Loading...
Specifications Myr 2oIg - ooag-,rte I 65-4/8 S s/-/ow04--E 5-7— CT ENGINEERING 4/ GMM-,PR°'�1#1 F Alr INC\Gj •-- 60• 11 180 Nickerson St. 41%.(D y 4 "t , ite 302 � ,� I Battle,WA 98109 II► rr .. - 206)285-4512(V) ilLREG�J .i'al�44 (zo6)zss o61st��►' 22 '\ �� •' S" teaton@ctengmeenng.com 05/15/2. S T. ��� ZONAL - LLETIN 05/15/2014 Date: May 15,2014 Number: General Project#: Multiple Project Name: All Polygon Single and Multi-Family Projects Attached:None Subject: Epoxy and Acrylic placed anchors for HDU holdowns Drawings Affected: Holdown Schedule Description/Action: This bulletin provides design clarifications and/or variation requests for the all Polygon Homes single and multi- family projects located in western Washington and western Oregon. Holdown bolts may be set in drilled holes with either epoxy or acrylic anchoring adhesive per the table below. For temperatures between 50 degrees and 110 degrees Fahrenheit, 'Simpson Strong-Tie SET-XP' Epoxy Adhesive System may be used. For temperatures between 0 degrees and 70 degrees Fahrenheit, 'Simpson Strong-Tie AT'Acrylic-Based Adhesive System may be used. Contact engineer of record for alternate products and temperature ranges. Note that HPAHD22 holdowns may be replaced with HDU4 holdowns and STHD14 holdowns may be replaced with HDU5 holdowns unless noted otherwise by the engineer. SET-XP AT-30 MIN. HOLDOWN CL OF BOLT A307 ROD HOLE HOLE MIN. EDGE EMBED. MODEL TO F.O.S. DIAMETER DIAMETER DIAMETER DISTANCE DEPTH HDU2 1 5/16" 5/8" 3/4" 11/16" 1 3/4" 5 1/4" HDU2 1 5/16" 5/8" 3/4" 11/16" 2 3/4" 4 3/4" HDU4 1 5/16" 5/8" 3/4" 11/16" 1 3/4" 5 3/4" HDU4 1 5/16" 5/8" 3/4" 11/16" 2 3/4" 5 1/2" HDU5 1 5/16" 5/8" 3/4" 11/16" 1 3/4" 6 1/4" HDU5 1 5/16" 5/8" 3/4" 11/16" 2 3/4" 5 3/4" HDU8 1 3/8" 7/8" 1" 1" 1 3/4" 8" HDU8 1 3/8" 7/8" 1" 1" 2 3/4" 7 1/2" HDU 11 1 3/8" 1" 1 1/8" 1 1/16" 2 3/4" 8 3/4" HDU14 1 9/16" 1" 1 1/8" 1 1/16" 2 3/4" 91/2" CALL WITH ANY QUESTIONS Issued by: Todd Eaton Date: May 15, 2014 Distribution: Contact Information: Ron Smith Ron Bowen Polygon Chris Walther Marty Martin Polygon Bob Weible Milbrandt Architects W:\03Dwgs\03180 polygon general\bulletins\03180_General Bulletin_2014.05.15 epoxy holdowns.doc Structural Engineers