Loading...
Plans I. 0 l too. ow 16 ,f G 1 y itsj,., , 1 4 k a ', P i ,: ir...0 145 s W 4 i OF pEp.nt : 4 ' Jike s NG ,1.Ne‘s GoN No oT " ` '0 r ► BPs ofso1PRE. : `t : !a -, + it 1.144 NR 'S�GQRSR �of � 41 al / Atli ovii. 41' Iv t - .� " 12520 Southwest bath Avenue Goo* . THE ACTIVATION C.F A .J1 k . RECEIVED SMOKE DETECTOR Sri \ LL. OFFICE COPY ACTIVATE A VISIBLE ," w < DEC 16 2019 AUDIBLE SUPERVISORY CITY OF TIGARD J CITY OF TIGARD SIGNAL AT A CONS IANf LY REVIEWKD CODE COMPLIANC119UILDING DIVISION ATTENDED LOCA Fla`r Approved: I OMSC 606,4.1 OTC: [ 1 _- Permit#: —Address: 1 W V Suite #: By: Date: ) r2-,)9 011.1E1151011E0 AND TOLERENCEO PER A ISI T14DM 1982 Installation Instructions: 1) Remove existing RTU and curb adapter if applicable. Attn:Installing Contractor Tag: (TURNBUCKLE TIE-DOWNS) 2) Clean surface of existing curb of any gasket or caulk. Apply CDI provided gasket around perimeter of - - - '` PER TY 2-3/8 BOLTS curb and around all duct connections. r `'€. 3)Set CDI curb adapter onto existing curb and align lJ 1 supply and return ducts. Some adapters may require (ADAPTER TIE-DOWNS) cutting supply and/or return duct openings. `,F(' 1 6 2019 QTY 6-#12 SELF-TAPPING 4)Install turnbuckle tie-down straps(Qty 4)so the 1---,, SCREWS PER TIE-DOWN largest hole is approximately 14"from where the RTU CITY O'; TIGARD lifting holes holesrplace. Drill provided 318" bolts through curb adapte r r BUILDING DIVISION g,.. walls. Attach each bracket using provided hardware. 5) Gasket top surface of adapter around perimeter and likil:4 around the supply and return openings. 6)Install RTU as normal. 7)Install turnbuckle between turnbuckle tie-down and lifting holes of RTU. Tighten turnbuckle without deforming adapter wall or RTU base rail. 8)Install 14 Ga.adapter tie-downs with a minimum of 2 per side. Spacing to be a maximum of 48" between tie- downs. Each tie-down to have a minimum of qty 3-1" #12 self-tapping screws screwed into the base flange of the curb adapter and a minimum of qty 3-#12 self- tapping screws screwed into the existing curb wall. The length of these screws must be adequate to �, securely fasten into the steel wall of the existing curb. . CDI to provide 3"screws to attach tie-downs to existing curb. If longer screws are necessary, i 0 contractor will be responsible for providing them. ,�\ r ,,,,‘,00020 `..-- �. 1 _ 10: Adapter Wall #of Adapter Length Tie-Downs Under 7' 2 straps APPROVALS ,TE J 7'-10' 3 straps ..... TURNBUCKLE HOLD- 10'-14' 4 straps _ DOWN INSTRUCTIONS - - IIIII� 14'-18' 5straps Wednesday August 66,2006 101s 25 AN 18'-27 7 straps 17560 TYLER ST NV4 tl ... ....`" 1$'-2G 7 straps CDI ELKRIVER,MN55330 F 1 p6ap91.nea V6303914851 sr., 1.24 I succr 1 Or 1 Al A