PFI2020-00096 p e CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PFI2020-00096
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/18/2020
Parcel: SEG1499
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Centuryt-ink National
Project Description: SEG 1583/1499. Over-lash 416'of fiber on existing strand along SW 72nd Ave.
Class of Work: FEES
Type 1 -Utilities(gas, electric,data) Description Date Amount
PFI Permit Fee 03/18/2020 $300.00
Owner: Total $300.00
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.00v to schedule inspections online.
Contractor:
NORTH SKY COMMUNICATIONS LLC
11818 SE MILL PLAIN BLVD SUITE 410
VANCOUVER,OR 98684
PHONE: 3602546920
Applicant:
TODD HURD
214 E 24TH STREET
VANCOUVER,WA 98663
PHONE: 5034676422
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By: �— !—
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12020-00096
Tvoe: Condition Name: Status: severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc.shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property,public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity, the applicant shall coordinate with the City's inspector,Trent Brickey at
503-718-2686,to establish a preconstruction meeting..
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection, and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis, to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector,in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI—Utilities 31 -OTHER Applied Notice
Other
RECEIVE®
MAR 16 2020
City of Tigard CITY OF TIGARD PFI#: 2U2o- 6 0001C
=
T ENGINEERING DEPAR
ING-10"IGINEERING
. Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
Sub-loop—N546338 11655 TYPE OF WORK
Sandbur
Project name: g ( ) ❑ TWE 1—Franchise utility Work
Brief description of project: Over-lash 416' of fiber on existing Perfonued by NWN,PCE• or utility
agency
strand along SW 72nd Ave. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
Work performed for the purpose of
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral iustallation and
Location (address if available):
Along the East side of SW 72nd main line tap
❑ TYPE 3—Full Scale Development Wodc
Ave near SW Sandburg St. e) � �j�l performed with land use apprrn,:d which
7— includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION Streetwidening
Name: CenturyLink National Mainline installation for sanitary sewer,
storm solver, Tigard water, and Tigard
Mailing address: 214 E 24th St water service area
City/State: Vancouver, WA Zip: 98663 ❑ TYPE 4-Small Cell Technology
Phone:
503.467.6422 ❑ TYPE 5-Tigard 7Hangle
Email: Todd.Hurd@CenturyLink.com Phone: 503-467-6422 NOTE: Type 1 and 2 applications may be
Contact name:
Todd Hurd emailed to r�=rmitsr2ltil rra d-or.aov.
Phone: 503.467.6422 Email: Todd.Hurd@CenturyLink.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: North Sky Communications, Inc CCB Number: 208747
Mailing address: 10860 SW Clutter Rd City/State: Sherwood, OR Zip: 97140
Phone: 503.949.8195 (Brandon Stavang) Email: bstavang@northskycomm.com
ENGINEER INFORMATION
Name: K&B Technical Solutions; Attn: Matt Oliver
Mailing address: PO Box 2529 City/State: Clackamas, OR Zip: 97015
Phone: 503.650.6041 x222 Email: Matt_Oliver@kbmail.net
ADDITIONAL INFORMATION
Esdmated value of workis required(if over$5,000):$ Nq (within the public right-of--way)
Is work related to a LAND USE DECISION? ❑Yes 19 No Case number:
I
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwvatigard-ocgov 503-718-2421 Page 1 of 4
APPLICANTS
NOTE: Person specified as Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigaud,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or licensed Utilities are not required to obtain the owners signature on the application.
I,the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Todd lour Matt Oliver(Authorized Agent) 3/13/2020
Applicant's or authorize agent's signature Print name Date
Property owner's signature(if required) Print name Date
STAFF USE •
Case No:F r I (,u Af Permit fee: 26000 Received by: Date:
Approved by: _ %v �`I Date: 3�/4,/0,0 Z-0 Notified by: Date:
City of Tigard • 13125 SWI Tall Blvd. Tigard,Oregon 97223 wwwdgard-orgov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFT Permit Fee.See below for calculations. Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR ONLY FOR STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITA' 0 f DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit El Site Address
application?
TYPE 3-Must provide 4 sets of plans(sized 24 x 36
or 22 x 34)and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property . .
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.figard-or.gov • 503-718-2421 • Page 3 of 4
Edge of Pavement
I !— Ditch �10
Streetlight
1 �I
T--nm a 6v�erTinF--
1 i
W I o
A f 1
r 1 Existing House
Q I all ( Existing 1
F. 3� . Driveway
J or 1 1
m� r
t
1 � E�.isliny Shop i
Powerpole ' 1 I a
�. o .o
la
I 95, I
Fio a tne s_.--
i ( Fire Hydrant(FH)
I 1 1
i1 Scale: 1"=30'
� 1 I
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if ot applicable)
� I I
� I �
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street& street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 •Page 4 of 4
—�� CONSTRUCTION NOTES
1. ALL WOW(AREAS TO BE RESTORED TO LAKE OR
/ BETTER coroWDN.
a/ I 2. ALL OTHER UTILMES ARE BASED OFF EgmND
LOCATES OR URUHY STRUCTURES.
3. D IS THE CONSTRUCTION CONTRACTORS
IE MISIWUIY TO COIL FOR LOCATES BEFORE
DW7ANG.
LEGEND
O,ERLRIASH NEW FIBER A-
7190 SW SANDBURG ST OUSTING STRAND
a me
COONS FIBER —A
•a� yy E%ISIDIING UPUtt POLE ®PPOLE IID
a RIGHT WAY �h
Y UNE
FACE OF
�W
ti FACE OF CURB t
FOCE OF PAVEMENT
w -•n nen_ EIOSHNG SOEWPIN
vW=i _A
O A
A A A A
5003 n '
U A 209AWJJ1''�A' A_
ti A
FROM POLE 5003.OYMMN"NEW FIBER --—
CABLE ON EXISTING SBUPO 26T(N)TO
— — POLE 1952(SHOWN ON SHEET 2). BEGIN ADM WTR(AT FJ05I►FG
—SW 72ND AVE- — - _ UTILITY POLE 5003.
7291 SW TECH CENTER OR
TT A-.
CenturyLink•
T
W ; RCA$IDH i 1
W D]/11/i0 Y.O. J.N. pRCIWl
MI I..DEVOMEMRINEI
"rA..EMYEM
Call e.mre ra e§.
nuro wn.
LF�
MG14 RINGFER:Tab lLitl.SDa.N6I.UTI
EIIGINFT NWOKtM: M -.,02U31(
PROJECTNUMBER AWmW SWBIIlST(CILN CR3D15Y11E55f
LOCATpH:SW T3M Aweb SW SftlWrp 6r
0 to' m' TIa.N.OR 0T323
KING NNIE'SW 9•M•.p51_SWNg91py� M1.44V
$Glf: 1'eNl' .V IffT: Ei 3
L- a CONSTRUCTION NOTES
I. All WORN AREAS TO BE RESTORED TO LINE OR
'
DEFIER CONDITION.
2. ALL OTHER MMES ARE BASED OFF DOSING
j LOGTES OR UTILITY STRUCTURES.
S. R IS THE CORMCDON CONTRACTORS
RESPONSIBILITY TO CVL FOR LOCATES BEFORE
13500 SW 72ND AVE 7185 SW SANDBURC ST N DECINC.
X
LEGEND
OrERUSH NEW FIBER —/.—�
MISTING STRAND
FROM PRE 1952,OVERUSH NEW EMSIBC FIBER A
FIBER CARIE ON EXUNC SRM E7RSING MIRY PRE OWNER
147'(N)TO POLE 1165. ®PRE ID
f/ RCHT OF WAY �n--
"�f0d--- PROPSM UNE — —
_P� ._ I17 FACE OF CU
1165 n____^, FB_ten EDGE OF PAVEMENT
A ---^n r EIOSTNC SIDEWALK --•n--
A_ AA A _A A w
--,w---_„ 1!Y A A A A A A FA
(M9)A — A O
7END WORKIXISTIIG =
MM'PRE 1165.. CONTINUE TO OVER/Y91 NEW FIBER CARIE ON r
E7TSIING SIPPER 269'(N)FROM PRE 5003
—SW 72ND AVE — (SHOWN ON SHEET 1)TO POLE 1952.
— — —SW 72ND AVE——�.--
c
13535 SW 72ND AVE Fti. //)) 740D SW CHERRY DR I 7291 SW TECH CENTER DR
N N E
IF (3T.AWF:��C.8E1tUfyllnk
IM
W�x/xo Y.o. [,Y. Yngixri
IU. WiE FNC OE46 ON1FlMlC COYYCNi
Nm��Af�OMOW. �
GNIYhLPd1.
IE RINGFE0.:TW1HwE-501ABTAf?t
EHOIIEEAINGFMM:YJB TCINctl SY.Mlwu
_ 8.LM&T TNI16MSlB-NAxS3BT gt30193-11!99)
LOCATMNl 9w YGq Aw NtYIBv+Dva el
WI GNAM:Bw0iIM8L YeYM_NMtlM_Tmb,On
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below-
1.
elow.1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3— Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s)-
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 September 2016
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
Y O
OQ= 0
3<
16
w \\ N
W2� p
0 0� �
v)
M
CIS
y 1 tLL
¢aa a
m WW
co
Q
_ I • U C
r— i • L O a
} •
A I •• >� a
I �
I 9 g 4 t • a u
/ < j r EMU)
I �
I : { I • m
:� d •
•
On 1�G � I •
o E �� •
O O C L• •
CD)>v
~ I
as oso WO
°a I •
a)� V • wQ�
lltY�� i
——v
Sign Spacing and Buffer Lengths(feet) ,..,
Posted 5 xin 9etween5i ns 'Buffer" \ W ca
Speed A e C Space \ O O
20 50 Z 2 O
25 100 100 1W 75 O
30 100
950 350 350 350 150
45 180 O O=
50 500 500 500 210 ¢3 Q
55 250
60 295
65 700 700 700 325
70 355
September 2016 Chapter 5
Page 118 2011 Edition
Lane Closure at Intersection with Flagging Diagram 620
Diagram 620 covers work within an intersection when normal traffic control
must be interrupted. Work vehicles may or may not be in the work space.
1. During flagging, traffic signals shall be turned off. Contact the road
jurisdiction for approval and assistance (see Chapter 3).
2. For multi-lane facilities, traffic approaching the intersection shall be
reduced to a single lane on each approach. See Chapter 3 for
information on flagging through intersections.
3. There should be one flagger for each approach. One flagger may
control two adjacent approaches if sight distance, low volumes on side
roads, and flagger position allows for safe operation and clear direction
to motorists. For low traffic volume intersections (fewer than 400
entering vehicles per day), one flagger may be used.
4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues may be expected.
Sign Spacing and Buffer Lengths(feet)
Posted SpednBBetween Signs "Buffer"
Speed A B C SpMM
20 50
25 100 100 100 75
30 100
35 3S0 350 350 125
40 150
45 180
50 500 S00 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 119
Lane Closure at Intersection with Flagging Diagram 620
MFM
(oma ° 1 t
B
ro sraF
4�
B
A (Opt-."
• «EI E
1008 MK •• PFEPMEO � MVnc
ro sor AHrM
11_
A B B C
Burter- ..�
C B B A T
. I
M[!Y i0 STOP
1WfL MM
FA110
tOg10 e� A
B
PIEP
ro sraF
B op ow
EWE
t t
IHEP➢
C
FWD
WORK
MEPD
September 2016 Chapter 5