Loading...
Report a 78Lf sW v) r► pk Pt This design prepared from computer input by nl (9' v l 5 - 066(- Pacific Lumber and Truss-BC LUMBER SPECIFICATIONS TRUSS SPAN 31'- 0.0" IBC 2015 MAX MEMBER FORCES 4WR/DDF/Cq-1.00 TC: 2x4 DF 2400F LOAD DURATION INCREASE = 1.15 1- 2-1 01 35 2- 9=(-291) 2222 2- 3=1-2700) 337 BC: 2x4 OF 816BTR SPACED 24.0" O.C. 2- 3=1 0) 200 9-10=(-174) 1502 4- 9=) -368) 236 WEBS: 2x4 DE STAND 3- 4-f-2499) 330 10- 8=1-291) 2246 9- 5=( 0) 881 LOADING 4- 5=1-2288) 216 5-10=( 0) 893 TO LATERAL SUPPORT <= 12"OC. VON. LL( 25.0)+DL1 7.0) ON TOP CHORD = 32.0 PSF 5- 6=1-2309) 216 10- 6-( -380) 236 BC LATERAL SUPPORT <= 12"OC. VON. DL ON BOTTOM CHORD = 10.0 PSF 6- 7=1-2524) 330 7- 8=(-2649) 337 TOTAL LOAD - 42.0 PSF 7- 8-) 0) 77 LETINS: 3-00-00 3-00-00 Snow: ASCE 7-10, 25 PSF Roof Snow(Os) OVERHANGS: 9.6" 0.0" Cs-1, Ce=1, Ct=1.1, '=1 BEARING MAX VERT MAX BORE BRG REQUIRED BRG AREA LOCATIONS REACTIONS REACTIONS SIZE SQ.IN. (SPECIES) ADDL: BC CONC LL+DL= 75.0 LBS @ 13'- 6.0" 0'- 0.0" -155/ 1471V -82/ 86H 5.50" 2.35 DE ( 625) "` For hanger specs. - See approved plans ADDL: BC CONC LL+DL= 75.0 LBS @ 17.- 6.0" 31'- 0.0" -155/ 1410V 0/ OH 5.50" 2.26 DE ( 625) BOTTOM CHORD CHECKED FOR A 20 PSF LIMITED STORAGE II'_ LIVE LOAD AT LOCATION ISI SPECIFIED BY IBC 2015. 'COND. 2: Design checked for nett-5 tesfl uplift at 24 "oc spacing. City. of Tigard THE BOTTOM CHORD DEAD LOAD IS A MINIMUM OF 10 PSF. /`y�/ {-[�717)Tigard VERTICAL DEFLECTION LIMITS: LL=L/240, TL=L/180 App r re l Plans MAX TL DEFL = -0.001" @ 0'- -9.6" Allowed - 0.107" f� MAX TL DEFL = -0.001" @ 0'- -9.6" Allowed 0.107" / MAX LL DEFL = -0.188" 9 10'- 4.0" Allowed = 1.504" ®ate l� 'J 2 MAX TL DEFL - -0.351" 9 10'- 4.0" Allowed = 2.006" By (.r(� SEASONED LUMBER IN DRY SERVICE CONDITIONS MAX HORIZ. LL DEFL = 0.041" @ 30'- 6.5" MAX HORIZ. TL DEFL = 0.073" @ 30'- 6.5" f 15-06 , 15-06 f Design conforms to main windforce-resisting system and components and cladding criteria. 2-09-10 4-11-06 7-09 7-09 4-11-06 2-09-10 4 4 T 1' 'f f 1' Wind: 120 mph, h=22.6£t, TCDL=4.2,BCDL=6.0, ASCE 7-10, 12 12 (All Heights), Enclosed, Cat.2, Exp.B, MWFRS(Dir), 5.00 p M-4x6 4 5,00 load duration factor=1.6, Truss designed for wind loads 4.0" in the plane of the truss only. 5 ,--, OFFICE COPY M-1.5x3 M-1.5x3 �-r[T Ev I ST°N 111 tt` Eco veo M-3x6 M-3x6 MAR r 2 2020 CfTy ' ARD co CoBUILDIA 1 r/G 0 2 M-9x6 M-3x4 M-3x4 M-4x6 3 !G DIVISION M-3x6(3) y 10-09 y 10-04 +,5. y 10-04 y �‘Ep PROFFs y 12-00 y 19-00 y -S\� � AGINEF9 `S�o29 l ). 1' 0-09-10 31-00 89200PE JOB NAME : 22680 SAGEBUILT FRANKLIN - C3FAU Scale: 0.2040 , WARNINGS: GENERAL NOTES. online aremne noted WI ," I.Builder anderection acbr an awONwd ried oGenerald b.!d dal General T l Na . I. W down e i.Wsedadco prem y n the ms shoed distone indlwduel OREGON ry Truss: C3FAU end Waning bero co nduction cr em r. nrcomponent.Rapp dawn pew..compone rily da pew. a end waver 9L• li Dg A, 2.34 sodded.web bracing must be mewled when elm,... incorporation of=madam is tine reepenubitr of do building deign.. 3.Additional temporary bracing to insure abbliry dumq mneauc9on 2.Dew eseumse the top and bottom dime to be Wendy Wend of 1 is the...billy al.erector.Additional wrm.mmbrvdrq of Sa.c.and at 10'o.c reprtnrdy unless braced Mroghaut their length by O 41�0 (�P DATE: 2/25/2020 beaver')audue isth.mpomibhitn of thr bidding a.gn.r. 3.2v mnpaul ga,label br roll vs aong requywood ired Men.cm.• lNec7. pp �J SEQ.: K7403389 4.No bed should be applied m any component until O.al racing and 4.lremll.Aan of trues is the reapowdi4 of...dive mntreaur. Fl,rll�� fasteners ere complete end at no time should any leads getter then 6.Doge 0Yanra busses ere to be used in a mnrcbno.ive environment TRANS ID: LINK d.egnlmd.to applied to any mnmared. a De�.°gnrere sumeafull wring et en supports dawn.Snie dredgen 6.Lan„.Tmehasmmnbaloverandassuumenunrmpae.rdtyforth. RENEWAL DATE: 12-31-2021 e mbnmlon.handing.shipment end ins...Cl components roes..si.arum.to adequate bog, hoe'!welded a February 25,2020 6 PPIPAROA is SCSI, 409..gabled d,t llmeuomsed mho b: C.Plates endeemTNManmr Idea rtrues.and pleoedm their center 'J TPWd1LA n BL5l,copse of r6id,will be furnished upon repma 9.Ding gs ides who d sure51Sate innme MiTek USA,Inc.lCorlpuTrvs Software 7.7.0-SP3(,L)•E is.Far beer connector are design trues.ESN-1st,,ESN-,nee lMDex) 3/11/2020 RECEIVED To whom it may concern, MAR 1. 2 2020 Regarding furnace installation inside of roof truss diaphram: CITY Cr- TIGARD BUILDING DIVISION A platform built on top of the bottom chord of roof trusses shall be built in areas indicated on truss engineering page (C3 FAU). Each truss is designed to support an additional load of 150#. Platform to be built over enough trusses to support the weight of furnace unit and platform. (IE: 150# x3 = 450# ) I hope this clears up any question. Sincerely, Doug Minor DOUG MINOR TRUSS SALES dougm@paclumber corn CELL. 503-969-9266 Pacififumber & TRUSS COM►ANYI