Report /YIST &-a0y6 k.9 6010.63 .6611 Main Street#400 wAy � N Vancouver,WA 98660 ENGINEERING MEMO Mark Robinson 10530 Sw 71st Ave Jared Fischer, PE - Principal To: Portland, Oregon 97223 From: Waypoint Engineering, Inc. Project Name: Robinson Canopy Project Number: 19241 Footing Location, Ridge Subject: Venting, Project Completion Date: 03/03/2019 We have performed site visits and reviewed construction photos in reference to the project permit drawings dated 12/13/2019. We understand the jurisdiction inspector has requested confirmation that we have reviewed and approved the following: • Location of the cast in place footing located at gridline B/3 at the canopy post and its proximity to the existing pond. Acceptable, reviewed, and accounted for during site visit and design. • Existing footing found to be larger than expected at gridline B/4 (corner of the structure) is sufficient without requirement to demo and rebuild. • Ridge beam venting noted on 5/S2.02. Acceptable to be omitted as this is an outdoor structure. It appears that all non-compliant construction issues related to the structural gravity and lateral force resisting systems have been adequately addressed. Therefore, based on site observations performed, progress photos, and project communications throughout construction, it appears the project named above have been completed in accordance to the design intent of the approved structural construction documents. If you have any questions regarding this information, please feel free to contact us. Jared Fischer, PE Principal Waypoint Engineering, Inc. okED P:pFFs r� ,9 s li e • 013►� C) • •N c 9 F�6, R \!<Q' N F ISG� EXPIRES:12/31/2021