22 F City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.6gard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ONLY TYPE 4: SMALL WIRELESS DETAILED SUBMITTAL REQUIREMENTSCHECKLIST Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • w-vw.tigard-or.gov • 503-718-2421 • Page 3 of 4 - y - C� I Edge of Pavement I1'^ Ditch ---- Streetlight I --------- —r�'� I r 1 ' i T"�ro'�os elw'er m�'_ I Existing House rr1 Existing r Driveway e I V • of I I � f °i Existing Shop Pawerpale I is I> 1 I I — 96 �.— I Fopi %Line I I eh I Fire HrOrant(FH) I I I Scale: 1'=30' � I I I I I � I I � � I 1 TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.figard-or.gov 9 503-718-2421 Page 4 of 4 p Z¢ SViL I'�lp' Q N LL C^ O m F �O F,C yNy� a� H LL Iola 1 oleo pIBO U OVERLASH L,; SCT FIBER OPTM CAKE TRANSITION FROIA AERIAL TO UNDERGROUND PUCE — — — — — — — —TOE%6TINGCMLESTRMp� — NEW RISER BSI EMya 21? i � g Led SW 72ND AVE PROOF AND VERIFY EXISTING PATHWAY PULL IIHBCT FIBER OPTIC CABLE TNtOUGH EXISTING CONCUREiL S Ali / _ EXIT RIGHT-CF-WAY TO PROPERTY I(OCE Y co ZI 11101 I 14155 L a 0 g 1�^ i U Ley L I I.NL WORK MEAS TO BE RESTORED TO LOW Oft KE Cd�D1DN. L w e. 2.IEDERGROUND IELD OBS HAVE BEEN ROTTED FROM AVAILABLE RECORDS MDFIELO OBSERVATONS BUT ME NECESSARLY FJIACT d.IT IS THE CONSTRUCTION CONTRACTOR'S RESPONSIBLY TO FIELD tiw.�rwwrwwr LOCATE ALL UNDERGROUND UTILITIES PRIM TO CONSTRUCTION. WHEN WOR%IND OVER OR NEM SIDEWALKS:PROVIDE SPOTTERS M HOLD PEDESTRIAN COMPLETE REPW OF ANY AND ALL DAMAGES IMURRED SHALL BE AT THE AOlG�R UNTIL CONSTRMTKE UN BE PAUSED.OR IT IS SAFE TO PASS THROUGH TIE WORK ZONE. -iP����iM� EJ�ENSE OF iXE CONTRACTOR sRR�rr�HB CMME-IUIII.15STp '< WQ � LINETYPES SYMBOLS a iy o o� AERNL GABLE -- JOIHT USE FOIE ®FOIE TAO N O_o m= EXISTING CONDUIT "W USE POLE WI TRANSFORMER ®POLE TAG ^ N NEW COIOUR ------ POWER POLE WI TRANSFORMEA OFOIETM Ft HT -WAY IIFII POWER FOIE XPOLETAG EASEMENT D)t GRLE POLE *FOIE TM +~ H PUBLLG U,ILNT'EASEMEM FY TELEPHONE POLE FOIE iM LL O PROPERTY LME EMSTING CONpAT FEW CEMEF6W CA PROPOSEOCONDUTOBER ®' U FACE OF CURB Iul' PEDESTK EDGE OF PAVEMENT DY VAULTMANDHOLE EDGEOFCONCRETE WC MANHOLE e F EDGE OF GRAVEL FOF MET EDGE OF SIDEWALK %? VALVE Q E VATON LIMBS --- -- METER Q SEWER s--- HYDRANT Yf STDRM -- O POWER TRANSFORMER ® . WATER w—_- STREETLIGNTPOLE { GAS -- TRAFFIC SIGNAL POLE QO t POWER v SM CON,ROLLER TELEPHONE , GROSS Ww S"C p RRR FBER OPTIC - FC AAEROM SIGNAL S TREE O TAAFFO SIGNAL ,as --- CULVERT STREET L,GMT FENCE LME cuum RAE RAILROMTRACKS d a SUILOMG FOOTPmaT � a OY oil L CM.E-AO,t�,5810 Page 52 2011 Edition Bicycle and Pedestrian Accommodation Diagrams The following practices and details address the accommodation of bicycles and pedestrians within work zones. The following detail drawings should be incorporated, where appropriate, into the traffic control plan for any short term work. 1. See Section 1.6— Bicycle and Pedestrian Considerations for additional guidance. 2. Stay alert for pedestrians and bicycle traffic and accommodate safe passage for them, as needed. 3. The work space should be protected from bicycle and pedestrian intrusion by using barricades or closely-spaced channelizing devices. 4. Maintain access to transit stops or clearly close a transit stop using barricades or channelizing devices. Bicycle Accommodation Diagram 6-6 Bicycle Accommodation Principles: 1. If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a"(Bicycle) ON ROADWAY"sign (CW11-1) or the Bicycle symbol (W11-1) sign with an "ON ROADWAY" (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer) strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle signing placement. Sign Spacing and Buffer Lengths Ifeetl Poand SpadngBetwaan9gra "Bullar' —Spead A B I C Spam 20 50 25 100 100 100 75 30 100 35 3S0 350 350 125 40 150 45 180 s0 Soo Soo Soo 210 55 250 6" 285 65 700 700 700 US 70 365 Chapter 5 September 2016 2011 Edition Page 53 Bicycle Accommodation Diagram 5-6 I I I NOTES: • Bicycles on Roadway(CW11-1)sign should not interrupt standard sequences. For example: I o BE PREPARED TO STOP/Flagger Symbol I o _LANE CLOSED AHEAD/Lane Ends I Symbol • Bicycles on Roadway sign typically follows ROAD I WORK AHEAD sign and used as general warning. I I I I I I I I I A I I I I I I I I I I I I I I A I I I I I I� I I B I I I I I I I� ON ROADWAY I I I I I I C I I I I I ROAD I I� WORK I AHEAD September 2016 Chapter 5 Page 106 2011 Edition Diversion into a Continuous Left Turn Lane Diagram 430 Diagram 430 shows work in the travel lane(s) next to a continuous two-way left turn lane with one direction of traffic diverted into the continuous two-way left turn lane. 1. Use truck-mounted Flashing warning lights on work and protection vehicles. See Section 4.3 —Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. When two or more travel lanes are reduced to a single lane before the diversion, each lane shall be closed separately. Layout traffic control according to ODOT Standard Drawing TM 852 for 5-lane sections. 4. A shifting taper(L/2) may be added in the diverted traffic direction across the continuous two-way left turn lane (as shown). This option is recommended when the speed is 45 mph or greater. Sign Spacing and Buffer Lengths(feet) Posted Spadng Between Signs "Buffer" Speed AT B C Spam 20 So 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 Soo 500 Soo 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 107 Diversion into a Continuous Left Turn Lane Diagram 430 ROAD WORK AHEAD B llyll CES LANE CLOSED AHEAD A II U2 ;I I -- B� 1 Protection Vehicle wrrMA(both Optional) See Chapter 4 Butler • • u2 I ' LLJ2 • I A r I 1 y LB WORK AHEAD September 2016 Chapter 5