Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
---..... ... •---- — Building Permit Application Site Work F()R 01.1.1( F ( si:uwi City of Tigard RECEIVE !,Dan• vea 14 • 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review : % 1�rri , R ■ Phone: 503.718.2439 Fax 503.598.1960 Date B Other Permit: .� i + sf • T I( n it p Inspection Line: 503.639.4175 MAR 2 0 2019 Dale Ready/By: Internet: www.tigard-or.gov Notified/Method: MSup• Ste Paee 2 fw CITY OF TIGARD pkmeutal laformatiao TYPE of wol!WILDING DIVISION REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction 0 Demolition .p . F Permit fees*are based on the value of the work performed. �+a Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: 4 B-1 equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTI f work indicated on this application. ❑ I-and 2-famil Y dwellin Valuation: $ g ®Commercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other; Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 16200 SW Pacific Hwy Z3 New dwelling area: square feet i City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt. no.:Z3 Project name:Starbucks Covered porch area: square feet Cross street/directions to job site:Pacific Hwy&S.Durham Rd. Deck area; square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: - Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Paving as needed for reconfiguration of drive-thru lane and ADA compliance. Valuation: $125,000 Removal of existing bank drive-thru canopy along with proposed outdoor seating Existing building area: 2082 square feet area. New building area: square feel ❑ PROPERTY OWNER ® TENANT Number of stories: 1 Name: Starbucks Coffee Company Type of construction: V-B Address:2401 Utah Ave.S. Occupancy groups: City/State/ZIP:Seattle,WA 98134 Existing: B Phone:(206)318-1575 Fax:( ) New. A-2 ® APPLICANT ® CONTACT PERSON NOTICE Business name:GPD Group Professional Corporation All contractors and subcontractors are required to be Contact name:Guy Ripley licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:4600 E.Washington St.Suite 310 jurisdiction in which work is being performed.If the City/State/ZIP:,Phoenix,AZ 85034 applicant is exempt from licensing,the following reasons Phone: 602-733-6202 apply: Fax: :( ) E-mail: gripley@gpdgraup.com CONTRACTOR Business name:To be determined. BUILDING PERMIT FEES" Address: (Please refer le feesehedaale) City/State/"LIP: Structural plan review fee(or deposit): FL Phone:( ) Fax:( ) S plan review fee(if applicable): CCB lie.: ------ Total fees due upon application: 57 f,di Amount received: Authorized signature: This permit application expires if a permit is not obtained Print name: / within 180 days after it has been accepted as complete. (9 V.j... Date: 3/f C)f f R ' " Fee methodology set by Tri-County Building Industry Service Board. 1aBuilding\Permits1SIT-PermitApp.doc 08/02/2016 440-4613T(1 1/02/COMIWEB) CITY OF TIGARD SITE WORK PERMIT 7 a COMMUNITY DEVELOPMENT Permit#: SIT2019-00009 TJGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/07/2020 Parcel: 2S115BA02500 Jurisdiction: Tigard Site address: 16200 SW PACIFIC HWY Z3 Project: Starbucks Subdivision: 2004-015 PARTITION PLAT Lot: 1 Project Description: Site work for a Starbucks coffee shop drive-thru lane with outdoor seating and ADA compliance. Removing existing bank drive-thru canopy. Contractor: JOSEPH HUGHES CONSTRUCTION INC Owner: SN PROPERTIES PARTNERSHIP 11125 SW BARBUR BLVD 1121 SW SALMON ST PORTLAND, OR 97219 PORTLAND, OR 97205 PHONE: 503-624-7100 PHONE: FAX: FEES Description Date Amount Specifics: Permit Fee-Site Work 04/07/2020 $921.67 Plan Review 03/25/2019 $599.09 Type of Use: COM 12%State Surcharge-Building 04/07/2020 $110.60 Class of Work: ALT Plan Review Addl- Fire Life Safety 04/07/2020 $1.00 f $125,000.00 Info Process/Archiving-Lg$2.00(over 04/07/2020 $30.00 Project Valuation: 11x17) Info Process/Archiving-Sm$0.50(up to 04/07/2020 $27.50 11x17) Site Specifics: Erosion Control w/Development 04/07/2020 $236.40 Excavation Volume: cu.yd. Fill Volume: cu.yd. Impervious Surface: 1150 sq.ft. Engineered Fill: No Soil Report Required: No Paving: Yes Grading: No Landscaping: Yes Site Prep: No Storn Drains: Retaining Wall: No Fire Underground: Accessible Parking: Yes Fence: No Total $1,926.26 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1,900,332.2344. r®Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ---4 Building Permit Application Site 'Work ditto to I 1 'i i1\i,1 City ofTi and RECEIVE aa. tit g pe e 13- l M •Petmft No.: "gelq; le ICJ 7 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Reak 9 s"1 7 Phone: 503.718.2439 Fax: 503.598.1960 MAR qq ry n lyt�y; - - 1 q Other Pernik (/�lyZ11ra5 i r r t-.I'I t Inspection Line: 503.639.4175 w1I-i , 20i9 Onto!toady / tore: See Pepe 2 fur -- Internet: www.Ugard-or.gav Nontiwndethod;,5 t4/ 11 —'�,a Suppkokutal Information CITY OF TIGARD *3 ! TYPE or tr/O tDtN $1VI64OA1 / RY(�IJB ED PATA l•AND 2-FAMILY DWELLING ❑New construction ❑Demolition . •;��ii"4''49 Permit fees*are based on the value ofib e work performed, c ► • Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTI a work indicated on this application. a❑1-and 2-family dwelling i t Commerolal/industrial Valuation; S '�Accessory building 0 Multi-family Number of bedrooms: 0 Master builder 0 Other: y Number of bathrooms: 1O>) 61iE,JNFORNfA7'ION AND LOCATION ,( i ?JI Total number of floors: Job site address: 16200 SW Pacific Hwy Z3 f- •i (-- , New dwelling area: square feet City/State/ZIP:Tigard,OR e;(DWI''.. Oarage/catpart areas square feet • Suite/bldg./apt.no.:7,3 Project name;Starbucks Covered porch arca: square feel Iv Cross street/directions to job site:Pacific Hwy&S.Durham Rd. Deck area: square feet V Other structure area: square feet -'-1 REQUAAREDDATAOCO r RCIAL.UE�EMEC/MISf 1 Subdivision; Last no.: Permit 1pcs+are based on tdvvalue of the work performed. Tox mapJparcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION DP ORK •• • - work indicated on this application. ' Paving as needed for reconfiguration of drive-thru lane and ADA compliance. Valuation: $125,000 • , Removal of existing bank drive-tbru canopy along with proposed outdoor seating Existing building area: 2082 square feet '4 area. New building area: square feel ' 0 PRO)sl44T'Y OV1OEfl ! ii TENANT . . Number of stories:Name:Starbucks Coffee Company Address:2401 Utah Ave.S. Type orconstntotlon: V-8 Occupancy groups: City/Stale/ZIP:Seattle,WA 95134 t xisting: D r, " Phone:(206)318.1575 Fax:( ) NOW A-2 i14',Ap+yi�,A I - {$I e:INTACT PERSON „ - PbTICS Business name:CPA Croup Professional Corporation All cootraciors and subcontractors aro required to be Contact name:Guy Ripley licensed with the Oregon Construction Contractors Board under OILS 701 and may be required to be licensed in the Address:4600 E.Washington St.Suite 310 • jurisdiction in which work Is being n8 performed.If the Citylstute121P:,Phoenix,AZ 85034 applicant is exempt from licensing,the fallowing reasons Phone: 02-733-6202apply, Fax::( ) E-mall:griptay@gpdgroup.com CONTRACTOR . Business name:To be determined. Joseph Hughes Construction Bu!LDDYO.PF.1l1UFTxrEES+ Address: 11125 SW Barbur Blvd /stasrfee( v deposit): b� City/State/ZIP: Portland, OR 97219 Structural plan review fee(ordeposlq: Phone:( 503}624 7100 Fax;( ) FLSplan review fbe(if applicable): ,_. CCB no.. ZC?SS 700 158061 Total fees duo upon spplicatien: r�`r 1 di. t Amount received: Authorized signature: This permit application explrea Ifs permltte not obtained /' within ISO days after it kas hem ateepled as complete, Priulname: (•a V .� Date: 3/fq/19 + Fee rnethodalogyact by7ri•CountyPuildingIndustry Service Board. I:lnuilding\Pennits IT-PennitApp,doc 08/02/2016 440-46137(I I/02/COMAVl B) t Building Permit Application Site Work F0IYOFFICE USE ONLY Cityof Tigard Received g RECEIVEu�,uBy: 3 ;�,�<<r fi " Permit No �IZ--,..,, :INI 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Revie LI Q Phone: 503.718.2439 Fax: 503.598.1960 DaIsBy: ' 7 - / arKr Pemu,:�/ryA''��� ,��WU TIGARD --., Inspection Line: 503.639.4175 MAR 2 0 2019 Date Ready y: Jutu ® See Page a for Internet: www.tigard-ar.gov Notified/Methoda . I Y 7/ Supplemental Information CITY OF TIGARD � TYPE OF WOI 1LDING DIVISION REQUII D DATA:1-AND 2-FAMILY DWELLING ❑New construction 0 Demolition It i .` ,', »a Permit fees*are based on the value of the work performed. p Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: a 14 [J •i equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCT! / work indicated on this application. Valuation: S ❑ I-and 2-family dwelling ®Commercial/industrial ❑Accessory building ❑Multi-family Number of bedrooms. ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 16200 SW Pacific Hwy Z3 New dwelling area: square feet City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt.no.:Z3 Project name:Starbucks Covered porch area: square feet Cross street/directions to job site:Pacific Hwy&S.Durham Rd. Deck area: square feet Other structure arca: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Paving as needed for reconfiguration of drive-thru lane and ADA compliance. Valuation: $125,000 Removal of existing bank drive-thru canopy along with proposed outdoor seating Existing building area: 2082 square feet area. New building area: square feet ❑ PROPERTY OWNER ® TENANT Number of stories: 1 Name:Starbucks Coffee Company Type of construction: V-B Address:2401 Utah Ave.S. Occupancy groups: City/State/ZIP:Seattle,WA 98134 Existing: B Phone:(206)318-1575 Fax:( ) New: A-2 ® APPLICANT ® CONTACT PERSON NOTICE Business name:GPD Group Professional Corporation All contractors and subcontractors are required to be Contact name:Guy Ripley licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:4600 E.Washington St.Suite 310 jurisdiction in which work is being performed.If the City/State/ZIP:.Phoenlx,AZ 85034 applicant is exempt from licensing,the following reasons apply: Phone: 602433-6202 Fax::( ) E-mail: gripley@gpdgroup.com CONTRACTOR Business name:To be determined. BUILDING PERMIT FEES* Address: (Please refer Wee schedule) Structural plan review fee(or deposit): City/State/ZIP: Phone:( ) Fax:( ) FLS plan review fee(if applicable): CCB lie.: _ Total fees due upon application: 57z',(;1 7 — Amount received: Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: / Date: (7 V ..- 3�Ir7�/Q * Fee methodology set by Tri-County Building Industry Service Board. I:1Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(11/02/COM/WEB) , City of Tigard: Site Work Permit Checklist Page 2-Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain,drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below, unless otherwise noted. cut and fill has been limited to the furthest extent possible. Excavation Volume: 0 cu.yds. Grading Volume: (Soils report required for>5,000 cu.yds.) 0 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) 0 cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU ❑ Concrete ❑ Other: N/A *Total new impervious area including all buildings, sidewalks,and paving: 1,150 Sf sq. ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See"Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application: ® Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan Grading Plan and details ® *Landscaping Plan Erosion Control Plan and details ❑ Soils Report(if required) Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00 $51.09 minimum permit fee Alterations) Submittal S500.01 to$2,000.00 $51.09 for the first$500.00 and $2.69 for each additional$100 or fraction Commercial 3 thereof,to and including$2,000 00. $2,000.01 to$25,000.00 S91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including S25,000.00. One-&Two-Family Dwelling 3 $25,000.01 to$50,000.00 S338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including 550,000.00. $50,001.00 to$100,000.00 S540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including S 100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. 1:1Building\Permits 1SIT-PermitApp.doc 08/02/2016 2 Building Permit Application Site Work FOR OFFICE USE ONLY City of Tigard RECEIVE Received Pe mtNo.: _ y = • 13125 S W Hall Blvd.,Tigard,OR 97223 p m, new ` Z ! Phone: 503.718.2439 Fax: 503.598.1960 Date/By: Other Permit: T 1 G A It n Inspection Line: 503.639.4175 MAR 7 Z Q I Q Date Ready/By: n,.fs. See Page 2 for Internet: www.tigard-orgov Notified/Method. Supplemental Information �p� u rd.UC-al iL! TYPE OF StRED�pry ING fl'vMiriN REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building ❑Multi-family Number of bedrooms: ElMaster builder ❑Other: Number of bathrooms: JOB SITE I\FORMATION AND LOCATION Total number of floors: Job site address: 16200 SW Pacific Hwy Z3 New dwelling area: square feet City/State/ZIP:Tigard,OR Garage/carport area: square feet Suite/bldg./apt.no.:Z3 Project name:Starbucks Covered porch area: square feet Cross street/directions to job site:Pacific Hwy&S.Durham Rd. Deck area: square feet ��yy Other structure area: square feet Ste- /1t 6S rksrl 4) i-eyr A i REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: f 3 i, )/�4 /3 Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no. Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF 1S ORK work indicated on this application. Paving as needed for reconfiguration of drive-thru lane and ADA compliance. Valuation: Removal of existing bank drive-thru canopy along with proposed outdoor seating Existing building area: 2082 square feet area. New building area: square feet ❑ PROPERTY OWNER- ® TENANT Number of stories: 1 Name:Starbucks Coffee Company Type of construction: V-B Address:2401 Utah Ave.S. Occupancy groups: City/State/ZIP:Seattle,WA 98134 Existing: B Phone.(206)318-1575 Fax:( ) New: A-2 ® APPLICANT ® CONTACT PERSON NOTICE Business name:GPD Group Professional Corporation All contractors and subcontractors are required to be Contact name:Raffia Darwish licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address:400 N.34`a Street,Suite 216 jurisdiction in which work is being performed.If the City/State/ZIP:Seattle,WA 98103 applicant is exempt from licensing,the following reasons apply: Phone.(206)204-7450 Fax: :( ) E-mail:rdarwish@gpdgroup.com CONTRACTOR Business name:To be determined. BUILDING PERMIT FEES* Address: (Please refer to fee schedule) City/State/ZIP: Structural plan review fee(or deposit): S180.00 Phone:( ) Fes_( FLS plan review fee(if applicable): CCB lie.. Total fees due upon application: $21.60 Amount received: 201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Date: * Fee methodology set by Tri-County Building Industry Service Board. 1:1Building\Permits\SIT-PermitApp.doc 08/02/2016 440-4613T(l 1/02/COM/WEB) City of Tigard: Site Work Permit Checklist Page 2 -Supplemental Information Commercial,Multi-Family and One-and Two-Family Dwellings: No permit is required if fill is less than 50 yards(5 dump truck loads),or less than 3 feet deep and will not be supporting a structure. If a building will be constructed on the fill, it must be engineered fill. If fill is in a flood plain, drainage way,or wetland,the applicant must apply for a sensitive lands review (SLR). Please complete all items below,unless otherwise noted. cut and fill has been limited to the furthest extent possible. Excavation Volume: . 0 cu.yds. Grading Volume: (Soils report required for>5,000 cu. yds.) 0 cu.yds. Fill Volume: (Fill exceeding 12"in depth shall be compacted to 90%of maximum density) 0 cu.yds. Retaining structure? (Check one) ❑ Rock ❑ CMU E Concrete ❑ Other: N/A *Total new impervious area including all buildings, sidewalks, and paving: 1,150 Sf sq. ft. Site Utilities Plumbing Work: Complete the Plumbing Permit Application for site utilities plumbing work. Plans Required: See "Site Work Permit Application-Plan Submittal Requirements"attached. The following must accompany this application: ® Site Plan with Vicinity Map showing ADA ❑ *Parking(including ADA)and Lighting compliance Plan ® Grading Plan and details ® *Landscaping Plan ® Erosion Control Plan and details E Soils Report(if required) ❑ Retaining Structures *Does not apply to One-and Two-family dwellings. Plan Submittal: Permit Fee: TYPE OF SUBMITTAL #of Plans Valuation: Permit Fee: (New,Additions or Required at $.00 to$500.00 $51 09 minimum permit fee Alterations) Submittal $500.01 to$2,000.00 $51.09 for the first$500.00 and Commercial $2.69 for each additional$100 or fraction thereof,to and including$2,000.00. $2,000.01 to$25,000.00 $91.44 for the first$2,000.00 and Multi-Family R-1 Occupancy 3 $10.76 for each additional$1,000 or fraction thereof,to and including $25,000.00. One-&Two-Family Dwelling 3 $25,000.01 to$50,000.00 $338.92 for the first$25,000.00 and $8.06 for each additional$1,000.00 or fraction thereof,to and including $50,000.00. $50,001.00 to$100,000.00 $540.42 for the first$50,000.00 and $5.38 for each additional$1,000.00 or fraction thereof,to and including $100,000.00. $100,000.01 and over $809.42 for the first$100,000.00 and $4.49 for each additional$1,000.00 or fraction thereof. I:\Building'Permits\SIT-PermitApp.doc 08/02/2016 2 Site Work Permit Application Plan Submittal Requirements TIGARD Commercial, Multi-Family and One- & Two-Family Dwellings A site work permit is required for all commercial projects including new buildings,additions, accessory buildings larger than 120 square feet,modular structures and multi-family R-1 occupancies. A site work permit is required for excavation, fill,grading,paving,retaining walls, fire hydrants and fire department access on private property for work on individual lots not covered under the subdivision development. Note: A separate "plumbing"permit for site utility plumbing work is required for sanitary sewer, storm sewer and potable water systems on private property. Please see the Site Utilities - Plumbing Permit Application for plan submittal requirements. 1. SITE PLAN and vicinity map (fully dimensional,drawn to scale) showing the geographic location labeled with: A. ® map &tax lot# ® project name ® site address ® suite number ® zoning ® applicant name ® applicant phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Building pads (drawn to scale) with project location. 2. BUILDING PLAN submittal requirement: Three (3) complete sets, Civil only. All details listed below shall be incorporated into the plans: A. Site plan showing: 1) Required parking spaces and driveways. 2) A route,accessible to persons with disability,leading from the public way to an accessible building entrance. 3) Accessible parking spaces and adjacent access aisle connecting with the accessible route. 4) Curb ramps along the accessible route,curb, sidewalk and gutter. 5) Finish grade elevations along the accessible route. B. Topographic survey plan showing grade elevations crossing the entire site. C. Overall grading plan. D. Utilities plan showing: 1) Fire hydrant location and pipe size if on private property. 2) If the building is to be protected with an automatic fire sprinkler system, show location of the water service vault and the fire department connection (PDC) within 70 feet of a fire hydrant. 3) Size of underground water service for the sprinkler system. E. Erosion control plan complying with the requirements of the Clean Water Services (CWS) agency showing: 1) Silt fence locations. 2) Bio-filter bags/other approved barrier material surrounding catch basins. I:\Building\Permits\SIT-PermitApp.doc 08/022016 3 3) Illustrations detailing the correct installation of the silt fencing and catch basin protection. 4) Any other measures to ensure compliance with CWS standards. F. Landscaping plan. 3. ADDITIONAL REQUIREMENTS: A. Soils (geotechnical) report. A soils report is required for new buildings and additions to contain the following: 1) The report shall address the potential of soil liquefaction and instability (OSSC Sec. 1804.2). 2) Fills to be used to support foundation of buildings (OSSC Sec. 3301.1). 3) Foundation and lateral pressures exceeding 1,500 lb./sq. ft. (OSSC Sec. 1805). B. Fire flow and hydrant worksheet. C. Plan review deposit based upon project valuation. I:1Building\Pennits\SIT-PermitApp.doc 08/02/2016 4 11111 City of Tigard 11 COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: , 7'�6 y c t.rJ q Site Address: /6 (200 (5-t U ,/ ij c zL, Suite/Bldg#: Project Name: Ski`6e4„7 , (Name of commercial business occupying the space. If vacant,enter Spec Space.) /� ir- Planning Review yNJ"y �`�� �� Proposal: �//� / �Jlf+v awl 5*,-ram d�,� p �S 'lf dnv-e -riAr --C r�w r, c' ,'4. %. YJ Verify site address/suite # exists and active in permit system ' er Terrace Neighborhood:I 0 Yes G No nd Use Case#: / it k o11c - oOocc-" Pla_nsatch Approved Land Use: ,�/ IV Site Plan L►d L�pandscape Plan �I pother: .I ban Forestry Plan �'lfevation Plan •I °C ' ding Height: Maximum Height Actual Height 0 0.t ditions Met: 0 Prior to Submittal ❑ Prior to Permit Issuance 1 Ii Business Lice Exists: YJ Yes ❑ No,applicant notified to obtain business license Illy'ublic Facilities Improvement(PFI) Permit: Required: ❑ Yes,applicant was notified Lld No Applied For: ❑ Yes 0 No,stop intake Notes: Approved by Planning: - Date: V/3h ", Revisions (after B ilding Submittal only) R ew r Date Revision 1: Approved 0 Not Approved _ cl 3fr f l Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3/3/i f Site Plans: # Building Plans: # Building Permit#: nter uilding permit#above. Workflow Routing: GE-131anning ering hermit Coordinator U—frail t g Workflow Sign-off: off Planning(include notes from planning review) Route Application Documents: [4-Boriginal permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: .gtamil` di dr7 • By Permit Technician: . ?f1/1 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_060116.docx / Engineering Review ape at building pad: �G ❑ PFI Permit#: Ia Conditions "Met"prior to issuance of building permit No CoKmoirytou s Uirtasements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) 21 Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes I2'No Assess Water Quantity Fee in-lieu: ❑ Yes Er No LIDA Facility on lot: Yes ❑ No R'NOT Approved by Engineering: 1.4 E+i tit;l}t. Date 4 i - , Notes: ,P/�v. k S TvtLNn pcvtr f4 4*.v, Approved by Engineering: JJ 1 Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: Approved ❑ Not Approved t J)$j-}te, Revision 2: ❑ Approved 0 Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review onditions "Met"prior to issuance of building permit GWIGu p.I?6t A.10 pitcs-ram —Al 4111111 ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: f�.Revision Notice 3: Date Sent to Applicant: -c� SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes N/A Tigard Trans SDC: ❑ Yes y N/A Parks SDC: ❑ Yes V N/A *OK to Issue Permit Approved by Permit Coordinator: Date: s!i y k i9 I:\Building\Fonns\B IdgPennitRvw_COM_W ithLandUse_0709I 5.docx ` 1V�. ArchitectslEngineersiPlanners V www.aodgroup.com G P D GROUP" � 1-800-955-4731 ktaR%69i9 LETTER OF TRANSMITTAL �;�cekl oN�ovlsoNI Attention Branden Taggart Date 03.20.19 Job No 2016355.42 To City of Tigard Community Development Re Starbucks Remodel 13125 SW Hall Blvd. 16200 SW Pacific Hwy #Z3 Tigard, OR 97223 Tigard, OR 97224 WE ARE SENDING YOU E Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints E Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ Sepias ❑ COPIES DATE NO. DESCRIPTION dit 2 02.28.19 15 sheets Construction Documents — Civil set 2 02.28.19 15 pages Storm Water Report •- .dic0,417 4.ce.4L-t l_ e l 1 03.04.19 2 pages Plumbing Permit Application w/ supplemental information 41ro,r1 1 03.04.19 1 page Mechanical Permit Application w/ supplemental information receArfol V,-0.0'„z 4 1 03.19.19 4 pages Site Work Permit Application signed w/supplemental information 5 Q;j. 1 03.04.19 2 pages Electrical Permit Application w/ supplemental information 1 03.04.19 1 page Commercial Building Permit Application revised THESE ARE TRANSMITTED as checked below: ❑ For compliance ❑ Approved ❑ Submit copies for distribution Li For your use ❑ Approved as noted ❑ Return corrected documents E As requested ❑ Revise&resubmit ❑ PRINTS RETURNED AFTER LOAN TO US ❑ For review and comment ❑ Rejected ❑ ❑ FOR BIDS DUE 20 REMARKS: Copy to File Signed Guy Ripley If enclosures are not as noted,kindly notify us at once. AKRON I ATLANTA I CLEVELAND I COLUMBUS I INDIANAPOLIS I LOUISVILLE I MARION I PHOENIX I SEATTLE I YOUNGSTOWN Branden Taggart From: Ripley, Guy <gripley@gpdgroup.com> Sent: Wednesday, March 20, 2019 12:16 PM To: Branden Taggart Cc: #Building Permit Technicians Subject: RE: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3 Attachments: Applications.pdf Good Morning Branden, I was able pull together the additional permit application information sooner than I expected so we will be sending you hard copies of everything this evening. I've attached the completed applications for informational purposes in the meantime. For clarification,the entire project valuation is$812K,of which: • $586K is for the building • $125K is for the site work • $72K is for the mechanical work The applications have been completed/revised as necessary. I apologize for any inconvenience. Please let us know if you need anything else. Thank you, Guy Ripley Designer GPD GROUP ARCHITECTS• ENGINEERS • PLANNERS T: 602.733.6202/ F: 602.772.3975 4600 East Washington Street, Suite 310, Phoenix, AZ 85034 grilgrgyp.com Confidentiality Notice: This email message, including any attachments, is for the sole use of the intended recipient(s)and may contain confidential and privileged information.Any unauthorized review, use, disclosure or distribution Is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the original message. Please consider the environment before printing this email. From: Ripley, Guy Sent:Tuesday, March 19, 2019 2:15 PM To: 'Branden Taggart' <brandent@tigard-or.gov> Cc: Darwish, Rafia <rdarwish@gpdgroup.com>; #Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: RE:Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3 Good Afternoon Branden, Thanks for letting us know—I misunderstood the sub permit information requirements as communicated to me. We are pulling the information together and will have it to you as soon as possible. 1 We will ship the additional full size sets to you, but is it acceptable to email the rest of the information (valuations and completed apps)? Thank you, Guy Ripley Desig ner GPD GROUP ARCHITECTS• ENGINEERS• PLANNERS T: 602.733.6202/ F: 602.772.3975 4600 East Washington Street, Suite 310, Phoenix, AZ 85034 gpderouj.com Confidentiality Notice:This email message, Including any attachments, is for the sole use of the Intended recipient(s)and may contain confidential and privileged information. Any unauthorized review, use,disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by email and delete all copies of the original message. Please consider the environment before printing this email. From: Branden Taggart<brandent@tigard-or.gov> Sent: Friday, March 15, 2019 4:48 PM To: Ripley, Guy<gripley@gpdgroup.com> Cc: Darwish, Rafia <rdarwish@gpdgroup.com>;#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov> Subject: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3 Hello Guy, We received your permit submittals for the Starbucks located at 16200 SW Pacific Hwy Z3. However,we are missing various information that we will need to process these permits and to complete plan review: Site Work: • The valuation on the application is the same as the building permit valuation: $812,000.00. What is the valuation specifically for the site work? The site work valuation needs to be separate from the building permit valuation. • We received (1) set of site work plans. We will need to receive (2) additional sets of civil plans. I have attached our site work permit application above for you to reference with the permit requirements listed. • We did not receive a signature at the bottom of this application. We would appreciate it if you can sign, print, and date the application and return it to us. Mechanical: • What is the valuation? We need the valuation of this work to determine fees. Please enter the valuation on the application and return it to us. Electrical: • The application was missing the quantities in the fee schedule. Please enter the quantities on the application and return it to us so that we may begin plan review. Plumbing: • We are missing the plumbing fixture quantities in the fee schedule. Please enter the quantities on the application and return it to us. 2 • The second page of the plumbing fixture application was not included with your submittal. Please submit the second page with the completed Commercial Fixture Work section. I have attached the plumbing fixtures permit application above for you. If you have additional questions, please let me know. Thank you, Branden Taggart v City of Tigard s ■ Senior Permit Technician Community Development 13125 SW Kali Blvd Tigard, OR 97223 t503}718-2449 bra ndent©tigard-or.goy DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 3 Bra nden Taggart From: Branden Taggart Sent: Friday, March 15, 2019 4:48 PM To: gripley@gpdgroup.com Cc: Darwish, Rafia;#Building Permit Technicians Subject: Starbucks Permit Submittals: 16200 SW Pacific Hwy Z3 Attachments: Starbucks Permit Applications.pdf; SIT_PermitApp_080216.pdf; PLMF_PermitApp.pdf Hello Guy, We received your permit submittals for the Starbucks located at 16200 SW Pacific Hwy Z3. However, we are missing various information that we will need to process these permits and to complete plan review: Site Work: • The valuation on the application is the same as the building permit valuation: $812,000.00. What is the valuation specifically for the site work? The site work valuation needs to be separate from the building permit valuation. • We received (1) set of site work plans. We will need to receive (2) additional sets of civil plans. I have attached our site work permit application above for you to reference with the permit requirements listed. • We did not receive a signature at the bottom of this application. We would appreciate it if you can sign, print, and date the application and return it to us. Mechanical: • What is the valuation? We need the valuation of this work to determine fees. Please enter the valuation on the application and return it to us. Electrical: • The application was missing the quantities in the fee schedule. Please enter the quantities on the application and return it to us so that we may begin plan review. Plumbing: • We are missing the plumbing fixture quantities in the fee schedule. Please enter the quantities on the application and return it to us. • The second page of the plumbing fixture application was not included with your submittal. Please submit the second page with the completed Commercial Fixture Work section. I have attached the plumbing fixtures permit application above for you. If you have additional questions, please let me know. Thank you, t