Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Report (2)
GREEN MOUNTAIN A g5LI siA) Seavoi& tille structural engineering Memorandum February 18, 2020 To: Amilian Avgi, Riverside Homes From:Corina Muntean, P.E Re: Plan 2885 at Elderberry Ridge Lot 7 I understand that the garage shear wall does not meet the 3.5:1 ratio that is noted on detail 11 on S2 or permit drawings. We recommend that the inside of the pier be sheathed and nailed as shear wall type D. If you have any questions, don't hesitate to ask. cl,Ep PR ace �G NSF sfo 49 78PE '9 OREGON pR�NA MU EXPIRES 12 3i - 07,0 A greenmountainse.com-Info©greenmountainse.com-4857 NW Lake Rd., Suite 260,Camas,WA 98607