Loading...
Report Bend Office (541)330-9155 Geotechnical ice (503)601-8250 (541)345-0289Carlson Testing, Inc. Eugene Office Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: October 9, 2019 Job#: T1805750 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: Durham AWWTP—Dewatering Centrifuge Replacement (6893) Address: 16060 SW 851h Ave. —Tigard, OR Permit#: BUP2018-00130 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s) per our inspection reports only: Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractors work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Stevcrr'd -Leech---- Project Manager SW L/jng cc: CLEAN WATER SERVICES(DURHAM)-MICHAEL IDEHARA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT JACOBS ENGINEERING GROUP INC-JAMIE DOOLEY MCCLURE&SONS INC-SAM LOEUNG MCCLURE&SONS INC-KYLE HANSEN P:\Projects\General\2018\T1805750110-09-19 Final Letter.doc Updated 11/30/11 STRUCTURAL OBSERVATION REPORT: FINAL CLOSEOUT REPORT CWS PROJECT NO. 6893 Project Final Structural Observation Summary Project: Durham Dewatering Centrifuges Replacement Structural Observations By: Luke Scoggins, SE, PE of Jacobs (Final Walkthough Only. Performed via Received Photos) Date: 13 December 2019 Permit Numbers: BUP2018-00130 Contractor: McClure and Sons, Inc. Comments: Structural observations have been completed for the above listed facilities on this project as required by Section 1704 of the 2014 Oregon Structural Specialty Code and per the Statement of Special Inspection Plan shown on the Drawings. To the best of my knowledge, the construction conforms to the requirements of the contract documents and all reported deficiencies have been successfully resolved. The above statement is based on: • One structural observation for final conditions based on received photographs. • Special Inspection reports, including Carlson Testing, Inc. final summary letter dated October 09, 2019. • Contractor submittals, deferred submittals, and requests for clarification. SE/PE Stamp: (71CTUp,4 PROP4e 76316PE .• Digital Signature OREGOy4D rG�� MqY 0 44RON SG SIGNED: December 13,2019 EXP.06-30-2020 (8.1) REV 10/95 FORM 21A