Loading...
Plans £#YLMENThL PHOTOVOLTAIC ROOF MOUNT SYSTEM The City LIof TglaTY nd and its 3395ENERGY 8TH AVE, 20 MODULES-ROOF MOUNTED - 6.40 kWDC, 4.80 kWAC employees shall not be PhoneTLAND, 97214 responsible for discrepanckwcontrsct°r#OR CCDif:195141 7643 S W CORNUTT ST, TIGARD, OR 97224 USA which may appear herein. REVISIONS DESCRIPTION DATE REV PROJECT INFORMATION: SYSTEM SUMMARY: GOVERNING CODES: OWNER: RYAN CHRISTMAN SYSTEM SIZE(DC):6.40 KW 2017 NATIONAL ELECTRICAL CODE (NEC) ADDRESS: 7643 S W CORNUTT ST,TIGARD, OR 97224 SYSTEM SIZE(AC):4.80 KW 2019 OREGON FIRE CODE (OFC) COUNTY: WASHINGTON COUNTY (N)20-HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W)MODULES 2019 OREGON STRUCTURAL SPECIALTY CODE APN: 2S112BD14000 (N)20-ENPHASE IQ7-60-2-US MICRO-INVERTERS COORDINATES: 45.41352, -122.75701 VALIDITY OF PERMIT (N)JUNCTION BOX CUST. PHONE: N/A (E)225A MAIN SERVICE PANEL WITH 200A MAIN BREAKER, PGE Approved plans ELECTRICAL CONTRACTOR BUILDING DATA: SINGLE FAMILY RESIDENTIPTLHE ISSUANCE OF A PERMIT (N)30A UTILITY DISCONNECT APPLICABLE CODES: 2017 OESC&2019 OSSC BASED ON CONSTRUCTION shall be on job site. MAX, MIN TEMP: 37°, -8° DOCUMENTS AND OTHER CITY OP TIGARD FINANCING: N/A DATA SHALL NOT PREVENT DESIGN CRITERIA: EET INDEX CLIMATE DATA SOURCE: PORTLAND/HILLSBORO THE CODE OFFICIAL FROM WIND SPEED: 96 MPH (ASCE7-16) REVIEWED FOR ODE COMPLIAN REQUIRING THE CORRECTION RISK CATEGORY: IIPV-0 COVER SHEET `i -,,�"i `i i s OF ERRORS. ORSC 105.4 WIND EXPOSURE CATEGORY: B OTC:Approved: [ PV-1 OVERALL SITE PLAN PV-2 ROOF PLAN WITH MODULES8 GENERAL NOTES: GROUND SNOW LOAD: 25 PSF OTC: [ ] PV-3 BRANCH LAYOUT MAY ] 20ZO ROOF TYPE: ASPHALT SHINGLE Permit#: INNS -0A)— (y 1 CQLY PV-4 FRAMING PLAN &SECTION r;i ' t °'-)..__ t': 1. PV SYSTEMS AND SUPPORTING STRUCTURE SHALL COMPLY NUMBER OF LAYERS: -01 PV-4.1 ATTACHMENT DETAIL WITH REQUIREMENTS OF 2017 OESC&2019 OSSC. ROOF FRAME: PRE-ENGINEEREDt t-22 ,, 11 TRUSS�� �' IO .7 �W l.o NifirS\-- PV i THREE LINE DIAGRAM 2. 3111.3.2-PV RACKING AND ATTACHMENTS SHALL BE UL 1703 STORY:TWO Suite #: hie( PV-6 ELECTRICAL CALCULATION&NOTE PROJECT NAME CERTIFIED. PV-7 WARNING LABELS 3. 3111.3.4-PV SYSTEM SHALL HAVE A FIRE CLASSIFICATION E- : Date: d THAT IS EQUAL TO OR GREATER THAN THE ROOF ASSEMBLY • W REQUIRED BY OSSC SECTION 1505.1. OFFICE COPY z 4. 3111.4.3-3111.4.7-PV LAYOUT SHALL NOT RESTRICT EGRESS, LIGHT VENTILATION,OR ROOF DRAINAGE REQUIREMENTS. W 5. 3111.4.8.1 -GENERAL PATHWAY REQUIREMENTS: O • 36"WIDE PATHWAY SHALL NOT BE REQUIRED ON PROJECT SITE +Is ;t ~ NO W STRUCTURES WITH A PV ARRAY AREA OF 1,000 SF OR LESS9 ,mwuc P,. ARRAY LOCATION W _ NO SECTION IS LARGER THAN AND WITH AN INTERSECTING A150 FEET MEASURED IN Inctn r k - Porilana Luke(levee 1- C.1 d' JACENT F AND Gen INSTALLED ON A ROOF WITH A SLOPE THAT EXCEEDS 2:12 1 , . If Z CD a d LENGTH OR WIDTH. Olive Garden Malian Z • • WHERE PV ARRAY DOES NOT EXCEED 25%AS MEASURED IN raYrrield .►. t+�W*� Q O O CO 1# PLAN VIEW OF TOTAL ROOF AREA OF A STRUCTURE,A Ly teorn�t g M • 1 0 0 c MINIMUM OF 12" UNOBSTRUCTED PATHWAY SHALL BE e''i , �• �r`srt : ( rt N • MAINTAINED ALONG EACH SIDE OF ANY HORIZONTAL RIDGE. L s e�,G� t � ?vex I Q • WHERE THE SOLAR ARRAY EXCEEDS 25%AS MEASURED IN i .kr (� Z PLAN VIEW OF TOTAL ROOF AREA OF THE STRUCTURE, A a ' 4 ' �`° t = CO MINIMUM OF ONE 36" UNOBSTRUCTED PATHWAY SHALL BE RaR° srve«"®� McMenamins Q6 HI w U ~ Q PROVIDED IN ADDITION TO A MINIMUM 12"UNOBSTRUCTED ; 't John Barleycorns r Z ALONG EA. SIDE OF ANY HORIZONTAL RIDGE. ; sw0.e:.cln „ 7643 South West 9Tr S t I�' ,';',. 6. ROOF STRUCTURE IS CONVENTIONAL LIGHT FRAMED WOOD t a Comutt Street The Home Depot I' } I1O f. ,4,,'•,' : CONSTRUCTION WITH PRE-ENGINEERED TRUSSES @ 24"O.C. $ t W REFER TO ALLOWABLE SPAN REQUIREMENTS IN TABLE a 305.4.1. PetroCard Pacific Pride u , PROJECT 7. 3111.4.8.5.1 - DISCONNECTS, J-BOXES, COMBINER BOXES OR • -• ink GUTTERS SHALL NOT BE PLACED IN ANY REQUIRED tee• inQOffice Depot < +' N/A PATHWAY OR CUTOUT. ` ar4f .. 8. 3111.5.3.1 -TOTAL SYSTEM WEIGHT SHALL NOT EXCEED 4.5 SHEET NAME sw PSF. PV MODULES AND RACKING SHALL BE DIRECTLY e ATTACHED TO ROOF FRAMING AS SHOWN IN PV-2. ‘ Pacific Corporate Center T 4,1._,_-•,..-- COVER SHEET ATTACHMENT SPACING WILL BE 48" O.C. MAX,AND WHEN 'Q 0i ATTACHMENT LOCATED WITHIN 3'OF ROOF EDGE, HIP, AVE, ,y"/ COI i'tutt St S Vj Cornult `it RIDGE SHALL BE 24"O.C. MAX. 'S ' SWkshly°g SHEET SIZE 9. 3111.5.4-MAX MODULE HEIGHT< 18"OFF ROOF SURFACE. i Courtyard by Marriott a a Portland Tigard; 1 , ,x; . ,�;.4 9 .4., ANSI B O / COVER SHEET VICINITY MAP Ali, AERIAL VIEW ^ SHEET NUMBER SCALE: NTS. SCALE:NTS SCALE NTS -/Y PV-0 �v' ✓ r - --PROJECT DESCRIPTION: PROPERTY LINE —50.01 ' ROOF DESCRIPTION " : ELEMENTAL --------- L. , ENERGY 20*320 HANWHA Q CELLS Q.PEAK DUO BLK-G5 320(320W)MODULES Z ROOF TYPE ASPHALT SHINGLE ROOF MOUNTED SOLAR PHOTOVOLTAIC MODULES I J 1339 SE 8TH AVE, I � ROOF ROOF AZIMUTH PRE-ENGINEERED PORTLaND,OR97214 SYSTEM SIZE: 6.40 DC I TILT TRUSSES SPACING Phone-(541)316.5786 4.80 AC I I 41 16 180° 24"OC coot ecro#OR ccs#:195141 REVISIONS _EQUIPMENT SUMMARY I 10- #2 16 180° 24"O C __ DESCRIPTION DATE REV 20 HANWHA Q CELLS Q.PEAK DUO BLK-G5 320(320W)MODULES I ' #3 , 16° 270° 24"O.C. 20 ENPHASE IQ7-60-2-US MICRO-INVERTERS CC- 1 if) NOTE:*CHECK WITH CITY/COUNTY OR LAND SURVEYOR I ' FOR ACCURATE PROPERTY LOCATION. I t7`"' I I 1 1 I ELECTRICAL CONTRACTOR I I I I SUNEYE LOCATION I 3'-3" I I I ' I 3'-8" ROOF#3 _ I (3) HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W)MODULES 0 1 4 i - O i_ROOF#3 ,,i 0 TILT-16° � AZIM.-270° I D 1 PROJECT NAME 1 _ I I E I - w M ' 1 ch Z o W of Io CI � � o t ' t c!) I— c' o W ROOF#1 I I W (13)HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 1 18 0 2 (320W)MODULES F Z CNIm o I (N)TESLA POWERWALL(INTERIOR WALL) O 0 r /1 ROOF#1 I '� I (N)30A UTILITY DISCONNECT(INTERIOR WALL) - r TILT-16° AZIM.-180° I (N)ENPHASE COMBINER BOX/RSID(EXTERIOR WALL) (n 5 Q � - % (E)MAIN SERVICE PANEL 225A RATED,WITH Ur Z ' ,� (E)200A MAIN BREAKER (INTERIOR WALL) , (E)UTILITY METER(EXTERIOR WALL) U 1— Q 1 � �© � -- (N)TESLA GATEWAY(INTERIOR WALL) ZQ � e 1 i IROOF#2 , I ROOF#2 PROJECT TILT-16° i (4)HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 N/A I AZIM.-180° (320W)MODULES wINur Z SHEET NAME JI I ' EXISTING 1 I M DRIVEWAY I OVERALL SITE PLAN WI M 1 CL O1 r 1 SHEET SIZE ctf.L ----J ANSI B --------------- PROPERTY LINE SHEET NUMBER OVERALL SITE PLAN ik\ T 50.01' SCALE:3/32"= 1'-0" 5 W CORNUTT ST PV-1 MODULE TYPE, DIMENSIONS & WEIGHT BILL OF MATERIALS ELEMENTALee ENERGY EQUIPMENT QTY DESCRIPTION NUMBER OF MODULES=20 MODULES MODULE TYPE=HANWHA Q CELLS Q.PEAK DUO BLK-G5 320(320W)MODULES SOLAR PV MODULE 20 HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W)MODULES 1339 SE 8TH AVE, PORTLAND,OR 97214 MODULE WEIGHT=41.2 LBS/18.7 KG. INVERTER 20 ENPHASE IQ7-60-2-US MICRO-INVERTERS Phone-(541)316-5786 MODULE DIMENSIONS= 66.3"X 39.4"=18.14 SF UTILITY DISCONNECT 1 30A UTILITY DISCONNECT Connector#ORCCB#:195141 REVISIONS UNIT WEIGHT OF ARRAY=2.79 PSF ATTACHMENT 59 SUNMODO EZ3 IDGE 10 1.GENERALNOTES: END CLAMPS/STOPPER SLEEVE DESCRIPTION DATE REV 1. CONDUIT ISISRAILS 10 R R EKING-16s"SECTION DIAGRAMMATIC.FINAL ROUTING TO BE DETERMINED BY INSTALLER. (E) BACK OF RESIDENCE MID CLAMPS 22 MID CLAMPS 1UF0 i 2. SUNEYE SHOT S1 WAS COLLECTED IN THE SPECIFIED LOCATIONS AND END CLAMPS 36 CORRESPONDS TO RYAN CHRISTMAN RESIDENCE SHADE REPORT"PDF IGROUNDING LUG 9 IRONRIDGE GROUNDING LUG ROOF DESCRIPTION 1 1 ROOF TYPE ASPHALT SHINGLE PHOTOVOLTAIC MODULES ELECTRICAL CONTRACTOR HANWHA Q CELLS Q.PEAK DUO ROOF ROOF TILT AZIMUTH PRE-ENGINEERED TRUSSES ROOF#3 -- BLK-G5 320(320W)MODULES SPACING (3)HANWHA Q CELLS Q.PEAK DUO ,(� 66.3" �' #1 16° I 180° 24"O.C. BLK-G5 320(320W)MODULES #2 16° 1 180° 24"O.C. #3 16° 1 270° 24"O.C. ;I:le X M ARRAY AREA& ROOF AREA CALC'S o r h I 4 ROOF#3 t ❑ y 12"FIRE PATHWAY AREA OF NEW AREA OF TILT-16° Il cp PROJECT NAME ARRAY ROOF(PLAN VIEW) TOTAL ROOF AREA COVERED BY ARRAY o� AZIM.-270° a,a ////// (Sq.Ft.) (Sq.Ft.) ■ 363 2129.12 17% '1.f °O ❑ i3 CO 17%ROOF AREA(ARRAY<25%OF ROOF AREA) W ❑ .r1.1. C-) x � (E)PRE-ENGINEERED TRUSSES @ 24 O.C. Z o ❑ 0 r 1'�. (N)(59)SUNMODO EZ3 (n 0 �/ O /—6'-9"—/ 10'-0" d 14'-4" / 10'-0" /'/ z / SPACED AT 24"&48"O.0 H N 0 W iiXiiriirriii✓iii�ri • iir..)zelf: llwirl�>rvr r/r//// ./Y/// (N)IRONRIDGE XR10 RAIL W r W (E)ASPHALT SHINGLE ROOF,TYP. Ct > CD o d LEGEND ROOF#1 o • O (N)TESLA POWERWALL(INTERIOR WALL) Q Q 0 r TILT-16° , . . • / - r- ACD UTILITY DISCONNECT AZIM.-180° o) j/^ (N)30A UTILITY DISCONNECT(INTERIOR WALL) I U o W I_ 1- j/ (N)ENPHASE COMBINER BOX/RSID(EXTERIOR WALL) W Ce N J TG TESLA GATEWAY / (E)MAIN SERVICE PANEL 225A RATED,WITH B TESLA POWERWALL (E)200A MAIN BREAKER(INTERIOR WALL) = Cr) _ (// UM UTILITY METER - - ‘,9 % ,�- (E)UTILITY METER(EXTERIOR WALL) 0 0 I— Q I--.\ ' (N)TESLA GATEWAY(INTERIOR WALL) z I- MSP 225A MAIN SERVICE PANEL WITH 2O0A MAIN BREAKER CB ENPHASE COMBINER BOX JB ROOFTOP JUNCTION BOX ROOF#2 --- - - - TILT-16° PROJECT EX] AZIM.-180° — ROOF#2 0 PIPE VENT (4BL)HANWHAK-G5 320(32 W)MODULES CELLS Q.PEAK DUO SHEET NAME ATTIC VENT ROOF#1 - UO SUNMODO FLASHING (13) HANWHA K-G5 Q 0(320W)ODU CELLS Q.PEAK DLES ROOF PLAN WITH MODULES IRON RIDGE XR10 RAIL CONDUIT RUN SHEET SIZE S W COKNUTT ST ANSI B ;ROOF PLAN WITH MODULES (E) FR.ONT OF RESIDENCE SHEET NUMBER SCALE: 3/32" = 1'-0" PV-2 ELEMENTAL 111 (20) HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W) MODULE 66.3" '� '�� co ENERGY (20) ENPHASE IQ7-60-2-US MICRO-INVERTERS - 13396E 8TH AVE, PORTLAND,OR 97214 (1) BRANCH OF 12 MODULES & Phone-(541)316-5786 (E) BACK OF RESIDENCE M conracroruoRccex:195141 (1) BRANCH OF 08 MODULES CONNECTED IN PARALLEL PER BRANCCD H REVISIONS BRANCH#1 - PHOTOVOLTAIC MODULES DESCRIPTION DATE HANWHA Q CELLS Q.PEAK ROOF#3 DUO BLK-G5 320 (320W) (3) HANWHA Q CELLS Q.PEAK DUO MODULES BLK-G5 320(320W)MODULES 12"FIRE PATHWAY :',1 r.//,_ ../_� i k ELECTRICAL CONTRACTOR 0 /. �- ❑ 1 11 ❑ 1 PROJECT NAME ❑ W j 0 Z / %///,'////-//I/ //// //i/ i- ,"h i OAP / ////iy/i/ W//7 W i- - BRANCH#2 Cl CO 0 O —f—� (n I- N O w in I- N (� ;` o i Z w 0 0- ■ � 2 p , / 1 i 5Q _ Irti/ i co — U � ~ Q Z 1 cc ROOF#1 - -- PROJECT (13)HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W)MODULES N/A -- ROOF#2 SHEET NAME (4) HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 (320W) MODULES BRANCH LAYOUT (20)ENPHASE IQ7-60-2-US MICRO-INVERTERS SHEET SIZE ANSI B S W CORNUTT 5T ' (E) FRONT OF RESIDENCE .:\BRANCH LAYOUT ^ SHEET NUMBER 1 SCALE: 1/8" =1'-0" PV-3 *.) ELEMENTAL PV-4 SOLAR MODULEE ENERGY B - - /� 1339 SE 8TH AVE, V 1L0�� PORTLAND,OR 97214 RAKE RAKE � Phone-(541)316-5786 ���_ \ Contractor#OR CCB#'195141 EAVE ` t6 m ` ` REVISIONS P. , D _.....iiiii .„i dixi i i i i 1 ii„, _......„,.. ! � -- 7 DESCRIPTION DATE REV m is .13 '(•,�, • 4"' PRE-ENGINEERED )- PV-4`. TRUSSES@ 24"O.C. RIDGE C j�� _--I_. �� WKS,W- . i ELECTRICAL CONTRACTOR io 1 ilnili ' "&i111 -- d.. r N m rlvly 1 �. m N 1 1M _ . 1991/ NIom..� : OM hil MIIIIIIIIIIVA PVA D .�1miii n di 1 m 703 m r KE \ PROJECT NAME 41 LLI FRAMING PLAN )SECTION DETAIL z SCALE: 1/16" = 1'-0" TV-4j SCALE: 1/8" = 1'-O" LLI H- Q 0 I- 'I' O w SOLAR MODULE iii w F- i-3;1pM1 SOLAR MODULE �, p" Z Z CO a ? 50^ _* \ \ � I (n E CV J B 2 M U Q PRE-ENGINEERED N- TRUSSES@ 24"O.C. PRE-ENGINEERED Z TRUSSES@ 24"O.C. z, N- '2 CC I.r N N N m in N PROJECT N N N N/A SHEET NAME FRAMING PLAN & ATTACHMENT DETAIL T . \ \ SHEET SIZE ANSI B - ',SECTION DETAIL SHEET NUMBER 'SECTION DETAIL PV-4 PV-4;' SCALE: 1/8" = 1'-0" PV-4 SCALE: 1/8" = 1' 0" EstELEMENTAL ENERGY 1339 SE 8TH AVE, PORTLAND,OR 97214 Phone-(541)316-5786 f %\, Contractor#OR CCB#:195141 s` n REVISIONS PV(MODULE `f1 ;-\\ DESCRIPTION 1 DATE REV SEE (2/PV-4.1) FOR O ' -�' ENLARGED VIEW \ • ELECTRICAL CONTRACTOR .01 (;> ��� ''� � v'— (E) ASPHALT SHINGLE ROOF il / PRE-ENGINEERED TRUSSES @ 24" O.C. `dr ice- ' ;' ✓d �/ PROJECT NAME U 1 ATTACHMENT DETAIL Z PV-4 Inw SCALE:NTS I.1.1 - - - — u) H CCVV 0 W END/MID CLAMP j — n N. d \ IRONRIDGE XR10 RAIL Z Z O m PV MODULE \ \ „�- L-FOOT SERRATED 2 U / (E) ASPHALT SHINGLE ROOF = ch (D Z D / -- / '� U c ~ Q / / Z N- . / I 0:00.0 0. 4 PROJECT 11, SUN MODO EZ3 FLASHING N/A \ / -, SHEET NAME \ /' ice PRE-ENGINEERED TRUSSES@ 24" O.C. ATTACHMENT \ / --�- DETAIL � �`_ 5/16" 3"- X LAG BOLT SHEET SIZE \ j ANSI B 2 ENLARGED SECTION VIEW .\�_____:= SHEET NUMBER PV-4.1 PV-0 SCALE:NTS SYSTEM SIZE: EL ENE 1N�T� -. -_ AC OUTPUT CURRENT ACCORDING TO ART.690.8(B)(1) 20.00 Amps E EM Y NOMINAL AC VOLTAGE 240 Volts 20 x HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 = 6.40kW 20 x ENPHASE IQ7-60-2-US =4.80kW THIS PANEL IS FED BY MULTIPLE SOURCES(UTILITY AND SOLAR) 1339SE8TH AVE, PORTLAND,OR 97214 Phone-(541)316-5786 _ -- GENERAL NOTES: Contracts#OR CCB#:195141 (1) BRANCH OF 12 MODULES & 1. CONTRACTOR RESPONSIBLE FOR COMPLYING WITH ALL REVISIONS • 1 BRANCH OF 08 MODULES , LOCAL OR NATIONAL CODE REQUIREMENTS AND DESCRIPTION DATE REV CONNECTED IN PARALLEL PER BRANCH EQUIPMENT INSTALLATION INSTRUCTIONS. 1_ -_ -_ 2. SEE PV-7 FOR LABELING REQUIREMENTS TO UTILITY GRID L1 L2 N Kill BI-DIRECTIONAL CONTRACTOR 12 MICRO-INVERTERS IN BRANCH CIRCUIT#1 (E)MAIN AE2VICE PANEL 1-PHASE,3-W, UTILITY METER �- 120/240V(N)125A ENPHASE225A COMBINER BOX/RSID (INTERIOR WALL) (N)TESLA GATEWAY NEMA-3R,120/240V,1e (E)MAIN BREAKER TO -• -- (INTERIOR WALL) , {--EXISTING WIRE ,. / \ - - EXTERIOR WALL HOUSE 240V,200A/2P --- Leo—� I I ) - . 200A I -- - 1 N JUNCTION BOX 2 / J — 1 I 1 I \ N G T - �- �. O (N)30A PV BREAKER 08 MICRO-INVERTERS IN BRANCH CIRCUIT#2 f� - -T^`_ - ) _20A-� \ �� ••• - I i IBo#WBNY��i .. . ` r =li �_ --__ ` y 20A (N)30A BATTERY BREAKER \' P �_ � * "._ ( l I Lam- i ; I ` >G 15A '_\ PROJECT NAME •l� / i 1 -__. _-- ___._ -ry I ti 1 / , •P (2)/f310 AWG THWN•2 li , 1 Li �\ li _ -_-__ _. - (1)#6 THWN 2 NEUTRAL `--'I `"I -{- _ __ _ I _ - - 4LI (1)#6 EMT CONDUAWG THWN-2 IT W �- I . Pi- 0 t I it � M' IQ-Envy BRANCH TERMINATOR I rG -It --- - {G}� Z Q-TERM FOR IQ SERIES(TYP.) (1)Q-CABLE (2)#10 AWG THWN-2 1 �I� I (2)#12 AWG TRUNK CABLE (1)#10 AWG THWN-2 GND I W ENPHASE IQ7-60-2-US --' (1)PV#6 BARE CU GND IN 314'NM-B CONDUIT - -1 GEC MICROINVERTERS(240V) L- -iii, LW i (2)#10 AWG THWN-2 __ 0 0 (LOCATED UNDER EACH MODULE) _� (1)#)0 AWG TG THW NEUTRAL GROUNDING � I- N 0 (1)IN10AWMTCONDUIT ELECTRODE SYSTEM LijN I- N d w IN 3l4"EMT CONDUIT -� �� (1 (2)#10 AWG THWN-2 UTILITY AC DISCONNECT o CL (1)#10 AWG THWN-2 NEUTRAL-_.-- 30A,2P,NEMA 3R,240V Z �/ D7 (1)#10 AWG THWN-2 GND (INTERIOR WALL) •IN 1"EMT CONDUIT } (4)[24-161AWG THWN-2_, G 0 O N U - r I COMMUNICATION WITH I_ (n - _ r POWERWALL f cc (V J I (N)5kW AC BATTERY = CO — 11 TESLA POWERWALL 2 AC U ~ Q NRTL LISTED,NEMA3R (INTERIOR WALL) Z ti Q VOLTAGE DROP CALCULATIONS WIRE RUN #OF MODS IV(VOLTS) I(AMPS) I', L(FT) VD** VD(%) WIRE SIZE* RACEWAY PROJECT N/A BRANCH#1(MODULE)TO JUNCTION BOX 12 240 12 I 60 2.29 0.95% 12 AWG FREE AIR BRANCH#2(MODULE)TO JUNCTION BOX 08 240 08 35 0.89 0.37% 12 AWG FREE AIR SHEET NAME JUNCTION BOX TO AC COMBINER 12 240 12 25 0.60 0.25% 10 AWG 3/4"NM-B CONDUIT ELECTRICAL LINE BRANCH#1 ,I___-_. JUNCTION BOX BRANTO CH#2COMBINER 08 240 08 25 0.40 0.17% 10 AWG 3/4"NM-B CONDUI I DIAGRAM AC COMBINER TO MSP 20 240 20 10 0.40 0.17% 10 AWG 3/4"EMT CONDUIT SHEET SIZE MSP TO GATEWAY 240 200 1 5 0.12 ` 0.05% 3 3/0 AWG 2" EMT CONDUIT ANSI B ,MAX VOLTAGE DROP: 1.42% j (r1 WORST CASE VALUES ELECTRICAL LINE DIAGRAM SHEET NUMBER SCALE: NTS Worst Isc=MaX(9.82A,9.99A)=9.99A PV-5 Worst Voc=Max(37.27V,41.87V)=41.87V lT l��..-.--:.La GI-.�..«a_I G.._--... nnon All -:�La.- .-•.��_.._r ELEMENTAL SOLAR MODULE SPECIFICATIONS iAC CONDUCTOR AMPACITY CALCULATIONS: AC CONDUCTOR AMPACITY CALCULATIONS: ee ENERGY FROM JUNCTION BOX TO COMBINER PANEL: FROM MSP TO GATEWAY: MANUFACTURER/ HANWHA Q CELLS Q.PEAK DUO BLK-G5 320 aTN AVE, MODEL# (320W)MODULES I AMBIENT TEMPERATURE ADJUSTMENT FOR EXPOSED CONDUIT PO 1ass 339 se SE ,OR 9n14 +22 EXPECTED WIRE TEMP(In Celsius) 37° Phone-(541)316-5786 VMP 33.80V • PER NEC 310.15(B)(2)(c) TEMP.CORRECTION PER TABLE(310.16) 0 91 Contractor#OR CCB#._195141 EXPECTED WIRE TEMP(In Celsius) 37°+22=59° -- REVISIONS IMP 9.47A - NO.OF CURRENT CARRYING CONDUCTORS 2 0 71 DESCRIPTION DATE REV 40 5ev TEMP.CORRECTION PER TABLE(310.16) CONDUIT FILL CORRECTION PER NEC 310.15(B)(2)(a) 1 ISC I 9.94A j NO.OF CURRENT CARRYING CONDUCTORS 2 CIRCUIT CONDUCTOR SIZE ) CON MODULE DIMENSION CIRCUIT CONDUCTOR AMPACITY 3/0 225A I 66.3"L x 39.4"W x 1.26'D(In Inch CIRCUIT CONDUORRORC ON PER NEC 310.15 B)(2)(a) 1 0 - - - SIZE 12 AWG SPECIFICATIONS CIRCUIT CONDUCTOR AMPACITY 30A I REQUIRED CIRCUIT CONDUCTOR INVERTER REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690.8 A8B) 15A MAX OCPD ESSENTIAL LOADS PANELPACITY PER NEC 69p.8(B) 200A ELECTRICAL CONTRACTOR MANUFACTURER!MODEL# ENPHASE IQ7-60-2-USI, ( i NOMINAL OUTPUT VOLTAGE VAC AX.STRING LENGTH)X MAX UTPUT DERA ED AMPACITY OF CIRCUIT NOMINAL OUTPUT CURRENT 240 IAA 1DERATED MICRO-INVERTERS PACITV OF CIA T CONDUCTOR PER NEC TABLE ABLE 31p CURRENT i TEMP.CORRECTION ION PER TABLE(3 ON CONDUCTOR PER NEC TABLE 31D.16 204.75A TEMP. 0 NDUIT FILL PER NEC ONDCORRECTION PER TABLE(310.16)N X CIRCt OreaterClhaOnNotherwise ess)the( for circuit conductor size 21.3A p Resul AMBIENT TEMPERATURE SPECS �, CONDUIT FILL CORRECTION PER NEC 310.15(B)(2)(a)X RECORD LOW TEMP -8 CIRCUIT CONDUCTOR AMPACITY RIRCUIT should be gCTOR AMP(200A) entry _ - and ampacity AMBIENT TEMP(HIGH TEMP 0.4%) 370i I Result should be greater than(15A)otherwise less the entry for circuit conductor size and ROOF TOP TEMP 59° ampacity AC CONDUCTOR AMPACITY CALCULATIONS: CONDUCTOR TEMPERATURE RATE MODULE TEMPERATURECOEFFCENTOFVoc D27%I 90°C AC CONDUCTOR AMPACITY CALCULATIONS: FROM MSP TO BATTERY: i FROM COMBINER BOX TO INTERCONNECTION: PROJECT NAME EXPECTED WIRE TEMP(In Celsius) 37° NUMBER OF CURRENT No.OF INVERTER I 20 TEMP.CORRECTION PER TABLE(310.16) 0.91 PERCENT OF CARRYING CONDUCTORS IN EXPECTED WIRE TEMP(In Celsius) I 37° NO.OF CURRENT CARRYING CONDUCTORS 2 LLl VALUES EMT TEMP.CORRECTION PER TABLE(310.16) 0.91 7CONDUIT FILL CORRECTION PER NEC 310.15(8)(2)(a) 1 0 .80 4-6 NO.OF CURRENT CARRYING CONDUCTORS .70 7-9 --- - -_ - 2 CIRCUIT CONDUCTOR SIZE 10 AWG .50 10-20 CONDUIT FILL CORRECTION PER NEC 310.15(B)(2)(a) 1 CIRCUIT CONDUCTOR AMPACITY 40A W ~ O 10 AWG - I .1- O CIRCUIT CONDUCTOR AMPACITY (/) I-- N 0 W CIRCUIT CONDUCTOR SIZE 40A I REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690 8(B) 30A1 LLI I- NO BATTERY OUTPUT CURRENT W z E O- REQUIRED CIRCUIT CONDUCTOR AMPACITY PER NEC 690.8(B) 25A DERATED AMPACITY OF CIRCUIT CONDUCTOR PER NEC TABLE 310.16 I Z W CO 1.25 X TOTAL NO. OF INVERTER X MAX INVERTER OUTPUT CURRENT ( ) C 0 0 TEMP.CORRECTION PER TABLE COND X 36.4A TEMP.ONDCORRECTIONOR PER TABLE NEC 3 X 36.4A G Q N- DERATED AMPACITY OF CIRCUIT CONDUCTOR PER NEC TABLE 310.16 CONDUIT FILL CORRECTION PER NEC 310.15(B)(2)(a)X ( CIRCUIT CONDUCTOR AMPACITY I 0 N I- CONDUIT FILL CORRECTION PER NEC 310.15(B)(2)(a)X Result should be greater than(30A)otherwise less the entry for circuit conductor size and Q 4t CIRCUIT CONDUCTOR AMPACITY ampacity (7 Z D Result should be greater than(25A)otherwise less the entry for circuit conductor size and U ,. H a. ampacity O Q Z 1..-- Q } Et ELECTRICAL NOTES: CALCULATIONS NOTES: PROJECT 1.)ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL,AND LABELED FOR ITS APPLICATION. 1. WIRE SIZES INCLUDE DE-RATING FACTORS SUCH AS AMBIENT TEMPERATURE AND MORE THAN 3 CURRENT CARRYING CONDUCTORS 2.)ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90 DEGREE C WET IN CONDUIT- N/A ENVIRONMENT. 2. BRANCH CABLE VOLTAGE DROP AND LENGTH DATA FROM MICRO INVERTER MANUFACTURER.LENGTH FROM BRANCH TO SOLADECK 3.)WIRING,CONDUIT,AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY INCLUDED. SHEET NAME TO,AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE,HIP,OR VALLEY. 3. WHERE AC UNGROUNDED CONDUCTORS ARE INCREASED IN SIZE,EGC SHALL BE INCREASED IN SIZE PROPORTIONATELY ELECTRICAL 4.)WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL ACCORDING TO THE CIRCULAR MIL AREA OF THE UNGROUNDED CONDUCTORS, CALCULATION & COMPLY WITH NEC 110.26. 5.)DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS.CONTRACTOR SHALL ELECTRICAL NOTE FURNISH ALL NECESSARY OUTLETS,SUPPORTS, FITTINGS AND ACCESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. SHEET SIZE 6.)WHERE SIZES OF JUNCTION BOXES,RACEWAYS,AND CONDUITS ARE NOT SPECIFIED,THE ANSI B - CONTRACTOR SHALL SIZE THEM ACCORDINGLY. - 7.)ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. • 8.)MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SHEET NUMBER SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. PV-6 - 9.)MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C.VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. Er 013 ELEMENTAL 4" / f ENERGY 2 \ 1 1/2" 1339 SE 8TH AVE, P 9 - BRANCH#1 DISCONNECT Phoneo -(541)3 6-57 NOT RELOCATE THIS 240VAC 12 AAC WARNING:MULTIPLE POWER SOURCES PRESENT. -( )CCB#:19s fV li 6400 WATT PHOTOVOLTAIC ARRAY LOCATED ON ROOF. contracts#OR 195141 OVERCURRENT DEVICE 01 BATTERY INSIDE. AC DISCONNECT LOCATED IN GARAGE REVISIONS ' DO _ _ _ _ • ELECTRICAL PANEL,RAPID SHUTDOWN INITIATION DESCRIPTION DATE REV _\ LOCATION: COMBINER PANEL QUANTITY:1 DEVICE LOCATED OUTSIDE NEXT TO METER. LOCATION: IN MSP QUANTITY:1 \ LOCATION: AT METER QUANTITY:1 3 SOLAR PV SYSTEM ELECTRICAL CONTRACTOR I X 1 1/2" SECOND SOURCEIS A PVMULTIPLE POWERRARRA BATTERY CES \ BRANCH#2 DISCONNECT NPRESENT. 1 � EQUIPPED WITH INSIDE. AC DISCONNECT LOCATED IN GARAGE : • 240VAC 08 AAC RAPID SHUTDOWN ELECTRICAL PANEL,RAPID SHUTDOWN • INITIATION DEVICE LOCATED OUTSIDE NEXT TO LOCATION: COMBINER PANEL QUANTITY:1 METER. LOCATION: INTERCONNECTION PANEL QUANTITY:1 // SOLAR ELECTRIaq ��., PROJECT NAME j-- L_ PV PANELS J 2" ,, r 5.25" ' �� LLI . 1 ti U Z BATTERY AC DISCONNECT , 1 LU 1--- 240VAC 23 MC Co RAPID SHUTDOWN SWITCH00. TURN RAPID SHUTDOWN cco FOR SOLAR PV SYSTEM LOCATION: BATTERY DISCONNECT QUANTITY:1 SWITCH TO THE "OFF" Z eL W CO QO0 � POSITION TO SHUT 2 U - >- 11/2 , \ DOWN PV SYSTEM AND rn Q CV BATTERY BACKUP AC REDUCE SHOCK HAZARD = M - Z LOCATION: RSD INITIATION DEVICE QUANTITY:1 DISCONNECT 240VAC \ IN THE ARRAY U ( I— Q LOCATION: BREAKER QUANTITY:1 . Z ~ 2 �1/ < 4,• l CAUTION: 1 1/2" -f / 3 PHOTOVOLTAIC SYS TEM _ — __ I --"-- - \ PROJECT COMBINER PANEL.DO SOLAR AC DISCONNECT N LOCATION: MAIN DISCONNECT QUANTITY:1 N/A NOT ADD LOADS, 240VAC 20 AAC \ SHEET NAME \ 2 LOCATION: COMBINER PANEL QUANTITY:1 LOCATION: BACKFED BREAKER QUANTITY:1 / '1i- - \ WARNING LABELS WARNING: ELECTRIC SHOCK HAZARD. TERMINALS ON THE LINE AND SHEET SIZE LOAD SIDES MAYBE ANSI B ENERGIZED IN THE OPEN POSITION. 1 \ SHEET NUMBER ' LOCATION: BATTERY DISCONNECT QUANTITY:1 PV-7