Loading...
PFI2020-00233 rr CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12020-00233 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 07/01/2020 Parcel: SEG3730 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: ZipIy WO#51351-5500240 Project Description: SEG 3730/7580 SW Hunziker Rd. OH to UG relocated 7580 SW Hunziker for Fields Apartments. Class of Work: FEES Description Date Amount Type 1 - Utilities (gas, electric, data) Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tiqard-or.cov to schedule inspections online. Contractor: PHONE: Applicant: RUSS WELLS 4155 SW CEDAR HILLS BLVD BEAVERTON, OR 97005 PHONE: 5036431001 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. PermitteelApplicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00233 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire 8 Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345 (Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19- PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. Contact Ken Fisher at 503 816 6146 or kenny@tigard-or.gov. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22- DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAUCONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general, will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard pm# 2D20-D0233 ENGINEERING DEPARTMEN C TIGA}tf, Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: •-i 5af j - i-AZ U2-[v ❑ TYPE I-Franchise tDmin Work la-domrcd be N\SN.I'G1 and/or Brief dcsu'iptiunofproject: Du,,r� I' iuBnyageny 158t lye Atip744, Ji'4 irk' 'tea) ❑ 'gym 2_,tc„\' Sdrawlk/fhires•ay/Starr Work M J t]daIiDCJv'I ) -ll[] �7�.ti}� �I Irrfonned for the pumou of . l r • S:dtu':dL installation or repair SITE INFORMATION • Udrrway:yapmach inn ('• \ �) 'j)/U� and repair Location (address if available): 1' 3') 51A)tiYu✓lkiat • Sanitary sewer lateral installation and pram SEG3730 "'a-'n' 0 TYPE 3-Pull scale f vvn 1norni \C'otk performed with Land me APPLICANT INFORMATION Trail id which inquire any of �J r the iolkswing Name: is]��`y(/ w-. .-. ••Subdivisions or Panirions • s s •Soma u�,hamgl Mailing address: ljc 1H i, 'iU� � /n{ I, Mainline • installation for Sunken,- Gh'/State: 1l4JZ1( ✓ OIL- Zip: Ct71L� sewer.Stour sever,Tigard water and • Tigani Warr Sterner.\era Phone: 'Y}�j" �j'"1 ' ��,.� ��+ ,/ ❑ TYPE+_sn,�lc:<nl'rd,rtnl<>ge Email: r 4I S4 I ne: '5LJ ,4-5 JOLII L' ( ❑ TYPE S-Tigard Triangle Contact name: R ._- 5-(A." 2 7T CI Email: 6•,,54 ( r Ll1�a '1)-11• i .(.i.4.11 Phone: �4IS " 3l 7i3 `Y � S CONTRACTOR INFORMATION 0 Same as applicant Name: • CCD Number. Mailing address: N/A City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: Al/A City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ 32-teZ ' (within the public right-of-way) Is work related to a L1ND USE DECISION? ❑1. o Case number. City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • n-m wc.egard-or.gov • 303-718-2421 • Page 1 of 4 APPLICANTS NOTE: person specified as"applicant"shall be desigiated"Permitter"and shall provide financial assurance for work,if required by the city pursuant to T91C 15.04.114 • Wall the esccptwm of a utikn operating,pursuant to a valid freaduse or Hearse with the City of!card.wheat the owner and the applicant are different people,the applicant must be the purchaser of record or a knee in possession with written authorization from the owner or an arm of die never the owner num sign dat application in the space prodded or submit a rcmtsm authorization utid,this applicaunn I.ranclined or 1..im ed Varies are sea regained to obtain the tm'trrs signature tat the a11,licmian. 1,the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is grunted.I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. /6/40/A 0.4) Ap iq ear or authorized agent's signature Print name Oat Property owner's signature(if required) Print name Date • Case No:PFI2020-000233 Permit fee: ®- Received by:A� Date: 0 Approved by: < s FiSi 4' Date: ej-L-01.it3a Notified by: Date: City of Tigard • 13123 SW Hell Blvd. • Ti pal,Oregon 97213 • u,nwtipul-ocgov • S03-718-2421 • Page 2 of 4 n t n PF L— rec. p' c 443.3. t„,-aL LL 1 S /->•'rT rkG"t -A-U +1,.t Nt,,,,5 lettiici, 's 7, P✓& -r DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL.PFI PERMIT FEE Part 1: Required submittal fee is Ill°°of the.Net PFI Permit Fee.See below for calculations.Is(inimum of S300 NET PFI PERMIT PEE Part 2: .111 non-water system improvements engineer's tctunate\7°a!less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements aq ineen's estimate X 12°o. t,ttSl-.Ali'LINEnAI1 FOR n141l1 51_ i A1.1 TYPE 4:SMALL WIRELESS FACILITY TYPE I—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name ❑ Sam Address How many install sites are proposed as part of this permit application? TYPE 3-Must provide 4 sets of plans(sized 24 s 36 or 22 sc 34)and an electronic version of all submittal The proposed equipment is located ou which of the following: items. The plans must that include: ❑Public Right-of-Way 0 Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the El General Notes(Gty,\C'atet,Sewer.etc.) type&use ❑ Street(Flan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities El Grading Landscaping/Tire Plan ❑ Composite Utility Plan(Electrical,Phone,Gas,Storm, Sanitary,\Vatec,Sigoage,Street Lights.etc) ❑ Details Cl Traffic Sight Distance ❑ Signing and Striping ❑ Street light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land me name,revision and plan log block,dates and sheet numbers.) ❑ Enyinec(s Construction Estimate Additional Sul,mittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathwal Design ❑ Water provider Approval City of Tigard • 13125 SE'Hall Blvd. • Tigard,Oregon 97223 • wirierigardor.gtn • .l13-718-2421 • Page 3 of 4 s& kkti6r) cI 4-c ci;st- gcv Ir4U •.tom,i 9 sw "y " s( Edge ofPayemeffi �Streeursht I �-Ditch�►' ._._r_._ i I A,— ,7;,...,,,,tw. r. I Q.) _ .I e; i @may Existing House au I �i ul , I II k 1 I ilI �1 ai I ye I gi l i i Evans Shop I I Power,._ I if\ 1 Ia 95• i i iFir.Hydrant TN) i I I Scale 1-1430' i I ) I I 1 I TYPE 1 AND T1 PI' MINII IM SKETCH REQUIREMENT i Fut N/A if not applicable) =:• _Property lines d;dimensions Existing utilities locations (sewer,storm,water) 11= _All existing structures INCIZZIIIIIIExisting curb or edge of pavement _Utility do street light poles ______Existing S/W or D/W apron ,Slope of property Trees City of Tigard • 13125 SW Hall Bled • Tigard,Oregon 97123 • an aetigardorgor • 503-718-2421 • Page 4 of 4 a JOINT POLE NOTE 1-PGE JOB-93772 -TK1451g�ICKET co VICINITY MAP TOTAL ALLOTTED HOURS -TK1451824 Ci .,.::'e1'. 5t0311Vay.. Q Cl?.qM1 YlRlf SAINT. •TK1451528 p Sew a e SW/Y RSISPLIC ox,, 0 0 rATET CONSTRUCTION NOTE g ®"`" 1-THIS WO ISCIAC CUSTOMER DRIVEN- N "°„y,,x«< _ DBG PROPERTIES-TODD COLEMAN-PROJECT «„,I„«,ox MANAGER imA awed 2-CITY/TIGARD PERMIT REQUIRED cxn W.'''. CONSTRUCTION 3-FLAGGING NECESSARY•SEE TRAFFIC --w n+aTx ..A"AD.c Til p0u II,. :w. n CONTROL PLAN .Sa'a CO cavmscxa pre BIG $10.0 CONSTRUCTION CONTACTS •••JOB SITE PERMITSDAVIDCARNLEY-971-940-9000 wrxACAvu.-n crtrrtRauo wx.C:eucn JAMES STAATS50375&3119 p su KET 0 p o wOT WSW!) SCHEDULINGCONTACT p NO PEflw2 SWARD RYAN ROBERTS-503-643-3713 SHEET 1 OF 3 w5ne 10 POLE FACILITIES CONTACT LAUREL KIELTY 425-281i NORTH jr,,,,,..,008 Evr,MN SQUARED AC4L IC' R INSPECTION CONTACT awrza m i0 p p p ,S1S Aq RON HAYHURST 503282-3345 emen o G 0 NR TAR ENGINEERING CONTACT ******CIAC WORK ORDER******* POINT Or CONTACT IA RUSS WELLS 503-312-7330 51351-5500240 RUSS YELLB MELLS 001 tA PYR,B LABOR HOURS DBG PROPERTIES '6:onYE xoxG u ns 2184 SW PARK PL rsvJELLs '"".SCSESV MATERIAL REQUIREMENTS SPLICE-C-24/M-4/X-S PORTLAND,OR 97205 CREW-C-30IM-10/X-27 TODD COLEMAN-PROJECT MANAGER RwRrp„ *•72 FIBER**1050' SONICOM-FLAGGING-16 HOURS MCR70883001 505-269-7461 1 ziplyfiber ••1-30'-5 POLE SEE CAS CODES FOR ACCOUNT 1 MC 012305A CODES••2-2X3 HANDHOLES•MINOR TGRD/CIAC-OH TO UG RELOCATE 7580 SW HUNZIKER ST MATERIAL 51351-5500240 ,. c. CNZIK DR. 55M240 s NT woe .,, ew d.E PACS quB,N£\1 VMM SCALE �_ DISTRICT, .a v MNOSF. FNG SEC i I ARTISTIC AUTO B4 NOTE-ALPHA DESIGNATIONS/ DESCRIPTIONS-SEE SHEET 3 7585 SW HUNZ �I IKE� 7L! . 4�/kEg _ RISER © -- �I� NO SPUCE 2 �'" ~ � � I � • APPLY C O 1N Oo °1L /° HILLCREST APARTMENTS • �I ,I 7582 SW HUNZI ��; . �, 7582 SW HUNZIKER .of AI 0 0 —r/ �NELDMOT�\ O:777r /,I PLANT RECORDS • • SHEET 2 OF 3 NORTH © 30'-5 DFf \ ZPIOLE ONLY PLY ON N. QC210164925 • APPLY CRP P.MNIMMINIIIIN C2101 B4B25 ) �( 4O'4 BT'81 - E — SW CRESTVI ,DRIVE - } ziply fi ber , TGRD/CIAC•OH TO UG RELOCATE co 7580 SW HUNZIKER U) 51351-5500240 NURR.E 55plIJd/1 �EXUICaar ,. ur£-C :w,sH scuff XCn ,,s, , , TM+sha• CHc. SEC. NEW/2421.201 300 06.2020 EXISTING/REMOVE 72—FIBER 72 0 374 03.2008 X0.1-20+ RBN 72 TGRDORXA H1009,93-144 XD,1-20+ NEW/2422.201 TGRDORXA H1009,93-144 0 750' 05.2020 2421.004/5480-3PFA0FV/03.20081374' 72—FIBER 72 XD.1—20+ EXISTING/REMOVE TGRDORXA H1009,93-144 NEW2441.001 0 156 03.2008 Q 200' RBN 72 4" SCH 40 PVC XD,1-20+ PLACED%PROVIDED BY DEVELOPER TGRDORXA H1009,93-144 NEW/2441.001 2423.004/5480-3PFAOFV/03.2008/158' 100' "ABANDON IN PLACE" 2' SCH 40 PVC PLACED/PROVIDED BY ZIPLY FIBER Qi TGRDORXA H1009 NEW/2441,001 24/144 Q 35' TGRDORXA FC2038,649-858+ 2" SCH 40 PVC XD,11-24 IN PLACED/PROVIDED BY ZIPLY FIBER TGRDORXA BBFTP H1009.1-144 OUT NEW/2441.001 C2101B3984 TGRDORXA HH9/5652 PLACED BY DEVELOPER/PROVIDED BY ZIPLY FIBER 40'-4 BT'58 IN FIELD/NOT ON PLANT RECORDS NEW/2441.001 HH9/5654 UTIUZE TO REMOVE 000 ACCT CODE PLACED/PROVIDED BY ZIPLY FIBER O 30'-5 DFT ZIPLY ON 135' POLE ONLY \ 5135 SHEET240 OF 3 Q 10024 BBI ziply fiber AE DA5,701—800 PLACED/PROVIDED BY ZIPLY FIBER Q C2101B4925 1-30'-5 POLEMC 012350A2411.001 ( 40-4BT,61 ) TGRD/CIAC-OH TO UG RELOCATE OG2101134925 PROJECT 7580 SWHUNZIIKER PGE RELOCATING TO EAST wn.eea 55fX124➢ o AREA F,e.cace..><, TOP POLE2IPLV TO LOWER-HAUL APPLY CRP oa.nwre nev,�.rNT WASH PHONE 74 NONPP,O11.. Y SCALE. Pn DP-rsicr_ OWL S OF rmar arc '.EC. LANE CLOSURE WITH FLAGGING SIGN SPACING AND BUFFER LENGTHS PEDESTRIAN/BICYCLE SAFETY ESCORT REQUIRED POSTED SPACING BETWEEN SIGNS BUFFER AT WORK SITE WHILE CONSTRUCTION WORK IN PROGRESS SPEED A B C SPACE NOTE-TRAFFIC CONTROL ORANGE CONES TO BE ODOT DIAGRAM 820 20 50 SPACED PER TRAFFIC SAFETY GUIDELINES REFERENCE 25 100 100 100 75 DEPENDING ON POSTED SPEED LIMIT AND TAPERED ARTISTC AUTO BODY 30 100 PER POSTED SPEED LIMIT 7585 SW HUNZIKER 35 40 350 350 350 12550 45 50 500 500 500 210 ZIPLY FIBER WORK O O ZONE 55 250 PLACE/SPUCE AERIAL E G FIBER D-ionvi-1(--\---0 NEW AERIAL FIBER gCCABLE!— I I A I Ell I B I C O FLAGGER AHEAD SIGN ( A I 'A46 I /� 1\OO M\A,l� ��� I C.---1A I A I A O BE PREPARED TO SIDEWALK i / SW HUNZIKER ST STOP SIGN SW HUNZIKER ST 1 ZIPLY FIBER POLE PGE TAG 3984 OONE LANE ROAD G E TO BE REMOVED AHEAD SIGN O O DEVELOPMENT. I PROPOSED THE FIELD APARTMENTS DEVELOPER PLACED/PRROVIDED O ROAD WORK 14�"' ZIPLY FIBER HANDHOLE 10 2'CONDUIT AND HANDHOLES AHEAD SIGN PROPOSED SIDEWALK TRAIL 25'DEDICATION-RAN AS 1 DEVELOPER PROVIDED H•FRONTIER PART OF THE FIELD I EASEMENT TO HILLCREST MANHOLE-SPLICING APARTMENTS DEVELOPMENT APARTMENTS A=ORANGE SAFETY CONE HILLCREST APARTMENTS 7582 SW HUNZIKER ST TRAFFIC FLAGGER DIRECTION SAFETY PERMIT 1-PRINT t OF 1 SIGN I ziply fi ber TGRD/CIAC-OH TO UG RELOCATE 7580 SW HUNZIKER 500260 ,Casa 5'(nn a I°E, .we. 135�-5 °A'E' - RUSSNELL...,NMai 5 TARE �..,..m A BULE .gymW TAX IPIR PX 1 MI6., R. REC