Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT .111 COMMUNITY DEVELOPMENT Permit#: MEC2020-00315 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 06/01/2020 TIGARD 9 Parcel: 2S103CA00207 Jurisdiction: Tigard Site address: 11590 SW FONNER ST Project: Alexeev Subdivision: WOODCREST NO.2 Lot: 29 Project Description: Mechanical for 577 sf second story addition: Mini-split system and heat pump installations with associated duct work and(1)attic/crawlspace fan. Contractor: OWNER Owner: ALEXEEV,ALEXANDER&OLGA LIVING ALEXANDER&OLGA ALEXEEV 22578 CANYON RIDGE PL 11590 SW FONNER ST CASTRO VALLEY, CA 94552 TIGARD, OR 97223 PHONE: 510-828-0467 PHONE: FAX: FEES Specifics: Description Date Amount Heat Pump 05/28/2020 $122.12 Type of Use: SF Duct Work 05/28/2020 $23.32 Class of Work: ALT Type of Const: Attic/Crawlspace Fans 05/28/2020 $23.32 Occupancy Grp: 12%State Surcharge-Mechanical 05/28/2020 $20.25 Stories: Fuel Fuel Types: Gas Pressure: Total $189.01 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 . . . 4. Issued By: Permittee Signature: Ca 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application f( .: Oi l li l I ' i Ov i 1 City of Tigard tr I Received , • • V'� ���`�t IIM q 13125 SW Hall Blvd.,Tigard,OR 9722 E !I Date/By: Plan Review • Phone: 503.718.2439 Fax: 503.598.19 I)eteJB y Other Permit: Inspection Line: 503.639.4175 FICA R D qKaN —��' d 1 MAY p O 20�U Date Ready/By: fa Paget for Internet: www.tigard-or.gov Notified/Method: Supplemental Information -4 CY C.; TiGARD G DI\IaiOI a COMMERCIAL FEE' SCHEDULE - USE CHECKLIST TYPE OF WOILj�IN ��,( Mechanical permit fees"are based on the value of the work CI New construction !d Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES' pii 1-and 2-family dwelling 0 Commercial/industrial 0 Accessory building For special information use checklist ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: �/5 O r Air conditioning 46,75 Job site address: 9 .c u ' FON ei2 c f Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: /cihe i 494, f 72 2 P, Furnace 100,000+BTU(ducts/vents) 54.91 HSuite/bldg./apt.no.: Project name: iLcirez.;✓ .DA/"T/O,f/ eatwo �* 6Lo6 /221 2 Duct work 23.32 3,,32 Cross street/directions to job site: 7 bl,0 Lon ,,,,cs r- OF' Hydronic hot water system 23.32 Residential boiler(radiator or /A/7RPSe (7, / SW //67W ,4r/E hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: o Other: 23.32 ft/�O/�O �S'T2 Lot �9 Other fuel appliances: Tax map/parcel no.: 2 S/ 03 C'g 102Lo r Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 /°�� Flue vent for water heater or gas /) /NL{i147/04/ . ems'-.S / X �'rf,L renv7//,4f fireplace 23.32 /�1 Log lighter(gas) 23.32 pee/77,7/ .�''g7'P//'7 �G2 Q// , .' ' Wood/pellet stove 33.39 J� S 2'e, to e,Yie7/1 � '! ce.4 e , e/zc-,s fj&'/ Wood fireplace/insert 23.32 UGC'2 087 el �,�y( 7 4, I Chimney/liner/nue/vent 23.32 is PROPERTY OWNER J ❑ TENANT Other: 23.32 h Environmental exhaust and ventilation: Name: it evy t N4 c^Q 4YE-L,-7/ Range hood/other kitchen ment 31.39 Address: //S,90 S �Q,(//t/,'/2 .� Clothes dryer exhaust 33.39 City/State/ZIP: 7`/c"�,6 0 a. 9722 3 Single-duct exhaust(bathrooms, p -4 toilet compartments,utility rooms) 23.32 Phone:(SO) fl0 � 5t�!y Fax: ( ) Attic/crawlspace fans / 23.32 23,.32 'APPLICANT 0 CONTACT PERSON Other: 23.32 Fuel piping: Business name: prep/0 Q 77 ©emu ; $14.15 for first four,$4.03 for each additional Contact name: 4 LE,'' drGh-x-F4'U Furnace,etc. Address: //5 9O S'1iV /4.0.viVVEIL S T' Gas heat pump Wall/suspended/unit heater City/State/ZIP: 73,v_A�D �� 9'72 03 Water heater Phone:(3-/C „p2A, ^ 0 4-5 I- Fax::( ) Fireplace . Range E-mail: deg aeelC..e Q ii C a�. f/r74t-r e,. Ce0-7 Barbecue CONTRACTOR Clothes dryer(gas) Business name: Other: �',�p d7l/�/y�n MECHANICAL PERMIT FEES` Address: `/..''9p S'l vv7 triV///ZCJ7 S' Subtotal /6 if, 76 City/Stale/ZIP: // CA,fi217 OE 7722 3 Minimum permit fee(S90.00) /is�J 7 Phone:(Si0) d 2 p Q,ti67 Fax:( ) Plan review(25%of permit fee) State surcharge(12%of permit fee) 20, �"" CCB lie.: TOTAL PERMIT FEE %� This permit application expires if a permit is not obtained withinp Igo days after It has been accepted as complete.�6, r©/ Authorized Stgtla " Fee methodology act by Tri-County Building Industry Service Board Print name: Am,' 1z:e e:A(/ Date: a5.220, 2D I:\Buadiog\PamitelMEC Pe muApp 040113.doc 440.4617r(11/02/COM'WF.B) -Tv os Branden Taggart I . a C0 1 t" >1. From: Branden Taggart Sent: Thursday, May 28, 2020 7:39 PM To: olga.alexeev7@gmail.com Subject: Mechanical, Electrical, and Plumbing Permits - 11590 SW Fonner St. Attachments: Branden Taggart2.vcf; Mechanical Permit Invoice.pdf Hello Olga, I have created the Mechanical, Electrical, and Plumbing permits associated with your addition. The mechanical permit invoice is attached above, and the permit fees can be paid online through our website: https://aca.accela.com/tigard/Default.aspx. From there, click on the Building tab, enter the permit number in the Record Number field, and click Search. Once paid, please notify us at TigardBuildingPermits@tigard-or.gov, and I will issue this permit. I have several questions regarding the Electrical and Plumbing Permit Applications that Alex submitted: • The electrical scope of work includes a sub panel relocation as well as a upgraded service. We normally charge (2) 200 amp or less fees, but only(1) fee is listed. Which is correct? • The plumbing permit mentions a relocated bathroom. Instead of a water heater, did you intend to relocate a water closet along with the DWV? Also, would you be relocating a sink? I will make the Electrical and Plumbing permits ready to issue once I confirm the scope of work. Please let me know if you have questions. Thank you, IIBranden Taggart City of Tigard i,rti Senior Permit Technician T lc:A Et D Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandent@tigard-or,gov 1 Branden Taggart From: Olga Alexeev <olga.alexeev7@gmail.com> Sent: Thursday, May 28, 2020 9:29 PM To: Branden Taggart Subject: Re: Mechanical, Electrical, and Plumbing Permits - 11590 SW Fonner St. Caution!This message was sent from outside your organization. Allow sender I Block sender Hi Brenden, About the electrical scope (1)200 service is correct Plumbing: we do not relocated the water closet.The sink will be relocated. Please let me know if you have any questions. Thank yuo, Alex Alexeev On Thu, May 28, 2020 at 7:39 PM Branden Taggart<brandent@tigard-or.gov>wrote: Hello Olga, I have created the Mechanical, Electrical, and Plumbing permits associated with your addition. The mechanical permit invoice is attached above, and the permit fees can be paid online through our website: https://aca.accela.com/tigard/Default.aspx. From there, click on the Building tab, enter the permit number in the Record Number field, and click Search. Once paid, please notify us at TigardBuildingPermits(a tigard-or.gov, and I will issue this permit. I have several questions regarding the Electrical and Plumbing Permit Applications that Alex submitted: • The electrical scope of work includes a sub panel relocation as well as a upgraded service. We normally charge (2) 200 amp or less fees, but only(1) fee is listed. Which is correct? • The plumbing permit mentions a relocated bathroom. Instead of a water heater, did you intend to relocate a water closet along with the DWV? Also,would you be relocating a sink? I will make the Electrical and Plumbing permits ready to issue once I confirm the scope of work. Please let me know if you have questions. Thank you, Branden Taggart City of Tigard Senior Permit Technician Community Development 13125 SW Hall Blvd Tigard,OR 97223 (503)718-2449 brandentetigard-or.gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e- mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules "City General Records Retention Schedule." 2