Loading...
PFI2020-00067 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT s COMMUNITY DEVELOPMENT Permitm PF12020-00067 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 02/26/2020 Parcel: 1 S125DA08700 Jurisdiction: Tigard Site address: 9260 SW 70TH AVE Subdivision: KINGS VIEW Lot: 65 Project: Jarvis Sewer Project Description: Replace sewer line from property line to past curb in the street via trenching. Class of Work: FEES Type 2-Sidewalk/Driveway Approach Description Date Amount PFI Permit Fee 02/26/2020 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at wvw.licard-or.00v to schedule inspections online. Contractor: ENVIRONMENTAL WORKS LLC 2634 SE STEELE ST PORTLAND,OR 97202 PHONE: 5037196715 Applicant: DWIGHT CARLISLE 2634 SE STEELE ST PORTLAND,OR 97202 PHONE: 5037196715 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: Jtk fffb XA T7L 6 V Issued By: �'"' lam'}✓! C Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12020-00067 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Sidewalk/C 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings,mailboxes,etc.shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI—Sidewalk/1 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S.Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Sidewalk/1 O6-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Sidewalk/1 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire&Rescue)and to 503-962-8140 (Tri-Met) and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI—Sidewalk/1 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI—Sidewalk/1 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI—Sidewalk/1 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI—Sidewalk/1 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m.unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m.unless authorized by the City Engineer. PFI_Sidewalk/C 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI—Sidewalk/1 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense PFI—Sidewalk/1 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary,it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Sidewalk/[ 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI_Sidewalk/[ 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector,Trent Brickey at 503-718-2686,to establish a preconstruction meeting. PFI_Sidewalk/L 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,and after completing work covered by the permit. PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City,in advance of work performance. PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector,in writing,of any/all assignment changes. PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Sidewalk/[ 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI—Sidewalk/1 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Sidewalk/[ 31 -OTHER Applied Notice Other RECEIVED City of Tigard FEB 2 4 2020PFI#: 2-020— oXxx-1 ~ ENGINEERING DF'.P:1RTi\1ENT CITY OF TIGARD PLANNING/ENGINEERING • . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: !�V\Vi roy\y,ne.VACA lr.�ot�5 /�Qir12A I�e.D0.ti� ❑ TYPE 1- I ianrhi.e I rili„ 1\,tt{. �^rIxrlurmc-d Brief description of project: (8o\wtR Se w ear �i�2 T bm `{ 11 1 :usenet OYo-\ "A(VAA P TO ()0.F1 won Iryy\e— K-TYPE2-RtI\\ Sid,aall.'I),i,,m,i,;' ,,,„ \CStrk paii,rmcd Gm the putt,osr„I: 5�ree\� Yt Ca., �'e.V1L�t`/�at • sidnralk inarallarira, n repair • 13m •:g appn,adt inslallaI it'll and repair SITE INFORMATION �ani[atseyr latetat insiauati,n and /��tl9 O -7044. �v� rminlit, 311 Location (address if available) D TYPE 3-full Scale l)crclalnncnt \\,ale Ixrt7nna•d,cith land use appmul a hick ineltules am'rd the fidl,nyinp: • Sulxliyisiun+orPartitions APPLICANT INFORMATION . ' streetuid.nin}• • l Q or\K-J • \lainlinc lin• sa installation nitary N(Axer. Name: fr/,YDY\vy,e v( `C�A 1 e storm scycrr. Tigard ,kala, and I•igurd Mailing address: 'Z(o�tk �n STt�\Ey� t,ucr scryice strut City/State: P0 &L (�`� zip: ❑ TYP6a-timall(:c117ccbn,J„q, Phone: So t ty ��` D TYPE 5-'1 igard Tri-.Im„Ic —1 ('.mail: NOTE: Type I and 2 applications may he Contact name: \r, /\ emailed to t���� o+ar`\ 5`ems Phone: Ismail: CONTRACTOR INFORMATION 9l aine as applicant Name: CCB Nunlher: Mailing address: City/State: zip: Phone: Ismail: ENGINEER INFORMATION Namc: Mailing address: City/State: ;Lip: Phone. Finail: ADDITIONAL INFORMATION Estimated value of work is required(if overS5,(N)(I):$ 1 IN r OO Q (within the public right-of-wav) Is work related to a I.AND USE DIS(:ISION? 0)'es ❑No Case number: City of Tigard • 13125 S\V I Tall Blvd. • Tigard,Oregon 97223 • w",,u.ti}rard-or.gov • 5(13-71A-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as`i\pplicant"shall he desilmated "Permittee"and shall pro%idc financial assurance for work,if required by the city pursuant to TNI<. 15,04.140. \\it the csetption of a utility o1wrAnng pursuant to a valid franchise or license with the(,it%of Ti;;uJ,when tlir own.r and the ahplic mi ere different poop{c,the applicant mum he the purchascr(if rucoal or a lesser in a itt wriovn aut hon nation from the uN nee or:m agent of the owner. The owner nmsr si4m this application in the space provided or submit a e'ntten authorization with this ,tppliuniun. Franchised or Licensed Utilities are not r«µiiml nt obtain chs owner's sit;oature on the application. 1, the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property, • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. bAe t S l j t S t Z 20 2 Apps or t orized agent's signature Print name Datc Property owner's signature (if required) Print name Date STAFF USE ONLY Case No:P 1,20Wl'000(A1 Permit fee: .�00• Received by: Date:2- Approved Approved by: Date: -2-12`112-0261 Notified by:_Al, Date: 20 City of Tigard • 1.112 1 S\\ I tall Blvd. • Tigard,Oregon Q-223 • wwm�lit ird-or;gov it i3--I ti '_-131 • Page 2 of 4 CY T � b s LCLA - v f, 7� V ^� aYT n Oti N h �P � S � 6 � o X �� Samuel Copelan From: Samuel Copelan Sent: Monday, February 24,2020 4:34 PM To: dwight@eworksnw.com Cc: ROW Permits;Trent Brickey Subject: PF12020-00067 Traffic Control Plan (TCP) for work at 9260 SW 70th Ave. Attachments: PF12020-00067 Site Plan.pdf Categories: Misc. Correspondence Good afternoon Dwight, Before we can issue PFI2020-00067 for the sewer line replacement at 9260 SW 70'Avenue,we will need to have a traffic control plan (TCP) to show how you will divert traffic from the work area. On the attached site plan,please mark where you will be putting cones, tape, etc. to block off the work area from those who are using the right of way. Please include a legend that clarifies any symbols shown on the plan. When you have finished with the TCP, please scan it and send it to Trent (included in this email) or bring it to him in person at the Permit Center. Thank you,please let us know if you have any questions. Sincerely, -Sam City of Tigard Public Facility Improvement (PFI) Permits Monday-Thursday 8am-5pm Phone: (503) 718-2421 E-mail: rowpermitsQtie^ ar�gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 1