Plans ri
PROPOSAL AND CONTRACT
CONSTRUCTION DIVISION RECEIVED
PO BOX 17196
LICENSED BONDED INSURED APR 01 2020
PORTLAND OR 97217
OR CCB # 221561/WA CCB #JRJOHRJ821MK
PHONE(503)240-3388/FAX(503)240-3424 CITY OF TIGARD
WWW.JRJOHNSONINC.COM BUILDING DIVISION
J_R_ JOHNSON, LLC
PREPARED FOR: QUAIL HOLLOW SOUTH HOA BLDG 4 SCOPE: FRONT STOOP REPAIRS
PROPERTY: QUAIL HOLLOW SOUTH
SCOPE OF WORK: THE FOLLOWING WORK WILL BE COMPLETED AT TARGETED FRONT
STOOP LOCATIONS.ALL REPLACEMENTS TO BE IN A LIKE FOR LIKE MANNER-
TARGETED REPAIR ALLOWANCE:
• REMOVE AND REPLACE DECAYED BOTTOM RAIL.
OFFICE COPY
Approved plar>
Jig be on
LIABILITY
The City of Tigard and its
employees shall not be
responsible for discrepancies
Which may appear herein:
CITY OF TIGARD
REVIEWED FOR DE COMPLIANCE
VALIDITY OF PERMIT Approved: [
THE ISSUANCE OF A PERMIT OTC: [ I
BASED ON CONSTRUCTION
DOCUMENTS AND OTHER Permit#: ty`51- -OiO — DC> I I
DATA SHALL NOT PREVENT > ddl.e's: 13O00 S VC Are, y\ U I
THE CODE OFFICIAL FROM
REQUIRING THE CORRECTION Suite #:
OF ERRORS. ORSC 105.4 I : - Date: i f tt- 7,e)
X_\DOCUMENTS\PONO BUILDING CONSULTANTS\QUAIL HOLLOW TOWNHOMES\20-1821-001_QUAIL HOLLOW SOUTH_LANDING
REPAIRS\PERMITS\4\QHS FRONTSTOOPS.DOC
EAD S,
CFRTIRED
NAT-31325-1
Building 4 12988 12998 13000 13008
Replace Decayed Stringer
Replace Tread
Replace Decayed Top Cap
Replace Decayed Post
Replace Decayed Bottom Rail X
Damaged Grab Rail