Report DESIGNY. FIELD REPORT l//15 Z a1,k- co 3 S/6 ' .
Page 1:of 1 /(O6 (ei PG)
r. /y G.0
COI ProjeCt Polygon-129.03 Prepared By: Jessica Pence
Project Name: River Terrace East Date: 01/30j 2,020
Location SW seholls Fern!,&Roy Rogers,Bvrtn. _ Report*: 306
Arrival: 0915 Departure: 0930
Weather Cloudy, SOs Permit*: TBD
Site Visit Requested By: Rob hlowser(Polygon) Met With(on site). Rob(phone)
Purpose^. Observe Lots 139.140 Subgrade
Outstanding Issues: I *RESOLVED*
1 was informed lots 139-140 subgrade had been over-excavated where previously observed as soft(see site plan).
Subgrade appeared to consist of brown silt.Using a W'diameter steel foundation probe,I observed the relative
consistency of the subgrade.Probe resistance indicated generally medium stiff to stiff subgrade conditions.
Based on our observations,it is our opinion the lot subgrade observed today have been prepared in general
accordance with our geotechnical recommendations.
Distribution:
Attachments:,Site PI _ (I)
Reviewed rep / t
This ortpmseres*Want as a recubd om. ofusfias rg m geatechrwaf ttsuces. f*on tha aonpaemr m ea won the plans and
specification,thruughout rr o of du protect SrrWKVK ache presence of our reareeenntlrs.Ourwockd*ts • . _ • ,dhectlen of ttm contractor.Ma • adoesemployeas
or agents.Our Barn is not ponside for ate safety this bald regeet is a ObArtreptuenlgion dour field observadons and ;teconevendatdns.The• can anq Os
oonsldersd esnl Wa"mrkw afbre Gate<Ngn psojed manager,as Indebted by Ida*In ix 14,6,—d P/'uaiorb
Signature 1 , f
9450 SWcommerceclyde uire:300 I Wilsonville,OR 97070 1503,968.3787 I www.geodeslgnlnc.cafn