Permit Support Document CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT BUILDING
BUP2020-00008
Date Issued: 04/15/2020
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 t Parcel: 2S102AA00603
Jurisdiction: Tigard
Site address: 12020 SW MAIN ST
Project: Woodcraft Subdivision: TIGARD HIGHWAY TRACTS Lot: 12
Project Description: Remove(2)walls to office and receiving to increase the size of the lumber room. 4/21/20:REPRINTED permit to
show change of contractor.
Contractor: ROYAL REMODELING RESOURCES INC Owner: DRL LLC
PO BOX 230805 PO BOX 1006
TIGARD, OR 97281-0805 TUALATIN, OR 97062
PHONE: 503-684-7873 PHONE: 970-730-9663
FAX:
FEES
Specifics:
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 04/14/2020 $87.17
Demolition
Occupancy Grp: Occupancy Load: 12%State Surcharge-Building 04/14/2020 $10.46
Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 04/14/2020 $1.00
Stories: 0 Height: 0 ft 11x17)
Bedrooms: 0 Bathrooms: 0 Misc Administration Fee 04/21/2020 $45.00
Value: $1,500
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $143.63
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: Permittee Signature:
((( Ca 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept In a conspicuous place on the job site until completion of the project.
Approved plans are required on the Job site at the time of each inspection.