Loading...
PFI2020-00057 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12020-00057 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/29/2020 Parcel: SEG1286 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Frontier Project Description: PGE replacing Frontier pole on SW Hunziker Road. Permit application is to work in the ROW to remove old pole. Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount Owner: Total REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tioard-or.00v to schedule inspections online. Contractor: NORTH SKY COMMUNICATIONS LLC 11818 SE MILL PLAIN BLVD SUITE 410 VANCOUVER, OR 98684 PHONE: 3602546920 Applicant: ROSALIE SIMS PHONE: 5033197787 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant k Signature: ,Set LAJZ2(4 &L Issued By: ti Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00057 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings,mailboxes,etc. shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m,to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13 -DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17- REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19 -PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, Trent Brickey at 971-228-9269,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis, to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other - City of Tigard RECEIVE FEB 1 1 2020 PFl #:��0� = I?NGINEERING DEPARTMENT Public Facilities Imps'veirient (PFI) Permit PROJECT INFORMATION PGE REPLACING FRONTIER POLE SW HUNZIKER RD TYPE OF WORK Project name: QQ TYPE 1—Franchise Utility Work Frontier to transfer to the new Pole laced b performed by NWN,PGF., or utility Brief description of project: _ P Y PGE and remove the old pole. agency PGE replacing Frontier Pole(3005)with 45C3 AT 12805 SW 77TH PL in Tigard. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Permit application is to work in the right of way to remove the old Pole. Work performed for the purpose of Pole located on SW Hunziker road east of SW 77TH PL. _ • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 12805 SW 77TH PL, TIGARD main line tap Location (address if available): ❑ TYPE 3—Full Scale Development Work Pole located east of SW 77th PI on SW Hunziker ST north side pg� performed with land use approval which L includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening Name: FRONTIER COMMUNICATIONS • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 4155 SW CEDAR HILLS BLVD water service area City/State: BEAVERTOK OR Zip- 97005 ❑ TYPE 4—Small Cell Technology 503-319-7787 ElTYPE 5—Tigard Triangle Phone: rosalie.h.sims@ftr.com 503-319-7787 Email: Phone: _ _ NOTE: Type 1 and 2 applications may be Contact name: ROSALIE SIMS emailed to rowpermits t)i tigard-or.gov. Phone: 503-319-7787 Email: rosalie.h.sims@ftr.com CONTRACTOR INFORMATION ❑ Same as applicant Name: North Sky Communications CCB Number: 208747 Mailing address: 10860 SW Clutter RD City/State:-Sherwood, OR _ Zip:_97140 Phone: 503-647-9991 Email: 503-319-8405 ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ®No Case number: City of Tigard • 13125 SCK/Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant" shall be designated"Pertnittee" and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of'1'igard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. �igioly signed by Ro»Ile slurs Rosalie Sims C°m"a"il°="mR°�k'i.°eS'i m°q °R{ccm° ,cds Dne2020M.1113.-51?-0T _Rosalie sims 2-11-20 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: J6)%Z-6L4)-0427S73" Permit fee: _ 57to Received by: 1•.419 Date: a I� Approved by: Z—rewle- Date: Notified by: kA Date:-4W2--V Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI) Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Pemtit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ' STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site address application? TYPE 3 -Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Wap ❑Private Property ❑ Cover—Site,Vicinity,abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes (City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ 'Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement Ditch ---- Streetlight I ---•—•---•—•—•— —C—•— t /Rain Iham a I I I W� Existing House ar I Existing �I �r Driveway 751 I 1 =1 Ii o� I (L Vi � Existing Shop j Power= I I o I o I� 95 — — — D Wcp-F Line II Fire Hydrant(FH) I � I Scale: 1"=30' I I I TYPE 1 AND TYPE 2: MINIUM SKETCH I I I ' I I I I REQUIREMENTSapplicable) North arrow Property fines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 PGE POLE FTR#501222 C2101B839,PGE REPLACING 6502 WITH 8502.NEW POLE TO BE PLACED EAST OF AND NEXT TO EXISTING TO BE ALL OTHER CABLES ARE REMOVED.WORK WITH PT4027925 TO TRANSFER / UNDERGROUND TO THE NEW PGE POLE. FRONTIER HAS NO RISERS ON POLE. 7805 SW HUNZIKER ST / 77th PI PORTLAND NDGE36472 I PORTLAND GENERAL ELECTRIC I ADDRESS 12805 SW O1lN944ER-i9 TIGARD 832902 501222 C21016839 FRONTIER PORTLAND GEN RAL ELEC*IC pGE REPLACING FRONTIER POLE `\ 832903 NO FRONTIER 672' AERIAL .\ FRONTIER RISER ON POLE SS 30024 �\ 3 36470 XD,I+BBGTD2,602-640+ (30-5)(01.1995) XD,4I+BBGTD 2,642+ `\ 45-3 XD,43.44+BBGTD 2,645.646+ X ,47-48+BBGTD 2,649-675+ / C2ONTIE1 01 B3 D,76-300 3 NTIE \ 501224 C21018841 5� AERIAL 1032 01.201 -\ 501223 C210183592 PORTLAND GENERAL ELECTRIC RBN 12 `\ PORTLAND GENERAL ELECTRIC / TGRDORXA H1009,49-54+ \ 36469 36469 -69+ S TGRDORXA H1009,67 UG 50' �I AE 20024 I'I'H \ _ FRONTIER / S127 S 24' AERIAL X[),10-1 II BBGTD 3,1501-170 AERIAL 1032 0/20100 rSwM Ijk !� i_ XD,1+ �t II RBN 12 eRs7'1 - BBGTD 2,602-640+XDA + I TGRDORXA H1009,49.54+ BBGTD 2,642+XD,43-04+ TGRDORXA H1009,67-69+ BBGTD 2,645$46+XD,47-08+ i XD,10-12 BBGTD 2,649.681+X[),82+ BBGTD 2,683-685+XD,86+ BBGTD 2,687-691+XD,92-95+ / DBGTD 2,696-696+XD,99+ i CONSTRUCTION NOTE BBGTD 2,700+XD,101-125+ I PGE REPLACING FRONTIER POLE 36470 3005 / BBGTD 2,726-771+X[),172+ WITH 4503.PGE PLACING NEW POLE NEXT TO BBGTD 2,773-776+XD,177+ AND EAST OF EXISTING POLE. / BBGTD 2,778-781+XD,782+ FRONTIER TO RETAIN OWNERSHIP.WORK XD,183-184+BBGTD 2,785+ / XD,186+BBGTD 2,787-788+ WITH PT4027941 FOR BILLING PGE,FRONTIER XD,789+BBGTD 2,790-791+ TO REMOVE POLE ON COMPLETION OF / XD,192+XD,793+XD,194+ TRANSFERS. flo-n-her BBGTD 2,795+XDD,196-197+ BBGTD 2,798-800+XD,201-225+ CITY OF TIGARD PERMIT REQUIRED. BBGTD FLAGGING REQUIRED. TGR[)NESC PGE FTR POLE 2,826-833+XD,234-237+ 12805 SW HUNZIKEIKER RD PROJECT C.O.AREA:TGRO BBGTD SEE SHEET 2 FOR VICINITY MAP. Nu eER: EXCH.CORE. 2,838-858+XD,259-260+ ORA'NN GATE: FHONR. ROSA�IE SI EHE WASHINGTON BBGTD 2,861-897+X[),298-300 _ scALE. _ TAX olsrRlcr. DWG oR TANSHP 11 IRNG', SEC'. VICINITY MAP Building Products V k syr Madison Furniture H`�zf Manufacturing Inc QTerex Services Q SF As G 7805 SW HUNZIKER ST r SVV Hampton st Sw,,v Artistic Auto Body Q 6 Sunbelt Turret Steel nraa H °a� Q Charter MechanicalSao ,:sw ��► 1 tiky, O sW Hunakw St BP d�P $ 12805 SW 77TH Hill ��'� a crest yap a' PL TIGARD Q Love Your Skin Day Spa aye g 0 Q Invictus Wireless ® N N� S� f� Comerstone© Potso Dog Park i Clinical Services 9 0 1% + 3' sw C, a ,ew st d IHIIhop Cafe AI at Q Or s — Go ,gle ma me Mao dale 02020 Goonk Unned States Tema Sendleedbeck 200 fl 51351-5250491 5460-TIGARD 2S1W1B WP2 OF 2 N Page 84 2011 Edition omi 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane,two-way o roadway. See the detail inset for the layout if using a single flagger to control 0 both directions of traffic on low volume roads(less than 400 ADT)with good sight distance as discussed below. O 1. Use truck-mounted flashing warning lights on work and protection o I y vehicles.See Section 4.3—Lights and Lighted Signs for exceptions. rn 2. For added visibility,attack-mounted arrow board or PCMS in caution � �,, � l t LL mode may be used. w a y 3. Flaggers at each approach are required if any of the followingCc ~ conditions exist: a. Night Operations. b. Work space is over 200 feet in length. 9 c. Sight distance is less than 750 feet from each approach �----------------j 5� through the lane closure. I V—A d. Traffic volumes are greater than 400 ADT. I4. The length between the Flagger Ahead signs shall not exceed one j t j it mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding onejt I 3 mile. I ; 5. Cones should be used to outline the work space when curves or other o = j m roadway alignments prevent clear direction for the motorists to pass I = ® t I I '� the work space safely. I m m ilr� aE 6. Cones along the work space are recommended when posted speeds I o V I'. 3i j • are 45 mph or greater,when working under heavy traffic or when travel j I lanes are narrower than 11 feet. i J I ><` ' 7. Extended queue signing(see Diagram 5-4)should be used when I m o x I W traffic queues extend beyond the initial advance warning sign. 1 I tCIO 8. When flagging near an intersection,the"Flagger Ahead"(CW23-2) j to " I r sign should be visible to traffic entering from any side road.Additional ————-- ----- 1 t � cc advance warning and Flagger Ahead symbol signs may be placed on — the side road(s). 7717 Sign agdng and Buhr LangtAs(fwl) 9. Sign set-up and flagger placement shown may be used for intermittent Poabd Betweensigns 1 Burt full road closures of 20 minutes or less. aPwa a s c I space 50 1 10. The"ONE LANE ROAD AHEAD"(W20-4)sign is optional and should 20 100 100 1W g be considered on high volume or high speed roads,or when extended30 i queues are expected. w aso 350 iso 150 as 1 0 so soo soo Soo 20 Soo zso �f Chapter 5 December 2011 December 2011 Chapter 5