Loading...
Report MOD I here by certify that this plan, specification, 114 471 Sw ,o~th Ave or report was prepared by me or under my !� direct supervision and that I am NICET P'C L✓ Certifie . ���-- DEC 15 MO Brent Kotula Date: /2020 CITY OF TIGARD NICET Certification No, 113889 BUILDING DIVISION Water-Based Systems Layout - Level IV Certification Expires: June 1, 2023 UPOnOr AquaSAFETM Fire Safety System OFFICE COPY Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : ROSHAK AT RIVER TERRACE-One Head Calculation (H.16) Drawing : RESIDENTIAL Location : PLAN E-8 TIGARD OR Remote Area : 1 Contract : U190805-01 Data File : U190805-01 Roshak at River Terrace E-8.wx1 Date/Time : 08/14/2020- 10:51 AM Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor, Inc. Page 1 ROSHAK AT RIVER TERRACE-One Head Calculation (H.16) Date 8/14/2020 HYDRAULIC DESIGN INFORMATION SHEET Name - ROSHAK AT RIVER TERRACE Date - 8-9-2019 Location - TIGARD OR Building - RESIDENTIAL System No. - 1 Contractor - WOLCOTT PLUMBING Contract No. - U190805-01 Calculated By - NOAH EAKMAN Drawing No. - x Construction: (X) Combustible ( ) Non-Combustible Ceiling Height x OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: (X)1 ( )2 ( ) 4 ( ) S ( )Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 13 Gpm System Type Listed Pres. at Start Point - 7.04 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 16 x 16 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 128 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 13 Psi Required 28.33 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: Tank or Reservoir: A Date of Test - x Rated Cap. Cap. T Time of Test - x @ Psi Elev. E Static (Psi) - 55 Elev. R Residual (Psi) - 50 Other Well Flow (Gpm) - 300 Proof Flow Gpm S Elevation - 100 P Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H.USA 03087 Water Supply Curve C Uponor, Inc. Page 2 ROSHAK AT RIVER TERRACE- One Head Calculation (H.16) Date 8/14/2020 City Water Supply: Demand: C1 - Static Pressure : 55 D1 - Elevation : 12.127 C2- Residual Pressure: 50 D2 - System Flow : 13.001 C2- Residual Flow : 300 D2 - System Pressure : 28.328 Hose ( Demand ) D3 -System Demand : 13.001 Safety Margin : 26.657 150 140 130 P 120 R 110 E 100 S 90 S 80 U 70 R 60 d C1 C2 E 50 _ 40 D2 30 G 20 10 Dt . I . . . . . 50 100 150 200 250 300 350 400 450 FLOW ( NA1.85) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Uponor, Inc. Page 3 ROSHAK AT RIVER TERRACE- One Head Calculation (H.16) Date 8/14/2020 _ Fitting Legend Abbrev. Name % % 1 1'% 1'/ 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G NFPA 13 Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 D 0 0 0 0 0 0 D 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a*show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a *will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA Uponor, Inc. Page 4 ROSHAK AT RIVER TERRACE-One Head Calculation (H.16) Date 8/14/2020 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 55.0 50 300.0 54.985 13.0 28.328 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.16 128.0 4.9 7.04 13.0 T.32 128.0 7.63 T.25 118.0 12.29 T.24 108.0 16.9 T.19 108.0 17.07 S.1 104.0 19.62 MTR 100.0 26.1 STR 100.0 28.33 H.15 128.0 7.33 T.34 128.0 7.57 T.35 118.0 12.25 T.36 108.0 16.78 T.33 108.0 16.83 H.11 128.0 7.59 H.9 128.0 7.64 H.6 128.0 7.71 T.23 128.0 7.76 T.21 118.0 12.32 T.27 128.0 7.65 H.5 128.0 7.69 T.20 128.0 7.72 T.17 128.0 7.75 T.18 118.0 12.24 H.2 118.0 12.25 H.3 118.0 12.27 T.22 118.0 12.29 H.1 128.0 7.75 H.4 128.0 7.76 H.7 118.0 12.25 T.29 118.0 12.25 H.13 118.0 12.26 H.14 118.0 12.27 T.39 118.0 12.27 T.40 118.0 12.29 T.37 108.0 16.78 H.12 108.0 16.79 H.8 118.0 12.29 T.26 118.0 12.29 T.31 118.0 12.29 H.10 118.0 12.29 T.38 108.0 16.78 Computer Programs by Hydratec Inc. Route 111 Windham N.H.USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 5 ROSHAK AT RIVER TERRACE - One Head Calculation (H.16) Date 8/14/2020 Nodel Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf *Remote Head to Supply H.16 128 4.90 6.33 1 Utr 2.0 20.000 150 7.040 to 0.0 2.000 0.0 T.32 128 6.33 0.862 0.0 22.000 0.0267 0.587 Vel = 3.48 T.32 128 -2.82 1 Utb 17.0 23.000 150 7.627 to 0.0 14.000 4.331 T.25 118 3.51 0.862 0.0 37.000 0.0090 0.332 Vel = 1.93 T.25 118 -0.06 1 Utr 2.0 16.000 150 12.290 to Utb 17.0 16.000 4.331 T.24 108 3.45 0.862 0.0 32.000 0.0087 0.278 Vel= 1.90 T.24 108 5.08 1.25 Utr 4.0 6.000 150 16.899 to 0.0 4.000 0.0 T.19 108 8.53 1.054 0.0 10.000 0.0174 0.174 Vel= 3.14 T.19 108 4.47 1.25 Utr 4.0 15.000 150 17.073 to T 2.44 6.440 1.732 S.1 104 13.0 1.054 0.0 21.440 0.0380 0.814 Vel= 4.78 S.1 104 0.0 1.5 2E 3.443 100.000 150 19.619 to 0.0 3.443 4.732 ** Fixed Loss=3 MTR 100 13.0 1.244 0.0 103.443 0.0169 1.751 Vel = 3.43 MTR 100 0.0 1 E 2.336 35.000 150 26.102 to T 5.841 9.345 0.0 STR 100 13.0 0.995 G 1.168 44.345 0.0502 2.226 Vel = 5.36 0.0 STR 13.00 28.328 K Factor= 2.44 *New Path H.16 128 6.67 1 0.0 10.000 150 7.040 to 0.0 0.0 0.0 H.15 128 6.67 0.862 0.0 10.000 0.0294 0.294 Vel= 3.67 H.15 128 0.0 1 Utr 2.0 6.000 150 7.334 to 0.0 2.000 0.0 T.34 128 6.67 0.862 0.0 8.000 0.0294 0.235 Vel= 3.67 T.34 128 -2.84 1 Utr 2.0 17.000 150 7.569 to Utb 17.0 16.000 4.331 T.35 118 3.83 0.862 0.0 33.000 0.0105 0.347 Vel = 2.11 T.35 118 -0.96 1 Utb 17.0 18.796 150 12.247 to 0.0 14.000 4.331 T.36 108 2.87 0.862 0.0 32.796 0.0062 0.203 Vel = 1.58 T.36 108 0.57 1 Utr 2.0 4.000 150 16.781 to 0.0 2.000 0.0 T.33 108 3.44 0.862 0.0 6.000 0.0087 0.052 Vel = 1.89 T.33 108 1.63 1.25 0.0 10.000 150 16.833 to 0.0 0.0 0.0 T.24 108 5.07 1.054 0.0 10.000 0.0066 0.066 Vel = 1.86 0.0 T.24 5.07 16.899 K Factor= 1.23 *New Path T.34 128 2.84 1 Utr 2.0 2.000 150 7.569 to 0.0 2.000 0.0 H.11 128 2.84 0.862 0.0 4.000 0.0060 0.024 Vel = 1.56 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 6 ROSHAK AT RIVER TERRACE-One Head Calculation (H.16) Date 8/14/2020 Node1 Elevi K Qa Nom Fitting Pipe CFact Pt to ar Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf H.11 128 0.0 1 Utr 2.0 6.000 150 7.593 to 0.0 2.000 0.0 H.9 128 2.84 0.862 0.0 8.000 0.0060 0.048 Vel= 1.56 H.9 128 0.0 1 Utr 2.0 9.000 150 7.641 to 0.0 2.000 0.0 H.6 128 2.84 0.862 0.0 11.000 0.0061 0.067 Vel = 1.56 H.6 128 0.0 1 Utr 2.0 6.000 150 7.708 to 0.0 2.000 0.0 T.23 128 2.84 0.862 0.0 8.000 0.0060 0.048 Vel = 1.56 T.23 128 0.54 1 Utb 17.0 14.000 150 7.756 to 0.0 14.000 4.331 T.21 118 3.38 0.862 0.0 28.000 0.0084 0.234 Vel = 1.86 T.21 118 1.09 1 Utr 2.0 14.000 150 12.321 to Utb 17.0 16.000 4.331 T.19 108 4.47 0.862 0.0 30.000 0.0140 0.421 Vel = 2.46 0.0 T.19 4.47 17.073 K Factor= 1.08 *New Path T.32 128 2.82 1 Utr 2.0 2.000 150 7.627 to 0.0 2.000 0.0 T.27 128 2.82 0.862 0.0 4.000 0.0060 0.024 Vel = 1.55 T.27 128 0.0 1 Utr 2.0 4.000 150 7.651 to 0.0 2.000 0.0 H.5 128 2.82 0.862 0.0 6.000 0.0060 0.036 Vel= 1.55 H.5 128 0.0 1 Utr 2.0 4.000 150 7.687 to 0.0 2.000 0.0 T.20 128 2.82 0.862 0.0 6.000 0.0060 0.036 Vet= 1.55 T.20 128 0.0 1 Utr 2.0 2.000 150 7.723 to 0.0 2.000 0.0 T.17 128 2.82 0.862 0.0 4.000 0.0060 0.024 Vel= 1.55 T.17 128 -0.54 1 2Utb 34.0 12.000 150 7.747 to 0.0 28.000 4.331 T.18 118 2.28 0.862 0.0 40.000 0.0040 0.162 Vel = 1.25 T.18 118 -0.92 1 Utr 2.0 7.000 150 12.240 to 0.0 2.000 0.0 H.2 118 1.36 0.862 0.0 9.000 0.0016 0.014 Vel= 0.75 H.2 118 0.0 1 Utr 2.0 9.000 150 12.254 to 0.0 2.000 0.0 H.3 118 1.36 0.862 0.0 11.000 0.0015 0.017 Vel= 0.75 H.3 118 0.0 1 Utr 2.0 10.000 150 12.271 to 0.0 2.000 0.0 T.22 118 1.36 0.862 0.0 12.000 0.0015 0.018 Vel = 0.75 T.22 118 -0.26 1 2Utb 34.0 2.000 150 12.289 to 0.0 28.000 0.0 T.21 118 1.1 0.862 0.0 30.000 0.0011 0.032 Vel = 0.60 0.0 T.21 1.10 12.321 K Factor= 0.31 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 7 ROSHAK AT RIVER TERRACE - One Head Calculation (H.16) Date 8/14/2020 Nadel Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf *New Path T.17 128 0.54 1 Utr 2.0 13.000 150 7.747 to 0.0 2.000 0.0 H.1 128 0.54 0.862 0.0 15.000 0.0003 0.004 Vel = 0.30 H.1 128 0.0 1 Utr 2.0 11.000 150 7.751 to 0.0 2.000 0.0 H.4 128 0.54 0.862 0.0 13.000 0.0003 0.004 Vel= 0.30 H.4 128 0.0 1 Utr 2.0 2.000 150 7.755 to 0.0 2.000 0.0 T.23 128 0.54 0.862 0.0 4.000 0.0002 0.001 Vel= 0.30 0.0 T.23 0.54 7.756 K Factor= 0.19 *New Path T.18 118 0.93 1 Utr 2.0 8.000 150 12.240 to 0.0 2.000 0.0 H.7 118 0.93 0.862 0.0 10.000 0.0008 0.008 Vel= 0.51 H.7 118 0.0 1 Utr 2.0 3.000 150 12.248 to 0.0 2.000 0.0 T.29 118 0.93 0.862 0.0 5.000 0.0006 0.003 Vel = 0.51 T.29 118 0.0 1 Utr 2.0 14.000 150 12.251 to 0.0 2.000 0.0 H.13 118 0.93 0.862 0.0 16.000 0.0008 0.013 Vel= 0.51 H.13 118 0.0 1 Utr 2.0 9.000 150 12.264 to 0.0 2.000 0.0 H.14 118 0.93 0.862 0.0 11.000 0.0007 0.008 Vel = 0.51 H.14 118 0.0 1 0.0 1.000 150 12.272 to 0.0 0.0 0.0 T.39 118 0.93 0.862 0.0 1.000 0.0010 0.001 Vel = 0.51 T.39 118 0.95 1 Utr 2.0 5.000 150 12.273 to 0.0 2.000 0.0 T.40 118 1.88 0.862 0.0 7.000 0.0029 0.020 Vel = 1.03 T.40 118 0.32 1 2Utb 34.0 13.000 150 12.293 to 0.0 28.000 4.331 T.37 108 2.2 0.862 0.0 41.000 0.0038 0.154 Vel = 1.21 T.37 108 -0.57 1 Utr 2.0 2.000 150 16.778 to 0.0 2.000 0.0 H.12 108 1.63 0.862 0.0 4.000 0.0022 0.009 Vel = 0.90 H.12 108 0.0 1 Utb 17.0 5.000 150 16.787 to Utr 2.0 16.000 0.0 T.33 108 1.63 0.862 0.0 21.000 0.0022 0.046 Vel = 0.90 0.0 T.33 1.63 16.833 K Factor= 0.40 *New Path T.35 118 0.96 1 2Utb 34.0 4.000 150 12.247 to 0.0 28.000 0.0 T.39 118 0.96 0.862 0.0 32.000 0.0008 0.026 Vel= 0.53 0.0 Computer Programs by Hydratec Inc. Route 111 Windham N.H.USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 8 ROSHAK AT RIVER TERRACE-One Head Calculation (H.16) Date 8/14/2020 Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf T.39 0.96 12.273 K Factor= 0.27 *New Path T.22 118 0.26 1 Utr 2.0 4.000 150 12.289 to 0.0 2.000 0.0 H.8 118 0.26 0.862 0.0 6.000 0.0002 0.001 Vel = 0.14 H.8 118 0.0 1 Utr 2.0 3.000 150 12.290 to 0.0 2.000 0.0 T.26 118 0.26 0.862 0.0 5.000 0 0.0 Vel = 0.14 T.26 118 0.06 1 Utr 2.0 1.000 150 12.290 to 0.0 2.000 0.0 T.31 118 0.32 0.862 0.0 3.000 0 0.0 Vel = 0.18 T.31 118 0.0 1 Utr 2.0 9.000 150 12.290 to 0.0 2.000 0.0 H.10 118 0.32 0.862 0.0 11.000 0.0002 0.002 Vel = 0.18 H.10 118 0.0 1 Utr 2.0 8.000 150 12.292 to 0.0 2.000 0.0 T.40 118 0.32 0.862 0.0 10.000 0.0001 0.001 Vel= 0.18 0.0 T.40 0.32 12.293 K Factor= 0.09 *New Path T.25 118 0.06 1 2Utb 34.0 2.000 150 12.290 to 0.0 28.000 0.0 T.26 118 0.06 0.862 0.0 30.000 0 0.0 Vel = 0.03 0.0 T.26 0.06 12.290 K Factor= 0.02 *New Path T.37 108 0.57 1 0.0 3.000 150 16.778 to 0.0 0.0 0.0 T.38 108 0.57 0.862 0.0 3.000 0.0003 0.001 Vel = 0.31 T.38 108 0.0 1 Utr 2.0 3.000 150 16.779 to 0.0 2.000 0.0 T.36 108 0.57 0.862 0.0 5.000 0.0004 0.002 Vel = 0.31 0.0 T.36 0.57 16.781 K Factor= 0.14 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 I here by certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am NICET Certifie r r i V v E J DEC 15 2r20 Brent Kotula Date: /2020 CITY OF TIGARD NICET Certification No. 113889 BUiLD�NG DIVISION Water-Based Systems Layout - Level IV Certification Expires: June 1, 2023 uponor AquaSAFETM Fire Safety System OFFICE COPY Uponor, Inc. 5925 148th Street West Apple Valley, MN 55124 800-321-4739 Job Name : ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15& H.11) Drawing : RESIDENTIAL Location : PLAN E-8 TIGARD OR Remote Area : 1 Contract : U190805-01 Data File : U190805-01 Roshak at River Terrace E-8.wx2 Date/Time : 08/14/2020- 10:49 AM Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Uponor, Inc. Page 1 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15&H.11) Date 8/14/2020 HYDRAULIC DESIGN INFORMATION SHEET Name - ROSHAK AT RIVER TERRACE Date - 8-9-2019 Location - TIGARD OR Building - RESIDENTIAL System No. - 1 Contractor - WOLCOTT PLUMBING Contract No. - U190805-01 Calculated By - NOAH EAKMAN Drawing No. - x Construction: (X) Combustible ( ) Non-Combustible Ceiling Height x OCCUPANCY - RESIDENTIAL S Type of Calculation: ( )NFPA 13 Residential ( )NFPA 13R (X)NFPA 13D Y Number of Sprinklers Flowing: ( )1 (X)2 ( ) 4 ( ) S ( Other T ( ) Specific Ruling Made by Date E M Listed Flow at Start Point - 13 Gpm System Type Listed Pres. at Start Point - 7.04 Psi (X) Wet ( ) Dry D MAXIMUM LISTED SPACING 16 x 16 ( ) Deluge ( ) PreAction E Domestic Flow Added - 0 Gpm Sprinkler or Nozzle S Additional Flow Added - Gpm Make SENJU Model RC-RES I Elevation at Highest Outlet - 128 Feet Size 7/16 K-Factor 4.9 G Note: Temperature Rating 162 N Calculation Gpm Required 26.0717 Psi Required 43.3 At Ref Pt STR Summary C-Factor Used: Overhead 150 Underground 150 W Water Flow Test: Pump Data: Tank or Reservoir: A Date of Test - x Rated Cap. Cap. T Time of Test - x @ Psi Elev. E Static (Psi) - 55 Elev. R Residual (Psi) - 50 Other Well Flow (Gpm) - 300 Proof Flow Gpm S Elevation - 100 F Location: x P L Source of Information: x Y Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve C Uponor, Inc. Page 2 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15 & H.11) Date 8/14/2020 City Water Supply: Demand: C1 - Static Pressure : 55 D1 - Elevation : 12.127 C2- Residual Pressure: 50 D2-System Flow : 26.072 C2- Residual Flow : 300 D2 -System Pressure : 43.303 Hose ( Demand ) D3 -System Demand : 26.072 Safety Margin : 11.643 150 140 130 P 120 R 110 E 100 S 90 S 80 U 70 R 60 Cl C2 E 50 D2 - - 40 30 20 10 D1 . I . . . . . 50 100 150 200 250 300 350 400 450 FLOW ( N ^ 1.85 ) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Uponor, Inc. Page 3 _ ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15& H.11) Date 8/14/2020 Fitting Legend Abbrev. Name % % 1 1% 1% 2 2% 3 3/ 4 5 6 8 10 12 14 16 18 20 24 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G NFPA 13 Gate Valve 1 1 1 1 1 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Utb* Aquapex Tee-Branch 2 17 14 9 12 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Utr* Aquapex Tee-Run 1 2 2 4 2 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with*. The fittings marked with a*show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a* will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Flow Summary - NFPA Uponor, Inc. Page 4 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15 &H.11) Date 8/14/2020 SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure STR 55.0 50 300.0 54.946 26.07 43.303 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes H.15 128.0 4.9 7.04 13.0 H.16 128.0 7.47 T.32 128.0 8.42 T.25 118.0 13.57 T.24 108.0 18.85 T.19 108.0 19.48 S.1 104.0 24.16 MTR 100.0 35.24 STR 100.0 43.3 T.34 128.0 7.17 T.35 118.0 13.23 T.36 108.0 18.4 T.33 108.0 18.6 H.11 128.0 4.9 7.12 13.07 H.9 128.0 7.5 H.6 128.0 8.04 T.23 128.0 8.42 T.21 118.0 13.64 T.27 128.0 8.44 H.5 128.0 8.46 T.20 128.0 8.49 T.17 128.0 8.51 T.18 118.0 13.36 H.2 118.0 13.41 H.3 118.0 13.47 T.22 118.0 13.54 H.4 128.0 8.44 H.1 128.0 8.47 T.39 118.0 13.44 T.40 118.0 13.54 T.37 108.0 18.4 H.12 108.0 18.43 H.7 118.0 13.38 T.29 118.0 13.39 H.13 118.0 13.42 H.14 118.0 13.44 H.8 118.0 13.54 T.26 118.0 13.54 H.10 118.0 13.54 T.31 118.0 13.54 T.38 108.0 18.4 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 5 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15&H.11) Date 8/14/2020 Nodel Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf *Remote Head to Supply H.15 128 4.90 8.20 1 0.0 10.000 150 7.040 to 0.0 0.0 0.0 H.16 128 8.2 0.862 0.0 10.000 0.0430 0.430 Vel= 4.51 H.16 128 0.0 1 Utr 2.0 20.000 150 7.470 to 0.0 2.000 0.0 T.32 128 8.2 0.862 0.0 22.000 0.0430 0.946 Vel = 4.51 T.32 128 -2.47 1 Utb 17.0 23.000 150 8.416 to 0.0 14.000 4.331 T.25 118 5.73 0.862 0.0 37.000 0.0222 0.822 Vel = 3.15 T.25 118 0.98 1 Utr 2.0 16.000 150 13.569 to Utb 17.0 16.000 4.331 T.24 108 6.71 0.862 0.0 32.000 0.0297 0.950 Vel = 3.69 T.24 108 10.42 1.25 Utr 4.0 6.000 150 18.850 to 0.0 4.000 0.0 T.19 108 17.13 1.054 0.0 10.000 0.0632 0.632 Vel= 6.30 T.19 108 8.94 1.25 Utr 4.0 15.000 150 19.482 to T 2.44 6.440 1.732 S.1 104 26.07 1.054 0.0 21.440 0.1375 2.947 Vel = 9.59 S.1 104 0.0 1.5 2E 3.443 100.000 150 24.161 to 0.0 3.443 4.732 ** Fixed Loss= 3 MTR 100 26.07 1.244 0.0 103.443 0.0613 6.342 Vel = 6.88 MTR 100 0.0 1 E 2.336 35.000 150 35.235 to T 5.841 9.345 0.0 STR 100 26.07 0.995 G 1.168 44.345 0.1819 8.068 Vel = 10.76 0.0 STR 26.07 43.303 K Factor= 3.96 *New Path H.15 128 4.81 1 Utr 2.0 6.000 150 7.040 to 0.0 2.000 0.0 T.34 128 4.81 0.862 0.0 8.000 0.0160 0.128 Vel = 2.64 T.34 128 4.33 1 Utr 2.0 17.000 150 7.168 to Utb 17.0 16.000 4.331 T.35 118 9.14 0.862 0.0 33.000 0.0526 1.735 Vel = 5.02 T.35 118 -2.96 1 Utb 17.0 18.796 150 13.234 to 0.0 14.000 4.331 T.36 108 6.18 0.862 0.0 32.796 0.0255 0.836 Vel= 3.40 T.36 108 0.91 1 Utr 2.0 4.000 150 18.401 to 0.0 2.000 0.0 T.33 108 7.09 0.862 0.0 6.000 0.0328 0.197 Vel= 3.90 T.33 108 3.33 1.25 0.0 10.000 150 18.598 to 0.0 0.0 0.0 T.24 108 10.42 1.054 0.0 10.000 0.0252 0.252 Vel = 3.83 0.0 T.24 10.42 18.850 K Factor= 2.40 *New Path T.34 128 -4.33 1 Utr 2.0 2.000 150 7.168 to 0.0 2.000 0.0 H.11 128 -4.33 0.862 0.0 4.000 -0.0132 -0.053 Vel = 2.38 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 6 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15&H.11) Date 8/14/2020 Nadel Elevl K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf H.11 128 4.90 13.07 1 Utr 2.0 6.000 150 7.115 to 0.0 2.000 0.0 H.9 128 8.74 0.862 0.0 8.000 0.0485 0.388 Vel = 4.80 H.9 128 0.0 1 Utr 2.0 9.000 150 7.503 to 0.0 2.000 0.0 H.6 128 8.74 0.862 0.0 11.000 0.0485 0.533 Vel= 4.80 H.6 128 0.0 1 Utr 2.0 6.000 150 8.036 to 0.0 2.000 0.0 T.23 128 8.74 0.862 0.0 8.000 0.0485 0.388 Vel= 4.80 T.23 128 -1.82 1 Utb 17.0 14.000 150 8.424 to 0.0 14.000 4.331 T.21 118 6.92 0.862 0.0 28.000 0.0315 0.881 Vel= 3.80 T.21 118 2.02 1 Utr 2.0 14.000 150 13.636 to Utb 17.0 16.000 4.331 T.19 108 8.94 0.862 0.0 30.000 0.0505 1.515 Vel= 4.91 0.0 T.19 8.94 19.482 K Factor= 2.03 *New Path T.32 128 2.46 1 Utr 2.0 2.000 150 8.416 to 0.0 2.000 0.0 T.27 128 2.46 0.862 0.0 4.000 0.0048 0.019 Vel= 1.35 T.27 128 0.0 1 Utr 2.0 4.000 150 8.435 to 0.0 2.000 0.0 H.5 128 2.46 0.862 0.0 6.000 0.0047 0.028 Vel= 1.35 H.5 128 0.0 1 Utr 2.0 4.000 150 8.463 to 0.0 2.000 0.0 T.20 128 2.46 0.862 0.0 6.000 0.0047 0.028 Vel= 1.35 T.20 128 0.0 1 Utr 2.0 2.000 150 8.491 to 0.0 2.000 0.0 T.17 128 2.46 0.862 0.0 4.000 0.0045 0.018 Vel = 1.35 T.17 128 1.82 1 2Utb 34.0 12.000 150 8.509 to 0.0 28.000 4.331 T.18 118 4.28 0.862 0.0 40.000 0.0130 0.518 Vel = 2.35 T.18 118 -1.54 1 Utr 2.0 7.000 150 13.358 to 0.0 2.000 0.0 H.2 118 2.74 0.862 0.0 9.000 0.0057 0.051 Vel= 1.51 H.2 118 0.0 1 Utr 2.0 9.000 150 13.409 to 0.0 2.000 0.0 H.3 118 2.74 0.862 0.0 11.000 0.0056 0.062 Vel= 1.51 H.3 118 0.0 1 Utr 2.0 10.000 150 13.471 to 0.0 2.000 0.0 T.22 118 2.74 0.862 0.0 12.000 0.0057 0.068 Vel= 1.51 T.22 118 -0.72 1 2Utb 34.0 2.000 150 13.539 to 0.0 28.000 0.0 T.21 118 2.02 0.862 0.0 30.000 0.0032 0.097 Vel = 1.11 0.0 T.21 2.02 13.636 K Factor= 0.55 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 7 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15&H.11) Date 8/14/2020 Nodel Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf *New Path T.23 128 1.82 1 Utr 2.0 2.000 150 8.424 to 0.0 2.000 0.0 H.4 128 1.82 0.862 0.0 4.000 0.0028 0.011 Vel = 1.00 H.4 128 0.0 1 Utr 2.0 11.000 150 8.435 to 0.0 2.000 0.0 H.1 128 1.82 0.862 0.0 13.000 0.0026 0.034 Vel = 1.00 H.1 128 0.0 1 Utr 2.0 13.000 150 8.469 to 0.0 2.000 0.0 T.17 128 1.82 0.862 0.0 15.000 0.0027 0.040 Vel = 1.00 0.0 T.17 1.82 8.509 K Factor= 0.62 *New Path T.35 118 2.96 1 2Utb 34.0 4.000 150 13.234 to 0.0 28.000 0.0 T.39 118 2.96 0.862 0.0 32.000 0.0065 0.209 Vel= 1.63 T.39 118 1.54 1 Utr 2.0 5.000 150 13.443 to 0.0 2.000 0.0 T.40 118 4.5 0.862 0.0 7.000 0.0141 0.099 Vel= 2.47 T.40 118 -0.26 1 2Utb 34.0 13.000 150 13.542 to 0.0 28.000 4.331 T.37 108 4.24 0.862 0.0 41.000 0.0127 0.522 Vel = 2.33 T.37 108 -0.91 1 Utr 2.0 2.000 150 18.395 to 0.0 2.000 0.0 H.12 108 3.33 0.862 0.0 4.000 0.0082 0.033 Vel = 1.83 H.12 108 0.0 1 Utb 17.0 5.000 150 18.428 to Utr 2.0 16.000 0.0 T.33 108 3.33 0.862 0.0 21.000 0.0081 0.170 Vel= 1.83 0.0 T.33 3.33 18.598 K Factor= 0.77 *New Path T.18 118 1.55 1 Utr 2.0 8.000 150 13.358 to 0.0 2.000 0.0 H.7 118 1.55 0.862 0.0 10.000 0.0020 0.020 Vel = 0.85 H.7 118 0.0 1 Utr 2.0 3.000 150 13.378 to 0.0 2.000 0.0 T.29 118 1.55 0.862 0.0 5.000 0.0020 0.010 Vel= 0.85 T.29 118 0.0 1 Utr 2.0 14.000 150 13.388 to 0.0 2.000 0.0 H.13 118 1.55 0.862 0.0 16.000 0.0019 0.031 Vel = 0.85 H.13 118 0.0 1 Utr 2.0 9.000 150 13.419 to 0.0 2.000 0.0 H.14 118 1.55 0.862 0.0 11.000 0.0020 0.022 Vel = 0.85 H.14 118 0.0 1 0.0 1.000 150 13.441 to 0.0 0.0 0.0 T.39 118 1.55 0.862 0.0 1.000 0.0020 0.002 Vel= 0.85 0.0 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations : Hazen-Williams Uponor, Inc. Page 8 ROSHAK AT RIVER TERRACE-Two Head Calculation (H.15& H.11) Date 8/14/2020 Nadel Elevl K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Egiv Len Total Pf/Ft Pf T.39 1.55 13.443 K Factor= 0.42 *New Path T.22 118 0.71 1 Utr 2.0 4.000 150 13.539 to 0.0 2.000 0.0 H.8 118 0.71 0.862 0.0 6.000 0.0005 0.003 Vel = 0.39 H.8 118 0.0 1 Utr 2.0 3.000 150 13.542 to 0.0 2.000 0.0 T.26 118 0.71 0.862 0.0 5.000 0.0004 0.002 Vel= 0.39 T.26 118 0.27 1 2Utb 34.0 2.000 150 13.544 to 0.0 28.000 0.0 T.25 118 0.98 0.862 0.0 30.000 0.0008 0.025 Vel= 0.54 0.0 T.25 0.98 13.569 K Factor= 0.27 *New Path T.40 118 0.26 1 Utr 2.0 8.000 150 13.542 to 0.0 2.000 0.0 H.10 118 0.26 0.862 0.0 10.000 0.0001 0.001 Vel = 0.14 H.10 118 0.0 1 Utr 2.0 9.000 150 13.543 to 0.0 2.000 0.0 T.31 118 0.26 0.862 0.0 11.000 0.0001 0.001 Vel = 0.14 T.31 118 0.0 1 Utr 2.0 1.000 150 13.544 to 0.0 2.000 0.0 T.26 118 0.26 0.862 0.0 3.000 0 0.0 Vel = 0.14 0.0 T.26 0.26 13.544 K Factor= 0.07 *New Path T.37 108 0.91 1 0.0 3.000 150 18.395 to 0.0 0.0 0.0 T.38 108 0.91 0.862 0.0 3.000 0.0007 0.002 Vel = 0.50 T.38 108 0.0 1 Utr 2.0 3.000 150 18.397 to 0.0 2.000 0.0 T.36 108 0.91 0.862 0.0 5.000 0.0008 0.004 Vel = 0.50 0.0 T.36 0.91 18.401 K Factor= 0.21 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 �-�rr� r4- Uponor, Inc nECEI V �- Estimate Cover 5925 148th Street West Roshak E-8 DEC 15 222„�0 Apple Valley, MN 55124 CITY OF TIGARD SaIeSR e in 14 Hollabaugh Brothers &Associates, Inc. 3028 17Th Avenue SE Portland, OR 97202 OFFICE COPY Project Summary Project Number: U190805-01 Project Name: Roshak at River Terrace E-8 Close Date: August 14, 2020 MainSystemPLBG-Qty = 1 MainSystemFP-Qty= 1 Quotation Terms And Conditions Important Comments: This quote is list price by residential unit only. Please consult you wholesaler or distributor for price multipliers. Construction changes to homes will require a revised quote upon request only. Where fire protection plans show plumbing layouts this quote includes that material. Tools Uponor requires that a sprinkler flow test be performed on every fire sprinkler system installation.A bucket test is the recommended method to verify the system -see instructions and detail on plans. A special SPRINKLER WRENCH is needed to connect sprinklers to their fittings. Some jurisdictions require that wrenches be left with the homeowner after installation. If wrenches are needed see last page of material list for part numbers. Pricing can be found in your Uponor catalog. Created using Hydratec, Inc. HydraBID Uponor, Inc Estimate Details 5925 148th Street West MainSystemPLBG Per Unit (Qty. 1) Apple Valley, MN 55124 Wirsbo AQUAPEX Tubing Part Number Description Quantity Unit Unit Cost Total Cost 111111/111111 F3040500 1/2" Uponor AquaPEX Blue 100-ft. coil 1.2 EA 82.00 98.40 F3040750 3/4" Uponor AquaPEX Blue 100-ft. coil 0.2 EA 142.00 28.40 ProPEX Rings Part Number Description Quantity Unit Unit Cost Total Cost Q4690512 ProPEX Ring with Stop 1/2" 40 EA 0.35 14.00 Supports Part Number Description Quantity Unit Unit Cost Total Cost F7050750 Tube Talon (1/2" 5/8" 3/4" PEX) 100/bag 1 EA 33.00 33.00 A5750500 PEX Wall Support Bracket 1/2" and 3/4" 1 EA 7.75 7.75 A5250500 1/2" Plastic Bend Support 11 EA 2.16 23.76 EP Multi-port Tees Part Number Description Quantity Unit Unit Cost Total Cost Q2237550 314" EP Branch Multi-port Tee 3 outlets 2 EA 11.40 22.80 ProPEX Plugs Part Number Description Quantity Unit Unit Cost Total Cost Q4350500 ProPEX EP Plug for 1/2" PEX 10 EA 1.60 16.00 ProPEX Tees Part Number Description Quantity Unit Unit Cost Total Cost Q4755575 ProPEX EP Tee 1/2" PEX x 1/2" PEX x 3/4" PEX 1 EA 9.70 9.70 Unit Price $ 253.81 Page 3 Created using Hydratec, Inc. HydraBlD Uponor, Inc Estimate Details 5925 148th Street West MainSystemFP Per Unit (Qty. 1) Apple Valley, MN 55124 Fire Sprinkler Assemblies Part Number Description Quantity Unit Unit Cost Total Cost LF74970FC LF RC-RES (162°F) Flat Concealed Sprinkler 15 EA 56.50 847.50 LF RC-RES (205°F) Flat Concealed Sprinkler with White LF74971FW Cover Plate 1 EA 100.00 100.00 Concealed Flat Cover Plate for 162°F LF RC-RES Q70749WH Sprinkler 3 1/4" White 15 EA 30.60 459.00 Wirsbo AQUAPEX Tubing Part Number Description Quantity Unit Unit Cost Total Cost F1041000 1" UponorAquaPEX White 100-ft. coil 3.5 EA 246.75 863.63 F1061250 1 1/4" UponorAquaPEX White 100-ft. coil 0.4 EA 545.00 218.00 ProPEX Rings Part Number Description Quantity Unit Unit Cost Total Cost Q4690756 ProPEX Ring with Stop 3/4" 10 EA 0.71 7.10 Q4691000 ProPEX Ring with Stop 1" 100 EA 1.52 152.00 Q4691250 ProPEX Ring with Stop 1 1/4" 8 EA 1.73 13.84 Supports Part Number Description Quantity Unit Unit Cost Total Cost F7051000 Tube Talon (1" PEX) 50/bag 3 EA 40.90 122.70 ProPEX Adapters Part Number Description Quantity Unit Unit Cost Total Cost MOINEM ProPEX LF Brass Male Threaded Adapter 1" PEX x 1" LF4521010 NPT 2 EA 24.90 49.80 F7000005 Fire Sprinkler Adapter Push-on Nut 25/pkg. 1 EA 68.00 68.00 A7750700 Fire Sprinkler Adapter Mounting Bracket 3/4"and 1" 16 EA 10.90 174.40 ProPEX LF Brass Fire Sprinkler Adapter Tee 1" PEX x 1" LF7701010 PEX x 1/2" FNPT 16 EA 53.10 849.60 ProPEX Tees Part Number Description Quantity Unit Unit Cost Total Cost Q4751010 ProPEX EP Tee 1" PEX x 1" PEX x 1" PEX 14 EA 7.35 102.90 Q4751150 ProPEX EP Tee 1" PEX x 1" PEX x 1/2" PEX 2 EA 6.70 13.40 Q4751175 ProPEX EP Tee 1" PEX x 1" PEX x 3/4" PEX 3 EA 7.45 22.35 Page 4 Created using Hydratec, Inc. HydraBlD • Uponor, Inc Estimate Details 5925 148th Street West MainSystemFP Per Unit (Qty. 1) Apple Valley, MN 55124 Q4751311 ProPEX EP Tee 1 1/4" PEX x 1" PEX x 1" PEX 1 EA 15.70 15.70 Q4751331 ProPEX EP Tee 1 1/4" PEX x 1 1/4" PEX x 1" PEX 2 EA 16.20 32.40 A 1" RES RISER ASSY MUL PUR REL 1 EA 0.00 0.00 ProPEX Valves Part Number Description Quantity Unit Unit Cost Total Cost ProPEX LF Brass Commercial Ball Valve(full port) 1 1/4" LFC4821313 PEX x 1 1/4" PEX 1 EA 88.30 88.30 Tools Part Number Description Quantity Unit Unit Cost Total Cost Sprinkler Socket for LF RC-RES Sprinklers LF74970FC Q7500700 and LF74971 FW (See Uponor Catalog for pricing) 1 EA 0.00 0.00 Miscellaneous Part Number Description Quantity Unit Unit Cost Total Cost 1 1/2" PVC Elbow for 1" PEX Bend Support (See Uponor A5501000 Catalog for pricing) 2 EA 13.65 27.30 Screws#10 x 1 1/2" Pan Head Full Thread 100/pkg (See F7001500 Uponor Catalog for pricing) 1 EA 27.20 27.20 Unit Price $ 4,255.12 Page 5 Created using Hydratec, Inc. HydraBID