Loading...
Permit Support Document CITY OF TIGARD ELECTRICAL PERMIT Permit#: ELC2020-00008 COMMUNITY DEVELOPMENT TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 01/06/2020 Parcel: 2S101 DB01000 EL/4o.= Jurisdiction: Tigard Site address: 7080 SW FIR LOOP 100 Project: Hansen, Hunter&CO.PC TI Subdivision: 72ND BUSINESS CENTER Lot: 12 Project Description: Tenant improvement. Reconfigure plugs and lights to accommodate new wall layout. 2/6/20:REPRINTED permit to correct address. Contractor: PRIME ELECTRICAL SERVICES LLC Owner: SHROYER FARMS INC 3312 SE BELLA VISTA PL PO BOX 789 VANCOUVER,WA 98683 PHILOMATH, OR 97370 PHONE: 503-318-5170 PHONE: FAX: FEES Quantity Description Date Amount 10 crt Branch Circuits wo/Purchase 01/06/2020 $122.96 Specifics: Service or Feeder 1 ea Signal circuit or Limited 01/06/2020 $75.00 Type of Use: COM Energy Panel Class of Work: ALT 1 ea 12%State Surcharge- 01/06/2020 $23.76 Electrical Type of Const: Occupancy Grp: Total $221.72 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.2232..1987 or 1.800.332.2344. Issued By: Permittee Signature: OWNER INSTALLATION ONLY The installation is being made on property I own which is not intended for sale,lease or rent. OWNER'S SIGNATURE Date: CONTRACTOR INSTALLATION ONLY SIGNATURE OF SUPR. ELEC' Date: LICENSE NO. Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the job site at the time of each inspection.