Loading...
PFI2020-00102 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT = COMMUNITY DEVELOPMENT Permit#: PF12020-00102 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 03/18/2020 Parcel: SEG2613 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2743491 Project Description: Adjacent to 16285 SW 85th Ave. Unjacketed cable replacement-Durham South L-604ft. Class of Work: FEES Type 1 - Utilities(gas,electric, data) Description Date Amount PFI Permit Fee 03/18/2020 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503.639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at LAigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: TOM COX PHONE: 5037365419 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: �— C Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00102 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire &Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI—Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary,it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI—Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI—Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI—Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector,Trent Brickey at 503-718-2686,to establish a preconstruction meeting. PFI—Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI—Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI—Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI—Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments,property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI—Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI—Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI—Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other RECEIVEZ,, City of Tigard MAR 17 2020 PFI #:-a20-0QA94 ENGINEERING DEPARTMENT CITY OF T iGARD PLANNINGlENGiNEERI,1,iu Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2743491 9 TYPE I—Franchise Utility Work Brief description of project: performed by NWN,PGF„ or utility agency ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer UNJACKETED CABLE REPLACEMENT- DURHAM SOUTH L-604FT Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and � ( /')/ Location (address if available): J �C1�/:5 main line tap ❑ TYPE 3—Full Scale Development Work 16285 SW 85TH AVE U performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening PGE Linda Ott • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd DR water service area City/State: Beaverton, OR Zip: 97003 ❑ TYPE 4—Small Cell Technology Phone: 503.612.6093 ❑ TYPE 5—Tigard"Triangle Email: preregcoord@pgn.com phone: NOTE: Type 1 and 2 applications may be Contact name: Tom Cox emailed to rotvpermirs wtigard-ongov. Phone: 503.736.5419 Email: preregcoord@pgn.com CONTRACTOR INFORMATION ❑ Same as applicant Name: pge Crew CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-wap) Is work related to a LAND USE DECISION? E]Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tiprd-or.gov 503-718-2421 • Page I of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid fi inchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owners signature on the application. I, the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. za. "& 0>'T Linda Off for Tom Cox 3.17.20 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: n—Mgazpermit fee: Received by: ,rW Date: Approved by: Y 1i Date: 21/J'1Z021, Notified by: Date: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwvutigard-orgov • 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY • ' STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www..t4ard-or.gov • 503-718-2421 • Page 3 of 4 sw " 1- '• Edge of Pavement Sireetlight I �•� Ditch I I i TY–pro'poos d"Se1werTine" CU N� Existing House I Q I =1 I Existing j Driveway a, I I a, v� I � � I o I I Existing Shop 1 Powerpole I 1. o e 1 I� _ 95_ ' j 1:ropeWline—-—-—-—-—- l Fira Hydrant(FH) I I I Scale: 1"=30' I I I TYPE 1 AND TYPE 2: MINIUM SKLA CI I REQt IRENIE'NTS (Put N/A if not applicable) ( I I r I I I I � North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard - 13125 SW Hall Blvd. - Tigard,Oregon 97223 - wwwtigard-oLgov - 503-718-2421 • Page 4 of 4 W ; LEGEND 1 X✓aF tUGT,IM6 1 1 ___.___. SVa VEYCRIUb nlry I , sN, �RE�YE-.RaN�rI..R,.I,x,�IN„x..Fa«I.ES WI-2 VT-651NEW): `TNq NaoNrmurwFEzuxsrul.ncDlmwnl.InrwrNs Install: N4N SU39669-VAULT CONC.56-xB4-A 72'OD UV-577 j POLES SU39640-CONC.DBL NON-SLIP VLT LID 56'x84542'575/577-Lid I POLE CUSS(;2,3,4,Hi,H2,S7 S _ LATERAL TAP UNIT 4 POS-3 PHASE Qv:m NT-CL - -- (10)ELBOW KIT-JKTD CABLE-#2AL WL3 PD4692: ^rC —POLE HEIGHT (2)DUST COVER Install: �ry (3)ELBOW KIT-JKTD CABLE-#2AL u U CONDUCTORS Remove: (3)ELBOW KIT-JKTD CABLE-#2AL -------swrAu Ae uuEm JxcPPRwAx+w 1-PW coxolxr _ at 1YEPRJxrOMIMiRY 'CREW TO LEVEL TRANSFORMER i ------ i�ilaaconomr AaRNoox rRwaArauB W L 5 PD-8187: -aro✓no Aa4xoavEn aelx PGR wlorsr Ins1aI1: r ro?e (3)ELBOW KIT-JKTD CABLE-#2AL1 s¢ EQUIPMENT B 162888 1 2000 Rr (3)E wsr.maulrRov rnwcAropw Rla mwzwa (3)ELBOW KIT-JKTD CABLE-#2AL I war�wsE E ear rl 1 -_.... 1 Ibj rxsraa swwM.w,ulrcoxc.u-,s,-.T,-ea uvm _ I -smvwo-cone eeE xox.tl.Pnnm i 1 NOTES: 1.MUST MAINTAINWINSASFTN VERTICAL SEPARATION FROM CANTER WINS AND 1FT VERTICAL SEPARATION BELOW. 2,MAINTAIN IFT SEPARATION FROM CITY OF TIGARD i CATCH BASINS LANDSCAPING NOTES 3,USE 4TM'BENDS,FOR OPEN BOTTOM VAULTS. WL4 PRE-CLEARS FIELD CUT BEND ABOVE GRADE TO PROVIDE SLACK AROUND%FMR FOR SWITCHING.(PULL TENSIONSASSUNE 90•BEND.) u 4.REPIACE GROUND RODS 4 E%CESSNE CORROSION IS 88 ABC 112614 DISCOVERED DURING CONSTRUCTION. 4 ABG 150 336PD-01eT y PDa882 211 S.GROUND ABANDONED CABLE PER LC22095•i. _ __________ ni r 6.CHECK COORDINATION OF STREET LIGHT FUSING. a6C2AL ___ = ve,� WTD BROB1 VICINITYMAP ] IdR IODi 55' .._..... ABC 2PL S'� 2 mx, 17- .w�.i...... 18080 PD'2 ,J1I .. WORK AREA • WL 1 PL-5806: ,•-•. wA 1541879 g Install: (3)142 CIO F700T UG TAP 44N PVC CONDUIT UNIT c 7 ? Remove: (3)142 CIO F100T UG TAP 4-IN PVC CONDUIT UNIT WL 4 PD-2: a,call Install: WL6 VT-8189: ELBOW KIT-JKTD CABLE-#2AL Remove: Remove; II so,rc�E.o-.xEne.urm:R,uw5 meR11RP IxweNExT SU61-CONC.VLT LID.56'56'6',DIAMOND-PLATE - -,,,,• PMRGn.En.Npn NEn.EX�clgefkall xorgl.Exr ELBOW KIT-JKTD CABLE-#2AL LATERAL TAP UNIT-4 POS-3 PHASE - ,.�•.., wX.. i+'�n xGcr,,la OP,�sxwX.P,X,o-lawl. (10)ELBOW KIT-JKTD CABLE.#2AL m N FROM ANYDEVIATIOFROO M THIS DESIGN MUST `VAULT TO BE ABANDONED.CREW TO REMOVE C_APPROVED BY THE PGE°en ITC7 :n'u r VAULT LID AND FILL WITH SAND. IGl)5 nFxnON: CAll8l3 BFPORF YOU OIG THINK xrG'w 04M.I✓VI r✓✓I.BLow R✓IESAWI'r(D BY mE oefWxwlm.m. non CExrzR. EnwEs uEsersoxTx rx oAn ss2-oazmlc SAFETY TM"ovGx Psaaolamo rou Marosraw mrlFt or iw,,FA. luxe meal IX1 Ulx nr FIRST rronENAnox cFxrzx ROAXxumarroxe Dai.vi.zan� rO REQUEST UIIIIry LOCATES[III INE MEGGN dl"MIMbelm on, IXOTIFIGTIONCEN IE R,IIIAIEEAI! 15e1ae YIII.M9 aBW u 1Iau51 NE55 DRYS PRIOR IO EICMVAPON 66-2 PGECANSTBVcm)N0uKVIG NCB c rJ VERIFILA ON , Fonnbn: Dab' Generel Foreman: Oab: blmmanuan - SDPA1ENG fEVIEW SBUkTBYCE51GNFf2: - -- SO0*020 1in=42It I 1070001 1000007831 M2743191 R \ UNJACKETED CABLE REPIACEMENT-DURHAM SOUTH L-604FT Q a 6C DURHAM-SATTLER 1Ta22 'ssss S z� w'E/Loanory �3 16285 SW BSTH AVE TIGARD M.97224 6 6EGM N FU PRI 1 NEW 677 VAULT 1 COw/rY EC 11 5 1 N WASHINGTON L2113B,C21MA 1OF2 I CESGYev —o'j 'Z D 20 4D 80 Feet r ...�. l 1 I 1 N ' TOM COX 503.69T.p411 STEPNA I K NZIE ao O IINYI GENFPK RRIC CO.-M1L PICY3¢ESExvED MENEEMEMEN N WL 2 VT-65LEGEND 577-PGE STITCH VALLI W/NON-STP IID ----------- 10#2 EPR in 2" HDPE CONDUIT PD-8187PD-8692 IP-1 30#2 EPR in 4"HDPE CONDUIT .o 'o�B' bry 1-4S 4 —1_4 NOTE 1. MUST MAINTAIN 5 FT. HORIZONTAL SEPARATION FROM ® SO o 65 z PL-3906 2. MAINTAIN WATERMAINFT. SEPARATION FROM CITY OF TIS AND I FT. VERTICAL GARDLOW. f jJE-'( CATCH BASINS. BOTTOM 3 J FIELD CUTS ENDS ABOVE GRADE TO VAULTS. TO PRO DE SLACK PD-2 FOR SNITCHING. (PULL TENSIONS ASSUME 90'BEND). 4, REPLACE GROUND RODS IF EXCESSIVE CORROSION IS DISCOVERED DURING CONSTRUCTION. WL 3 PD-8692 5. GROUND ABANDONED CABLE PER LC22035.7. RB. CHECK COO EXISTING 3-PH PAD RDINAPON OF STREET UGHT FUSING. mMr e�o¢P uHja omrx —._.. Y xrt Zi/.fDYMtf x W TO Yr-65 PRIMARY CABLE & CONDUIT TABLE CONDUIT PNNMRYCAEIE3 "WILT INFORMATION ,s LOCATb1/ Sn QTY lENBTN 1ENGM PULL Hill CABLE LENGTH LENGTH •� wno m ouvx s� mµsadER PM- (inl DESIGN ACTUAL ASIA, OERGN ACTUALFonmin COmPNM CCxWIT CCHPQIRAMW RIDM 7D IN (ft) (IOF) (161 SI.&TY9a 1111 (<I) NOTES o.xw PL990fi VT-6S 1 1 ?u 111 109 Biu TPS 283 VT•6S POEM 4 3 32 19 17 82ALTM 52 VT-65 PO2 2 1 75 12 u RALEPR % WL 4 PD-2 N-6S M187 4 1 155 111 82 QALTM 275 x°m See. ---24• } nay sift AtI EXISTING MICROPAO rvn soc "•"L°"ft oTmrn Owa Unnn.. Wsoca TOMI A 2 7S E1ALEM % Ma. ® caa wG P E o° TO VT-65 x.�r N P 409 RAL[1MTPX 809 T,...n N /� wx FT...� TOTALS W wo U C at tY 1-N'in �CMUNW 14• TRANSFORMER LOADING -�_.-- RHASE SIZE! COE NIV NEW PH CHANGE? CONCUT,a l rIAD GUR�nON AEC 1125 611 AEri NO NO rmr.en A IS 41509 INl MO _.. AEC ISO BEMISAS-wXO NO ATTENTION: CALL 811 BEFORE YOU OIG OREGONIAWREQUIRES YOU M FOLLOW RULESADOPTED _ THINK BY ME OREGON UTICITYNOTIFICATION CEMER. ' x �Pjo w,,.IT nor EXIIISLT G3DPH8187 PAD THRq/GN B51-001E-0090 YW MAY ONTAMI CWOPESOF I SAFETY THE RULES BYCALLING THE OREGON UTILITY - TRENCH-FOOT TABLE FIRST! NOTIFICATIONCENTERADMINISTR MNO(W0 232-1987J 1O REQUESTUTILITYLOCATES.CALL THE OREGON eI o¢vnNxj xau - COMMIT UTILITYNOTIFICATIGN CENTER,All ATI-EAST Know Whel'e 6B OW ,K LOCATION SIZE O7V LENGIN LENGTH 2BUSWESSDAYSPRIORTOEXCAVATION. CBIl beforB you DIG. Y 1Y Rta¢V WIEI nl - xu x cw ON DESIGN ACTUAL PGE CONSTRUCTION DRAWING FROM TO ((y (N) SDPEVENG REVIEW. AS-BUILTBYDESIGNER: ?A.a c 113906 In 4 1 11T AS-BUILT VERIFICATION 8 NESC VIOLATIONS CORRECTED IPI PD8692 4 1 27 This tloclBneM accwafely repmsenfs FIELD constnrc8an. IPI PD1 2 l 70 Foreman: Date: :7. IPI VTfS 2 2 5 GF: Date: `TOY W-85 VT-65 PD8187 4 1 155 OATS 1/29/2020 SCALE IIA=421AaauNr.1070001 Al ):1000007834 AMNO.M2743491 mE UNJACKETEDCABLE REPLACEMENT-DURHAM SOUTH L-604FT cpwr. Sze ioul "A �GE DURHAMSATTLER 17X22 / LO 16228585 SW 85TH AVE,TIGARO,OR 97224 O (4)SEGMENTS EGMEMS OF UG PRI,(1)VT-65 VAULT couNTY SECTla4sl: IYORXIHIN sREer LocATION WASHINGTON C2113B,C2114A CRflY CEMER OESM.NBY MpIE vR,,mBY 2o{2 ADDRESS I I TOMC OX 503.867.0414 JOHN DUNGAN ADnREss 2 ®PORTLAND GENERAL ELECTRIC CO.-ALL RAWTSRESERVED Page 94 2011 Edition Self-Regulating Lane Closure Diagram 350 Use this detail for closures of one lane of a low-speed, two-lane, two-way road. 1. Use this diagram only if all of the following are true: a. Work space is less than 200 feet. b. The posted speed is 40 mph or less (unless not posted and speed governed by basic rule). c. Average Daily Traffic(ADT) is less than 400. d. Sight distance (in feet) is more than 750 at each end. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 3. For added visibility, a truck-mounted arrow panel or PCMS in caution mode may be used. 4. A"Lane Ends (Right)" (W4-2R)symbol sign, or`RIGHT LANE ENDS" (W9-1 R) sign, may be placed inside the cone taper for more emphasis. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 30 1 100 40 350 350 350 125 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 95 Self-Regulating Lane Closure Diagram 350 ROAD ---J—11 1 I t WORK B Initial AHEAD • Warring • Sign I • A • ONE LANE i•® �� ROAD I AHFADProtection Vehicle • :=F] YIELD w/TMA(both Optional) OR TO See Chapter 4 • ONCOMING r TRAFFIC • Buffer • 501-100, • �ORV-1 A ONE LANE B ROAD AHEAD ROAD 1 C WORK Initial AHEAD Warring Sign December 2011 Chapter 5