TCDA Resolution No. 20-01 CITY OF TIGARD, OREGON
TOWN CENTER DEVELOPMENT AGENCY
RESOLUTION NO. 20— b i
A RESOLUTION AMENDING THE TIGARD TRIANGLE URBAN RENEWAL
PLAN BY ADDING A MULTI-USE PATH OVER HIGHWAY 217 TO THE LIST OF
URBAN RENEWAL PROJECTS
WHEREAS, the Tigard Triangle Urban Renewal Plan("the Plan") includes a list of Transportation
projects authorized by the plan;and
WHEREAS,a multi-use path over Highway 217 would provide a safe and effective connection for
pedestrians and cyclists between the Downtown and the Tigard Triangle, the two parts of the Tigard
Tovvn Center; and
WHEREAS, a multi-use path over Highway 217 is consistent with Goal 2 of the Plan which is to
"Provide a safe and effective multimodal transportation network that provides access to, from, and
within the [Urban Renewal] Area and supports mixed-use and pedestrian-oriented development"
and Objective 2 which is to "Create more access points into and out of the Area by building new
overpasses and/or undercrossings and modifying existing intersections and/or interchanges so that
the Area is more connected to downtown Tigard,Portland Community College,and other
neighboring areas and businesses"; and
WHEREAS, the portion of the envisioned multi-use path within the Tigard Triangle Urban Renewal
Area would be an eligible project for urban renewal funding;and
WHEREAS,under Tigard Triangle Urban Renewal Plan Section IX: Amendments to the Plan,
adding new projects to the Plan is a Minor Amendment that requires approval of the Agency Board
by resolution.
NOW,THEREFORE,BE IT RESOLVED, by the Tigard Town Center Development Agency that:
SECTION 1: The Tigard Triangle Urban Renewal Plan is hereby amended with the
language found in Exhibit A.
SECTION 2: This resolution is effective immediately upon passage.
PASSED: This _�� day of «Lr� , 2020.
Chair—City of Tigard
Town Center Development Agency
ATTEST: /l
Recorder—City of Tigard
Town Center Development Agency
TCDA Resolution No. 20- cli
Page 1
Proposed new text is shown in double-underline.
The following transportation projects are intended to provide a safe and effective multimodal
transportation network in the Area that supports mixed-use and pedestrian-oriented development
through improved internal connectivity, external access, and mobility; a variety of travel options;
comfortable, interesting, and attractive streetscapes; and, well-managed parking options.
Table 1 —Transportation Projects
Nuinfier
I New Hwy 217 Overpass Extend Beveland Rd south over Hwy 217 to Hunziker
(Beveland) Rd/Wall St area with car, ped, and bike facilities.
2 New Street Extend 74th Ave south from 99W to Hermoso Way or
(74th Ave) Beveland Rd.
3 New Street Extend Atlanta St west from 69th Ave to Dartmouth St or
(Atlanta) future 74th Ave.
4 New Hwy I-5 Overpass Provide ped/bike bridge across Hwy I-5 from Beveland Rd
(Beveland) to Southwood Dr.
New Hwy 1-5 Overpass Provide ped/bike bridge across Hwy 1-5 between the
5 (Red Rock Creek) Triangle and PCC Sylvania around location of Red Rock
Creek.
6 Modified Intersection Install traffic signal and turn lanes where needed at Atlanta
(Atlanta/68th) St/68th Ave intersection.
7 Modified Intersection Add protected left turn and transit improvements on 68th
(99W/68th) Pkwy at 99W.
Develop comfortable, interesting, and attractive streetscapes
8 Modified Streets throughout the Area, especially along designated pedestrian
streets.
9 New Trail Build a new trail along Red Rock Creek parallel to and I
(Red Rock Creek) south of 99W.
10 New Streets Improve connectivity,circulation, and access throughout the
Area with new or extended local streets.
Project Project 'F%pe Project Description
Number
11 Modified Street(72nd TBD. Improve 72nd Ave corridor, including
Ave) intersections/interchanges. Dependent on 72nd Ave
Corridor Study recommendations.
Modified Street(99W) Implement access management strategies and median
12 projects in Hwy 99W Plan, including additional pedestrian
crossing locations.
13 Modified Add second left turn lane on Hwy 217 northbound
Interchange ramp to 99W.
(99W/Hwy 217)
14 Modified Signals Upgrade signals throughout the Area with adaptive signal
coordination technology.
Parking Management Plan Develop
a plan and implement strategies for managing
15
parking.
Transportation Study Periodically evaluate the functioning of the transportation
16 system to refine project scope and inform project
prioritization.
L7 Highway 217 Multi-use Provide_RWL ike ridee and Red-1�ock Creek Trai(
Pa t cQnmcti2�ross_Lm 217 beetwwten SW 72"d Ave and
Hunziker Road.