Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2020-00067 TIC'ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/08/2020 Parcel: 2S109ACO2100 Jurisdiction: Tigard Site address: 14850 SW 132ND TER Project: Alberta Rider Elementary Subdivision: None Lot: None Project Description: Interior modifications to existing main entry,main office&conference room to create a secure entry vestibule. Existing egress width remains unchanged. Existing egress routes in main office modified to enable new door with lockdown hardware. Contractor: IN LINE COMMERCIAL CONSTRUCTION Owner: TIGARD-TUALATIN SCHOOL DIST 23J 18880 SW SHAW ST ATTN: BUSINESS MANAGER ALOHA, OR 97006 6960 SW SANDBURG ST TIGARD, OR 97223 PHONE: 503-642-5117 PHONE: FAX: 503-649-3301 Specifics: FEES Description Date Amount Type of Use: COM Permit Fee-Additions,Alterations, 03/18/2020 $1,432.11 Class of Work: ALT Type of Const: VA Demolition Occupancy Grp: E Occupancy Load: 0 12%State Surcharge-Building 03/18/2020 $171.85 Dwelling Units: 0 Plan Review 03/10/2020 $930.87 Stories: 0 Height: 0 ft DC Provision Review, COM TI-Ping 03/18/2020 $406.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 03/18/2020 $572.84 Value: $153,067 Info Process/Archiving-Lg$2.00(over 03/18/2020 $46.00 11x17) Info Process/Archiving-Sm$0.50(up to 03/18/2020 $162.50 Floor Areas: 11x17) Metro CET 03/18/2020 $183.68 Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $3,905.85 Required: Required Items and Reports(Conditions) 1 Special Inspection(see plans) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. I Building Permit Application Commercial FOR OFFICE I. `,1' (IAI.1 f+ +ECEIVE Received �1 ap4City of Tigard 711Y 1 Datert;Y: -) , , it Permit N pro DDIJ�'% 't 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review C Phone: 503-718-2439 Fax: 503-598-1960 q Date/By: 3 11- Related Permit: TIGARD Inspection Line: 503-639-4175 MAR b 201.0 Date Ready/By: Juan: el See Page 2 for Internet: www.tigard-or.gov Notified/Method3 4,A - - Supplemental Information f;4Tt"1l.,F MCA 14.t .s-c TYPE OF W dlLOINGDIVISICAN' REQUIRED DATA:I-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all II Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ❑Commercial/industrial Valuation: $ ❑Accessory building ID Multi-familyNumber of'bedrooms: ❑Master builder •Other: School Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:14850 SW 132nd Avenue New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suite/bldg./apt.#: Project name: Alberta Rider Elementary Covered porch area: square feet Cross street/directions to job site: SW Maddie Lane School Secure Vestibule Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the / r is ePESCRIPTION OF WORK work indicated on this application. Protect consists of modifications to existing main entry,main office&conference room Valuation: $153,067.00 u to create a secure entry vestibule.Existing egress width remains unchanged.Existing Existing building area: 68,900 square feet ,-J egress routes in main office are modified to enable new door with lockdown hardware. New building area: 68,900 square feet J • PROPERTY OWNER 0 TENANT Number of stories: 2 Stories Name:Tigard-Tualatin School District Type of construction: II-B Address:6960 SW Sandburg Street Occupancy groups: k4 City/State/ZIP: Tigard,OR 97223 Existing: E-1 &A-2.1 Phone:( 503) 431-4000 Fax:( ) New: E-1 &A-2.1 APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* Business name: DAY CPM (Please refer to fee schedule) (1 Structural plan review fee(or deposit): 9 ye ,c i 7 % Contact name:Jesse Cavazos Address: 808 SW Third Avenue,Suite 800 FL5 plan review fee(if applicable): City/State/ZIP: Portland,OR 97204 Total fees due upon application: Phone:( 210) 803-8253 Fax::( ) Amount received: ”e; f 7 fe E-mail: jesse.cavazos@otak.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted PhotoVoltaic Solar Panel System. Business name: /s. �-C _ J Submit two(2)sets of roof plan with connection details 4a't�l4/'L (F�int neerJ 60 1 !/-" l7(/`" and fire department access,along with the 2010 Oregon Address: ,r ,�/ f_, ft,) . A.„,...„ Solar Installation Specialty Code checklist. City/State/ZIP: t U 1 L i p e'7o'?�" Permit fee(includes plan review $180.00 �1 and administrative fees): Phone:(5'01) ( k- ./1 7 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: 5'` � Total fee due upon application: $201.60 u `Authorized signature: 2^ This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Jesse Cavazos Date: March 4,2020 * Fee methodology set by Tri-County Building Industry Service Board. 1:Building\Permits U3UP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/021COM WE /n' 7' /6Lr9-n/ 46-71 / 71-1/r , ,_c9,T TX-us G'E drL[N City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT q Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard,Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering [1] $ $151,567.00 MULTIPLIER(25%bather removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 37,891.75 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order. (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (I) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ L•\Building\Permits\BUP_COM PemiltApp.doc Rev.03/05/2019 City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT i Ili ■ T l c n Building Permit Review — Commercial - No Land Use Building Permit #: QGt/,,,,zo' O —je06, 7 Site Address: /4 ,'ft) / ?,j J 77-er Suite/Bldg#: Project Name: X4r-,, JeJP?-- t'kW' (Name of commercial business occupying the space. If ant,e�n er Spec Space.) Planning Review Proposal: '/ 77pti 1 V--Q '7 bU Le Existing Business Activity: ge1Ga6 / Proposed Business Activity: /i II Verify site address/suite# exists and active in permit ssyt ‘‘ ''ver Terrace Neighborhood: CI Yes '(ZrZ No • g: m�rmitted Use: es ❑ No CI Spec Space Confirm no land use required. usiness License: Exists: ❑ Yes ❑ No, applicant was provided a business license application Notes: Approved by Planning: C ��_ Date: 4-'6 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: El Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 3/S/ Site Plans: # 3 Building Plans: # ._3 Building Permit#: tenter building permit#above. Workflow Routing: 'Erflanning ❑ Permit Coordinator ❑ Building Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: 1.0-Building: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: .0 ys� Date: -Vie7�-e) 1:\Building\Forms 1BldgPermitRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: ,- r Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applica Revision Notice 2: Date Sent to Appli,.nt: Revision Notice 3: Date Sent to A.. cant: ❑ SDC Fees Entered: Wash Co ns Dev Tax: ❑ Yes ❑ N/A Tigard ans SDC: ❑ Yes ❑ N/A Par DC: D Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Cos dinator: Date: I:\Building\Forms\B ldgP ermitRvw_COM_NoLandUse_111819.docx