Loading...
PFI2020-00132 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 114 s COMMUNITY DEVELOPMENT Permit#: PFI2020-00132 T[G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/13/2020 Parcel: 2S 115AB00200 Jurisdiction: Tigard Site address: 16164 SW 113TH AVE Subdivision: WILLOW-BROOK-FARM Lot: 25 Project: PGE Job#M2743411 Project Description: SEG2624//16164 SW 113th Ave. (Easement)Unjacketed Cable Replacement. Durham South D-3216 Ft Class of Work: FEES Description Date Amount Type 1 -Utilities(gas,electric, data) PFI Permit Fee 04/10/2020 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tieard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: TOM COX 2213 SW 153RD AVE BEAVERTON, OR 97003 PHONE: 5036126093 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: S�ecjU ' Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2020-00132 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association[ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13- DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, Trent Brickey at 971-228-9269, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED City of Tigard APR 0 7 2020 PFI#: 2020-00132 • ENGINEERING DEP8PI LARD TIGARD Public Fa E '1mprovement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2743411 IR TYPE 1 Franchise Utility Work performed by NWN,PGE, or utility Brief description of project: agency (EASEMENT)UNJACKETED CABLE REPLACEMENT-DURHAM SOUTH D-3216FT ❑ TYPE 2 ROW Sidewalk/Driveway/Sewer Work performed for the purpose of Sidewalk installation or repair Driveway approach installation and repair SITE INFORMATION Sanitary sewer lateral installation and main line tap Location (address if available): SEG2624 ❑ TYPE 3 Full Scale Development Work 16164 SW 113TH AVE -WOODSPRING APARTMENTS performed with land use approval which includes any of the following: Subdivisions or Partitions APPLICANT INFORMATION Street widening Name: PGE Linda Ott Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd DR water service area City/State: Beaverton, Zip: OR 97003 ❑ TYPE 4 Small Cell Technology 503.612.6093 ID TYPE 5 Tigard Triangle Phone: Email: preregcoord@pgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: Tom Cox emailed to rowpermits(�tigard-or.gov. Phone: 503.736.5419 Email: prereqcoord@pgn.com CONTRACTOR INFORMATION 0 Same as applicant Name: Potelco CCB Number: 76668 Mailing address: 3884 PACIFIC HIGHWAY 99E City/State: Hubbard OR Zip: 97032 Phone: 503.902.0244 Email: tjriesterer@poteico.net ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? DYes ElNo Case number: City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 www:tigard-or.gov 503-715-2421 Page 1 of 4 APPLICANTS NOTE: Person specified as Applicant shall be designated Permittee and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. With the a ception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authori ation from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authori ation with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: To the best of my knowledge,all the information provided within this application package is complete and accurate. The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. If the application is granted,I will e excise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. 1.tua Ott- Linda Ott for Tom Cox 4.7.20 Applicant s or authori ed agent s signature Print name Date Property owner s signature (if required) Print name Date STAFF USE ONLY Case No: PF12020-00132 Permit fee: ,4e 2i Od Received by: SC Date: 04/07/2020 Approved by: Y re4-i/.d Date: ���'/Z Notified by: m- Date: City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit INITIAL PFI PERMIT FEE Pan 1: Required submittal fee is 10 of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Pan 2: All non-water system improvements engineer s estimate 7 (less the initial PR Permit Fee). WATER LINE CONSTRUCTION FEE Pan 3: All public water system improvements engineers estimate 12 . FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑ Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: 0 Public Right-of-Way 0 Private Property ❑ Cover Site, icinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water uality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 wwwtigard-or.gov 503-718-2421 Page 3 of 4 Edge ofPavemem t— Ditr}: _II". Streeth,Pub I r —•—•—•— •—•—• -{:,7 r—•— ` A P.?..Dian. I I I I 'I Exist ng Hause Ir.• --i I I :a�tiag 1 I • C IIvr«ay �f i I I al / I a1 �! �1 1 a _ r I �,t04. 1 a! 1 1 nl I Ex,oho,Shop 1 r 41, I - I�„Ie I o • e I I I I , I = ti.,et.S„I ; , I I P11�J I I -case -•-,11 I I I I 1 I I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines dimensions E isting utilities locations (sewer,storm,water) Street street names All e isting structures Proposed work E isting curb or edge of pavement Utility street light poles E isting S/W or D/W apron Slope of property Trees City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 vnvw.tigard-or.gov 503-718-2421 Page 4 of 4 ----- •• wY-ar ' AN3•N1 ei LEGEND a w[e.a. SW ^Og1.0... q " % ___r sumac u w f dv ,tsra �I.ocd4/n w.es. Aea ram '"" c py mar �u ni NW 811YYEPHEI➢OR jM .,., .[{� MN wooer MR..A. !ALF•h[vra ./ no R M i 49i POLES�FUlE fM66(f.3.;I H11Q.51 A]••we (/ Y xt a eDa. y \ .'r, 1w.. tw ruu .rffia �PNENEIOHT m Aso .ix. 6. aV CONDUCTORS is Y • a♦ -.[wre0aY4 • me, A„,,,.owu.wa[ma.a �$�$;- .'VIAru ._�.LfW1MCx04 eW-eeuunuR,Fxnue' • rm1 nuuuasu�rw.oarrn.v.r.,rxs[swn A Fwvrn.srualow,n,xmna�. TF - HrtrwiwWNgiNWF1]IpA 10 conRsr.,1 r✓e'eRaY r •on.[nnr.eemrrrxr.[r.[[ .Nz n1 AM eMw mYxeouEenxYaenm �u ' "NiMtg OTE4 � M......,.a...w n,a.e....„�r•v.-.rorce. UEVAENT vat _ WL B VTR. rr/., 4�A. BNT31> rox vrer PONT IAMNME. 4 nrMarru.wwwx.reo vrmn. na CO 45 NUBS SEED 13NAP .[3 _ vrvm.arn.a..wr ro no�*ama. •N3 • PIS tlN] m,wrvs�e wax _"p1y" 1s Ea Y _ „w Y SL N INIAH.3 Il N4RZ�: ru •.YYT _ •--. " " WATER VUNsAVE rt 1.E -'La. m SS41 ] V4VTyN r FT$EP n Ar y� • /J ae[ s/Bo Bw. 1 AI, LCD F. rw q a M Pe' ,/ ..ra a.,8EM, 104 FON w�.,R•NN-wi•Ua[.tlx. VE TJ.M4 1 YLL h, -FFA� • ..: n sum, ,iftV [ iEPI8e CF EIA'WpF F twu,wawrsurt0n VT rev ue a.. 5 DISC JAPES O NO O r 1.8.52833.... wTwvn w A e0l9Ae 0 ]rECN Cop1O•1611MM or MEET L1FT'.FNVaSp Ny4 • n rcw ry.l5 MOW - FP,e • eNA • 'VICINITY MAP t 1N• ' ye inu1E w rnm.w+ 7 P16ENI YOBB•PRYpAMBIYEWR _ •ppr PPtr rF _ .._FCNMn 3t ♦T ♦___ KY". • DI 44. i B100[Hf au .r - $u (Err ,1261 • • N _ .8 rib(APEA �mrol.vr.o i Y". I [miiwr[m..m[+u.erl r 61.26510 • FPaeu �= x. its (T• , t lIt .: I I• oa g a �OAT5 Berl • 'd ] yESt f :sln __ 1 E .. Ra ,SINE e 1 iE 1!1 nat x ; . [no. E r.e oneox ree e • • e IWVDE11411ON FltO, In IS JL S,GrJ ✓SI y B1NNfi pY REAPPROVED BY iNEWEPRO/Ki MANAGER i _ 0 r... -wm CNl[-nu �u1ll•9NE�IfPf4 r Oo•w/w[-VN[Ube4 eP" 10& THINK ,.a'• N:3N SAFETY ^' n�BNem..,•[.,,. new" Bw. 1e ,rt�. i -mu.e•n.wwu as �� mAm.IIPTINCATION CENTER.MAT �1N•••net le C �� YNn 'MAIN NN•WaLTIMAIMI,rxmmr¢nror••rvr• qe.wm wa.nr .v etnL]F SrFN•xSISCC•II•NY11N••FFNWON)I mVurroe qNEc.YA--0„ n W., ,•• Fww,rvi: �: �..j ^ n.ar... cn.YFea•m: . •aroma r.o.+nww.r.a.rw� wdb cwi S �.r r WM* NNNInmCvlWnit 1.��q �u 1 10oo067W I rm/''1' .lN 1l>IN •91e m3.1 ar• nn, Or T.4RIun.u.w.. teae,.7 �..n M� mmtln-ton io10001 ANn \ INJMJ�1EUMIBSF1EM1EL£M-OURIYYlW1110.erp1•mrt I. rt'Wi] F.v r AN 1INLl a q. apw• 1IONS 6,1,...WAFIELO 11IiL A'?`vr.Y P1 44 .- \ m+a. .,Y Es.we maa.•A W \E/• r ..�.Bw nnrlwE nuao.Fm• y�i N ENrs RINMV OI NEW NO WU E• n+/• 0134:4 mre �MA Ase]wl �'�1 gMF�(1,1 L�y84144p LIB N wen 0 M M 171.2 F• .r. •33BNN �. ��{,�/ ^^s^^`liPYl Ctir51 pax IBFB r r „ w' TT 1T0 m F . "^ate/ N ^'^"^1MCON W]Ni M111KYBGMFRtlfZ oa1' ......1.......0.4480oUr[wuuma'[e u1•9111 iaaan® ALL 2 VT-153(NEW) WI 7 PD-29 W. 12 PO-16 1 1 , LEGEND x 5 *. pKG � j .. 10#2 EPR in 2"HDPE CONDUIT '� r -- -- 30 1/0 AL EPR TX in '+ "•- I 4"HOPE CONDUIT /� �..�... • LI,-,u, cores. �/ TO A EO 11 1. MUST MAINTAIN s FT.HORIZONTAL SEPARATION FROM Y4210 PD-O04- 4TO vl_I53 (INSTALLED CN� �-� (HEWN WRNNI SOUTH N) -J 10 FL-Is WATER AND 1 FT VERTICAL SEPARATION BELOW. 2. MAINTAINN 1 1 FT SEPARATION FROM OTT OF TIGNN CATCH BASINS. S. AS USE '/90'BENDS,FOR CPEN BOTTOM VAULTS,FIELD WI_ PD-26 WIU APO-JO CUT BEND ABOVE GRADE TO FROMDE SLACK FOR r 1^+'. SNITCHING(PULL TENSIONS ASSUME 90'BEND). E REPLACE(ROUND RODS IF EXCESSIVE CORROSION IS DISCOVERED DURING CONSTRUCTION. 5. GROUND ABANDONED CABLE PER L -J. MI 5. CHECK COORDINATION OF STREET LIGHTIGHT T FUSING. TO PO-2/Fi L(MEWV`'-ISJ 1O VT-115w)4J L 10 PO-29 rI InnWL 4 PO-27 A IlV C WL 9 P S.D-1 per .,.. .�.� / I mza um 1 MillkoN m it 1 Cu TO PO-26'' TO VT-ISO 410 VT-61 INSTALLED TO PD-29 (NEW)E- ON DURHAM SCUM K) i.1 'H 14 wL]E:... i. uy[wa V✓L t0 PU-J1 AFTEll101r CALL HI BEFORE YOU DIG • IA�,h .m I THINK 0REa0NUWREOUNTES you TO FOLLOW REESABWJ'IE0 avTSE IZESA VSET FORTH TYICBIiErt 1NOOERUE3AREDRO.TO AMY OVE BM N COP SO ,as R.1 SAFETY InTO00OFTBVC 1AN9 YCUIMYMTANLCTESCM • WIE RLLElTO GENDER TNEDAEOLWONO(1 uL. FIRST! ,rmT aFours uTurvpwuLl LAUa/THE l Y;ut-THe oRE4ox way.Wlrw9Me. 1/•1270,7 E IC c BI SATAN Cr 6FAlIWY��. 11 POE CONSTRUCTION DRAWING J•1_ SDPMIENG REVIEW I AS-BUILT BY DESIGNER: i i TG vT-I5H \ro vT-15A AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED TO PO-27 E-1 L-.(REN) TO PO- , /(0EW] This document a)AIIOI YArywen.FIE O construction Fatenlsn: Deb: OF: Deer: wL 6 vt-154(NEW) ( S r - WI_11 PD-15 WT.'2DO2020 RR..I I VI l Acmum 1W01 IABM 10000071E IAMB.-AC1 A3M1 Pl{ •:. LT - `' Iv w, N IP ID \,JI�Y ,ew,N, ..mA, w. UNJACKETED CABLE REPLACEMENT-DURHAYSOUTH 5-3215 FTea ignIg / DNS 9 A , tlxTT �I� - -,; �E 1H&SW 11TH AVE,MAF O119722I aM Cfsawynont 111111 4 e-. ,l / \ 15EGMENI3OF 1./0 PRIMARY.(!)NEW 60 VAULTS ,., _- - M a�WASHINGTON C2auSA ` amg writ sneer: MxswvnLE aon a \.,.�1-� I r s.o. UN CENTER LFLIAM dimm er- .. dimFr K.MINAO. TOM COX 5055107.0114 JCHN DLNCMI TO PD-31.-= 1->TO P5-16 MILedWLLE,OR(FOX ®PORNANO OETERALF,ccmw cc.-ALL Al6II15NEIIERVED TRENCH-FOOT TABLE TRANSFORMER LOADING LEGEND . PNAN SIN 6 TOP Kw NNW, N,OMINM? CONDUIT • n Nu NO 16•l0. . ITMATM1l ,,,. ow MUM M I • ILO ssn so too 10#2 EPR in 2"HDPE CONDUIT .... MUM MI • n enT w VISION • m - MIS _.NO Mp. . WON TO :I'. ON _- - 30 1/0 AL EPR TX in P..;N, ;,, - • 1 3 7, : W NO YIS NO 4"HDPE CONDUIT NL HDTFG O; RI iu 1 1. MAST MAINTAIN 5 FT.HORIZONTAL SEPARATION FROM M7 +' + PRIMARY CABLE&CONDUIT TABLE 1. WATER I"FT CARAT ON FFRCOM SEPARATION of TIG RRoLOM- OF O6W6 _ r ' K CATCH BASKS. • iVl hex 1 I(` CONDUIT PRIMM.MAIM ASr01 WFUNATun 3. USE•EN 90'BENDS.FOR OPEN BOTTOM VAULTS.FIEL➢ Na a,t _ t 7741 t0CAO•I CUT WATCHING.D(POVE ULL TE"ADE TO ASSUMEE SLACK 90'BENOOR q:' IMF } 1 CO SYE al LINGO! l[NMTM Mill : Mill TAM MOWN IENGIM b2n.n Complete tw MI M.G.I ACTMO. I I"V MUM ACTUAL 1. REPLACE GROUND ROOS IF EXCESSIVE CORROSION IS Rw 1 1 ,'. _ Di J 1+T-lY 1 I 1(61 i'. VP19I N]0 R !1 '.' ;G.I 1 l Y'a(.1.5' 1� "R' wTFS G. CHECK CCCORONAPHDISCOVERED DURING C OF STREET LIGHT FUSING.PS 1 1 _ B. GRWND ABANDONED CABLE PER L 1. LIGHT FUSMC. VT AST M• I ( 1IR {D70 R1) fly !i !I elY(4G ClI RM l 1 Po-n pj - R 1 7Atvu -1 1 (o R5l j V0_LfU IN 31 i IN LI'. Ila IF: MN I 1 III W..N Po'p - R 3l3 11 µl .IN;VP '>'s iv. e 1".l: I PON P0-Yl ] _ iit _ VL.IY t Na l 1N[Fa _ 1E.1 Toe* no, VTLN I R]3 i AN e: 57 v1a PR +174 114 r is.I roll 7 M vl#(,. M-il 1617 Rtl a 1D ' gYIT OA Tool I WA i , ' I9S4 MYTH ' TIH IPA • I1 10T 61 6L.1ybM Mt TIT Y 45 I l]Lc •I-1' v • . j%/////i r:.,. `` P0.26-\ ®_' T-154 1-2" INSTALLED 3I T c` N ".,".N ,,: r .- __ ON DURHAM - -'1 SOUTH K IP-4 IPSF I it P0.13 i ,TTENmGV' GAL.VII BEFORE YOU DIG I THOSE Rue ARE SETSVWro PQLLOVRIl.AONS /ED 1 '.2''I THINK •R TI+E OREGlNURDSVOIWICBTw"0ENm1. PD-30 I ,"OSERUESAREEnfORnlNaw 91OET ro PD-27 I PD-31— RULESBYllc+mw. GOREGON UTILITY aF 7 �`IP.g SAFETY meRNATION CANTING TTEMEGdI.1(10 IP-7 F1RST! NOIEJGIICNCENTER IDWMMTNNlO ORVSOw7J % �_f- TC REQUEST tIPIM LOCA,Es.GLL FXE OREGON ".,�.MyZB�. LF u 9ry NO,IEICA,ro"CENTER AlLEAST 1 }BUSINESS OATS PRIOR TO EXCAVATION. WMPIAI•IMV•IP 2 I !1-T POE CONSTRUCTION DRAWING SOPM`£NO REVIEW.' IAS-BUILTBY DESIGNER: IP 2 t PD-15 AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED PD-28 � ' \fIYjT moeo..m.n.m„Mm.n,.,I+,F,ELBL•I�,m . IP-1 IP-3 I I Foremen: Dote: '�' I I GP D•M: 1-4" INSTALLED ON I=- '-r �I W °"=vtlxm •,n=Tm�A M-,Bro9D, (••e 1009o016u AB•Mc. }}Ll 1-2" INSTALLED ON �' t1 DURHAM SOUTH S E-p,��i J ` UNJACKETED CABLE REPLACEMENT BDUTHD-u1B FT PL-9326 '-ill PD-29 DURHAM SOUTH K ,I ,@ MNccm+BUMMERFIEID 1TAYl PG� L 1O1.4 SW 113TH AVE.TIGARD OR Bi1N VT-153 N./ 11 SEGMENTS OF UP!PRIMARY.(1I FEW NO VAULTS YLMTrro wwwww "HP. I MLSCNWLE WASHINGTON C2115A LIE CENTER 3G9 ueo SWB0ECPMn"R0. TOM COI( 503.807.0111 JOHN DINCAN MLSWVKLE,GR PAM 0 PoNMNO GENERAL ELECTRIC CO.ALL ROWS RESERVED Page 94 2011 Edition Self-Regulating Lane Closure Diagram 350 Use this detail for closures of one lane of a low-speed, two-lane, two-way road. 1. Use this diagram only if all of the following are true: a. Work space is less than 200 feet. b. The posted speed is 40 mph or less (unless not posted and speed governed by basic rule). c. Average Daily Traffic (ADT) is less than 400. d. Sight distance (in feet) is more than 750 at each end. 2. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 3. For added visibility, a truck-mounted arrow panel or PCMS in caution mode may be used. 4. A"Lane Ends (Right)" (W4-2R)symbol sign, or"RIGHT LANE ENDS" (W9-1 R)sign, may be placed inside the cone taper for more emphasis. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 I 30 100 40 350 350 350 150 45 180 50 500 500 500 210 55 250 Chapter 5 December 2011 2011 Edition Page 95 Self-Regulating Lane Closure Diagram 350 j • /oD --.t 1 WORK t3 AHEAD • Initial Warning • Sign / I • A • ONE RO ROAD I j ` v/ AHEAD % • \ Protection Vehicle • am TO YIELD w/TMA(both Optional) - •L—1I 1 ONCOMING OR TO See Chapter 4 ONCOMING TRAFFIC 13uffer TRAFFIC • • 50' 100' • • \ _ORY 114- A ONE LANE B ROAD y AHEAD , 1 ROAD 4 1 41 v C WORK i 1AHEAD/Initial Warning Sign December 2011 Chapter 5