Loading...
PFI2020-00129 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT ,g COMMUNITY DEVELOPMENT Permit#: PFI2020-00129 T t GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/14/2020 Parcel: SEG3441 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Frontier- Replacing 5 poles Project Description: SEG773, SEG702, and SEG3441//Frontier to transfer to the new poles placed by PGE and remove the old poles. PGE replacing 4 Frontier poles located on east side of SW 69th Ave just south of SW Baylor Street for their reconductor project and replacing 5th pole that is defective also located on NW 69th Avenue just north of SW Baylor Street. Permit application is to work in the ROW. Class of Work: FEES Type 1 - Utilities(gas,electric, data) Description Date Amount Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: ROSALIE SIMS 4155 SW CEDAR HILLS BLVD. BEAVERTON, OR 97005 PHONE: 5033197787 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See ./2P (2. — Issued By: TI r1� Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2020-00129 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities • 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAUCONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED • City of Tigard APR 0 F 2020 PFI #: 2020 00129 i s ENGINEERING DEPARTMENT "'''A'''r-) TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION PGE REPLACING 5 FRONTIER POLES SW 69TH AVE TYPE OF WORK Project name: X TYPE 1 Franchise Utility Work Frontier to transfer to the new Poles placed by performed by NWN,PGE, or utility Brief description of project: -PGE and remove the old odes. agencY PGE replacing 4 Frontier Poles located on east side of SW 69TH Ave just south of ❑ TYPE 2 ROW Sidewalk/Driveway/Sewer SW Baylor St.for their reconductor project and replacing 5th pole that is defective Work performed for the purpose of: also located on NW 69TH Ave just north of SW Baylor St. Permit application is to Sidewalk installation or repair work in the right of way Driveway approach installation and repair SITE INFORMATION SEG773, SEG702, & SEG3441 Sanitary sewer lateral installation and SW 69TH AVE AND SW BAYLOR ST, main line tap Location (address if available): ❑ TYPE 3 Full Scale Development Work One Pole located north of SW Baylor Street, the other four poles performed with land use approval which are located south of SW Baylor St and north of SW Clinton St. includes any of the following: Subdivisions or Partitions APPLICANT INFORMATION Street widening Name: FRONTIER COMMUNICATIONS Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 4155 SW CEDAR HILLS BLVD water service area BEAVERTON,OR 97005 D TYPE 4 Small Cell Technology City/State: Zip: Phone: 503 319 7787 ❑ TYPE 5 Tigard Triangle Email: rosalie.h.sims@ftr.com Phone: _503 319-7787 _ NOTE: Type 1 and 2 applications may be ROSALIE SIMS emailed to rowpermits(w.tigard-or.gov. Contact name: Phone: 503-319-7787 Email: rosalie.h.sims@ftr.com CONTRACTOR INFORMATION 0 Same as applicant Name: North Sky Communications CCB Number: 208747 Mailing address: 10860 SW Clutter RD City/State:-Sherwood,OR _ Zip: 97140 Phone: 503-647-9991 Email: 503-319-8405 ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes VI No Case number: City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov 503-718-2421 Page 1 of 4 APPLICANTS NOTE: Person specified as Applicant shall be designated Permittee and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. With the e ception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authori anon from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authori anon with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: To the best of my knowledge,all the information provided within this application package is complete and accurate. The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. If the application is granted,I will e ercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Digitally signed by Roselle sins Rosalie Sims°"NRva&Sino,a=Frvntn ematisoehe h si.W. emeiloroselie h.slmspfn mm,c-US ��=g2R.gytt tt:sg:y -0100 Rosalie sims 4-02-20 Applicant s or authori ed agent s signature Print name Date Property owner s signature (if required) Print name Date STAFF USE ONLY Case No: PF12020-0012 Permit fee: - Received by: Sc Date: 04/03/2020� � Approved by: Date: .4//3/2Q Notified by: 1' ' Date: 'I I _ __� City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 www.tigard-or.gov 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10 of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer s estimate 7 (less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer s estimate 12 . FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3- Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover Site, icinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type use: 0 Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water uality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 www.tigard-or.gov 503-718-2421 Page 3 of 4 c; 1\ •• \I .. SI Ed le of Pavement • Streeter t,f Ditch 'r / yam.,. J. i T—�iTlir•s d'Sow'erMFF-- 1 N . Existing House I I �' I Existing I .. ,atD)iyeway :I of 1 cr =1 `nl • a, i A� 1• 41 1 a�I ✓ I 'El Cr—11 I „a �� . l 1 0 • Existing Shop I \T . Powerpole I I .2 ! `1"\ I r I� 95' I 1 p------ ! . Fire Hydrant(FH) I I • I Scale 1-=30' I I I I I I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines dimensions E isting utilities locations (sewer,storm,water) Street street names All e isting structures Proposed work E isting curb or edge of pavement Utility street light poles E isting S/W or D/W apron Slope of property Trees City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-otgov 503-718-2421 Page 4 of 4 / x 0 20' SW ATLNITA ST AKF 25 24 PGE TO REPL FTR BOP 250532 SW ATLANTA S7 (SW ATLANTA ST) _ _ -— - BBGTD 20.1551-1552+ FTR TO RETAN OWNERSHIP -----� 1m,1553+ J45-31(01.19fi6) ---_—_ _ —POLE BBCTD 2Q1554-1570+ WKIW PT4240479 45-4 250533 INN C113603980 X tOM STRAND 19856 BBGTD 120,1572-1575 AE 900 FRONTIER - 0, N.y}� SPLICE BBGTD 20.1201-1275+XD.76-100+ , ,� }�6. 0 309' BBGTD 20,1301-1325+XD,12G137+ 0_�0Q 10:'IX 9k NEW PGE-4 ' AERIAL SS 900.25fr AE 100 24 XD,1338-1349+BBGTD 20,1360-1396. TGRD Mn y.G'10,v..3 N'yA POLE BBGTD 20,1501-1552+ XD,I397-1398+BBGTD20,1389-1400. 7R3fi 0 .S'y0�0� XD,1553+ XD,201-709.X0,110+XD,71141W. yiS)p�}tp 7" luG AE:900-26 BBGTD 20,1554-1570+ XD,201.225+XD,826900 • t:.F''i',a u;0i;,:e'iq;v:, 1 FROM NH 7-236 XD,1571+ - SEE SHEET BBGTD 20,1572-1600 PGE REPL FTR POLE , 250533)) 250533 EMPTY AERIAL 165' (45-5)(01.1950) C113604664 45C2 SS SOO26 X PLACE STAND OFF BRACKET TO ATTACH RISERS O 257' BBGT020,1201-1275+XD,76-100+ 0. AKF 200 24 BB 1301-1331+XD,132-137+ K. IC1f36D4M)41 PORTLAND GENERAL (FRONTIER) ELECTRIC BBGTD 20.301-400+ XD,1338-13438-1349+BBGTD 20,1350-1306+ BBGTD DCA,1201-1275+ X0,1397-1398+13130T0 20,1399-1400+ PT3969042 XD,176-200 XD,201-709+XD,110+XD,711-800+ W I RISER POLE WITH 900 PAIR XD,201-225+XD,826-900 t, RISER FROM MN © 25' AE-STUB 300 24 wI BBGTD DCA,1701-1750+ O PGE REPL FTR POLE BBGTD 20.1551-1575+ SW BAYLOR ST 01 H BBGTD 20,1376-1400+ —-—-—- - -—- SW BatLOR ST (SW BAYLOR ST) BBGTD 20.1601-1650+ O __ o -—-—- --_ XD,151-156+ 264046 C113505044 p F a+r —T —_� —---- _--_--__-_,- BBGTD 20,1332-1349+ (250540 p � XD,175-200+ ��n� (454)(�1.1967) 34844 C113604666- —'� BBGTD DCA,1751-1775+ (C1136046631 FRONTIER 34824 C1138D5144lor BBGTD 20,76-100+ �y (FRONTIER) 250540 FRONTIER X0,251-300 1" '�• I I C1136D466350C3 X+",t) PORTLAND GENERAL © 560 07.2015 Ge V J 24-F1BER 24 0 4) �y0• I ELECTRIC PT3974903 TGROORXA FC2038,335-336+ I,Q FIBER RISER ON POLE SEE®FOR UG UG 1540 07.2015 XD 3-24 �p�J O FIBER COUNT SPLICED INTO®AERIAL 24 ((34840 FIBER CABLE.FIBER COIL ON POLE. 7GROO�RXA FC2038.335-336+ p 1 (454)�01.1967) XD.3-24 0 (34840) (C1136012025) CBD1202545C3 PGE REPL FTR POLE i0 0 (FRONTIER) PORTLAND GENERAL ELECTRIC © 57' AERIALCONSTRUCTION NOTE BBG6 TO 20,1576-1600+ .I I ill t.,164 .T� PT397`.1052 PGE REPLACING 4 FRONTIER POLES FOR x0,26 NO FTR RISER RECONDUCTOR PROJECT ALONG SW lo • 34839 AERIAL 650' PLACED CN 5057440 ct, -. 7ss'q, 69TH AVE.PGE TO OWN NEW POLES Q AKF 900 24 ; I I H 61235-4. 'o WORK WITH PT TICKETS,FRONTIER TO BBGTD 20,1201-1400+ rn , BBGTD DCA,1201-1275+ (34639)) TRANSFER AND REMOVE THE OLD X0,176-200+ 454)(01.1967) C7136D466245G3 POLES. BBG1 20,1501-1662+ PGE REPL FTR POLE I 1c1136D4662i PORTLAND GENERAL . (FRONTIER) ELECTRIC XD,1663-1664+ BBGro 20,1665-1875+ - I D _ PT3974946 SEE SHEET 2 FOR VICINITY MAP. f fron-h er. 66GTD 20.301-375+ BBG7 NO FTR RISER 1 BBGTD 20.1751-1775+ I IBBGTO19,3 BBGTD 20.376-400+ I D101s7s-16LD PERMIT REQUIRED. PER CITY OF TIGARD. Ca-cr.or car,o-,s BBGTD DCA,1701-1775+ XD,651-850+ I FLAGGING REQUIRED. TGRD NESC CIAC PGE REPL 5 FTR POLES BBGTD 20.76-100 ----__ SW CLINTON ST SW 69TH AVE RECONDUCTOR PROJ. II ' _ _ REVISED 4-2-20 PGE TO REPLACE PROJECT C.O. REA:TGRD 02sosts 01136D11 DEFECTIVE FTR POLE#250532. NONBER 5256500 I EXCR.CODE,61361 O AERIAL 520' REMOVED ON 5057440 DRAWN DATE: ENGR ROSALIE SI NTY:WASHINGTON FRONTIER 250537 C1136D4549 FRONTIER TO RETAIN OWNERSHIP OF 0401-20 PHONE: 503a157707 aE. 2020RH05250560.1 55 900 26 FRONTIER THE NEW POLE. SCALE1=100 TAX DISTRICT: DWG 1 OF 3 [) TWNSRP:IS RNG: 1W SEC:NO NO WORK THIS SHEET TO MH 237 TO MH 236 FC2038,335336+2XD OO U RBN SM-24 O0T102:1-22+28XD+51-72+ o 0 28XD+X:1.4+2XD UG AES:106-22 \ 0 0 O 6 U AE2 0 /C2 O O 0,1-225+25+675XD _Q 0 C20,1-250+650X0 v = T102,1-25+51-75+ LV Tn AE:9-24 — ci MH236 XD.1-4 W 4 — G UG UEB54-22 Z o CI MH235 .4 N H..1 / CA F 1.. C20,1.250+650XD— �� \\\ AE:9-24 / 0T102,1-25+25XD+ \/ C20,1-250+650X0 T102,51-75+ 25XD+XD,1-6 O O I —UGAKF:1-24 O O AES106-22 22XD+1102,23-25+C20,226-250E O O 22XD+T102,73-75+25XD 0 1 O O O 10A1:50-24 22XD+7 102,23-25+22XD+T 102.73-75 0 A 1 TO C.O. 0 TO C.O. O TO MH 235 TO MH 234 f ,tFo1 ■ ■er L39 MH7 L39 MH6 Coy-,ml.r GONDA, MH236 111+15 MH235 105+55 TGRD NESC CIAC PGE REPL 4 FTR POLES 5106TA 546-7876685 5106TA 546-7876685 SW 69TH AVE RECONDUCTOR PROJ UG1S1W36D UG1S1W36D PROJECT CA.AREA:TGRD SW 69TH SIO ATLANTA ST SW 69TH 5/0 BAYLOR ST NuuoEo 5256500 EXCH.CODE:s,151 DRANM DATE: ENGR: ROSALIE SIMtNrY:WASHINGTON 02-22-20 PHONE: 503-319-7787 f 8E'. 2020 RHS 5256E40.2 SCALE:1=100 TM DISTRICT' DWG 2 OF 3 TWNSHP:IS RNG: ,Al SEC WO VICINITY MAP tAr L ooald s 9 I F .... F " ' [he Hert,ary Q a Oregon Education 0 r t. Association Petco ; 5 Smart Foodserwce el _ 0,y i Warehouse StoresSW v ?? Regal Tigard 9 Oa) Costa,Gas 9 e V Oaf ni 1 COMO Wholesale Q 9 -P el S m a rt ? 1 rrr E oj ''- Enterprise Rent A Cal 're E ; d ‘ c.^,,, (I .Jr , 4 Park 217 9 landmark Ford l incoln 9 Value Village Walmart Simercenter Q i _ .... - r $ III Consumer Cellular 9 Sykart Indoor Racing 49 GOOttie ,irr irorrt$1131 ',J, Map data 42010 °Med States terms Send feedback SOON, • PGE REPLACING 4 FRONTIER POLES FOR THEIR RECONDUCTOR PROJECT SW 69TH AVE AND REPLACING 1 DEFECTIVE FRONTIER POLE. 51351-5256500 5460-TGRD 1S1W36D WP3 OF 3 N Page 84 2C11 Edition 2011 Edition Page 85 I Stationary Lane Closure with Flagging Diagram 320 Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way I roadway. See the detail inset for the layout if using a single flagger to control I c both directions of traffic on low volume roads(less than 400 AD-7)with good :m sight distance as discussed below. m s o. 1. Use truck-mounted flashing warning lights on work and protection o g¢ 0 vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. I rn 2. For added visibility,a truck-mounted arrow board or PCMS in caution ' _ t 1 as mode may be used. w a t' mo a.y 3. Flaggers at each approach are required if any of the following Lu a occ 0 r t— conditions exist: 40.4I a. Night Operations. 4014 b. Work space is over 200 feet in length. 40.4 c. Sight distance is less than 750 feet from each approach s • o0y through the lane closure. ' L= •• >0a d. Traffic volumes are greater than 400 ADT. I • o`s t "ic �a 4. The length between the Flagger Ahead signs shall not exceed one �e .L i I t E E • II11 /� 2 o mile. Use Diagram 340—lane Closure with Pilot Car if exceeding one mile. • 3 5. Cones should be used to outline the work space when curves or other o !" i T `�roadway alignments prevent clear direction for the motorists to pass — I :E1 ' — the work space safely. c E 1: / I •• a.E i , 11 6. Cones along the work space are recommended when posted speeds p� O?g i ••. are 45 mph or greater, when working under heavy traffic or when travel �1 A c> lanes are narrower than 11 feet. co coo <� 7. Extended queue signing(see Diagram 5-4)should be used when ® 1 .r 1 o traffic queues extend beyond the initial advance warning sign. o i r r `ii' / o c e 8. When flagging near an intersection, the Flagger Ahead"(CW23-2) I rn Y1 I '� a sign should be visible to traffic entering from any side road.Additional m advance warning and Flagger Ahead symbol signs may be placed on W the side roads). g& o 9. Sign set-up and flagger placement shown may be used for intermittent Slgn Spacng and Buffer Lengths(feet) O S full road closures of 20 minutes or less. posted Spacing Between Signs Buffer Speed p 6 C Space 10. The"ONE LANE ROAD AHEAD"(W20-4)sign is optional and should 20 00 00 00 s be considered on high volume or high speed roads, or when extended 100 queues are expected. 40 350 350 350 5 45 ,60 50 500 500 500 210 55 250 Chapter 5 December 2011 December 2011 Chapter 5