Plans O
xx:2NN
0I N
DIM
a'a'
Q Z
E+
r4:,,i_j]cc
0�` "3' rota.,/ 1 -4 L `,- :SEf a Cx
mI-
cn
11 l 4,4�(.4../9 :# Darns
Ofr3" 7iL- :ssalp[Ty
-� :# Inu.►ad
I I :Dia
I :paAoJddy
113MynaTAIOO TQOD 2IOJI craimausal
CIIIVOLL dO AiDD
900,000BTU,2PSI,875 OF
DEVELOPED LENGTH \\,r
`
fl
- BUILDING TO BE DIVIDED INTO
2 TENANTS APRROX.HERE /�
NEW GAS METER \�
EX GAS METER
ilLTj
Ex.UH j
THERE ARES EXISTING UNIT HEATERS(UH)LENNOX LF2e-150 USING I rIXGAS 0
150,000BTU IN THE WEST HALF OF THE BUILDING TOTALING 900,000NTU - 7
TIE NEW GAS LINE INTO � L
EXISTING GAS LINE \ CAP EXISTING GAS LINE
N
! rIXGAS rEX GAS rEx GAS
Ex.LIN
�� 2'NEW GAS
r
; CO
MOD 30I330 o
o
..1-
Ex.UN
r44-
Ex.UH 1Ex.UH Ex.UH
F WEST EAST-4
The gas piping in the west half of the The gas piping M the east 2/12/20
building to be feed off of the new gas meter half of the building to
and non a new r gas line to refeed the remain as b and on the
existing heaters existing gas rooter
N ISIAIG DV i. t1-
d 1j1 AORI_O
OZOZ 9 I sew
C1: 1.7 43 8 NO NEW GAS EQUIPMENT BEING ADDED TO THE BUILDING.ALL GAS EQUIPMENT IS EXISTING.
P1