PFI2020-00111 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
IIIIs COMMUNITY DEVELOPMENT Permit#: PFI2020-00111
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/01/2020
Parcel: SEG1706
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: CenturyLink National
Project Description: SEG 1707/1706. Bore 1,106 feet(1)-2"conduit and place(7)24"x36"vaults. Starting at 13960 SW
72nd Ave on east side of road and ending at 7400 SW Landmark Ln in the west side of cul-de-sac.
Class of Work: FEES
Description Date Amount
Type 1 -Utilities(gas, electric, data) PFI Permit Fee 04/01/2020 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tioard-or.00v to schedule inspections online.
Contractor:
NORTH SKY COMMUNICATIONS LLC
11818 SE MILL PLAIN BLVD SUITE 410
VANCOUVER, OR 98684
PHONE: 3602546920
Applicant:
TODD HURD
214 E 24TH STREET
VANCOUVER,WA 98663
PHONE: 5034676422
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
PermitteelApplicant
Signature: See apj000t. _
Issued By: / V d v-O
Special Conditions(See Attached) (((fff
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12020-00111
Tvce: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of
any agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited
and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up
and suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work
area. Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be
effectively maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and
area wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)
and 503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign
at each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the
City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized
by the City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987.
If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole
before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at
the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work
with affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector,Trent Brickey at
971-228-9269,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged
inspection,and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis, to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicants failure to
obtain or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to
the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of
Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
RECEDED
• City of Tigard MAR 2 3 2020 PFI#:Z02o �i I I
II
ENGINEERING DEPARTMEN'EITY OF TIGARD
p NING/ENGINEERING
TIGARD Public Facilities improvement (PH) Permit
T T . ,
PROJECT INFORMATION
7350 SW LANDMARK LN TYPE OF WORK
Project name: ® TYPE 1—Franchise Utility Work
Bore 1,106'(1)-2"conduit 8,place(7)24"x36"vaults. performed by NWN,PGE, or utility
Brief description of project:
agency
Starting @ 13960 SW 72nd Ave on E side of road and ending at ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
7400 SW Landmark Ln in the west side of cul-de-sac. Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available):
7350 SW Landmark Ln main line tap
❑ TYPE 3-Full Scale Development Work
JCs'S l l o7 J 11 D(p Tigard, OR 97223 performed with land use approval which
includes any of the following:
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: CenturyLink National • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 214 E 24th St water service area
city/state: Vancouver, WA 98 Zip: 6630 TYPE 4-Small Cell Technology
Phone:
503-467-6422 0 TYPE 5-Tigard Triangle
Email: Todd.Hurd@CenturyLink.com phone: 503-467-6422 NOTE: Type 1 and 2 applications may be
Todd Hurd coi.,ilcd to rowper a nits tigard-or.eov.
Contact name:
Phone: 503-467-6422 Email: Todd.Hurd@CenturyLink.com 1
CONTRACTOR INFORMATION 0 Same as applicant
Name: North Sky Communications, Inc CCB Number: 208747
Mailing address: 10860 SW Clutter Rd City/State: Sherwood, OR lip: 97140
Phone: (503) 949-8195 (Brandon Stavang) Email: bstavang@northskycomm.com
ENGINEER INFORMATION
Name: Waeco Engineering
Mailing address: 18543 Cascade View Dr SE City/State: Monroe, WA Zip: 98272
Phone: 360-722-2852 Email: spencer@waecoeng.com
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? 0 Yes II No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant" shall be designated"Perrnittee" and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I, the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Spencer Kariniemi(signed for Todd Hurd) 3/11/2020
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No:WI2D20-OOI I I Permit fee: 3 --00 Received by: �- Date: 3 2-3 1 -
Approved by: 7vv t vrf t Date: 3/.&'12O2 l q
Notified by: 1 1- Date: t
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-oLgov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY FOR STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal 8 Dimensions
considered?(check all that apply): ❑Small Cell 0 Macro 8 Street Name
8 Site Address
How many install sites are proposed as part of this permit
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way 0 Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the 0 General Notes (City,Water,Sewer,etc.)
type&use: 0 Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www..tigard-or:gov • 503-718-2421 • Page 3 of 4
9 WW- ,. Y „ st.
Edge ofPavement
1 Ditch ��
Streetlight
`` —r—
. .. -.lie' .;,..400...............,,,
r T—proposrd"Se1werTine-
C. I •
i CD rt
III
1
ry IIIi I Existing House
'Q r4 I.
Existing 1
Si3� • Driveway •
v o� I
inl
a� � H
T1
Ii
f • I I
i A 1 Existing ShopII
_ •. '\ 1
Powerpole I 1
' e
~� o 5' 1
I 0- 9
I
I ._. AAA
1 1 I Fire Hydrant(FH)
I I
Scale: 1"=30'
I I
I I
I I
I I
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable)
X North arrow X Property lines&dimensions X Existing utilities locations
(sewer,storm,water)
X Street&street names X All existing structures
X Proposed work X Existing curb or edge of pavement X Utility&street light poles
X Existing S/W or D/W apron N/A Slope of property N/A Trees
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-otgov • 503-718-2421 • Page 4 of 4
Page 106 2011 Edition
Diversion into a Continuous Left Turn Lane Diagram 430
Diagram 430 shows work in the travel lane(s) next to a continuous two-way
left turn lane with one direction of traffic diverted into the continuous two-way
left turn lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. When two or more travel lanes are reduced to a single lane before the
diversion, each lane shall be closed separately. Layout traffic control
according to ODOT Standard Drawing TM 852 for 5-lane sections.
4. A shifting taper(L/2) may be added in the diverted traffic direction
across the continuous two-way left turn lane(as shown). This option is
recommended when the speed is 45 mph or greater.
Sign Spacing and Buffer Lengths(feet)
Posted Sparing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 125
350 350 350
40 150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 107
Diversion into a Continuous Left Turn Lane Diagram 430
ROAD
WORK
AHEAD -- ---
B
lylt
A I I
AHEAD
II
•
•
•
1 Buffer
Protection Vehicle
wITMA(both Optional)
See Chapter 4
El /,
i
Buffer
I i
•
• L/2
I•
/
L/2 . I A
•
1yt
ROAD
WORK
MEAD
September 2016 Chapter 5
.12-' „O CONSTRUCTION NOTES
0 Ai
iimWOW AREAS TO FE R6IaE1 TO LEE OR BET1BX
W_ --{)-_'G� SEW _. -.SEW- O MI.OTHER OR mire SIRUCES ARE ma)co-fUSTNG LOCATES
k • PLACE NEW HAND HOLE N� 5 1 g R IS ME CONSTRUCTION CONTRACTORS RESPONSIBlm TO
IN SOFT SURFACE 210 // 0 nu FOR LOCATES BEFORE IMIXNNG.
i Fp /
7u 7110 CHANCE OFFICE SOUJOON
\ 3 / �� p LEGEND
p //f pG y UC FlBFA-WBRNC --B---B--
�'� 1" /97 F UG RBER-PROPOSED --.B---B--
/ AEAVL FIBER-EXISTING A\/ 3 /.6// 1FTdl1 FlBER-PROPOSED A
9... BORE 55' (W) PLACING `' a STRANSTRAND-PRa'bSFD
// NEW (1)-Y CONDUIT AND/55' F ps-.,
G,4,3 /� FIBER OPTIC CABLE /
/. REFAOUT-DIMING N/ 1 5v pC '.4I INNEIOIICT-FROPO51D
\� / `1�' BORE 227 (SE) PLACING 7 �E G
a��������������������������������������������������u� �' NEW (1)-2' CONDUIT AND / ® S/ W
// FIBER OPTIC CABLEnSn / TELEPHONE i
FOC FOC //� 3 y�/ FpO E
c, /� PLACE NEW HAND HOLE .4 F yiDp�pay SINITIRf SEVER(SEW) SEW
SW
@ IN SOFT SURFACE /
o X
O � �9// yo Fo°V' �IW EOP
yl� OIL
,,3 /9' f 3 / SEE FOC 'EpC UNWORN RIG WADY rc -p�1y-
/ �.' J� EDGE a RESENT EOP
/ y`J f� /,��/�I FILE OF CURB FCC
U //?
Q; / SIWOyFtlSTNG MIIIY VWF ❑N h IU 4Zp4 �IDOSING URIIIY FOIE ®PORE poy , C� / / NayA�aW
PROPOSED MJTY HA4DIKKf NOK
cFoc I //://4
y ,y1 E>aslRlc sraa INIET o
4p °CA4`l /4 ;�� I FOC FOC EDSTING 5�1 1VNH0� M�
JJy y4.� NhT���‘‘‘‘‘‘‘‘‘‘����‘‘‘‘‘‘‘‘‘'‘‘‘‘‘������‘‘�jfbSTNG SEWER YWHOIE Ma_Z
?\0LACE NEW HAND HOLE C�
IN SOFT SURFACE II COSTING N5C OTUIT
4
[' ]IIR OmvR ID RIM 1RLLP6Ip 6DlMl4 42
J y yO/ <,V \ SW I RR RI RaIWRA
INSTALL NEW RISER ON / w ` \ AS-BUILT
o I LR1/'20 ac mI mom_
q\ EXISTING UTILITY POLE. In + MO wE PM TRENCH 3 TO VAULT i1 ..62.h6,,,, A,'
LOCATION PLACING NEW 2 `�'(.3� CenturyLinle CONDUIT \ 7 330 SW IAu�uLRN Callmm,.�w ea. sAWW,I�,
LENNRVLINK ENAINE6W:TOBONURO
L? . — ENGINEERING FIRM'.WRECO ENGINEEWNG _ _
y� PROJECT NUMBER;N580528
/ \� / I LOCATION MO SWLANDMARK LN
TN:OSW OR 971224
LANDMAR
DRAWING NPAE.L...ma W P..,
CONFIDENTNUPROPRIETMY SHEET. 3 OF II
0 1 B. A \ CONSTRUCTION NOTES
n \A 1O ALL U UI(AREAS ID BE I(STOIED TO WE OR BETTER
INN
\ COIOIION.
\\\1 `` O IQ1 OWESDIRY ARE BASED OFF COSTING LOCATES
OR�� I O IT IS THE CON57MACRON CONTRACTORS RESPONSNUT TO
`6T\�\ CAE FOR LOCATES BEFORE OWTNG.
o 0 A
£ �a
\s LEGEND
M �A
7J30 SW LANDMARK IN i * 513 UG OWE-E1EMIEW --B---B--
n UC FlBER-POOP05E0 �B� —B—
,E I IAN1L DEER-OOSTNG A
'A ADRAL RBER-PROPOSED
A
STRAW)-E150NG — — —
0 0 , STIWA-PROPOSED
O 1A CONGA-COSMIC —_____—
,1 COMET-PROPoSEO .
INNERDUCT-DIVING 1 NIEROUCI-PROPOSED — A.A.
.
,A
,A W
IEIEPRERW T
r A \ E I
/. o d ED £ ,E SANITARY SEWER(SEW( SEW
n o `E I STORM DRIEST SD
1 0I
TV
SEW - STAR
—SEW SEW SEW- SEW
SEW SEW SEW SEW I^1 OIL
m UNIMOWI WIRY
Y UNK
// �—HHA4 M/ SW
-M/tl S/ m/s 5/W M/21 S/W I ROD a WAYEDGE OF PAVEMENT FIE/Woe
A' M3 T^ 2436 Sn��M ---J-4C' '� S/W S/W 9//�A o FACE OF d11® -EOP
N S/W S/W 5/W , S/lo't' —�// CZ-----
__�k qqq ���. �'Mr p—!�� 1F i 5/w
CO
323' }r `q\ STING MIRY VAULT QY
� 5 ,
5D� `PLACE NEW HAND HOLE BORE 247' (S AND W) PLACING I EOM I)h111'PO FOIEE ® O
�SD� IN SOFT SURFACE NEW (1)-2" CONDUIT AND
_------SO-- FIBER OPTIC CABLE fl, PROPOSED MNY HANDROE0 [I�]
0T SW LANDMARK IN 1'�
El151MC MIDI INLET 1=1
MOW ST=uvEroLE ,,I)
0051NTC SEWER 0100W
RF k _k fl R/W ruFOr N/WF9r A/W r=Or I FOC o FASTING SEC UIMA QU
u
FOC FOC FOC FOCI �\ U v1mF Rum w..1CR Ra Boa 01
7 AS-9LT
IDOVIA
8O AI
a/'t!/A mK Tw MOM.
� N0. CAE ENO OEM,. TPMNE wow
K....NA.EEIEw. AdA,
Cane VWO. LeVel(3y.A0.min Cen4Y17MnR-
CFIRURVLINK ENGINEER:TOUR GURU
ENGINEERING FIRM:WAECO ENGNEERIN6
PROJECT NUMBER:N580510
0 10• p. LOCATION:MO SW LANDMARK LN
MARG.OR BERM
— DRAWING NAME:Wwiw.GNPAvep
LGNFIDENR4RRGPRIETARV SHEET ♦ Of 11
2 CONSTRUCTION NOTES
i o
/ 7 '0 All WM COM AIF15 TO I[RESTORED TO ME DR IETIFR
zi
SS 7140 SlY UNDNAIM EN I O ALL ORMHER 6RNl�C MS else OFF DVa"ONC LOCATESSS
i GS IT FOR Nlf/IlES THE oowsrw F0 MANG.Rs RESPON;;�RI'ro
i
4iiiriiiiiiiiiiinnUl/Ze://///ice/wvi
FOC �FOC
g FOG LEGEND
UG FIBER-pI61MG
UG PEER-PROPOSED . B B .
PERK FIBER-DIMING A
MM.FIBER-PROPOSED A
MING
PLACE NEW HAND HOLE —SEW - SEW —SEW-- SEW SEW u,� 557RVT.D_
IN SOFT SURFACE „/a M/a M/a M/}J� g� -
O fq w HH-05 / M/a 5 t/N S a g 5 4 CONCUR-PROPOSED ..
N M MOW =
s/W S/W S/ INNS TT-PROPOSED — .
O 14 /W B���B" _ S/W ---R—SEC B—__R—Srge/W B---R—Si �.����.� .�___ --4'tR—__q--
- (323') w
BORE 227' (SE) PLACING 7EIEPIIOtE T
BORE 40' (S) PLACING / NEW (1)-2" CONDUIT AND vRRrar SEWERS E
T FIBER OPTIC CABLE (EW) sEW
�I�NEW (1)-2" CONDUIT AND STORK DRAIN SD
"911 FIBER OPTIC CABLE I —SD---- X
EF i SW LANDWRK LN —SD —Tv
—
II 40' S_____—SD----- sTM
E _SD--SOUNKNOWN u111111' UNK
II —
miff RIGHT OF WAY R/w—
II 1____ __0_____________so__________
EDGE OF PAVEMENT --EOP
_ 214; I c>� KAr �Qp�k90 - FACE c CURB FOC
R/W R/W RQ1ry '•�V s/W
LH FO F� FOG FOG FOC FCC FOG FOC FOC-
HH PLACE NEW HAND HOLE �� EDSTND HIV VAULT Ea
pW
CTT L IN SOFT SURFACE EDSENG nunP4F ONO
0 PROPOSED IDIOT IWWIOIE [AL
EXISTING STORM INLET o
WPC STORK MANHOLE 9
o FOC I
4 cosmic SEWER NWIEIE 1S3
0
0
DIM.*II5C LOW (
F,
O FOC -
FOC FOC FOC FOC c> snag.=wogs la ma IRIBIG No maw.RE
91/171 NW WI RWNWVSS
N2 l5-@LILT
111111 ansuxPI
a/n/To sa napa.urv.L
wrt ENSEW.iPNc cauD+r
C lIMN..r.SWP. L.YN(.W).AW.. . -- CenturyLinir
vig
CENTURILN!ENGINEER TG00 HURD
ANIRSAISIN ENGINEERING FIRM'.WAECO ENGINEERING
ppppp �1��1qqq�a''' ''��''' ''' PROJECT NUMBER:SWAN
LOCATION 73508W VROMMN LN
uruwlnc NNW L.a.n eq PA,s u..
SfiVE: 1'.RO'
CONFIDENTIAL/PROPRIETARY axffT. s a n
CONSTRUCTION NOTES
I j i 0 NL WORN ARFAs to BE 551 10 LIKE 0R SEWER
j CREAIFE HONE!ERRING NG l COMMON.
7350 SW IANDRARIE LN / - O ILL mix LOUR6 WE a1GD OFF FITSRNG LOWS
j �l, 9 OR IRINY STRUCTURES.
% O II Is ME WNSIRUCWON CONTRACTORS RESPCNSOUTY TO
L _� �a�irry iiiiii/%%%%%%/4%%//%%.%///ri.,/,%4 COTE Fat LITOTES BEFORE OWING.
F00 FOCI I LEGEND
CC FIBER-MSTA= --B---B--
W1BER-PROPOSED —B---B—
ION EXONN L FIBER- G A
/F�' FIBER-PROPOSEDSTRAND — —A
-
1/
Qi STRAND-COMING
MVO-PROPOSED
�"N�M/,y FOC I CONDUIT-cam/M�C FOC CONpAT-PROMISED =w w m m=
'#j� r.- INNOTOUCI-DOSING
NNERDUCT-PROPOSED
\
\4/..j ..,
�`� �\W M/8 M/N ��pTT M/O s/w M/l S/x, M/N 5�,_ TELEPHONE ,N
QQQQQQ,,,,,, ♦ \ S/W S/W S/Vr E
T
..Ni...._.
6 �S/W / \ SAMMY
FOC--�' FOC -I FOC FOC-' ORHSENFF(SETT') $N SD
x
TV
F0/7 SWM
- OIL
MOBICFN WIRY —UNK—
SW LANDMARK LN o RIGHT CC WAY R/W
EDGE OF PAVEMENT COP
BORE 214' (W) PLACING FACE OF GIRO FCC
NEW (1)-2" CONDUIT s/'—
FOC 243• AND FIBER OPTIC CABLE MIND COUP POLE
/JC/ CTNL (,� 4 FARRIG NUN VAULT
M❑
HH 0
�==-1�— --�_/��.a��p y_ _ __L '�." �L'�cnr— eEeFC� ® !10
C - zE PROPOSED PINY IWONNE ��7y
4 _ RR2-*
PLACE NEW HAND HOLE W I, pI EmsTNc STORM WILT o
IN SOFT SURFACE p Spy I1NW101E Q
/ 4 /W_ -RI FCC I EThTNG SEWER TANGLE fi ji
o DOSING 160 NUN Q
O O i L11W1 WII@uOi NIIOIG IttA]6 x0 mom 4L
0I. # AII 1 Rv x lclmw�¢
Kl5.0
I 16A9T1 1
aMln SON TRY
NO O MNL
DATE END oLsvt vw1Fc c OM.
IANENT
m COIIL.brlor. \ �\P�
Calir'`"XW eq. LeVel(.3/EAM436 CentU roll
GENIIIXYIINR ENOIIEER:ISO NAND
-14111 ENOIIEEHMO FIFA:WAECO ENGINEERING
PROJECT NUMBER:N 80028
LOCATION: IN 9 LAN
)}50 W OR 97122IOM b LN
T150 S
DRAWING NAME:Ima..RCH P.NM
WALE 1 m CONFIDENTINJRROPRETARY FNEET. 6 cF IA