Loading...
PFI2020-00198 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT 11111 Permit#: PFI2020-00198 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 06/10/2020 Parcel: SEG207 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: CenturyLink/Qwest N.558409 Project Description: SEG207,208,210//SW Locust. CTL is proposing to place new fiber in existing underground conduit underground along North side of SW Locust Street passing through SW Hall Boulevard cross street. Class of Work: FEES Description Date Amount Type 1 -Utilities(gas, electric, data) PFI Permit Fee 06/10/2020 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: BREANNA HODGE 6074 N DISCOVERY WAY, SUITE 125 BOISE, ID 83713 PHONE: 2085764031 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant ' , "A__ /n Signature: see . �L/1Jly(� Issued By: / /11A .) Special Conditions(See Attached) v Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2020-00198 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140 (Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times,including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m.Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m.unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16 -TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23 -MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28 -AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other RECEIVED JUN 0 9 2020 City of Tigard CITY OF TIGARD pm#: 2020-00198 I ENGINEERING DEPARTIING/ENGINEERING 1 1t, 11 Public Facilities Improvement (PFI) Permit PROJECT INFORMATION N558409 TYPE OF WORK . Project name: ❑ TYPE 1—Franchise Utility Work Brief description of project: CTL is proposing to place new fiber in exis. performed by NWN,PGE, or utility agency conduit underground along North side of SW Locust St passing ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer through SW Hall Blvd cross st. Work performed for the purpose of • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 10123 SW HALL BLVD main line tap SEG207, 208, 210 ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following: • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: CENTURYLINK/QWEST • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 6074 N DISCOVERY WAY STE.125 water service area City/State: BOISE,ID Zip: 83713 ❑ TYPE 4—Small Cell Technology 208-576-4031 ICI TYPE 5—Tigard Triangle Phone: Email: permitting@mountainitd.coPhone: NOTE: Type 1 and 2 applications may be Contact name: Breanna Hodge cmailed to rowoerntits@tigardorgov. Phone: 208-576-4031 Email: CONTRACTOR INFORMATION ❑ Same as applicant Name: Bruce Heiberg/C-2 Utility CCB Number: 154786 Mailing address: 11618 SE Sumner St Ste. A City/State: Portland, OR Zip: 97220 Phone: 503-772-1878 Email: bruce.heiberg@c-2utility.com ENGINEER INFORMATION Name: JOSHUA FALLIN Mailing address: 740 STATE ST City/State: SALEM, OR Zip: 97301 Phone: 503-798-1009 Email: josh.fallin@centurylink.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? 0 Yes 0 No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Pernuttee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. g a. Y4 Breanna Hodge 06/09/2020 Applicant's or authorize agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PF12020-0011998/� Permit fee: gad' Received by: SC Date: 06/09/2020 Approved by: 7 �C7. Date: 6/9/24)2O Notified by: tg/ Date: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name ❑ Site Address How many install sites are proposed as part of this permit application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way 0 Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-oxgov • 503-718-2421 • Page 3 of 4 9 c i •• y •. s 1 Edge of Pavement �� Ditch 'II'n 7"4Streetlight —•—•—•—•—•—•-r—•— ', t ® I t . I CI '•tom's1 i T— WerS SITini -- 1 , W ...:11 i ' ill 1 Existing House ( I :• 1 Existing Ili Q .-1 • Driveway dl u� . i 4it/41i ao I • .:,sue ' 1 dr • 1 a+e" 1 {II 1 1 i iP 1 Existing Shop 1 1 Powerpole � ( 1 1 `' o • s r , la 95' 1 ' 1 Ftre Hydrant(FH) I I 1 Scale 1'=30' I 1 i I I 1 I• i TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 I i 0 o B 0 m a N s tt a m s a f U Single Flagger Operation S'+ S I ` for Low Volumes (Optional) O a !c yt t d (ADT<400( • Z o c g a S a •g0 _ BE m it 10. 1 . c I PREPARED ORE LA E Q pY CC f' TO STOP r e 1S S °' A F F _ :i _ i ♦ ROAD AHE\ /AD 01 ROAD m S a b g nli 4 it�4t•4• e•.• �\■•••, _► iito, WORN r, w+. AHEAD y C ro TA g 4 . 1- i mxe .n Max. —• • • -• • •• — — — tb • ' • •'• 7 K K K K • Ike m cI-B IBIA ' ` \ Bufferr Protection Vehicle x ROAD w!TMA(both Optional) WORKSee Chapter 4 AHEAD BE . CI ONE tANE PREPARED AHEAD TO STOP Two Flogger Operation 3:. r (opal) CO rc Job Location: MULTNOMAH BLVD, PORTLAND, OR Narrative/Special Remarks THIS PROJECT PROPOSES TO PLACE NEW FIBER BACKBONE CABLE FROM THE CO AT THE INTERSECTION OF SW MULTNOMAH BLVD B SW 25TH f� II ', /1 -1 . I ly� � `'. AVE.THE FIBER WILL GO IN EXISTING UNDERGROUND F_St' +�It ROUTES FROM Mn TO Mn.APPROXIMATELY 6300'FROM JR ���` r CO TO MH 836 ALONG MULTNOMAH BLVD,8700'FROM { ` ( 'S" 1 u� t..1 (' - MN 836 ALONG MULTNOMAH TO MH 824 FROM MN 824 • LY J(I 1 _�_' 'J.`- � NORTH ALONG OLESONTHE FIBER WILL SPLIT 3RD TO HH 5854,3500EWEST00 ?` 1� _ -.Reit�... ALONG GARDEN HOME RD TO HH 7530 AND 10600' I SOUTH ALONG OLESON RD AND 80TH AVE TO NH 9055L. J THIS PROJECT TO BE COMPLETED IS TO N _ j n• — rJ ACCOMMODATE CONNECTION TO DAMAGED FIBER ;.� - - CABLE f �,44'Ie � =■!� ,'les=_ DEVELOPER CONTACT see "`I ■. �■1 1 1aY■ Held Order Information �� R. �� . Ilan sWF � < Service order # Customer Terminal: �■ Customer Name: Cable Assignment: �r—1" - d. 1� SW MULTNOMAH Rum SW MULTNOMAH BLVD. _ re A ! ■■ �{ Customer Address: 011111--SW GARDEN HOME RD - WINA A e'.,.ir mimes Cross Connect: ' --J�N , �� lm E"� Misc. Information ,I iti PROJECT AREA aim IiI.D awo iele0 F.eI.cN FarRmM1l cT'Ma eM oMr.N /.. F./il.2'- t SION NrMX none roc Coo*/Some Reeked wa My Porrnd lioquIrod'Mao i r I 11■ LL SIN Location ID S(NAFP) ''mil Information 10. Y_A •0��n1■u� =�� .r ' Oat Shade..� is 11 • 'iE==,n' I ,-" roc Cent.aet.: a D2 .f r.� - �- �� son mnaenua BMIG ' . N��, ., / :. II ��� REVISIONS No- ( • i ��• I r i" \ art WOOS DHDrnox _. f 11 ' 1 JiliI� �,- -r �. --- `��� /,� I C.d ECD: 12/12/2019 =0Centurylinlc MIN s whir maeuert54 s UM e myiwu .0 at mom mammas ss a o M w Ni wee sew am ere FM PROJECT MINT PROJECT COMM WM DOME LDETJCI COMM DONN CONOCINe CaWm1M SANK COONSKIN Sant MIT. KM raaDaeer Ns N.558409 INN WORM MJLra KULLiIoser.me IIJEEMIwMTI48 We MI*YfO1 IMIBB: II OM Maw MAKI: SHEET: 1 Of 11 Ore PaRANi ACM roe a7 D3"1Jn:Atta NWLMYfKn11 ANN MYrwIHI LOGO NSW RAE Ms MIT:swans • (c�J {{ 1 _, >' _/, _ iED 4 [�' ! 0� ._ �. r .,.. -I-.. -lam R _ .., .: .., q c .. t s . , , p a t. • D SWJAULTNgMNI1Lw ^� -- ^' �'�i �,�N / J!►z" I II o del ''-- T p - _ �� _ 11 P_1 TO SHT3 rj ''ram O� J O A,i gI I; -- 11 /5 ._ J l` RWe D PSW - DL NULL 056 0 = sw\ / 0 0--� RD PORMND.OR I j IS ` d CO II n OWa2SMA.G06-RLF7 925 - &LD iKsrsl�.cm•PLli I lgsl UOIENI ply Iyr�ynmm P'�4 `., 4 7 HDII'nJla INICOD / 1 Dca l uop.i UO04 y�OJD 1 NRT'9MNsooro .. N.,< REVISnecNIPINE IONS )< ECD: 12/12/19 cyCenturyLink RLE: I •E•�•.�r.Y.Of_r ECCU num, vi�maA.�wNs��fYR� FYI PROJECT -WHO PROJECT: COINNW WY MJNEM WINO WNW WNW/ CONSBI CTDN CONDNRTRI NUM CCONWIN Eta E%. iR`A•IINN 111.3 c N.550IAn MC nay MAC NE LAME MAN:WWA AATW! XIN::Joen LANE NE:Jow Yn. ME: IS DEN at NM POI WE SHEET:x ^r t� YTIY N:�PRo HONE:MSJUSW COWAN:Otto RCIC NYM7N1 MC YFMn11 MC M SIN SAM En NM HEET OF I I P. III I1I i r P • • 1 \--\\\\ 4 OWEII1L71JOENN eIw �.,, Al L7L- -� P4E1- 11.,\167. 8 Sw nu�ThOwa1 eLw_A7KY1�� TO SHT 4 --ma928 cJ 36 927 — f r*0 TO CO <-- �—�. SHT 2 1 (N.',PNW.C.W.RUF1 UOB614Y N3U.W I .. I Uo(31.a)Y p7 NOM A • Lt ��✓ \ D: 12/121 REVISIONS EC 19 as&' MR OGIN:NIINN ���CenturyLink . 1 DOl8 wr_ �-__ fOf. NC Mk PAIN, ii...7Nq e..P.ow.rNN2�Ne.NNWN..N� IW PROJECT WPYM PROJECT: COMM NAY[ ORNNOML OROIIT CONWCI NNW CONIOUCON COMMON ITIOIC M®Oa IICIN MOLT. 4O[:IIM.N OM.YNk N.558409 NNE:NNW NAN um woe MN tam lama NSL JOIN ammo INN.10N ammo Room II Do ln:ONO and In SHEET:3 OF 11 UII mow. M(:0110a7 COPAN:AICO NON:1103-W1511 MIL MY71L7411 11N61, n&N SILL:W. OAt '%‘..."''''''. } L : y � P.II • MOST aY tWA.Ot! �.;` (x58gJ.c t6-FLOE) 2 3 nJIM31.15IV Oft)0Um 110210 My 0000.00 �J b SW MULTNOMNI 9LVD .... .. _ UC131S+)V aY 200.00 --_ _ i p1K — P-7 6 szsCA, IR�sabrc.w-PLw� � r71 1 5 SHT33 .. y_;1 u00J6aTmum 430. •J MH DETAILS uT�cJTaPJaTsmaa ` day-' _ - " '. SEE SHT 10 a3 b —> P-5� If -A110N 1 —AI L7N:A11O(T _ ' -` -__ EN HOME No=--SW GARDEN 62 937 I 1J S TO SHT 5 1? c ti V gF CI 1 REVISIONS NM .asRR }�( ECD: 12/12/19 ®^�:CenturyLink 61M: I MI IS my a norm memo my soya mo moor saes R CR[ mom a.moimNo�.nm Ymima Wet ai TV PROJECT WPMI PROJECT: COIMMIT RIM NNtlONC CRIIIALT =R•:I MIMI G4RIRCI.11 CaMx1M YI••R C:RRNAM IICIRL X. MSC.Pt.BywNwpw.b i N.558409 OPAL mom WEE MR UMW MI[:ww MATTM SA:.MR(WIEN Mx:Jxl.•.7AD TOHM,: 1. CM KU:TON NY at SHEET:1OF 11 OO:.a•Y.ts Mae POMPLWMT COMPANY:•TCO PIIRIL MYTl4TH PMx:M 1 *JM .MN: M RT l.11 •OR SUM • MTL Anal, AMR%.AlISM A,)7y]n (•••ISOII_Al,RW1 A117DI1 A,17W 11; •, _T1.! N t�1 6364i1 POiFawo vol3awo L[l7APL roKL roPR 1G1“171 IOPWEQOQ ktE wI0POLE+DHla6EJ6aPa.EarmYPIXEZKO rOlk.LI o PoWorilo aA3.043o mamewI fK♦ Ao1m NUPE AZOV MI a m.e A11720.11 A ran 7301, n WOG n lID0 sei MIMES a, l Amm. u+rrar u�I ,� . ,� _ 1,} [C u 2 2 li i $z CKK �44 � RISER UP ... I � inn I ` 1 6i POLE 76W � HH DETAILS CP SEE SHT I I I"SACO C°H-P"1Fi O a /1,0 1�y a SW GARDEN HOME RD— coRleEw3mR.m (SW SHIRLEYLN a,o q*/ I H.SS0409.0W-PWF7� ' UU310 Ny 37WID �" Ug31ZSNNY 31W.O0 pHY • ,J 946 ;y —SW STEWART ST r .j SW OLESON RD_ sW ANY°ST L,13' 37 MH DETAILS I 947✓ SEE SHT 11 - _ 6 i L / __z -- SW ALDEN ST j" m CO % ° O u NM REYIS _ ECD: 12112 119 CCenturyLink• it: I 124 et.O.lrv.OR oNrmi.w we On TMO, 00®wok.lei.ilwwiyVa aImgum. 18 PROJECT *PN,PROJECT: OYM11R WY OIO®K=IJL'1 COLJCI Mai 0E6RU4101 COM0 IA1O RUCK COOYMI00 ktl@L eat OM 17 Yon*Ito 3 SHEET: (� I N.558409 ME OMIT kit *JS EY:MIA MIIM WY:J0IM WORMS PAWL Jae 0&3I 10118M: IE EG m:.® 6Y Qv J LLI: S V 11 OR:FC.IYB MEG 8104811117 LOVNR:*ICO MOW:MSTYnn FOE:10K1MI MYF: 10 S 71w SEAL m WO � nr-1i�� A�STJ GREENWOOD DR.. E -ool I SW KENSINGTON RD-Q U O � - swuricr V1 94B • • P-18 • < ' ' SW 0.0RECE LN ``. 3 P19 co (9 959109.c96•PkIFI 90316go 39C9.W /' T 10(3196)9 my MOOD u T� ,f u / ��� RS R FERRY RD Bwunoas RRTRn i 1.1.- r i SW BIRCH ST- _ ---SW BIRCH ST—I 1--- \ J1 JN Z SWCEDRCRESTST_ _ 1 wr SWCE.oCRES REVISIONS �� aW N>� )1( ECD: 12112/19 sy)CenturyLink GAG 1 ®I.O E Ai MO W ON0.QNIN O MOM= WC Ink �ROI111 f•OOIO OM N B M O NON-USE 1101111 Rai 1'W PROJECT vow PROJECT: GYYMM1 NW EMREFNE CONTACT amity DORM NNSITUC9gl OICIM= WON clams OMIT NAT. OM NO EOEMx Noa N.558409 IWE:uORRR IIIIC WII.N.. NM:wets ram EVE JmNOW® NM:JNO Omen Mem IE MN m:an KY ND: am,ann. NOM:INTASOINPI WARP ERG WMEal7aa7NI MEINLLfal-nil ENA TEATO SCALE Nis um SHEET:6OF11 III III 1U _JU__.__--AM-- ----:1 _ _.�..��... ,e,5 1 8;.r4—t- c T _.-SW CHESTNUT ST- 1. '...__..SW CHESTNUT ST.._ ---� J -- SW EEAWOOD ST_.....___ ". .._...SW ELMWOOD ST • II SW HEMLOCK ST „--• SW HEMLOCK eT- 1 1016 - 1! I ` ` r 1 SW LARCH ST_� ' SW LARCH ST 8W CORAL Sf _...._SWCOWLLST l„ ,' 1 ._ • II .J. (NOSPEOC PIIF) _ .. / P.tl .... 1 SW LANDAU ET l SW - - \ ._. LANDAU ST - P-11 uamavn�mm V— nneassE .,"" IAESI m3.mm —SW LOCUST 1.:: ... �s� 11 1111 TKKW 1110 !>P .-- 01 .�ii12 - '— � __..'" �... - _. SW LOCUST').) II i � `4 —SW JEFFERSON :- 2 m, MII - OrldIVIVII )f( ECD: 12112119 COCenturyLink sue I L-TU ftV I. lintri MI t it au PRJIOM •oA-IAr.Oc wow lam• PM PROJECT (SWUM PROJECT: (OMn MtEI OS tOCCT CORGI POWCbRTCCW MOIIW101 WOK ELMMiO RCldk Rat. CZ Raw arr.be N.558409 ME:PEW NW Um a YM:Loom MATT• u.WM JaW wvwlm NM MOO41.nam NINw II aam:rm ml¢r SHEET: 1•7 OF It Oa:MAYIM 110(Menem aiJIIT:Inc POE:MY7%nn NM NYTYTxl WPM SSW E(IIL In MIL 1 1 • ime _ v`y O ~�: -BW PEVTON RD ,..- �',935 T I le§ , ` J T �� 81NMILES T:T\ _ P-12 A I N.55810PP-PLOP/ eY[ ' C 0 U02164t02C0TO 01,(31.25ry V7=OM / Q (.1 L.L.- SW 66T7 AV 934 t\tr.. L-E71 -4 ------.:1\ qr 1-- le-.i N-_____ \ i a-zs '' o I fi 2 I N .._._.. _. . A7L7N �:- sw CANSV STET--'--- REVISIONS �'�� Ws R TO. * ECD: 12/12/19 liv Centuryunk Owe- I con•a I tEsa:ea F are la Tr a MOM Si NM X Man IV @WM r OM•OM aaa ar F all MOM, NI Faam,con,a MI a IN NM oa RR al:POMMY PTT PROJECT WRIT PROJECT: C0&IMTT IP& MIMIC tart4T CRILJCT OIER CUSTRUCTa COOIa&Ia RUNG COmWT00 MR* FRT. AM Fiber 4as...-s N.558409 NE:Elm? INC MS LA ROL MAI MATTE WIC JONI A Y= 41E: Is anaa wEs:o It EMI ur:woi ml ml $fIm'a 11 P:�r HE :Ty, T,fT MMA':*TCO FOE RO.IRTM IMG 1 E:RLTIwTM EKE'I IEEIE SUE:m MTh LEI• II/ E.. 8 --,_ _ III ®— h \ • ,if a936 SW VERMORT SIT fl-.SW VERMONT SIT I,— • •' manREVISIONS -ECD: 12112119 �=CenturyLink It ask maw, .r].MY.laa RrMr s_na Roy PROJECT ��kp WINI PROJECT: COMM RR[ RY®IC WRAC MVO di141 COWMEN IORRROOP YtAS L9®W101 mot at. MCI 14r11w11YiI ((�1111(((({{ (�[ 1J ii U WI[:CIBMt NME M:MUIRI! Mll(:k11CMRam wa.,.MMutm ME:JMRI AILRC UCS! II EJ01CY:M IIdMY: JIICII Vf 11 pry:PRRIIAS 1r;N.55f 0 5:aaCO RO1[:KYf4-TIN RMIL NYMIMI WU, N\IW YAM ors SAIL '