Loading...
Report FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ 4 II Transmittal Letter T I G A R I) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: .---)-- --1CP DATE RECEIVED: DEPT: BUILDING DIVISION . : FROM: R0I59-4,7' !/l©12✓C Lam' FEB 2 61 2020 G' COMPANY: yD(14-t 1-J�*ea1:2-7/c�, BU1L1;; 'u 1) . ;:�! PHONE: 9w )8 7 S 115-D3 6 i4 V 2-3 By:fr— RE: 9—,�-- ,..5W SAklegLl/S St- 6 � (Site Address) (Permit�� Ree-ce c'c�44�-JJ (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. Revisions: Cross section(s) and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. — Engineer's calculations. Other(explain): Yl a /Z ��l� � 7C yla� .i REMARKS: —Apia e GP/o/-Gs P _ � r t do/o-, cia-ff ,qp.t /..-tfr---(a-- • FOR OFFICE USE ONLY Routed to Permit Technician: Date: Initials: Fees Due: ❑ Yes ❑ No Fee Description: Amount Due: $ $ $ Special Instructions: Reprint Permit(per PE): ❑ Yes ❑ No ❑ Done Applicant Notified: Date: Initials: l:\Bui lding\Fonns\TransmittalLetter-Revisions_061316.doc roRECEIVED FEB 6 2020 Transmittal #1 Yorke&Curtis CITY OF FIGARD Project:21804-Reece Security 4480 SW 101st Avenue 3UILDING DIVISION 6755 SW Sandburg Street Beaverton, Oregon 97005 Tigard,Oregon 97224 Phone: (503)646-2123 Phone:503-830-0307 Fax:(503)643-5531 Final Letters TO: JEFF GROVE FROM: Robert Morris(Yorke&Curtis,Inc.) BUILDING INSPECTOR 4480 SW 101st Ave CITY OF TIGARD Beaverton, Oregon 97005 CREATED DATE:02/26/2020 COPIES TO: Will Mott(Yorke&Curtis,Inc.),Robert Morris(Yorke&Curtis,Inc.) TRANSMIT: VIA: FOR: ACTION: Your Use Submit As Requested Transmittal Items DESCRIPTION FORMAT DATE COPIES Copy of EOR Final Letter Other 02/26/2020 1 Copy of Special Inspections Final Letter Other 02/26/2020 1 Copy of Geotech Final Letter Other 02/26/2020 1 Comments This package includes copy of: • EOR Final Letter • Special Inspections Final Letter • Geotech Final Letter BY DATE COPIES TO Yorke&Curtis Page 1 of 1 Printed On:02/26/2020 10:40 AM a � 4" K ip February 21, 2020 U City of Tigard Building Department 13125 SW Hall Blvd Tigard, OR 97223 15895 SW 72ND AvE SUITE 200 PORTLAND,OR 97224 Emily Hall PHONE:503.226.1285 25977 SW Canyon Creek Rd, Ste E FAX:503.226.1670 Wilsonville, OR 97070 INFO@CIDAINC.COM W W W.CIDAINC.COM RE: Reece Security 6755 SW Sandburg Street, Tigard, Oregon 97223 Building Permit Number. BUP2019-00038 CIDA Project Number 170300.01 Re: Structural Sign Off CIDA has conducted structural observations in accordance with the 2014 Oregon Structural Specialty Code and reviewed testing reports from independent testing agencies, for the above mentioned building project To the best of our knowledge, no deficiencies remain. Please do not hesitate to call if you have any questions. Sincerely, __ R�.-TUR oi'pnr "urtj'''r G 11V 4, It 63�PE 9 r.oe `B o Curtis Gagner P.E., S. . '�� ra,� PG�� Project Engineer d G ARCHITECTURE EXPIRES: : !©I ENGINEERING c: Leslie Jones, CIDA PLANNING File INTERIORS LANDSCAPE . 6. - o to ch solutions l nel SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-l8-I-cros To: Reece Security;ginar@ress.us; emilyh@rcss.us Visit Date: June 19, 2019 Arrival Time: 0720 Permit#: Weather: 55 cloudy Subject: Observe initial footing subgrades I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed the subgrade exposed at the north footing and the east half of the south footing,as well as in the west interior footing near the west wall. Soils consisted of generally stiff native silt conforming to our recommendations and suitable for footing support. The west interior footing was overdug and crushed rock will be placed and compacted to subgrade. Other footing excavation is ongoing, as well as the elevator pit,and Will requested a return visit Friday afternoon. Sincerely,f Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresam@yorkeandcurtis.com jennifer@cidainc.com samanthat@cidainc.com lesliej@cidainc.com jpilot@civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1 1 12 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 GE M1ctions I ncl February 7, 2020 reece-I8-I-cros Reece Holdings; ginar@ress.us cc: Iesliej( cidainc.com robertmc yorkeandcurtis.com GEOTECHNICAL ENGINEERING — COMPLIANCE LETTER 6755 SW Sandburg Street, Tigard, Oregon This letter summarizes our geotechnical services for the new Reece Security facility in Tigard, Oregon. We previously provided a geotechnical report for this project. Our services for construction included on-call geotechnical observation of site stripping and preparation, placement and compaction of structural fill, subgrades for foundations and slabs, and wheel rolling of pavement base rock. Monitoring was completed on a part-time, on-call basis for the aforementioned activities during our site visits completed between June 19, 2019 and November I, 2019. Based on our observations, the activities described above and documented in our site visit reports were completed in accordance with the intent of the project specifications and our recommendations. All of our visits were documented in site visit reports which have been provided previously and are attached to this letter for completeness. The Limitations of our report apply. If you have any questions, Iplease contact us. The Limitations of our report apply. If you have any questions, please contact us. Sincerely, �PRO/+� *614r • 44 -11" _ of Don Rondema, MS, PE, GE ' c.. Principal MOON / I. Expires 1201! O I in 20978 5 Springwater Road, Estacada, OR 97023 p 503.869.8679; don@geotechsolutionsinc.om cjj ��Soiutions 1 ncl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-18-1-cros To: Reece Security;ginar@ress.us; emilyh@rcss.us Visit Date: November I, 2019 Arrival Time: 10 Permit#: Weather: 50 sunny Subject: Observe pavement base rock wheel roll I arrived on-site at the request of Will with Yorke and Curtis and met with Will and NWCivilworks and relayed the following observations. I observed wheel rolling of the drive isles using a loaded dump truck, and observed equipment in the parking areas, including the heavy grader. Base rock was well graded and being compacted with a smooth drum roller. Only one area of unsuitable deflection was noted, roughly 50 feet NNE of the NW building corner in the center of the drive isle. The area was 3yards by 5 yards and I marked it in white paint. Excavation in the center revealed suitably stiff conditions at 18 inches,and I recommended the whole area be dug to this depth and replaced with the on site crushed rock. We will return to the site as called. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresamayorkeandcurtis.com jenniferb@cidainc.com samanthat@.cidainc.com lesliej(a..cidainc.com curtisg@cidainc.com jpilotacivilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1112 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 soiutions Incl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-I8-I-cros To: Reece Security; ginar@ress.us; emilyh@rcss.us Visit Date: October 9, 2019 Arrival Time: 1 155 Permit#: Weather: 48 sunny Subject: Observe south aggregate fleet area subgrade I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed generally medium stiff silt subgrade with occasional cobbles as fleet area subgrade (reference RFI 5 attached). This subgrade conforms to our design assumptions and recommendations. The fabric on site was Mirafi 140N and is too light and not suitable,and should be a 160n (equivalent to the Propex 601) or 180n,with the geogrid overlying it(Tensar BXSQ2020 or equivalent). The base rock will likely flow seasonal seepage through it and outlet in the base rock to the paved area,which should be intercepted by the storm line rock backfill to flow downgradient away from the building. We will return to the site as called. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresam(p�yorkeandcurtis.com jenniferb@.cidainc.com samanthat@cidainc.com lesliej@cidainc.com curtisg@cidainc.com jpilot@.civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1 1 12 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 h G Limns Inc/ April 16, 2019 reece-l8-l-cros Reece Holdings;ginararess.us cc: samanthatAcidainc.com; lesliejacidainc.com; chanaf(Cyorkeandcurtis.com GEOTECHNICAL ENGINEERING RFI/SUBMITTAL REVIEW- RFI #5 Fleet Parking—Aggregate Only Section 6755 SW Sandburg Street, Tigard, Oregon As requested this letter summarizes our review of RFI #5 for the project (attached) for an aggregate only fleet traffic support section. A section of 12 inches of base rock over geogrid over separation fabric is suitable for support of fleet vans and light 2-axle panel trucks for a design life of 10 years and an accepted rut depth of 2 inches over time. Fabric and geogrid must be per the geotech report (Propex 601 and Tensar BXSQ2020 or equivalents). This section assumes construction in dry weather conditions. Subgrade stabilization, including additional rock thickness and a 2nd layer of geogrid 6 inches above the base may be required depending on the timing of excavation and the actual conditions encountered, as well as any use as a construction haul road. The Limitations of our report apply. If you have any questions, please contact us. Sincerely, 4?7 -.-4 # , e..i,8axl# srlf • y Don Rondema, MS, PE, GE J 14 I Principal CMOS ! Expires 12/3t12O I III 1112 7th Street, Oregon City, OR 97045 ph 503.657.3487 fax 503.722.9946 III" RFI #5 Yorke&Curtis Project:21804-Reece Security 4480 SW 101st Avenue 6755 SW Sandburg Street Beaverton,Oregon 97005 Tigard,Oregon 97224 Phone: (503)646-2123 Phone:503-830-0307 Fax:(503)643-5531 Section of rock at fleet parking TO: Don Rondema(Geotech Solutions, Inc) FROM: Chana Frederick(Yorke&Curtis) Leslie Jones(CIDA) 4480 SW 101st Ave Beaverton, Oregon 97005 DATE INITIATED: 04/02/2019 STATUS: Open LOCATION: DUE DATE: 04/07/2019 PROJECT STAGE: Pre-Construction COST CODE: SUB JOB: SCHEDULE IMPACT: No COST IMPACT: TBD SPEC SECTION: DRAWING NUMBER: note 12 on C1.0 REFERENCE: LINKED DRAWINGS: RECEIVED FROM: Dwayne Nelson(Civil Works NW) COPIES TO: Chana Frederick(Yorke&Curtis), Emily Hall(Reece Complete Security Solutions),Will Mott(Yorke&Curtis) Question from Chana Frederick (Yorke & Curtis) at 11:55 AM on 04/02/2019 for the fleet parking,we have bid 6"of aggregate base. Is this an appropriate section for the intended use? Awaiting an Official Response All Replies: T `;'3 s .Tiron-'�a This section still needs to be provided by the geotechnical engineer based on the existing soil conditions. Attachments: BY DATE COPIES TO Yorke&Curtis Page 1 of 1 Printed On:04/16/2019 11:21 AM 5oiufions Inc! SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-I8-I-cros To: Reece Security; ginar@rcss.us; emilyh@rcss.us Visit Date: September 24, 2019 Arrival Time: 0945 Permit#: Weather: 62 sunny Subject: Observe south pavement area base rock and curb base and initial north parking subgrade I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed generally medium stiff silt subgrade with occasional cobbles in the central northern parking area,with stockpiled suitably clean and well graded Tigard 1/4"-0 ready to be placed to protect the subgrade. The northeast corner contained many very large basalt boulders/blocks to 8 feet in dimension that will require rock hammering to remove. A minimum of 4 inches of crushed rock cover is needed as base in those areas. I observed and probed the dense 1/4"-0 pavement base and curb base in the southern parking area. The rock is currently suitable and dense, but is not working blanket thickness,and care should be taken to prevent subgrade disturbance and softening prior to paving. We will return to the site as called. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresameyorkeandcurtis.com jenniferbecidainc.com samanthat@cidainc.com lesliej(ccidainc.com curtisg@cidainc.com jpilot@civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. I/1 1 1 12 7h Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 solutions 1ncl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-I8-I-cros To: Reece Security;ginar@rcss.us; emilyh@rcss.us Visit Date: July 26, 2019 Arrival Time: 0555 Permit#: Weather: 58 sunny Subject: Observe south pavement area subgrade I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed generally stiff silt fill subgrade in the eastern 2/3 of the stripped pavement subgrade area,with the western 1/3 remaining to be prepared. I noted to Will occasional root concentrations to be removed, as well as loose silt near the crest of the slopes down to the wall. Will said he would send photos of the remainder. I stated I"-0 recycled pcc would be suitable for use as backfill on the slope to the wall. Will stated one foot of crushed rock was to be used for base,and once it is installed and compacted we should be called to observe a wheel roll. We will return to the site as called. Sincerely, Don Rondema, MS, PE, GE Principal 11 Cc: wilInnayorkeandcurtis.com theresam@yorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej@cidainc.com curtisgacidainc.com jpilot(c civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. 1/1 1 1 12 76'Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 5oiutions Incl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-18-I-cros To: Reece Security;ginar@ress.us; emilyh@rcss.us Visit Date: July 10, 2019 Arrival Time: 0845 Permit#: Weather: 68 cloudy Subject: Observe south building wall backfill and block wall subgrade I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed well graded suitable crushed rock fill placed and compacted. Nuclear densometer pin driving in 3 locations indicated that suitable compaction was achieved in accordance with our recommendations. The southern block wall subgrade was excavated with crushed rock base over it and several blocks placed at the southernmost bend. Subgrade soils consisted of suitable medium stiff silt. Crushed rock base was also suitable,and the wall was battered back. We will return to the site as called. Sincerely, 1 Don Rondema, MS, PE, GE Principal Cc: willm(ayorkeandcurtis.com theresam(ayorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej(@cidainc.com curtise@cidainc.com jpilot@civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1 1 12 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 6e tech Solutions Inch SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-I8-I-cros To: Reece Security;ginar@rcss.us; emilyheress.us Visit Date: July 9, 2019 Arrival Time: 0740 Permit#: Weather: 65 cloudy Subject: Observe wall backfill I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed well graded suitable crushed rock fill being placed. Will stated the exterior lift was 6 inches which was suitable. The first lift on the inside was one foot,and compacted, and for the first lift nuclear densometer pin driving indicated the bottom six inches was loose. For this initial lift this is suitable, however,the second lift was being placed 2 feet thick. In order to achieve suitable compaction and reduce the risk of the fill settling away from the dowelled slab, I recommended 8-inch lifts. Will requested a return visit tomorrow morning to observe compaction of additional lifts. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm(cr7yorkeandcurtis.com theresam([yorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej@cidainc.com curtisg@cidainc.com jpilotacivilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. I/I 1112 7'Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 G ottechh Solutions I nel SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-18-I-cros To: Reece Security; ginar@ress.us; emilyh@rcss.us Visit Date: June 26, 2019 Arrival Time: 0545 Permit#: Weather: 55 cloudy Subject: Observe footing subgrades I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed the subgrade exposed at the SW corner along the remaining portion of the south footing. Soils consisted of medium stiff native silt soils conforming to our recommendations and suitable for footing support. I also observed the remaining footing subgrade at the previously recommended overexcavation and replacement adjacent to the elevator pit. Excavation was made to roughly one foot (as observed in the SW exposed corner) and probing indicated very dense suitably compacted crushed rock fill to subgrade, suitable for footing support. We will return to the site as called. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresamayorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej(acidainc.com curtisgc cidainc.com jpilot@civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1 1 12 7th Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 • 6Voiu# ions I ncl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-l8-I-cros To: Reece Security; ginararess.us; emilyh cf ress.us Visit Date: June 24, 2019 Arrival Time: 1240 Permit#: Weather: 70 sunny Subject: Observe footing subgrades I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed the subgrade exposed at the east corner footings,the SW corner,and the south footing from near the center to the west within IS feet of the SW corner. Subgrade generally consisted of stiff silt and crushed rock fill suitable for footing support.. Undocumented fill is present above the existing SW corner footing base, and adjoining footings will need to bear on these native soils below the fill. Will will call for a return visit to observe remaining footings and the previously recommended overexcavation and replacement adjacent to the elevator pit. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm(a(7yorkeandcurtis.com theresam@yorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej@cidainc.com curtisg(a.cidainc.com jpilotacivilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. I/I 1 1 12 7"Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 • Solutions I ncl SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-18-1-cros To: Reece Security; ginararess.us; emilyh@ress.us Visit Date: June 21, 2019 Arrival Time: 1325 Permit#: Weather: 70 cloudy Subject: Observe footing subgrades I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed the subgrade exposed on the west end of the south footing to within 15 feet of the west wall,the fill placed below the slab west of that terminus,the elevator pit, and the remaining interior footings. Subgrade generally consisted of stiff silt and crushed rock fill suitable for footing (and slab) support with one exception. The interior column subgrade adjacent to the northeast end of the elevator sump pit was soft to a depth of roughly one foot. I recommended that area be overexcavated and replaced with crushed rock structural fill. Will requested a return visit Monday afternoon to observe additional excavation to the southwest. Sincerely, f Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresam(@.yorkeandcurtis.com jenniferb@cidainc.com samanthat@cidainc.com lesliej@cidainc.com curtisg@cidainc.com ipilot(a)civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. Ill 1 1 12 76 Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 to ch G Soiufions Inc ! SITE VISIT REPORT: Reece Security, 6755 SW Sandburg Street, Tigard reece-18-I-cms To: Reece Security; ginar@rcss.us; emilyh(aress.us Visit Date: June 19, 2019 Arrival Time: 0720 Permit#: Weather: 55 cloudy Subject: Observe initial footing subgrades I arrived on-site at the request of Will with Yorke and Curtis and met with Will and relayed the following observations. I observed and probed the subgrade exposed at the north footing and the east half of the south footing, as well as in the west interior footing near the west wall. Soils consisted of generally stiff native silt conforming to our recommendations and suitable for footing support. The west interior footing was overdug and crushed rock will be placed and compacted to subgrade. Other footing excavation is ongoing, as well as the elevator pit, and Will requested a return visit Friday afternoon. Sincerely, Don Rondema, MS, PE, GE Principal Cc: willm@yorkeandcurtis.com theresam@yorkeandcurtis.com jennifer@cidainc.com samanthat@cidainc.com Iesliej@cidainc.com Jpilot@civilworksnw.com This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering services. We rely on the contractor to comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include quality control,and contractors and subcontractors have no right to rely on our services and reports. Our work does not include supervision or direction of the contractor,the contractor's employees,or agents. Our firm is not responsible for site safety. 1/1 1 112 7'Street, Oregon City, OR 97045 p 503.657.3487 f 503.722.9946 Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER February 11, 2020 Job#: T1906577 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: REECE SECURITY- EXPANSION & FACADE UPGRADE Address: 6755 SW Sandburg Street-Tigard, OR Permit#: BUP2019-00038 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s)per our inspection reports only: Reinforced Concrete Cast-In-Place Anchors, Adhesive Anchors &Screw Anchors Structural Steel High Strength Bolts Wood Construction Any non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the "As-Built Condition"or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. If CTI did not provide additional review or re-inspection of those items beyond the inspections that initially generated each of the non-compliance items, then the engineer of record has provided acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. P:\Projects\General12019\T1906577\02-11-2020 Final Letter.doc Updated 11/30/11 February 11, 2020 Job#: T1906577 Page 2 of 2 CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Johnny Johnson Project Manager JJ/mrm cc: REECE COMPLETE SECURITY SOLUTIONS- EMILY HALL CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP' BARNETT CIDA INCORPORATED -CURTIS GAGNER CIDA INCORPORATED- LESLIE JONES, RA YORKE &CURTIS - ROBERT MORRIS YORKE &CURTIS -WILL MOTT REECE HOLDINGS LLC- EMILY HALL GEOTECH SOLUTIONS INC - DON RONDEMA Carlson Testing, Inc. Incompleted Items List (NCL) Feb 11,2020 T1906577. Project Name: REECE SECURITY - EXPANSION & FACADE UPGRADE Project Address: 6755 SW SANDBURG ST TIGARD OR Permit No: BUP2019-00038 P.O.No: Project Manager: J. JOHNSON Item# Insp. Date Item Description Compliance CTI Sign-Off Date Corrected 1 AI 09/13/2019 BASE PLATE PER 3, 4, 5, 6/S2.1 SPECIFY 1 1/4" RECEIVED AND REVIEWED J. JOHNSON 02/11/2020 THICKNESS, 1/2" BASE PLATES IN USE. ENGINEER OF NOTE FROM ENGINEER OF RECORD TO REVIEW. RECORD, CURTIS GAGNER DATED (2/11/2020) . THIS ITEM IS NOW IN COMPLIANCE. CC:REECE COMPLETE SECURITY SOLUTIONS - EMILY HALL CITY OF TIGARD BUILDING DIVISION - WALTER 'CHIP' BARNETT CIDA INCORPORATED - CURTIS GAGNER CIDA INCORPORATED - LESLIE JONES, RA YORKE & CURTIS - ROBERT MORRIS REECE HOLDINGS LLC - EMILY HALL • GEOTECH SOLUTIONS INC - DON RONDEMA Page: 1