Loading...
Report (8) YJP222o 00/2 3 ` . �]{) 1505 Westlake Ave N, CRO `/`► Phone: (206) 336.3204 1 Seattle,WA 98109 Fax CASTLE wxw.crowncastle.com %,0001 =April 24,2020 City of Tigard MAY b 2020 13125SW Hall Blvd ( arOF Tigard,OR 97223 :3[!iL INCiDIVISIOi`1 RE: Eligible Facilities Request to modify equipment on a communications tower located at: 8777 SW BURNHAM,TIGARD,OR,97223 Crown Site Number:879526/Crown Site Name:TIGARD Customer Site Number:PT89/Application Number:511776 Crown Castle USA Inc.("Crown Castle")on behalf of New Cingular Wireless PCS,LLC("AT&T Mobility")is submitting the attached Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 8777 SW BURNHAM,TIGARD,OR 97223 in CITY OF TIGARD,OR(the"TIGARD Tower"). Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act" (Pub.Law No.112-96,126 Stet 156),mandates that state and local governments"may not deny,and shall approve,any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government determines that the application is incomplete"[they]"must provide written notice to the applicant within 3o days of receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law, an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed with a local jurisdiction,excluding tolling. AT&T Mobility proposes to modify the"TIGARD Tower"as follows: Remove(8)antennas,(3)RRH's,and(8)TMA's;relocate Bey RRH's;and install(i)platform mount reinforcement kit,(6)antennas, (0)squid,(i)fiber trunk,and(1)DC trunk on existing tower.AT&T also proposes to install(i)converter system,(1)expansion kit to existing raycap,and(i)5G growth kit within existing shelter. Itemized list of submittal documents: • Cover Letter • Commercial Building Permit Application • Collocation Supplemental Questionnaire • Structural Analysis stamped by Oregon State engineer • Construction Drawings stamped by Oregon State engineer AT&T Mobility is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval of requests to modify existing personal wireless service facilities. If you should require more information regarding the Spectrum Act,please do not hesitate to contact me with your questions. The Foundation for a Wireless World. CrownCastle.corn CROWN j 1505 Westlake Ave N, Phone: (206) 336-3204 Seattle,WA 98109 Fax: �,,�► CASTLE www.crowncastle.com Sincerely, Sarah Baird Sarah.Baird@crowncastle.com (206)336-3204 The Foundation for a Wireless World. CrownCastle.com