Loading...
TCDA Resolution No. 20-01 CITY OF TIGARD, OREGON TOWN CENTER DEVELOPMENT AGENCY RESOLUTION NO. 20— b i A RESOLUTION AMENDING THE TIGARD TRIANGLE URBAN RENEWAL PLAN BY ADDING A MULTI-USE PATH OVER HIGHWAY 217 TO THE LIST OF URBAN RENEWAL PROJECTS WHEREAS, the Tigard Triangle Urban Renewal Plan("the Plan") includes a list of Transportation projects authorized by the plan;and WHEREAS,a multi-use path over Highway 217 would provide a safe and effective connection for pedestrians and cyclists between the Downtown and the Tigard Triangle, the two parts of the Tigard Tovvn Center; and WHEREAS, a multi-use path over Highway 217 is consistent with Goal 2 of the Plan which is to "Provide a safe and effective multimodal transportation network that provides access to, from, and within the [Urban Renewal] Area and supports mixed-use and pedestrian-oriented development" and Objective 2 which is to "Create more access points into and out of the Area by building new overpasses and/or undercrossings and modifying existing intersections and/or interchanges so that the Area is more connected to downtown Tigard,Portland Community College,and other neighboring areas and businesses"; and WHEREAS, the portion of the envisioned multi-use path within the Tigard Triangle Urban Renewal Area would be an eligible project for urban renewal funding;and WHEREAS,under Tigard Triangle Urban Renewal Plan Section IX: Amendments to the Plan, adding new projects to the Plan is a Minor Amendment that requires approval of the Agency Board by resolution. NOW,THEREFORE,BE IT RESOLVED, by the Tigard Town Center Development Agency that: SECTION 1: The Tigard Triangle Urban Renewal Plan is hereby amended with the language found in Exhibit A. SECTION 2: This resolution is effective immediately upon passage. PASSED: This _�� day of «Lr� , 2020. Chair—City of Tigard Town Center Development Agency ATTEST: /l Recorder—City of Tigard Town Center Development Agency TCDA Resolution No. 20- cli Page 1 Proposed new text is shown in double-underline. The following transportation projects are intended to provide a safe and effective multimodal transportation network in the Area that supports mixed-use and pedestrian-oriented development through improved internal connectivity, external access, and mobility; a variety of travel options; comfortable, interesting, and attractive streetscapes; and, well-managed parking options. Table 1 —Transportation Projects Nuinfier I New Hwy 217 Overpass Extend Beveland Rd south over Hwy 217 to Hunziker (Beveland) Rd/Wall St area with car, ped, and bike facilities. 2 New Street Extend 74th Ave south from 99W to Hermoso Way or (74th Ave) Beveland Rd. 3 New Street Extend Atlanta St west from 69th Ave to Dartmouth St or (Atlanta) future 74th Ave. 4 New Hwy I-5 Overpass Provide ped/bike bridge across Hwy I-5 from Beveland Rd (Beveland) to Southwood Dr. New Hwy 1-5 Overpass Provide ped/bike bridge across Hwy 1-5 between the 5 (Red Rock Creek) Triangle and PCC Sylvania around location of Red Rock Creek. 6 Modified Intersection Install traffic signal and turn lanes where needed at Atlanta (Atlanta/68th) St/68th Ave intersection. 7 Modified Intersection Add protected left turn and transit improvements on 68th (99W/68th) Pkwy at 99W. Develop comfortable, interesting, and attractive streetscapes 8 Modified Streets throughout the Area, especially along designated pedestrian streets. 9 New Trail Build a new trail along Red Rock Creek parallel to and I (Red Rock Creek) south of 99W. 10 New Streets Improve connectivity,circulation, and access throughout the Area with new or extended local streets. Project Project 'F%pe Project Description Number 11 Modified Street(72nd TBD. Improve 72nd Ave corridor, including Ave) intersections/interchanges. Dependent on 72nd Ave Corridor Study recommendations. Modified Street(99W) Implement access management strategies and median 12 projects in Hwy 99W Plan, including additional pedestrian crossing locations. 13 Modified Add second left turn lane on Hwy 217 northbound Interchange ramp to 99W. (99W/Hwy 217) 14 Modified Signals Upgrade signals throughout the Area with adaptive signal coordination technology. Parking Management Plan Develop a plan and implement strategies for managing 15 parking. Transportation Study Periodically evaluate the functioning of the transportation 16 system to refine project scope and inform project prioritization. L7 Highway 217 Multi-use Provide_RWL ike ridee and Red-1�ock Creek Trai( Pa t cQnmcti2�ross_Lm 217 beetwwten SW 72"d Ave and Hunziker Road.