Loading...
Permit CITY OF TIGARD BUILDING PERMIT . _ l'i--i-- , COMMUNITY DEVELOPMENT Permit#: BUP2020-00134 Date Issued: 07/06/2020 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 2S101DA02000 Jurisdiction: Tigard Site address: 6980 SW VARNS ST Project: Madrona Recovery Center Subdivision: VARNS ACRES Lot: 3 Project Description: Interior renovation for new tenant. Contractor: B&G RESIDENTIAL Owner: WEST COAST LUMBER INSPECTION BUR 4213 NE ALBERTA ST 6980 SW VARNS ST PORTLAND, OR 97218 PORTLAND,OR 97223 PHONE: 503-232-6004 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations. 07/06/2020 $2,289.79 Demolition Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 07/06/2020 $274.77 Dwelling Units: 0 Plan Review 05/29/2020 $1,488.36 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 07/06/2020 $406.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 07/06/2020 $915.92 Value: $295,600 Info Process/Archiving-Lg$2.00(over 07/06/2020 $70.00 11x17) Metro CET 07/06/2020 $354.72 Floor Areas: Tigard CET-Non-Residential-Admin 07/06/2020 $118.24 Tigard CET-Non-Residential-AH 07/06/2020 $2,837.76 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $8,755.56 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. c Issued By: �l ,� „;;; fit Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection dater— -'47-77 This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. I.. Building Permit Application Commercial ! a I" FOR OFFICE USE ONLY City of Tigard DateByd ` 2 2.0 �f) Permit 26 tore 104 �.1 3 Date : J/(�' �1t( s[J J • 13125 SW Hall Blvd.,Tigard,OR 97)23 7� Plan Revie i Phone: 503-718-2439 Fax: 503-598-1960 AY 2� Date/Fly: j— J Related Permit: T l G A K D Inspection Line: 503-639-4175 ,,i r r : Date Ready/By:7� , Furs: ® See Page 2 for Internet: www.tigard-or.gov "� - i :.y t F' , NoliftediMe od: ((///G/ ) ./ f Supplemental Information �Gj� TYPE OF W012K REQUIRE ATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all I l Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling ®Commercial/industrial Valuation: $ ElAccessory building El Multi-familyNumber of bedrooms: El Master builder El Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 6980 SW Varns Street New dwelling area: square feet City/State/ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Madrona Recovery TI Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: 25101 DA02000 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Selective interior renovation of administrative/office spaces valuation: $ 295,600 Existing building area: 4,010 square feet New building area: square feet /6i ® PROPERTY OWNER 0 TENANT Number of stories: 2 Name: Jeff Fantozzi Type of construction: V-B J Address: 6980 SW Varns Street Occupancy groups: City/State/ZIP: Portland, OR 97223 Existing: B Phone:(503 ) 639 0651 Fax:( ) New: l^ ® APPLICANT rig CONTACT PERSON BUILDING PERMIT FEES* Business name: t`i Access Architecture (Please refer to fee schedule) Structural plan review fee(or deposit): / 'fepef r 3� Contact name: Brendan Sanchez, AIA FLS plan review fee(if applicable): f Address: 400 Columbia Street, Ste 120 Total fees due upon application: City/State/ZIP: Vancouver, WA 98660 Phone:(503)756-9213 Fax::( ) Amount received: E-mail: brendan@access-arCh.COm PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial apd residential prescriptive installation of CONTRACTOR roof-top mounted Photovoltaic Solar Panel System. Business name: 6 ey 6— • e e l S Submit two(2)sets of roof plan with connection details A/ ,(��/ --�!_ and fire department access,along with the 2010 Oregon Address: !I,� �!V f. /r7�-(��r(7 S7 c/ Solar Installation Specialty Code checklist. City/State/ZIP: f'Ey V j 1 fil v� 72 L X Permit fee(includes plan review $180.00 and administrative fees): Phone:(6 jJt) 2_ - / co(� Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: �e� O� C� ht ��ef /LI Total fee due upon application: $201.60 Authorized signature: , " This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Brendan Sanchez, AIA Date: 5/20/2020 * Fee methodology set by Tri-County Building Industry Service Board. I:1Build ng\Permits\BUPCOM_PennitApp.doc Rev.04/21/2014 440-4613T(lI/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT it Er Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations T1GARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 282,000 MULTIPLIER(25%bather removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [21 $ 70,500 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ 24,500 (d) At least one accessible restroom for each sex or a single unisex restroom: $ 45,000 (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ 1,000 (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ 70,500 I:\Building\Pennits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARI 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. ❑X map&tax lot# ❑X project name ® site address El suite number © zoning ❑X applicant name Ej phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 Julie Drinkwater From: Julie Drinkwater Sent: Monday, July 6, 2020 11:21 AM To: Brendan Sanchez Subject: RE: BUP2020-00134, 6980 SW Varns, Madrona Recovery Hello Brendan I will update the permit with the contractor information. Thank you Julie Drinkwater Permit Technician Assistant City of Tigard Budding Department 13125 SW Hall Blvd Tigard,OR 97223 503-718-2804 From: Brendan Sanchez<Brendan@access-arch.com> Sent: Monday,July 6, 2020 11:20 AM To:Julie Drinkwater<JulieD@tigard-or.gov> Subject: RE: BUP2020-00134, 6980 SW Varns, Madrona Recovery Caution!This message was sent from outside your organization. Allow sender I Block sender Thanks Julie! The Owner will be making payment soon. B&G Builders has been selected as the General Contractor: B&G Builders 4213 NE Albert Street Portland, OR 97218 (503) 232-6004 Contact: Greg Ca pen Regards, Brendan Brendan Sanchez I Principal AIA,NCARB,LEED AP BD+C pronouns:he/him/his 400 Columbia Street,Ste. 120 Vancouver,WA 98660-3413 D: 360.326.1221 C: 503.756.9213 Access I Architecture 1 From:Julie Drinkwater<JulieD@tigard-or.gov> Sent: Monday, July 6, 2020 11:05 AM To: Brendan Sanchez<Brendan@access-arch.com> Subject: BUP2020-00134, 6980 SW Varns, Madrona Recovery Hello Brandan The permit for Madrona Recovery is ready to be issued. The balance due is $7,267.20. Attached please find the invoice for your review. To pay the fees online, you can go to our website: https://aca.accela.com/TIGARD/Default.aspx. From there, click on the Building tab, enter the permit number in the Record Number field, and click Search. I also wanted to mention that we will need to have the contractor information before we can issue the permit. Please let us know once the fees have been paid so that we can make the permit ready for you to pick up. Thank you Julie Drinkwater Permit Technician Assistant City-of Tigard Building Department 13125 SW Hall Blvd Tigard, OR 97223 503-718-2804 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 2 i . • City of Tigard 71 COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: ZAA,20.20 —OD/3 y Site Address: 6980 SW Varns St Suite/Bldg#: Project Name: Madrona Recovery T.I. (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: T.I. new tenant Existing Business Activity: Office Proposed Business Activity: Office (No patients will be visiting location at this time) X Verify site address/suite# exists and active in permit system. X River Terrace Neighborhood: ❑ Yes X No X Zoning: C-P XI Permitted Use: X Yes E No ❑ Spec Space X Confirm no land use required. XBusiness License: Exists: XI Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: Date: 5/21/20 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: -s/Z//Z 0 Site Plans: # 3 Building Plans: # Building Permit#: $Enter building permit# above. Workflow Routing: 2--Planning ❑ Permit Coordinator Pa : ding Workflow Sign-off: '-Sign-off for Planning(include notes from planning review) Route Application Documents: ,e'Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ,<." Z2 Date: .S7?��kj I:1Buildi ng\Form s\BldgPerm itRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: \PC Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applica ❑ SDC Fees Entered: Wash Co Trans It ev Tax: ❑ Yes ❑ N/A Tigard Tran C: ❑ Yes 0 N/A Parks S P': ❑ Yes ❑ N/A O OK to Issue Permit Approved by Permit Co. s inator: Date: I:\Building\Forms\BldgPerm itRvw_COM_NoLandUse_111819.docx CleanWatei:Services SENSITIVE AREA PRE-SCREENING SITE ASSESSMENT Clean Water Services File Number 20-001261 1. Jurisdiction: Tigard y_ 2. Property Information (example: 15234AB01400) 3. Owner InformationI t, . a Tax lot ID(s): Name: John Thornton 2S101 DA02000 Company: Madrona Recovery MAY 2 12020 Address: 7000 SW Varns Street +. ? f u OF .t CARD OR Site Address: 6980 SW Varns Street City, State,Zip: Portland, OR, 97223 1,1:1 'y.,t r 1 /t',1 )j* City, State,Zip: Portland, OR, 97223 Phone/fax: (503) 749-0200 Nearest cross street: Email: jthornton@madronarecovery.com 4. Development Activity(check all that apply) 4. Applicant Information El Addition to single family residence(rooms, deck, garage) Name: Brendan Sanchez ❑ Lot line adjustment ❑ Minor land partition Company: Access Architecture ❑ Residential condominium ❑ Commercial condominium Address: 400 Columbia Street, Ste 120 ❑ Residential subdivision ❑ Commercial subdivision City, State,Zip: Vancouver, WA, 98660 ❑ Single lot commercial ❑ Multi lot commercial Phone/fax: (503)756-9213 Other Interior tenant improvement Email: brendan@access-arch.com 6. Will the project involve any off-site work? ❑Yes 0 No 0 Unknown Location and description of off-site work: 7. Additional comments or information that may be needed to understand your project: This application does NOT replace Grading and Erosion Control Permits,Connection Permits, Building Permits, Site Development Permits, DEQ 1200-C Permit or other permits as issued by the Department of Environmental Quality, Department of State Lands and/or Department of the Army COE. All required permits and approvals must be obtained and completed under applicable local,state,and federal law. By signing this form, the Owner or Owner's authorized agent or representative, acknowledges and agrees that employees of Clean Water Services have authority to enter the project site at all reasonable times for the purpose of inspecting project site conditions and gathering information related to the project site. I certify that I am familiar with the information contained in this document, and to the best of my knowledge and belief, this information is true, complete, and accurate. Print/type name Brendan Sanchez Print/type title Principal Signature ONLINE SUBMITTAL Date 4/29/2020 FOR DISTRICT USE ONLY ❑ Sensitive areas potentially exist on site or within 200'of the site.THE APPLICANT MUST PERFORM A SITE ASSESSMENT PRIOR TO ISSUANCE OF A SERVICE PROVIDER LETTER. If Sensitive Areas exist on the site or within 200 feet on adjacent properties,a Natural Resources Assessment Report may also be required. XBased on review of the submitted materials and best available information sensitive areas do not appear to exist on site or within 200'of the site.This Sensitive Area Pre-Screening Site Assessment does NOT eliminate the need to evaluate and protect water quality sensitive areas if they are subsequently discovered.This document will serve as your Service Provider Letter as required by Resolution and Order 19-5, Section 3.02.1, as amended by Resolution and Order 19-22.All required permits and approvals must be obtained and completed under applicable local, State and federal law. ❑ Based on review of the submitted materials and best available information the above referenced project will not significantly impact the existing or potentially sensitive area(s)found near the site.This Sensitive Area Pre-Screening Site Assessment does NOT eliminate the need to evaluate and protect additional water quality sensitive areas if they are subsequently discovered. This document will serve as your Service Provider Letter as required by Resolution and Order 19-5,Section 3.02.1,as amended by Resolution and Order 19-22.All required permits and approvals must be obtained and completed under applicable local,state and federal law. ❑ THIS SERVICE PROVIDER LETTER IS NOT VALID UNLESS CWS APPROVED SITE PLAN(S)ARE ATTACHED. ❑ The proposed activity does not meet the definition of development or the lot was platted after 9/9/95 ORS 92.040(2). NO SITE ASSESSMENT OR SERVICE PROVIDER LETTER IS REQUIRED. Reviewed by . Date 5/18/2020 Once complete,email to:SPLReview@cleanwaterservices.org • Fax: (503)681-4439 OR mail to: SPL Review, Clean Water Services, 2550 SW Hillsboro Highway, Hillsboro, Oregon 97123 Main Office = 2550 SiN Hillsboro Highway Hillsboro, Oregon 97123 ° p: 503.681.3600 f: 503:681.3603 - cleanwaterserviees.org