Loading...
Report 131.1P2opit--Doi to /635g 4W 72414s-we Effective Engineering Solutions, Ltd. : 61 White Water Ct. New Lenox, IL 60451 -- 815-485-1470 (Fax) 815-485-0603 cleverenz@comcast.net September 5,2014 Mr. Dan Nelson Senior Plans Examiner City of Tigard Building Services Department Tigard,OR 97224 RE: Lamar Sign Structure @ 16358 SW 72nd Ave, Tigard, OR Dear Mr. Nelson: This is to certify that we have been sent information and proof of performance pictures for the footing installation for the sign structure at the reference location. We have reviewed all of these materials. To the best of our knowledge and belief the footing as installed meets the design drawings. 1 hope this information is suitable for your needs, if not please feel free to contact me. Sincerely, 1�%,E9 PRep1 vS #GtNfF �Dy 44' 4.e 4807 '1' yl Clifford W. Leverenz, . . owl 444 "Providers of Innovative Engineering Services" Dan Nelson From: John Floyd Sent: Friday, September 05, 2014 1:38 PM To: Dan Nelson Subject: FW: Engineer Letter Re: BUP2014-00180 Attachments: Engineer_Letter.pdf Hi Dan, I read this letter and the Engineer did not visit this site or witness the installation before stamping the letter, which is something I thought you wanted to see. If Lamar puts up a lot of resistance to what we're asking for, let me know so we can let our City Attorney know what's going on. She specifically asked me to keep her updated of any resistance during plan review. Thanks, John Floyd Associate Planner City of Tigard 503-718-2429 From: Jason Ripp [jripp@lamar.com] Sent: Friday, September 05, 2014 11:20 AM To: Dan Nelson Cc: Richard Smith; Steve Zluticky; John Floyd Subject: Engineer Letter Re: BUP2014-00180 Dan, 1) I attached a letter from our Engineer regarding the confirmation about the footing. 2) In addition, I will submit several e-mails with photographs of the footing from last year. 3) Please let me know if additional information is required. We want to start the reconstruction on Thurs., Sept. 11, 2014. This is when our contractor is available to conduct the project. If you have all the required information, can you please expedite the permit approval so that we can move forward with the project? Please contact me at 714.322.4504 with any questions. Thanks. Jason. Jason Ripp I Lease Manager,Lamar Advertising Co.,W. OR& WA 698 12th Street SE Suite#130, Salem, OR 97301 I O: 541.684.7939 I C: 714.322.4504 DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 1