Plans WC Cenpineers
STRUCTURAL&EARTHQUAKE ENGINEERING
215 w. 12th street suite 202 vancouver. washington 98660
Memo
To: Mike Miller
From: Luke Jannusch, PE
WRK #: 19093.00
Date: November 19, 2019
Re: Tigard Taphouse Demising Wall Removal at Second Floor
We have evaluated the walls removed at the second-floor level of the Tigard Taphouse
located at 9230 SW Burnham St. in Tigard, OR 97223. The roof framing system consists of
2x4 rafters with a horizontal 2x ceiling joist at 24" o.c. that span between exterior bearing
walls. Please note, ceiling joists must remain to keep structural integrity of roof system.
Based on our observation and understanding of the existing roof framing system,the walls
removed at the second-floor level in the attached sketch (1/SK) were not used for the
roof gravity framing system.
If you have any questions regarding this information, please contact us. We appreciate
the opportunity to work with you.
P• , VIM
/ ( �` OFFICE COPY
CITY OF TIGARD
t ' A. Jp REVIEWED FOR CODE COMPLIANCE
!EXPIRE& b/30Iy I I Approved:N J j •
OTC: [ I•
-
Pcrmit#: 43 I l ��f 9 — p 3 f 9
VALIDITY OF PERMIT Address: Sac vr Yl >j c.v.)
THE ISSUANCE OF A PERMIT Suite #:
BASED ON CONSTRUCTION By: 41 Date: 1)_ j-
DOCUMENTS AND OTHER
DATA SHALL NOT PREVENT
THE CODE OFFICIAL FROM
REQUIRING THE CORRECTION
OF ERRORS. OSSC 105.4
vaww.wrkengrs.cern
pit No. 19093.00 pg.,pg., 1 i 9/19
Subject: bCW.1 i^j VJ w 11 2.2vn ova 1 Design By; Lk4 - Section:
wrengineers project: 75 kY& ru-p\no u-Se Checked Br Palls' _a_
__Pt). + Roods Frt.w.)no wi-Y 5e-L*^2, { T`I eor 4Jan s..
I I i
1 � - ,s j tow „oo�r
} -
----- ( Fjcfs4—,5 RO.-C o4crb 1d.
1 1
I f f
1 1
1
1 E+s+,ti.5 Low
, _ _ —_.ts9G .
i
I
I d LA
l I I 1
i au 1
1�__ _ _ tx — f _ --{
2100.
1
'�`
% \ v� 1
Erisiii 6iv 4a crust r, / %, \ 1
Flow,
.— —%k' 1
i 1 IH
1t 1,t
1._eit.N I ,
rIA4erior ' nov;tbearin1r
16Z61..Ara - E1A,, ri 4-: n w 4 II 1 clo vvOSi Mg5 (,...)k 1 t
`i0 -t J-- c.in ' C.- vnearla.l I o<4Mb+ns.,
I J 1 I,
I
e�F F,o,; .4 p\ , ao 1:-1.~ W41ti
i
www.wrkengrs.com 36 0.695.9 731